Establishment profile
TEZAK HEAVY EQUIPMENT CO., INC.
67366 HWY 50 EAST, GUNNISON, CO, 81230
Summary
TEZAK HEAVY EQUIPMENT CO., INC. has accumulated 5 OSHA violations across 1 inspection over 24 years of recorded history, with $6,750 in total assessed penalties.
The establishment sits in the 79th percentile for violations within its industry-state peer group of 25,052 employers. The most recent enforcement activity was recorded 24 years ago.
Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
TEZAK HEAVY EQUIPMENT CO., INC. appears in OSHA workplace safety and MSHA mine safety records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
100% of inspections at this establishment produced violations,
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 4 distinct standards shown · 5 citations in this view · $6,750 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 1926.0651 K01 | 2 | 1 | $2,000 | May 2002 | May 2002 |
| 29 CFR 1926.0651 C02 | 1 | 1 | $2,000 | May 2002 | May 2002 |
| 29 CFR 1926.0651 J02 | 1 | 1 | $2,000 | May 2002 | May 2002 |
| 29 CFR 1926.0651 B01 | 1 | 1 | $750 | May 2002 | May 2002 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Above average violations. Peer group: 25,052 employers. This establishment has 5 OSHA violations; peer median is 1.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for TEZAK HEAVY EQUIPMENT CO., INC.. Verify directly with OSHA Injury Tracking Application →
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for TEZAK HEAVY EQUIPMENT CO., INC.. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 24+ years. Most recent activity: 24 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for TEZAK HEAVY EQUIPMENT CO., INC.. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in CO — for TEZAK HEAVY EQUIPMENT CO., INC., not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other TEZAK HEAVY EQUIPMENT CO., INC. operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 34S&S · 100 contractor · $28,553 proposed / $24,727 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 8939362 | Amrize Table Mountain Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Apr 2016 | — | Yes | HighNegligence | $2,277 | $2,277 |
| 8939363 | Amrize Table Mountain Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Apr 2016 | — | Yes | HighNegligence | $2,000 | $2,000 |
| 8754738 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Feb 2014 | — | Yes | ModNegligence | $2,000 | $343 |
| 8754747 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Feb 2014 | — | Yes | HighNegligence | $1,795 | $1,795 |
| 8754745 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Feb 2014 | — | No | ModNegligence | $1,026 | $726 |
| 8754743 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Feb 2014 | — | Yes | ModNegligence | $1,026 | $512 |
| 8754742 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Feb 2014 | — | No | HighNegligence | $1,026 | $512 |
| 8754740 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Feb 2014 | — | Yes | ModNegligence | $1,026 | $512 |
| 6424096 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Jan 2009 | — | Yes | ModNegligence | $946 | $662 |
| 8754735 | Amrize Table Mountain Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Jan 2014 | — | Yes | HighNegligence | $807 | $807 |
| 8762080 | Amrize Table Mountain Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Oct 2014 | — | Yes | ModNegligence | $540 | $540 |
| 8762079 | Amrize Table Mountain Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Oct 2014 | — | Yes | ModNegligence | $540 | $540 |
| 8754746 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Feb 2014 | — | Yes | HighNegligence | $460 | $460 |
| 8589708 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Jan 2013 | — | Yes | HighNegligence | $425 | $425 |
| 8762081 | Amrize Table Mountain Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Oct 2014 | — | No | HighNegligence | $362 | $362 |
| 9348002 | Amrize Table Mountain Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Feb 2018 | — | Yes | HighNegligence | $311 | $311 |
| 8754744 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Feb 2014 | — | Yes | ModNegligence | $308 | $308 |
| 6313942 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Dec 2005 | — | Yes | ModNegligence | $286 | $286 |
| 6445397 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Jun 2009 | — | Yes | ModNegligence | $285 | $285 |
| 8761867 | Amrize Table Mountain Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | May 2014 | — | Yes | ModNegligence | $243 | $243 |
| 8939272 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Dec 2015 | — | No | ModNegligence | $224 | $224 |
| 6299642 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Jun 2004 | — | Yes | ModNegligence | $217 | $217 |
| 9397680 | Amrize Table Mountain Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Jul 2019 | — | No | HighNegligence | $214 | $214 |
| 9397679 | Amrize Table Mountain Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Jul 2019 | — | No | HighNegligence | $214 | $214 |
| 8754741 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Feb 2014 | — | No | HighNegligence | $207 | $207 |
| 6424016 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | May 2008 | — | No | HighNegligence | $190 | $190 |
| 9397683 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Aug 2019 | — | Yes | ModNegligence | $181 | $181 |
| 7943489 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Sep 2001 | — | Yes | ModNegligence | $173 | $173 |
| 9476599 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Jun 2021 | — | No | ModNegligence | $172 | $172 |
| 9303670 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Jul 2017 | — | Yes | ModNegligence | $160 | $160 |
| 8838612 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Jun 2016 | — | No | ModNegligence | $157 | $157 |
| 8939277 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Dec 2015 | — | No | ModNegligence | $150 | $150 |
| 8939276 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Dec 2015 | — | No | ModNegligence | $150 | $150 |
| 8939275 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Dec 2015 | — | No | ModNegligence | $150 | $150 |
| 8939274 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Dec 2015 | — | No | ModNegligence | $150 | $150 |
| 8939273 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Dec 2015 | — | No | ModNegligence | $150 | $150 |
| 9728375 | Amrize Table Mountain Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Jun 2023 | — | No | ModNegligence | $143 | $138 |
| 9728374 | Amrize Table Mountain Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Jun 2023 | — | No | ModNegligence | $143 | $143 |
| 9728373 | Amrize Table Mountain Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Jun 2023 | — | No | ModNegligence | $143 | $143 |
| 9728332 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Apr 2023 | — | No | ModNegligence | $143 | $143 |
| 9728331 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Apr 2023 | — | No | ModNegligence | $143 | $143 |
| 9728330 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Apr 2023 | — | No | ModNegligence | $143 | $143 |
| 9728329 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Apr 2023 | — | No | ModNegligence | $143 | $143 |
| 9657597 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Nov 2022 | — | No | ModNegligence | $143 | $143 |
| 9657596 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Nov 2022 | — | No | ModNegligence | $143 | $143 |
| 8761942 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Jul 2014 | — | Yes | LowNegligence | $138 | $138 |
| 8761932 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Jul 2014 | — | Yes | ModNegligence | $138 | $138 |
| 6415270 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Aug 2007 | — | No | ModNegligence | $138 | $100 |
| 6415269 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Aug 2007 | — | Yes | ModNegligence | $138 | $138 |
| 9398530 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Jun 2020 | — | No | ModNegligence | $135 | $135 |
| 9398529 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Jun 2020 | — | No | ModNegligence | $135 | $135 |
| 9346904 | Cripple Creek and Victor Gold Mining Com Teller, CO contractor: Tezak Heavy Equipment Co, Inc. | Sep 2019 | — | No | ModNegligence | $135 | $135 |
| 9657592 | Amrize Table Mountain Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Nov 2022 | — | No | ModNegligence | $133 | $133 |
| 9657591 | Amrize Table Mountain Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Nov 2022 | — | No | ModNegligence | $133 | $133 |
| 9657417 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | May 2022 | — | No | ModNegligence | $133 | $133 |
| 9657416 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | May 2022 | — | No | ModNegligence | $133 | $133 |
| 7943488 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Sep 2001 | — | Yes | ModNegligence | $131 | $131 |
| 7940468 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Mar 2000 | — | Yes | ModNegligence | $131 | $131 |
| 6581971 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Jan 2011 | — | Yes | ModNegligence | $127 | $127 |
| 6445399 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Jun 2009 | — | Yes | LowNegligence | $127 | $127 |
| 6415174 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Feb 2008 | — | Yes | ModNegligence | $127 | $127 |
| 6415173 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Feb 2008 | — | Yes | ModNegligence | $127 | $127 |
| 9656329 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Nov 2021 | — | Yes | ModNegligence | $125 | $125 |
| 9656328 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Nov 2021 | — | No | ModNegligence | $125 | $125 |
| 9656327 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Nov 2021 | — | No | ModNegligence | $125 | $125 |
| 9656326 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Nov 2021 | — | No | ModNegligence | $125 | $125 |
| 9655448 | Amrize Table Mountain Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Oct 2021 | — | Yes | ModNegligence | $125 | $125 |
| 9655447 | Amrize Table Mountain Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Oct 2021 | — | No | ModNegligence | $125 | $125 |
| 9478256 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Feb 2021 | — | No | ModNegligence | $125 | $125 |
| 9478482 | Amrize Table Mountain Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Feb 2021 | — | No | ModNegligence | $125 | $125 |
| 9478481 | Amrize Table Mountain Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Feb 2021 | — | No | ModNegligence | $125 | $125 |
| 9478480 | Amrize Table Mountain Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Feb 2021 | — | No | ModNegligence | $125 | $125 |
| 9398532 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Jun 2020 | — | No | ModNegligence | $123 | $123 |
| 9398531 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Jun 2020 | — | No | LowNegligence | $123 | $123 |
| 9398528 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Jun 2020 | — | No | ModNegligence | $123 | $123 |
| 9398405 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Feb 2020 | — | No | ModNegligence | $123 | $123 |
| 9398404 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Feb 2020 | — | No | LowNegligence | $123 | $123 |
| 9398403 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Feb 2020 | — | No | ModNegligence | $123 | $123 |
| 9398402 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Feb 2020 | — | No | LowNegligence | $123 | $123 |
| 9397687 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Aug 2019 | — | No | LowNegligence | $121 | $121 |
| 9397686 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Aug 2019 | — | Yes | LowNegligence | $121 | $121 |
| 9397685 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Aug 2019 | — | Yes | LowNegligence | $121 | $121 |
| 9397684 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Aug 2019 | — | No | ModNegligence | $121 | $121 |
| 9348146 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Jan 2019 | — | No | ModNegligence | $121 | $121 |
| 9348145 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Jan 2019 | — | No | HighNegligence | $121 | $121 |
| 9348117 | Amrize Table Mountain Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Dec 2018 | — | No | ModNegligence | $118 | $118 |
| 9348116 | Amrize Table Mountain Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Dec 2018 | — | No | HighNegligence | $118 | $118 |
| 9348001 | Amrize Table Mountain Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Feb 2018 | — | No | HighNegligence | $118 | $118 |
| 9341400 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Feb 2018 | — | No | ModNegligence | $118 | $118 |
| 9341399 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Feb 2018 | — | No | ModNegligence | $118 | $118 |
| 9346039 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Jul 2017 | — | No | LowNegligence | $116 | $116 |
| 8932399 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Feb 2017 | — | No | ModNegligence | $116 | $116 |
| 8939364 | Amrize Table Mountain Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Apr 2016 | — | No | ModNegligence | $100 | $100 |
| 8762158 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Jun 2015 | — | No | ModNegligence | $100 | $100 |
| 8762157 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Jun 2015 | — | No | ModNegligence | $100 | $100 |
| 8762156 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Jun 2015 | — | No | ModNegligence | $100 | $100 |
| 8762155 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Jun 2015 | — | No | ModNegligence | $100 | $100 |
| 8762113 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Feb 2015 | — | No | ModNegligence | $100 | $100 |
| 8761941 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Jul 2014 | — | No | ModNegligence | $100 | $100 |
| 8761940 | Amrize Canon City Quarry Fremont, CO contractor: Tezak Heavy Equipment, LLC | Jul 2014 | — | No | ModNegligence | $100 | $100 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for TEZAK HEAVY EQUIPMENT CO., INC.. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for TEZAK HEAVY EQUIPMENT CO., INC.. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for TEZAK HEAVY EQUIPMENT CO., INC.. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for TEZAK HEAVY EQUIPMENT CO., INC.. Verify directly with UVA Corporate Prosecution Registry →
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2002-05-08 | Planned | 5 | — | $6,750 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Related searches
- Employers in COState-wide enforcement data
About this data
This profile aggregates federal enforcement records on TEZAK HEAVY EQUIPMENT CO., INC. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is TEZAK HEAVY EQUIPMENT CO., INC.'s OSHA violation history?
- TEZAK HEAVY EQUIPMENT CO., INC. has 1 OSHA inspection on record with 5 violations and $6,750 in total penalties.