Summary
SEARLES CONSTRUCTION has accumulated 2 OSHA violations across 1 inspection over 30 years of recorded history, with $75 in total assessed penalties.
The establishment sits in the 49th percentile for violations within its industry-state peer group of 72,631 employers. The most recent enforcement activity was recorded 30 years ago.
Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
SEARLES CONSTRUCTION appears in OSHA workplace safety, MSHA mine safety, and FMCSA motor carrier registration records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), SAM.gov federal debarment, CMS nursing home enforcement, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
100% of inspections at this establishment produced violations,
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 2 distinct standards shown · 2 citations in this view · $75 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 4084.062201 | 1 | 1 | $75 | Aug 1996 | Aug 1996 |
| 29 CFR 4084.062503 | 1 | 1 | — | Aug 1996 | Aug 1996 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Below average violations. Peer group: 72,631 employers. This establishment has 2 OSHA violations; peer median is 2.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for SEARLES CONSTRUCTION. Verify directly with OSHA Injury Tracking Application →
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for SEARLES CONSTRUCTION. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 30+ years. Most recent activity: 30 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for SEARLES CONSTRUCTION. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in MI — for SEARLES CONSTRUCTION, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other SEARLES CONSTRUCTION operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 35S&S · 36 contractor · $21,124 proposed / $20,286 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 6195353 | Portable Wash Plant Clinton, MI | Nov 2007 | — | Yes | ModNegligence | $1,995 | $1,995 |
| 6503113 | Portable Wash Plant Clinton, MI | Nov 2009 | — | Yes | HighNegligence | $1,795 | $1,795 |
| 6503111 | Portable Wash Plant Clinton, MI | Nov 2009 | — | Yes | HighNegligence | $1,795 | $1,795 |
| 6195348 | Portable Wash Plant Clinton, MI | Nov 2007 | — | Yes | ModNegligence | $1,795 | $1,795 |
| 6195352 | Portable Wash Plant Clinton, MI | Nov 2007 | — | No | ModNegligence | $540 | $121 |
| 6195349 | Portable Wash Plant Clinton, MI | Nov 2007 | — | No | ModNegligence | $540 | $121 |
| 6503112 | Portable Wash Plant Clinton, MI | Nov 2009 | — | No | HighNegligence | $362 | $362 |
| 6503110 | Portable Wash Plant Clinton, MI | Nov 2009 | — | No | HighNegligence | $362 | $362 |
| 9388817 | Portable Wash Plant Clinton, MI | Jul 2019 | — | Yes | ModNegligence | $319 | $319 |
| 7803637 | 36 Plant Clinton, MI | Apr 2000 | — | No | ModNegligence | $294 | $294 |
| 9388815 | Portable Wash Plant Clinton, MI | Jul 2019 | — | Yes | ModNegligence | $293 | $293 |
| 8885542 | Williams Rd Pit Clinton, MI contractor: Searles Construction Inc | Jun 2017 | — | Yes | ModNegligence | $280 | $280 |
| 8885541 | Williams Rd Pit Clinton, MI contractor: Searles Construction Inc | Jun 2017 | — | Yes | ModNegligence | $280 | $280 |
| 8842466 | Williams Rd Pit Clinton, MI contractor: Searles Construction Inc | Aug 2015 | — | Yes | ModNegligence | $243 | $243 |
| 6561510 | Williams Rd Pit Clinton, MI contractor: Searles Construction Inc | Jun 2011 | — | Yes | ModNegligence | $243 | $243 |
| 6195350 | Portable Wash Plant Clinton, MI | Nov 2007 | — | No | ModNegligence | $162 | $162 |
| 6178956 | Portable Wash Plant Clinton, MI | Aug 2006 | — | Yes | ModNegligence | $154 | $154 |
| 6178954 | Portable Wash Plant Clinton, MI | Aug 2006 | — | Yes | ModNegligence | $154 | $154 |
| 6150359 | Portable Wash Plant Clinton, MI | Apr 2004 | — | Yes | ModNegligence | $154 | $154 |
| 6150358 | Portable Wash Plant Clinton, MI | Apr 2004 | — | Yes | ModNegligence | $154 | $154 |
| 7846474 | 36 Plant Clinton, MI | Nov 2000 | — | No | ModNegligence | $150 | $150 |
| 9388323 | Portable Wash Plant Clinton, MI | Mar 2020 | — | Yes | ModNegligence | $135 | $135 |
| 9388263 | Williams Rd Pit Clinton, MI contractor: Searles Construction Inc | Oct 2019 | — | Yes | ModNegligence | $132 | $132 |
| 8885545 | Portable Wash Plant Clinton, MI | Jun 2017 | — | No | HighNegligence | $129 | $129 |
| 8885547 | Portable Wash Plant Clinton, MI | Jun 2017 | — | Yes | ModNegligence | $126 | $126 |
| 8885539 | Williams Rd Pit Clinton, MI contractor: Searles Construction Inc | Jun 2017 | — | Yes | ModNegligence | $126 | $126 |
| 9389139 | Williams Rd Pit Clinton, MI contractor: Searles Construction Inc | Dec 2020 | — | No | ModNegligence | $125 | $125 |
| 9389126 | Portable Wash Plant Clinton, MI | Oct 2020 | — | No | ModNegligence | $123 | $123 |
| 9389125 | Portable Wash Plant Clinton, MI | Oct 2020 | — | No | ModNegligence | $123 | $123 |
| 9389124 | Portable Wash Plant Clinton, MI | Oct 2020 | — | No | LowNegligence | $123 | $123 |
| 9389127 | Portable Wash Plant Clinton, MI | Oct 2020 | — | No | ModNegligence | $123 | $123 |
| 9389123 | Portable Wash Plant Clinton, MI | Oct 2020 | — | No | ModNegligence | $123 | $123 |
| 9389122 | Portable Wash Plant Clinton, MI | Oct 2020 | — | No | ModNegligence | $123 | $123 |
| 9389121 | Portable Wash Plant Clinton, MI | Oct 2020 | — | No | ModNegligence | $123 | $123 |
| 9389120 | Portable Wash Plant Clinton, MI | Oct 2020 | — | Yes | ModNegligence | $123 | $123 |
| 9389119 | Portable Wash Plant Clinton, MI | Oct 2020 | — | No | ModNegligence | $123 | $123 |
| 9389118 | Portable Wash Plant Clinton, MI | Oct 2020 | — | No | ModNegligence | $123 | $123 |
| 9389117 | Portable Wash Plant Clinton, MI | Oct 2020 | — | No | ModNegligence | $123 | $123 |
| 9388324 | Portable Wash Plant Clinton, MI | Mar 2020 | — | No | ModNegligence | $123 | $123 |
| 7847648 | Portable Wash Plant Clinton, MI | Aug 2001 | — | Yes | ModNegligence | $122 | $122 |
| 7847647 | Portable Wash Plant Clinton, MI | Aug 2001 | — | Yes | ModNegligence | $122 | $122 |
| 9388264 | Williams Rd Pit Clinton, MI contractor: Searles Construction Inc | Oct 2019 | — | Yes | ModNegligence | $121 | $121 |
| 9388262 | Williams Rd Pit Clinton, MI contractor: Searles Construction Inc | Oct 2019 | — | No | ModNegligence | $121 | $121 |
| 9388261 | Williams Rd Pit Clinton, MI contractor: Searles Construction Inc | Oct 2019 | — | No | LowNegligence | $121 | $121 |
| 9388260 | Williams Rd Pit Clinton, MI contractor: Searles Construction Inc | Oct 2019 | — | No | ModNegligence | $121 | $121 |
| 9388259 | Williams Rd Pit Clinton, MI contractor: Searles Construction Inc | Oct 2019 | — | No | ModNegligence | $121 | $121 |
| 9388822 | Williams Rd Pit Clinton, MI contractor: Searles Construction Inc | Jul 2019 | — | No | ModNegligence | $121 | $121 |
| 9388821 | Williams Rd Pit Clinton, MI contractor: Searles Construction Inc | Jul 2019 | — | No | ModNegligence | $121 | $121 |
| 9388820 | Williams Rd Pit Clinton, MI contractor: Searles Construction Inc | Jul 2019 | — | No | ModNegligence | $121 | $121 |
| 9388819 | Williams Rd Pit Clinton, MI contractor: Searles Construction Inc | Jul 2019 | — | No | ModNegligence | $121 | $121 |
| 9388818 | Williams Rd Pit Clinton, MI contractor: Searles Construction Inc | Jul 2019 | — | No | ModNegligence | $121 | $121 |
| 9388816 | Portable Wash Plant Clinton, MI | Jul 2019 | — | No | ModNegligence | $121 | $121 |
| 9388814 | Portable Wash Plant Clinton, MI | Jul 2019 | — | No | ModNegligence | $121 | $121 |
| 9388813 | Portable Wash Plant Clinton, MI | Jul 2019 | — | No | ModNegligence | $121 | $121 |
| 8952915 | Williams Rd Pit Clinton, MI contractor: Searles Construction Inc | Sep 2018 | — | Yes | ModNegligence | $118 | $118 |
| 8952881 | Portable Wash Plant Clinton, MI | Jun 2018 | — | No | ModNegligence | $118 | $118 |
| 8952880 | Portable Wash Plant Clinton, MI | Jun 2018 | — | No | ModNegligence | $118 | $118 |
| 8952879 | Portable Wash Plant Clinton, MI | Jun 2018 | — | No | ModNegligence | $118 | $118 |
| 8885551 | Portable Wash Plant Clinton, MI | Jun 2017 | — | No | LowNegligence | $116 | $116 |
| 8885550 | Portable Wash Plant Clinton, MI | Jun 2017 | — | No | ModNegligence | $116 | $116 |
| 8885549 | Portable Wash Plant Clinton, MI | Jun 2017 | — | No | ModNegligence | $116 | $116 |
| 8885548 | Portable Wash Plant Clinton, MI | Jun 2017 | — | No | ModNegligence | $116 | $116 |
| 8885546 | Portable Wash Plant Clinton, MI | Jun 2017 | — | Yes | LowNegligence | $116 | $116 |
| 8885544 | Williams Rd Pit Clinton, MI contractor: Searles Construction Inc | Jun 2017 | — | Yes | ModNegligence | $116 | $116 |
| 8885543 | Williams Rd Pit Clinton, MI contractor: Searles Construction Inc | Jun 2017 | — | No | ModNegligence | $116 | $116 |
| 8885540 | Williams Rd Pit Clinton, MI contractor: Searles Construction Inc | Jun 2017 | — | No | LowNegligence | $116 | $116 |
| 8885538 | Williams Rd Pit Clinton, MI contractor: Searles Construction Inc | Jun 2017 | — | No | ModNegligence | $116 | $116 |
| 8885460 | Portable Wash Plant Clinton, MI | Oct 2016 | — | No | ModNegligence | $114 | $114 |
| 8885459 | Portable Wash Plant Clinton, MI | Oct 2016 | — | No | ModNegligence | $114 | $114 |
| 8885458 | Portable Wash Plant Clinton, MI | Oct 2016 | — | Yes | ModNegligence | $114 | $114 |
| 8885457 | Portable Wash Plant Clinton, MI | Oct 2016 | — | No | ModNegligence | $114 | $114 |
| 8885456 | Portable Wash Plant Clinton, MI | Oct 2016 | — | No | ModNegligence | $114 | $114 |
| 8885455 | Portable Wash Plant Clinton, MI | Oct 2016 | — | No | ModNegligence | $114 | $114 |
| 6178953 | Portable Wash Plant Clinton, MI | Aug 2006 | — | Yes | ModNegligence | $114 | $114 |
| 6562519 | Portable Wash Plant Clinton, MI | Oct 2012 | — | Yes | ModNegligence | $108 | $108 |
| 6562518 | Portable Wash Plant Clinton, MI | Oct 2012 | — | Yes | ModNegligence | $108 | $108 |
| 6561039 | Williams Rd Pit Clinton, MI contractor: Searles Construction Inc | Sep 2010 | — | Yes | ModNegligence | $108 | $108 |
| 6503114 | Portable Wash Plant Clinton, MI | Nov 2009 | — | No | ModNegligence | $108 | $108 |
| 6503109 | Portable Wash Plant Clinton, MI | Nov 2009 | — | No | ModNegligence | $108 | $108 |
| 6503413 | Portable Wash Plant Clinton, MI | Aug 2009 | — | Yes | ModNegligence | $108 | $108 |
| 6503411 | Portable Wash Plant Clinton, MI | Aug 2009 | — | Yes | ModNegligence | $108 | $108 |
| 6410436 | Williams Rd Pit Clinton, MI contractor: Searles Construction Inc | Jun 2009 | — | Yes | ModNegligence | $108 | $108 |
| 6195354 | Portable Wash Plant Clinton, MI | Nov 2007 | — | No | ModNegligence | $108 | $108 |
| 6195351 | Portable Wash Plant Clinton, MI | Nov 2007 | — | No | ModNegligence | $108 | $108 |
| 8884672 | Williams Rd Pit Clinton, MI contractor: Searles Construction Inc | Nov 2015 | — | No | ModNegligence | $100 | $100 |
| 8884671 | Williams Rd Pit Clinton, MI contractor: Searles Construction Inc | Nov 2015 | — | No | ModNegligence | $100 | $100 |
| 8884670 | Williams Rd Pit Clinton, MI contractor: Searles Construction Inc | Nov 2015 | — | Yes | ModNegligence | $100 | $100 |
| 8884669 | Portable Wash Plant Clinton, MI | Nov 2015 | — | No | LowNegligence | $100 | $100 |
| 8884668 | Portable Wash Plant Clinton, MI | Oct 2015 | — | Yes | ModNegligence | $100 | $100 |
| 8842465 | Williams Rd Pit Clinton, MI contractor: Searles Construction Inc | Aug 2015 | — | No | ModNegligence | $100 | $100 |
| 8841525 | Portable Wash Plant Clinton, MI | Sep 2014 | — | No | ModNegligence | $100 | $100 |
| 8841524 | Portable Wash Plant Clinton, MI | Sep 2014 | — | No | ModNegligence | $100 | $100 |
| 8841510 | Williams Rd Pit Clinton, MI contractor: Searles Construction Inc | Aug 2014 | — | No | ModNegligence | $100 | $100 |
| 8841508 | Williams Rd Pit Clinton, MI contractor: Searles Construction Inc | Aug 2014 | — | No | ModNegligence | $100 | $100 |
| 8841507 | Williams Rd Pit Clinton, MI contractor: Searles Construction Inc | Aug 2014 | — | No | ModNegligence | $100 | $100 |
| 8841506 | Williams Rd Pit Clinton, MI contractor: Searles Construction Inc | Aug 2014 | — | No | LowNegligence | $100 | $100 |
| 8841509 | Williams Rd Pit Clinton, MI contractor: Searles Construction Inc | Aug 2014 | — | No | ModNegligence | $100 | $100 |
| 8841505 | Williams Rd Pit Clinton, MI contractor: Searles Construction Inc | Aug 2014 | — | No | ModNegligence | $100 | $100 |
| 8841504 | Williams Rd Pit Clinton, MI contractor: Searles Construction Inc | Aug 2014 | — | No | ModNegligence | $100 | $100 |
| 8841503 | Williams Rd Pit Clinton, MI contractor: Searles Construction Inc | Aug 2014 | — | No | ModNegligence | $100 | $100 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for SEARLES CONSTRUCTION. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for SEARLES CONSTRUCTION. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for SEARLES CONSTRUCTION. Verify directly with Environmental Protection Agency →
Motor carrier safety (FMCSA)
Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 1996-07-22 | Planned | 2 | 1 | $75 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Related searches
- Employers in MIState-wide enforcement data
About this data
This profile aggregates federal enforcement records on SEARLES CONSTRUCTION from every major federal compliance and enforcement source. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is SEARLES CONSTRUCTION's OSHA violation history?
- SEARLES CONSTRUCTION has 1 OSHA inspection on record with 2 violations and $75 in total penalties.