Establishment profile
SIERRA NEVADA CONSTRUCTION, INC
7600 USA PARKWAY, SPARKS, NV, 89431
237310 — Highway, Street, and Bridge Construction
EIN 880245093
Summary
SIERRA NEVADA CONSTRUCTION, INC has accumulated 3 OSHA violations across 5 inspections over 31 years of recorded history, with $875 in total assessed penalties.
The establishment sits in the 79th percentile for violations within its industry-state peer group of 178 employers. Inspection frequency runs at the 89th percentile. The most recent enforcement activity was recorded 10 months ago.
Federal records were found in 4 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
SIERRA NEVADA CONSTRUCTION, INC appears in OSHA workplace safety, WHD wage enforcement, MSHA mine safety, NLRB labor relations, and FMCSA motor carrier registration records only. No matching records were found in EPA environmental compliance, OFLC visa and labor certification (historical), SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
40% of inspections at this establishment produced violations,
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 3 distinct standards shown · 3 citations in this view · $875 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 1926.0651 J01 | 1 | 1 | $875 | May 2008 | May 2008 |
| 29 CFR 1926.0652 A01 | 1 | 1 | — | May 2008 | May 2008 |
| 29 CFR 1926.0152 A01 | 1 | 1 | — | Sep 1994 | Sep 1994 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Above average violations in NAICS 2373 within NV. Peer group: 178 employers. This establishment has 3 OSHA violations; peer median is 1.
Safety self-report (OSHA 300A)
Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.
Reported for 407 average annual employees at this establishment.
Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for SIERRA NEVADA CONSTRUCTION, INC. Verify directly with Occupational Safety and Health Administration →
Activity timeline
Most recent federal enforcement activity recorded 10 months ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
Department of Labor Wage & Hour Division — minimum-wage, overtime, child-labor, FMLA, and prevailing-wage enforcement.
Wage and hour cases
Closed DOL Wage & Hour Division cases (FLSA, FMLA, H-2B, MSPA, and related statutes). Backwages reflect amounts the agency assessed; civil penalty (CMP) is a separate fine levied on top, where the statute provides for one (FLSA / H-1B / H-2A / MSPA / FMLA / EPPA / FLSA Child Labor; other acts have no CMP column in DOL’s data). The Statutes column lists which laws each case cited. 1 case · $0 in backwages
| Case period | Industry | Statutes | Violations | Workers | Backwages | Civil penalty |
|---|---|---|---|---|---|---|
| Jun 2017 – Dec 2018 | Highway, Street, and Bridge Construction | — | — | 0 | — | — |
Source: DOL WHD enforcement database. Cases shown reflect those the agency has closed and made public. A violation count is the agency’s tally of cited violations (one violation can affect many workers); the workers column counts distinct employees the agency found to be affected.
Mine safety (MSHA)
Company-level in NV — for SIERRA NEVADA CONSTRUCTION, INC, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other SIERRA NEVADA CONSTRUCTION, INC operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 90 citations · 16S&S · 79 contractor · $27,512 proposed / $27,512 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 8873113 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Aug 2015 | — | Yes | HighNegligence | $4,400 | $4,400 |
| 8989018 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Mar 2016 | — | Yes | HighNegligence | $4,000 | $4,000 |
| 8873112 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Aug 2015 | — | Yes | HighNegligence | $2,000 | $2,000 |
| 8873110 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Aug 2015 | — | Yes | HighNegligence | $2,000 | $2,000 |
| 8609652 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Aug 2011 | — | Yes | ModNegligence | $946 | $946 |
| 8561600 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Mar 2011 | — | Yes | ModNegligence | $946 | $946 |
| 8609653 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Aug 2011 | — | Yes | ModNegligence | $634 | $634 |
| 8561598 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Mar 2011 | — | Yes | ModNegligence | $634 | $634 |
| 8875859 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Jul 2016 | — | Yes | ModNegligence | $615 | $615 |
| 8875856 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Jul 2016 | — | Yes | ModNegligence | $615 | $615 |
| 8609651 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Aug 2011 | — | No | ModNegligence | $425 | $425 |
| 8609649 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Aug 2011 | — | No | ModNegligence | $425 | $425 |
| 8875858 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Jul 2016 | — | No | ModNegligence | $413 | $413 |
| 8875855 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Jul 2016 | — | No | ModNegligence | $413 | $413 |
| 6432788 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Jun 2008 | — | Yes | ModNegligence | $308 | $308 |
| 8996601 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Jan 2017 | — | No | LowNegligence | $259 | $259 |
| 6477018 | Portable Rock Plant #1 Pershing, NV | Sep 2008 | — | Yes | ModNegligence | $243 | $243 |
| 8611394 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Aug 2012 | — | No | ModNegligence | $207 | $207 |
| 8611390 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Aug 2012 | — | No | ModNegligence | $207 | $207 |
| 8561597 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Mar 2011 | — | No | ModNegligence | $190 | $190 |
| 8875857 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Jul 2016 | — | No | ModNegligence | $185 | $185 |
| 8989400 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Jan 2017 | — | No | ModNegligence | $173 | $173 |
| 8875854 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Jul 2016 | — | No | ModNegligence | $149 | $149 |
| 8989021 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Mar 2016 | — | Yes | LowNegligence | $138 | $138 |
| 8611393 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Aug 2012 | — | No | ModNegligence | $138 | $138 |
| 8611392 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Aug 2012 | — | No | ModNegligence | $138 | $138 |
| 8611391 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Aug 2012 | — | No | ModNegligence | $138 | $138 |
| 8611389 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Aug 2012 | — | No | ModNegligence | $138 | $138 |
| 8609650 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Aug 2011 | — | No | ModNegligence | $127 | $127 |
| 8561596 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Mar 2011 | — | No | ModNegligence | $127 | $127 |
| 9437008 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Jan 2019 | — | No | ModNegligence | $121 | $121 |
| 9374873 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Sep 2018 | — | Yes | LowNegligence | $118 | $118 |
| 9374872 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Sep 2018 | — | No | ModNegligence | $118 | $118 |
| 9374871 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Sep 2018 | — | No | ModNegligence | $118 | $118 |
| 9374870 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Sep 2018 | — | No | LowNegligence | $118 | $118 |
| 9370293 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Mar 2018 | — | No | ModNegligence | $118 | $118 |
| 9370292 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Mar 2018 | — | No | ModNegligence | $118 | $118 |
| 6477798 | Portable Rock Plant #1 Pershing, NV | Mar 2009 | — | Yes | ModNegligence | $117 | $117 |
| 6477796 | Portable Rock Plant #1 Pershing, NV | Mar 2009 | — | Yes | ModNegligence | $117 | $117 |
| 8989399 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Jan 2017 | — | No | LowNegligence | $116 | $116 |
| 8989398 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Jan 2017 | — | No | LowNegligence | $116 | $116 |
| 8875860 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Jul 2016 | — | No | LowNegligence | $114 | $114 |
| 8989022 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Mar 2016 | — | No | ModNegligence | $112 | $112 |
| 8989020 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Mar 2016 | — | No | ModNegligence | $100 | $100 |
| 8989019 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Mar 2016 | — | No | LowNegligence | $100 | $100 |
| 8873117 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Aug 2015 | — | No | ModNegligence | $100 | $100 |
| 8873111 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Aug 2015 | — | No | ModNegligence | $100 | $100 |
| 8793532 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Oct 2014 | — | No | ModNegligence | $100 | $100 |
| 8703117 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Jan 2014 | — | No | ModNegligence | $100 | $100 |
| 8703116 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Jan 2014 | — | No | ModNegligence | $100 | $100 |
| 8703115 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Jan 2014 | — | No | ModNegligence | $100 | $100 |
| 8688148 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Aug 2013 | — | No | ModNegligence | $100 | $100 |
| 8688147 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Aug 2013 | — | No | LowNegligence | $100 | $100 |
| 8688146 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Aug 2013 | — | No | ModNegligence | $100 | $100 |
| 8688145 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Aug 2013 | — | No | LowNegligence | $100 | $100 |
| 8611395 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Aug 2012 | — | No | LowNegligence | $100 | $100 |
| 8561599 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Mar 2011 | — | No | ModNegligence | $100 | $100 |
| 8562064 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Sep 2010 | — | No | ModNegligence | $100 | $100 |
| 8562063 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Sep 2010 | — | No | ModNegligence | $100 | $100 |
| 8562062 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Sep 2010 | — | No | ModNegligence | $100 | $100 |
| 8562060 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Sep 2010 | — | No | ModNegligence | $100 | $100 |
| 8562059 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Sep 2010 | — | No | ModNegligence | $100 | $100 |
| 8562058 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Sep 2010 | — | No | HighNegligence | $100 | $100 |
| 8562057 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Sep 2010 | — | No | HighNegligence | $100 | $100 |
| 8562056 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Sep 2010 | — | No | ModNegligence | $100 | $100 |
| 8562055 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Sep 2010 | — | No | ModNegligence | $100 | $100 |
| 6487388 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Jan 2010 | — | No | ModNegligence | $100 | $100 |
| 6487387 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Jan 2010 | — | No | ModNegligence | $100 | $100 |
| 6477815 | Portable Rock Plant #1 Pershing, NV | Mar 2009 | — | No | ModNegligence | $100 | $100 |
| 6477801 | Portable Rock Plant #1 Pershing, NV | Mar 2009 | — | No | ModNegligence | $100 | $100 |
| 6477800 | Portable Rock Plant #1 Pershing, NV | Mar 2009 | — | No | ModNegligence | $100 | $100 |
| 6477799 | Portable Rock Plant #1 Pershing, NV | Mar 2009 | — | No | ModNegligence | $100 | $100 |
| 6477797 | Portable Rock Plant #1 Pershing, NV | Mar 2009 | — | No | ModNegligence | $100 | $100 |
| 6442154 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Mar 2009 | — | No | ModNegligence | $100 | $100 |
| 6442153 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Mar 2009 | — | No | ModNegligence | $100 | $100 |
| 6442151 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Mar 2009 | — | No | ModNegligence | $100 | $100 |
| 6477032 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Oct 2008 | — | No | ModNegligence | $100 | $100 |
| 6477031 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Oct 2008 | — | No | ModNegligence | $100 | $100 |
| 6477019 | Portable Rock Plant #1 Pershing, NV | Sep 2008 | — | No | ModNegligence | $100 | $100 |
| 6442041 | Portable Rock Plant #1 Pershing, NV | Jun 2008 | — | No | ModNegligence | $100 | $100 |
| 6442040 | Portable Rock Plant #1 Pershing, NV | Jun 2008 | — | No | ModNegligence | $100 | $100 |
| 6432789 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Jun 2008 | — | No | LowNegligence | $100 | $100 |
| 6432787 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Jun 2008 | — | No | ModNegligence | $100 | $100 |
| 6432786 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Jun 2008 | — | No | ModNegligence | $100 | $100 |
| 6432477 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Feb 2008 | — | No | ModNegligence | $100 | $100 |
| 6432476 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Feb 2008 | — | No | LowNegligence | $100 | $100 |
| 7958669 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | May 2007 | — | No | ModNegligence | $100 | $100 |
| 7958668 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | May 2007 | — | No | ModNegligence | $100 | $100 |
| 7958667 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | May 2007 | — | No | ModNegligence | $100 | $100 |
| 6393562 | Mustang Quarry Washoe, NV contractor: Sierra Nevada Construction Inc. | Mar 2007 | — | No | ModNegligence | $60 | $60 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
Company-level in NV — for SIERRA NEVADA CONSTRUCTION, INC, not this location alone
National Labor Relations Board — unfair labor practice charges and union representation cases. The NLRB records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other SIERRA NEVADA CONSTRUCTION, INC locations in the same state.
NLRB cases
National Labor Relations Board cases involving this employer. Includes unfair labor practice (ULP) filings and representation election proceedings. NLRB enforcement is process-driven; no per-case monetary penalty is assessed (remedies are case-by-case backpay orders, posting requirements, election re-runs, etc.). 2 cases · 2 ULP
| Case number | Type | Filed | Closed | Status | Region |
|---|---|---|---|---|---|
| 32-CA-125970 | Unfair labor practice | Apr 2014 | Apr 2014 | Closed | Region 32, Oakland, California |
| 32-CA-124558 | Unfair labor practice | Mar 2014 | Apr 2014 | Closed | Region 32, Oakland, California |
Source: NLRB case files. Rows shown are those the agency has published. Region numbers (1–31) correspond to NLRB's geographic offices.
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for SIERRA NEVADA CONSTRUCTION, INC. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for SIERRA NEVADA CONSTRUCTION, INC. Verify directly with Environmental Protection Agency →
EPA-registered facilities
Every EPA ECHO facility associated with this employer, sorted most-significant first. Each row links to EPA’s Detailed Facility Report for the source-of-truth record. Permits column lists active programs (Air = Clean Air Act, Water = Clean Water Act, RCRA = hazardous waste, TRI = Toxics Release Inventory reporting). 2 facilities · 1 marked inactive.
| Facility | Permits | Status | Inspections | Formal actions | Penalties | Last inspected | ECHO |
|---|---|---|---|---|---|---|---|
SIERRA NEVADA CONSTRUCTION 2055 E GREG ST · SPARKS, NV, 89431 | RCRA | No Violation Identified | 0 | 0 | — | Feb 2012 | View → |
SIERRA NEVADA CONSTRUCTION 1750 MARIETTA WY · SPARKS, NV, 89431 | RCRA | No Violation Identified | 0 | 0 | — | Dec 2003 | View → |
Source: EPA ECHO (Enforcement and Compliance History Online). Compliance status follows EPA’s own labels (“Sig Violation” = significant noncompliance; QNCR = quarters of noncompliance over the recent reporting window). Inactive facilities (struck through) retain historical enforcement records even after operations ceased.
Motor carrier safety (FMCSA)
Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for SIERRA NEVADA CONSTRUCTION, INC. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
- Department of AgricultureTAS::12 1102::TAS ARRA PROJECT.TAS MAINTENANCE OF THE 73 ROAD (MT WATSON BOULEVARD) ON THE LTBMU IN PLACER COUNTY. THE WORK INCLUDES A SINGLE LAYER CHIP SEAL WITH ASSOCIATED HAND PATCHING AND BRUSHING TO PREPARE THE ROAD SURFACE. IT ALSO INCLUDES TRAFFIC CONTROL ITEMS NEEDED TO MAINTAIN PUBLIC TRAFFIC WHILE WORK PROGRESSES.contract · Last action 2010-01-08$217,988
- Department of AgricultureGALENAcontract · Last action 2011-01-19$90,816
- Department of AgricultureTRUCKEE INFRASTRUCTUREcontract · Last action 2009-01-27$51,655
- Department of the InteriorSIERRA NEVADA CONSTRUCTION - NVSO PARKINcontract · Last action 2019-06-14$3,592
- Department of the InteriorWELL FOR WILD HORSE AND BURRO PROGRAMcontract · Last action 2008-08-28$-1,906
Federal contract dollars to this establishment. Primary NAICS: 237310 - HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Last action: 2019-06-14. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2025-09-18 | Referral | 0 | — | $0 | |
| 2008-04-15 | Referral | 2 | 2 | $875 | |
| 2005-10-18 | Unprogrammed Related | 0 | — | $0 | |
| 1997-09-18 | Planned | 0 | — | $0 | |
| 1994-09-15 | Unprogrammed Related | 1 | — | $0 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in highway, street, and bridge construction within NV, ordered by federal enforcement volume:
- SOUTHERN NEVADA PAVING, INC.NORTH LAS VEGAS — 4 federal enforcement records
- LAS VEGAS PAVING CORPLAS VEGAS — 3 federal enforcement records
- GRANITE CONSTRUCTIONRENO — 3 federal enforcement records
- WELLS CARGO, INC.NORTH LAS VEGAS — 3 federal enforcement records
- GRANITE CONSTRUCTION COMPANYLAS VEGAS — 3 federal enforcement records
- LAS VEGAS PAVING CORPORATIONLAS VEGAS — 3 federal enforcement records
- LAS VEGAS PAVING CORPORATIONLAS VEGAS — 3 federal enforcement records
- GRANITE CONSTRUCTION COMPANYCARSON CITY — 3 federal enforcement records
- LAS VEGAS PAVING CORPORATIONLAS VEGAS — 3 federal enforcement records
- WESTERN STATES CONTRACTING, INC.NORTH LAS VEGAS — 3 federal enforcement records
Related searches
- Highway, Street, and Bridge ConstructionAll employers in this industry
- Employers in NVState-wide enforcement data
- Highway, Street, and in NVIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on SIERRA NEVADA CONSTRUCTION, INC from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is SIERRA NEVADA CONSTRUCTION, INC's OSHA violation history?
- SIERRA NEVADA CONSTRUCTION, INC has 5 OSHA inspections on record with 3 violations and $875 in total penalties.
- How does SIERRA NEVADA CONSTRUCTION, INC's safety record compare to its industry?
- SIERRA NEVADA CONSTRUCTION, INC operates in the highway, street, and bridge construction industry. The industry average Total Recordable Incident Rate (TRIR) is 2.5. SIERRA NEVADA CONSTRUCTION, INC's self-reported DART rate is 2.14 compared to an industry average of 1.5.