SALT RIVER PROJECT - CORONADO GENERATING STATION is a fossil fuel electric power generation employer in ST JOHNS, AZ. Federal records show 2 OSHA inspections with 5 violations and $9,750 in penalties. All data sourced from public federal enforcement records.
Data sourced from OSHA, DOL WHD, MSHA, EPA ECHO, NLRB, FMCSA, OFLC, BLS, SAM.gov, CMS, USAspending, CPSC, NHTSA, and the UVA Corporate Prosecution Registry. Last updated: May 3, 2026.
SALT RIVER PROJECT - CORONADO GENERATING STATION
11 MILES N. OF ST JOHNS, AZ ON HW 191, ST JOHNS, AZ, 85936
Parent: SRP (10 locations)
221112 — Top companies in Fossil Fuel Electric Power Generation
157 employees
Industry Benchmark
Data Insights
Inspection Breakdown
Peer Comparison
Need API access, CSV upload, or PDF reports? Upgrade to Paid for $79/mo.
Inspection History
No inspection records found.
Related Searches
The FastDOL Report
Weekly workplace compliance news. Free.
Data aggregated from public federal enforcement and program records (OSHA, WHD, MSHA, EPA, NLRB, FMCSA, OFLC, BLS, SAM.gov, CMS, USAspending, CPSC, NHTSA) plus the UVA Corporate Prosecution Registry. Employer profiles matched by name and location — matching errors may occur. Risk scores computed by FastDOL, not official government assessments. OSHA citations typically appear 3-8 months after the inspection, so very recent enforcement actions may not yet be reflected. Data provided as-is. Report a data error.
Part of a larger organization
SALT RIVER PROJECT - CORONADO GENERATING STATION is one of 10 establishments in our dataset that roll up under the parent organization SRP.
Federal enforcement records on SALT RIVER PROJECT - CORONADO GENERATING STATION represent activity at this specific establishment. The full enforcement footprint of SRP across all 10 of its tracked locations is viewable on the parent profile.
Other establishments operated by SRP
- SUPERIOR INTERNATIONAL INDUSTRIES, INC. — CARROLLTON, GA — 1 federal record
- SRP — MESA, AZ
- SRP — GLENDALE, AZ
- SRP — AVONDALE, AZ
- SRP — PEORIA, AZ
Other employers in Fossil Fuel Electric Power Generation within AZ
- ARIZONA PUBLIC SERVICE COMPANY — JOSEPH CITY — 2 federal records
- ARIZONA PUBLIC SERVICE CO — YUMA — 2 federal records
- GLEN'S ELECTRIC L.L.C. — SPRINGERVILLE — 1 federal record
- SALT RIVER PROJECT/CORONADO GENERATING STATION — ST JOHNS
- SIERRA SOUTHWEST COOPERATIVE SERVICES, INC. — COCHISE
- TUCSON ELECTRIC POWER SPRINGERVILLE GEN. STA. — SPRINGERVILLE
Industry context
Within the fossil fuel electric power generation industry in AZ, SALT RIVER PROJECT - CORONADO GENERATING STATION ranks in the 95th percentile of OSHA violation frequency across 57 comparable establishments. That places this employer among the highest-violation establishments in its peer set.
OSHA penalty totals rank in the 95th percentile of the same peer group. Inspection frequency ranks in the 88th percentile.
The Bureau of Labor Statistics reports an industry-average Total Recordable Incident Rate (TRIR) of 2.3 for the fossil fuel electric power generation sector, with a Days Away, Restricted, or Transferred (DART) rate of 1.4. SALT RIVER PROJECT - CORONADO GENERATING STATION's self-reported DART rate is 3.2, which is above the industry average.
Activity timeline
No federal enforcement activity has been recorded against this establishment in the past 14 years.
Frequently Asked Questions
- What is SALT RIVER PROJECT - CORONADO GENERATING STATION's OSHA violation history?
- SALT RIVER PROJECT - CORONADO GENERATING STATION has 2 OSHA inspections on record with 5 violations and $9,750 in total penalties.
- How does SALT RIVER PROJECT - CORONADO GENERATING STATION's safety record compare to its industry?
- SALT RIVER PROJECT - CORONADO GENERATING STATION operates in the fossil fuel electric power generation industry. The industry average Total Recordable Incident Rate (TRIR) is 2.3. SALT RIVER PROJECT - CORONADO GENERATING STATION's self-reported DART rate is 3.2 compared to an industry average of 1.4.
About this data
This profile aggregates federal enforcement records on SALT RIVER PROJECT - CORONADO GENERATING STATION of ST JOHNS, AZ from 17 federal data sources. Records were found in 2 sources: OSHA workplace safety inspections, and BLS industry safety benchmarks. The remaining 15 sources were checked and found no matching records: WHD, MSHA, EPA, NLRB, OFLC, OFCCP, FMCSA, USAspending, SAM.gov, CMS, CPSC, NHTSA, UVA, SEC enforcement, SEC facts.
Establishments are matched across agencies using normalized employer name, state, and ZIP code. The dataset was last refreshed on May 3, 2026. SALT RIVER PROJECT - CORONADO GENERATING STATION resolves to the parent rollup SRP, which operates 10 establishments in our dataset.
This profile may be incomplete if SALT RIVER PROJECT - CORONADO GENERATING STATIONoperates under multiple legal names, files under variations our entity-matching rules don't yet cover, or maintains records below current matching thresholds. To report a missing record or correction, email corrections@fastdol.com.