Establishment profile
RYTEC CORPORATION
W223 N16601 CEDAR PARKWAY, JACKSON, WI, 53037
326199 — All Other Plastics Product Manufacturing
Summary
RYTEC CORPORATION has accumulated 23 OSHA violations across 3 inspections over 38 years of recorded history, with $2,655 in total assessed penalties.
The establishment sits in the 89th percentile for violations within its industry-state peer group of 413 employers. Inspection frequency runs at the 60th percentile. The most recent enforcement activity was recorded 2 years ago.
Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
RYTEC CORPORATION appears in OSHA workplace safety, EPA environmental compliance, and FMCSA motor carrier registration records only. No matching records were found in WHD wage enforcement, MSHA mine safety, NLRB labor relations, OFLC visa and labor certification, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
67% of inspections at this establishment produced violations, with 2 inspections producing serious-or-greater violations.
Peer comparison
Worse on violations than most other employers in NAICS 3261 within WI. Peer group: 413 employers. This establishment has 23 OSHA violations; peer median is 5.
Safety self-report (OSHA 300A)
Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.
Reported for 185 average annual employees at this establishment.
Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
Self-reported events under 29 CFR 1904.39 (24-hour notification of hospitalization, amputation, or loss of an eye) · Jul 2015 – Jan 2024 · 1 in last 5 years
Most frequent event: Struck by discharged object or substance
Source: OSHA Severe Injury Reports (federal OSHA only; state-plan states like California, Oregon, and Washington maintain their own programs and do not consistently report into this feed).
Severe injury reports — events
Each row is a hospitalization, amputation, or eye-loss event the employer self-reported to OSHA under 29 CFR 1904.39. Narratives are written by the reporting employer.
| Date | Event | Body part | Outcome | |
|---|---|---|---|---|
| Jan 12, 2024 | Struck by discharged object or substance | Knee(s) | Hospitalized | |
| Oct 18, 2017 | Struck by discharged object or substance | Thigh(s) | Hospitalized | |
| Apr 22, 2016 | Caught in running equipment or machinery during maintenance, cleaning | Leg(s), unspecified | Hospitalized | |
| Jul 18, 2015 | Caught in running equipment or machinery, unspecified | Finger(s), fingernail(s), unspecified | Hospitalized |
Source: OSHA Severe Injury Reports. Federal-OSHA jurisdiction only by default; some state-plan programs report voluntarily.
Activity timeline
No federal enforcement activity has been recorded against this establishment in 2+ years. Most recent activity: 2 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for RYTEC CORPORATION. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
No MSHA mine safety violations on file for RYTEC CORPORATION. Verify directly with Mine Safety and Health Administration →
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for RYTEC CORPORATION. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC)
No H-1B, H-2A, or H-2B labor condition applications on file for RYTEC CORPORATION. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
EPA Enforcement and Compliance History — Clean Air Act, Clean Water Act, RCRA, Safe Drinking Water Act. Status: No Violation Identified.
Motor carrier safety (FMCSA)
Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for RYTEC CORPORATION. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
- Department of Veterans AffairsGARAGE DOORScontract · Last action 2012-02-29$156,431
- Department of the TreasurySECURITY GARAGE REQUIREMENTcontract · Last action 2025-04-29$154,585
- Department of DefenseUSNS RICHARD E. BYRD DOOR CONTROLLERScontract · Last action 2025-07-16$133,752
- Department of DefenseRYTEC OVERHEAD DOORcontract · Last action 2018-03-28$110,118
- General Services AdministrationIGF::OT::IGF DEMOLITION-- DISCONNECTION FROM ELECTRICAL AND CONTROLS SYSTEM INCLUDING REMOVAL FROM SITE THE EXISTING COILING OVERHEAD DOOR LOCATED AT THE EXISTING DOCK : THE TWO DOORS ARE AS FOLLOWS: EXISTING DOOR A IS 21'-11 1/8 WIDE X 13-11 5/8 HIGH EXISTING DOOR B IS 9'-11" WIDE X 14'-1/2" HIGH NEW WORK-- FURNISH AND INSTALL RYTEC SPIRAL HIGH SPEED DOOR 1 EACH SPIRAL L/R 9-0 WIDE X 9-0 HIGH (DUMPSTER) WITH SPIRAL PAINTED SLATS, STD, RAL7037 DUSTY GREY ONE COLOR (BOTH SIDES-SP UP TO 16'W X 9', NEMA 4X CONTROL BOX STANDARD, ON/OFF KEY SWITCH, PATH WATCH SAFELY SYSTEM AND SPIRAL SLATS, BRACKETS&HARDWARE TO FILL IN UPPER 60" OF OPENING. FURNISH AND INSTALL RYTEC SPIRAL HIGH SPEED DOOR 1 EACH SPIRAL US/R 21'-3" WIDE X 14-0 HIGH (LOADING DOCK) WITH SPIRAL PAINTED SLATS, STD, RAL 7037 DUSTY GREY ONE COLOR (BOTH SIDES-SP UP TO 16" + 26"W X 14', RIGHT HAND MOTOR MOUNT NEMA 4X CONTROL BOX STANDARD, ON/OFF KEY SWITCH, PATH WATCH SAFELY SYSTEM. WORK ON EACH DOOR TO INCLUDE FREIGHT TO WORK SITE UNLOADING, ALL REQUIRED PREPARATION FOR INSTALLATION OF NEW DOORS INCLUDING MECHANICAL, ELECTRICAL&FILLER SLAT INSTALLATION AND FINAL CONNECTION TO EXISTING PUSHBUTTONS FOR ACTIVATION. ALL IN ACCORDANCE WITH QUOTE DATED 7/18/14 THE WORK CAN BE DONE DURING NORMAL BUSINESS HOURS (MF 7:00AM TO 5:00PM. THE GSA WILL PROVIDE NEW ELECTRICAL DISCONNECTS AND NEW LOCATIONS CENTER CONTROL BOXES AND RELOCATION OF EXISTING DUCT FOR A MINIMUM OF 45" FROM GARAGE BAY DOORS TO ALLOW FOR OVERHEAD DOOR INSTALLATION. SAFETY--ALL WORK SHALL COMPLY WITH APPLICABLE STATE AND MUNICIPAL SAFETY AND HEALTH REQUIREMENTS. WHERE THERE IS A CONFLICT BETWEEN APPLICABLE REGULATIONS, THE MOST STRINGENT WILL APPLY. THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY AND LIABILITY FOR COMPLIANCE WITH ALL APPLICABLE REGULATIONS PERTAINING TO THE HEALTH AND SAFETY OF THE PERSONNEL DURING THE EXECUTION OF WORK, AND SHALL HOLD THE GOVERNMENT HARMLESS FOR ANY ACTION ON ITS PART OR THAT OF ITS EMPLOYEES OR SUBCONTRACTORS, WHICH RESULTS IN ILLNESS OR DEATH. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY SAFETY EQUIPMENT AND ENSURE THAT SUCH EQUIPMENT AND ALL RELEVANT SAFETY PROCEDURES ARE ADEQUATE FOR THE JOB BEING PERFORMED AND ARE UTILIZED PROPERLY.contract · Last action 2014-12-09$96,953
- General Services AdministrationIGF::OT::IGF REPLACE TWO EXISTING ROLL UP DOORS WITH NEW HIGH SPEED SECURE ROLL UP DOORS AT THE CARTER-KEEP USMS SALLY PORT.contract · Last action 2016-09-15$80,307
- Department of DefenseR0014200 SYSTEM 4 CONTROL ASSY FOR T-AKE CLASS VESSELcontract · Last action 2022-12-13$74,407
- Department of DefenseR0014200 SYSTEM 4 CONTROL ASSYcontract · Last action 2023-01-26$72,506
- Department of Homeland SecurityIGF::CT::IGF - INSTALLATION OF OVERHEAD SECURITY DOORScontract · Last action 2016-09-29$67,362
- General Services AdministrationREPLACE ROLL UP DOORS.contract · Last action 2008-11-30$60,791
- General Services AdministrationGARAGE DOOR REPLACEMENT AT THE TED WEISS FEDERAL BUILDING.contract · Last action 2010-09-22$60,560
- General Services AdministrationF&I TWO ROLLING DOORScontract · Last action 2011-08-18$56,248
- General Services AdministrationPURCHASE AND INSTALL HIGH SPEED ROLL UP DOORS FOR FOB.contract · Last action 2013-08-12$51,141
- Department of DefenseMOTOR ENCORDER ASSEMBLYcontract · Last action 2023-09-28$47,735
- Department of JusticeIGF::OT::IGF - RYTEC CORPORATION - SALLY PORT DOOR - NEW AWARD ECAcontract · Last action 2017-09-22$45,295
- General Services AdministrationIGF::OT::IGF - REPLACE GARAGE DOOR WITH HIGH SPEED GARAGE DOOR AT TEH US COURTHOUSE, US COURTHOUSE, 700 STEWART ST., SEATTLE, WA 98101-4438contract · Last action 2014-08-28$44,976
- Department of JusticeLAS CRUCES EAST SALLY PORT EXIT DOOR OVERHEAD DOOR COMPANY AND LAS CRUCES INC. AND RYTEC CORPORATION ARE THE ONLY VENDORS SUPPLYING PARTS AND PERFORMING WORK ON THIS DOOR SPECIFICATION.contract · Last action 2018-09-24$44,135
- Department of DefenseROLL-UP DOORScontract · Last action 2016-02-04$41,814
- Department of the TreasuryINSTALL ROLL UP DOORcontract · Last action 2010-05-13$41,800
- General Services AdministrationOTHERcontract · Last action 2011-04-04$38,327
- General Services AdministrationREPLACE DOCK DOOR @ THE THOMAS F. EAGLETON COURTHOUSE, 111 S. 10TH STREET, ST. LOUIS, MO 63102.contract · Last action 2008-03-18$37,550
- General Services AdministrationCONTRACTOR TO PROVIDE ALL LABOR, TOOLS, EQUIPMENT, AND SUPERVISION FOR FURNISHING&INSTALLING ONE (1) EACH RYTEC SPIRAL RIGID HIGH-SPEED ROLLING DOOR IN ACCORDANCE WITH ROUND HEAD SPIRAL DOOR AS SHOWN ON PROPOSAL DATED SEPTEMBER 10, 2012 AT THE ROBERT C. BYRD UNITED STATES FEDERAL BUILDING&COURTHOUSE LOCATED AT 110 NORTH HEBER STREET, BECKLEY, WEST VIRGINIA.contract · Last action 2012-12-10$35,045
- General Services AdministrationIGF::OT::IGF THE DEFENSE CONTRACT MANAGEMENT AGENCY HAS A REQUIREMENT TO HAVE A HIGH SPEED GARAGE DOOR INSTALLED AT THE ENTRANCE TO THE UNDERGROUND PARKING STRUCTURE AT THEIR 4211 CEDAR SPRING ROAD, DALLAS, TX LOCATION.contract · Last action 2018-04-03$33,408
- Department of the TreasurySPIRAL DOORcontract · Last action 2019-06-26$32,441
- Department of DefenseDOOR, ROLL-UP, HIGH SPEED,contract · Last action 2011-09-14$28,238
- General Services AdministrationUSMS SALLYPORT DOOR, HOWARD BAKER COURTHOUSE, KNOXVILLE, TENNESSEE IGF::OT::IGFcontract · Last action 2013-09-06$27,345
- Smithsonian InstitutionIGF::CL,CT::IGF PURCHASE OF SPEED SPIRAL STEEL DOORcontract · Last action 2017-02-01$24,850
- Smithsonian InstitutionIGF::CL,CT::IGF DOOR INSTALLATION SERVICE, INSTALLATION OF LOADING DOCK SPEED DOOR 13'7" W X 15' 8"FT.contract · Last action 2016-03-02$24,850
- Department of Veterans AffairsIGF::OT::IGF AN EMERGENCY TO PROCURE ROLLING EXTERIOR DOOR WITH HEATED ELECTRICAL AIR CURTAIN AND INSTALLATION FOR LAUNDRY SERVICE AT SALEM VAMCcontract · Last action 2013-02-15$23,684
- Department of DefenseLEWIS&CLARK; PRE STAGE DR REPAIR PARTS CLASS BUY 1-contract · Last action 2019-06-25$15,702
- Smithsonian InstitutionIGF::CL,CT::IGF SERVICE, INSTALLATION PREDADOOR FOR HIGH-SPEED ROLLING DOORcontract · Last action 2018-03-13$15,597
- Department of CommerceROLLING DOOR AND INSTALLATION JVILLE NPCcontract · Last action 2020-09-21$15,500
- Department of CommerceREPLACEMENT BAY DOORcontract · Last action 2020-09-14$14,821
- Department of DefenseHI-SPEED DOOR CURTAIN AND BOTTOM BARcontract · Last action 2014-01-06$13,259
- Department of Veterans AffairsIGF::OT::IGF INSTALL DOORcontract · Last action 2016-09-19$11,687
- Department of Defense02241793 MOTOR,ACcontract · Last action 2015-09-30$11,284
- Department of Veterans AffairsIGF::OT::IGF HIGH SPEED ROLLING DOORS&INSTALLATIONcontract · Last action 2016-08-17$9,798
- Department of the TreasuryINSTALL ONE (1) HIGH SPEED ROLL UP DOOR-FW FACILITYcontract · Last action 2007-11-06$9,750
- General Services AdministrationGARAGEcontract · Last action 2008-03-20$9,000
- Department of DefenseN104D WATERS USNS RICHARD E BYRD MCPS BOARDcontract · Last action 2018-05-03$6,457
- General Services AdministrationIGF::CT::IGF REMOVE SCRATCHED PANEL SLATS AND REPLACE WITH STATS AT THE ROBERT C BYED USFB&CH LOCATED AT 110 NORTH HEBER STREET, BECKLEY, WVcontract · Last action 2013-09-10$5,080
- Department of DefenseSPIRAL DOOR ASSEMBLY FOR ONBOARD THE USNS WASHINGTON CHAMBERS EDICKN104B2contract · Last action 2017-10-19$5,027
- Department of DefenseCURTAIN AND BOTTOM BAR ASSYcontract · Last action 2013-02-07$4,675
- Department of DefenseIGF::OT::IGF DOOR CONTROLLERS FOR USNS WILLIAM MCLEAN.contract · Last action 2014-02-14$4,669
- Department of DefenseDOOR MOTOR AND PARTScontract · Last action 2010-03-12$4,491
- General Services AdministrationSMALL CONSTRUCTIONcontract · Last action 2008-03-12$4,000
- General Services AdministrationDOOR MANUFACTURERcontract · Last action 2011-06-02$3,421
- National Gallery of ArtIGF::OT::IGFcontract · Last action 2019-09-11$0
- General Services Administrationcontract · Last action 2019-05-02$0
- General Services AdministrationINSTALL NEW GARAGE DOORScontract · Last action 2008-03-03$0
Federal contract dollars to this establishment. Primary NAICS: 332321 - METAL WINDOW AND DOOR MANUFACTURING. Last action: 2025-07-16. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2024-01-19 | Referral | 0 | — | $0 | |
| 2016-02-17 | Complaint | 1 | 1 | $2,295 | |
| 1988-05-26 | Complaint | 22 | 9 | $360 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in all other plastics product manufacturing within WI, ordered by federal enforcement volume:
- BEMIS MANUFACTURING COMPANYSHEBOYGAN FALLS — 3 federal enforcement records
- PANORAMIC, INC.JANESVILLE — 3 federal enforcement records
- DUTCHLAND PLASTICS LLCOOSTBURG — 2 federal enforcement records
- PREMIER PLASTICS, INCFRANKLIN — 2 federal enforcement records
- ALWIN MANUFACTURING COMPANY, INC.GREEN BAY — 2 federal enforcement records
- ALWIN MANUFACTURINGCLINTONVILLE — 2 federal enforcement records
- FIBERPRO INC. DBA ADVANCED FIBER PRODUCTSLA CROSSE — 2 federal enforcement records
- EVCO PLASTICSDE FOREST — 2 federal enforcement records
- ACRY FAB INC.SUN PRAIRIE — 2 federal enforcement records
- REXNORD INDUSTRIES, LLCGRAFTON — 2 federal enforcement records
Related searches
- All Other Plastics Product ManufacturingAll employers in this industry
- Employers in WIState-wide enforcement data
- All Other Plastics in WIIndustry × state cross-filter
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →About this data
This profile aggregates federal enforcement records on RYTEC CORPORATION from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Frequently asked
- What is RYTEC CORPORATION's OSHA violation history?
- RYTEC CORPORATION has 3 OSHA inspections on record with 23 violations and $2,655 in total penalties.
- How does RYTEC CORPORATION's safety record compare to its industry?
- RYTEC CORPORATION operates in the all other plastics product manufacturing industry. The industry average Total Recordable Incident Rate (TRIR) is 2.8. RYTEC CORPORATION's self-reported DART rate is 1.65 compared to an industry average of 1.8.