Establishment profile
SIMS PUMP VALVE COMPANY, INC.
1314 PARK AVENUE, HOBOKEN, NJ, 07030
332919 — Other Metal Valve and Pipe Fitting Manufacturing
Summary
SIMS PUMP VALVE COMPANY, INC. has accumulated 16 OSHA violations across 4 inspections over 49 years of recorded history, with $5,083 in total assessed penalties.
The establishment sits in the 79th percentile for violations within its industry-state peer group of 157 employers. Inspection frequency runs at the 81st percentile. The most recent enforcement activity was recorded 15 years ago.
Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
SIMS PUMP VALVE COMPANY, INC. appears in OSHA workplace safety record only. No matching records were found in WHD wage enforcement, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls. Single-agency enforcement records typically indicate either a discrete incident-based inspection or a low-risk operational profile.
OSHA workplace safety
75% of inspections at this establishment produced violations,
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 14 distinct standards shown · 16 citations in this view · $5,083 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 1910.0213 H04 | 2 | 2 | $30 | Aug 1976 | Oct 1982 |
| 29 CFR 1910.0219 D01 | 2 | 2 | $25 | Aug 1976 | Oct 1982 |
| 29 CFR 1910.0037 A03 | 1 | 1 | $1,785 | Jan 2011 | Jan 2011 |
| 29 CFR 1910.0304 E01 IV | 1 | 1 | $1,785 | Jan 2011 | Jan 2011 |
| 29 CFR 1910.0134 C01 | 1 | 1 | $1,428 | Jan 2011 | Jan 2011 |
| 29 CFR 1910.0213 H03 | 1 | 1 | $30 | Aug 1976 | Aug 1976 |
| 29 CFR 1910.0157 C01 | 1 | 1 | — | Jan 2011 | Jan 2011 |
| 29 CFR 1910.0134 E01 | 1 | 1 | — | Jan 2011 | Jan 2011 |
| 29 CFR 1910.0134 C02 I | 1 | 1 | — | Jan 2011 | Jan 2011 |
| 29 CFR 1910.0215 B09 | 1 | 1 | — | Oct 1982 | Oct 1982 |
| 29 CFR 1910.0215 D01 | 1 | 1 | — | Oct 1982 | Oct 1982 |
| 29 CFR 1910.0219 E01 I | 1 | 1 | — | Oct 1982 | Oct 1982 |
| 29 CFR 1910.0242 B | 1 | 1 | — | Oct 1982 | Oct 1982 |
| 29 CFR 1910.0309 A 025045 | 1 | 1 | — | Aug 1976 | Aug 1976 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Above average violations in NAICS 3329 within NJ. Peer group: 157 employers. This establishment has 16 OSHA violations; peer median is 5.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for SIMS PUMP VALVE COMPANY, INC.. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for SIMS PUMP VALVE COMPANY, INC.. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 15+ years. Most recent activity: 15 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for SIMS PUMP VALVE COMPANY, INC.. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
No MSHA mine safety violations on file for SIMS PUMP VALVE COMPANY, INC.. Verify directly with Mine Safety and Health Administration →
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for SIMS PUMP VALVE COMPANY, INC.. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for SIMS PUMP VALVE COMPANY, INC.. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for SIMS PUMP VALVE COMPANY, INC.. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for SIMS PUMP VALVE COMPANY, INC.. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
- Department of Defense8505331607!PUMP UNIT,CENTRIFUGcontract · Last action 2018-04-23$442,117
- Department of DefenseFIRE CHARGING PUMP PARTScontract · Last action 2025-07-16$397,677
- Department of DefensePUMP,CTFGLcontract · Last action 2023-07-13$379,947
- Department of DefenseEAF PUMP,CTFGLcontract · Last action 2026-04-02$342,644
- Department of DefenseN105 BLACKWATER USNS WALLY SCHIRRA BUNDLED PROCUREMENT FOR SIMS VALVE CO PARTScontract · Last action 2018-06-01$337,455
- Department of DefensePUMP INSTALLATION KITcontract · Last action 2011-05-20$335,000
- Department of Defense8505893588!PUMP UNIT,CENTRIFUGcontract · Last action 2018-09-19$332,487
- Department of DefensePUMP,CTFGLcontract · Last action 2024-05-03$311,500
- Department of DefensePUMP, FIREcontract · Last action 2016-03-21$308,451
- Department of DefenseKIT, FIRE PUMP INSTALLATIONcontract · Last action 2014-08-18$298,500
- Department of Defense8507024370!PARTS KIT,ENGINE WAcontract · Last action 2019-12-10$292,000
- Department of Defense8506132122!PARTS KIT,ENGINE WAcontract · Last action 2018-12-14$292,000
- Department of DefenseFIRM FIXED PRICE PURCHASE ORDER TO SIMS PUMP VALVE COMPANY TO PROCURE 3 FIRM MAIN CAHRGING PUMPS FOR THE USNS CARL BRASHEAR.contract · Last action 2014-12-16$256,320
- Department of DefenseUSNS ALAN B. SHEPARD, FIREMAIN CHARGING PUMPcontract · Last action 2019-09-14$241,007
- Department of DefensePUMP,CTFGLcontract · Last action 2021-05-10$228,272
- Department of Defense8507344737!PUMP UNIT,CENTRIFUGcontract · Last action 2020-04-28$228,272
- Department of Defense8506234688!PUMP UNIT,CENTRIFUGcontract · Last action 2019-01-28$224,900
- Department of DefenseSTUFFING BOX ASM07030contract · Last action 2024-09-09$221,377
- Department of DefensePUMP,CTFGLcontract · Last action 2018-06-28$221,058
- Department of DefenseN421585125B321/CENTRIFUGAL PUMPScontract · Last action 2015-09-30$208,950
- Department of DefenseSISMSITE PUMP FOR THE USNS WILLIAM MCLEANcontract · Last action 2025-06-30$202,845
- Department of Defense8504810426!SEAL,PLAINcontract · Last action 2017-10-27$199,500
- Department of Defense8509500851!PARTS KIT,ENGINE WAcontract · Last action 2022-11-01$199,350
- Department of Defense8500557260!PUMP UNIT,CENTRIFUGcontract · Last action 2014-01-16$199,000
- Department of Defense8510896123!PARTS KIT,ENGINE WAcontract · Last action 2024-09-16$194,555
- Department of DefenseN104C / PM6 / T. LANZAROTTA / USNS ROBERT E PEARY FIRE CHARGING PUMP REPLACEMENTcontract · Last action 2024-03-15$175,695
- Department of DefenseIGF::OT::IGF FIRE MAIN CHARGING PUMPS FOR THE T-AKE SHORE BASED SPARES PROGRAMcontract · Last action 2016-02-16$175,224
- Department of DefensePUMPcontract · Last action 2009-06-01$173,000
- Department of DefenseN104D-CHARLES TAYLOR REEVES-PM1-USNS WASHINGTON CHAMBERS (T-AKE 11) - NS18297-A75 PUMPcontract · Last action 2022-11-18$172,970
- Department of DefenseFIRE MAIN PUMP FOR ESB VESSELcontract · Last action 2024-09-24$150,751
- Department of Defense8505927222!PARTS KIT,ENGINE WAcontract · Last action 2018-10-04$146,000
- Department of Defense8505517153!PARTS KIT,ENGINE WAcontract · Last action 2018-05-18$146,000
- Department of Defense8505983778!SEAL,PLAINcontract · Last action 2018-10-18$145,800
- Department of DefenseN104B1/PM6/ M. DICKSON/ USNS SACAGAWEA - CENTRIFUGAL PUMP AND MOTOR CASREP 22026.contract · Last action 2022-09-22$140,873
- Department of DefenseFIRE MAIN CHARGING PUMPcontract · Last action 2023-11-21$139,057
- Department of DefenseCENTRIFUGAL PUMP PARTS FOR 576A CENTRIFUGAL PUMP OVERHAULcontract · Last action 2025-09-15$138,230
- Department of TransportationREPLACEMENT OF TWO COOLING PUMPS THAT SUPPLY NON CONTACT COOLING WATER TO THE ENGINEERING LAB SPACEScontract · Last action 2016-06-28$137,140
- Department of DefenseFIRE MAIN CHARGING PUMP FOR T-AKE VESSELcontract · Last action 2025-01-02$135,747
- Department of DefenseN104B1 / PM6 / D.SWIFT / THIS IS A REQUIREMENT FOR FIRE MAIN CHARGINGING PUMP FOR THE USNS SACAGAWEAcontract · Last action 2024-04-03$132,747
- Department of Defense8511705329!PARTS KIT,ENGINE WAcontract · Last action 2025-10-16$131,505
- Department of DefenseN104B1 ALICEA; ROBERT E PEARYINTERNAL PARTS FOR FIRE PUMP.SIMSITE IMPELLER N5456A2040 AND SIMSITE CASING RING N5456B.contract · Last action 2019-01-28$130,536
- Department of DefenseN421587311B408 MECHANICAL SEALcontract · Last action 2017-12-06$130,305
- Department of Defense8508745806!SEAL,PLAINcontract · Last action 2021-12-14$118,980
- Department of Defense8511298399!SEAL,PLAINcontract · Last action 2025-04-06$118,327
- Department of Defense8506245382!PARTS KIT,ENGINE WAcontract · Last action 2019-01-30$116,800
- Department of Defense8504977068!PARTS KIT,ENGINE WAcontract · Last action 2017-11-29$116,800
- Department of DefenseKLScontract · Last action 2008-06-18$116,160
- Department of DefensePUMP,CTFGLcontract · Last action 2020-12-02$114,136
- Department of Defense8507520558!PUMP UNIT,CENTRIFUGcontract · Last action 2020-07-16$114,136
- Department of DefenseUSNS ZEUS (T-ARC 7) SIMS PUMP REPAIR KITcontract · Last action 2013-11-19$112,762
Federal contract dollars to this establishment. Primary NAICS: 333911 - PUMP AND PUMPING EQUIPMENT MANUFACTURING. Last action: 2026-04-02. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2010-11-03 | Planned | 6 | 4 | $4,998 | |
| 1982-10-20 | Planned | 6 | — | $0 | |
| 1978-06-01 | Planned | 0 | — | $0 | |
| 1976-08-11 | Planned | 4 | — | $85 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in other metal valve and pipe fitting manufacturing within NJ, ordered by federal enforcement volume:
- WM. STEINEN MFG. CO.PARSIPPANY — 2 federal enforcement records
- KRAISSL COMPANY, INC.HACKENSACK — 1 federal enforcement record
- IMPERIAL WELD RING CORP.ELIZABETH — 1 federal enforcement record
- STRAHMAN VALVES INC.FLORHAM PARK — 1 federal enforcement record
Related searches
- Other Metal Valve and Pipe Fitting ManufacturingAll employers in this industry
- Employers in NJState-wide enforcement data
- Other Metal Valve in NJIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on SIMS PUMP VALVE COMPANY, INC. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is SIMS PUMP VALVE COMPANY, INC.'s OSHA violation history?
- SIMS PUMP VALVE COMPANY, INC. has 4 OSHA inspections on record with 16 violations and $5,083 in total penalties.
- How does SIMS PUMP VALVE COMPANY, INC.'s safety record compare to its industry?
- SIMS PUMP VALVE COMPANY, INC. operates in the other metal valve and pipe fitting manufacturing industry. The industry average Total Recordable Incident Rate (TRIR) is 3.5.