Establishment profile
POWELL CONSTRUCTION COMPANY
OAK MOUND BANK BRIDGEPORT HILL, BRIDGEPORT, WV, 26330
Operated by Powell Construction Company, Inc · 1 of 50 establishments
Summary
POWELL CONSTRUCTION COMPANY has accumulated 4 OSHA violations across 1 inspection over 41 years of recorded history.
The establishment sits in the 63rd percentile for violations within its industry-state peer group of 13,528 employers. The most recent enforcement activity was recorded 41 years ago.
Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
POWELL CONSTRUCTION COMPANY appears in OSHA workplace safety and MSHA mine safety records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
100% of inspections at this establishment produced violations,
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 4 distinct standards shown · 4 citations in this view.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 1903.0002 A01 | 1 | 1 | — | Nov 1984 | Nov 1984 |
| 29 CFR 1926.0350 J | 1 | 1 | — | Nov 1984 | Nov 1984 |
| 29 CFR 1926.0401 A01 | 1 | 1 | — | Nov 1984 | Nov 1984 |
| 29 CFR 1926.0402 A08 | 1 | 1 | — | Nov 1984 | Nov 1984 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Above average violations. Peer group: 13,528 employers. This establishment has 4 OSHA violations; peer median is 2.
Safety self-report (OSHA 300A)
Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.
Reported for 22 average annual employees at this establishment.
Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for POWELL CONSTRUCTION COMPANY. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 41+ years. Most recent activity: 41 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for POWELL CONSTRUCTION COMPANY. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in WV — for Powell Construction Company, Inc, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other Powell Construction Company, Inc operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 60S&S · 100 contractor · $390,566 proposed / $197,785 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 8128381 | AFFINITY MINE Raleigh, WV contractor: Powell Construction Company, Inc. | Aug 2011 | — | Yes | HighNegligence | $66,142 | $15,500 |
| 7272893 | Beckley Pocahontas Plant Raleigh, WV contractor: Powell Construction Company, Inc. | Dec 2007 | — | Yes | HighNegligence | $45,000 | $11,000 |
| 7259251 | BECKLEY POCAHONTAS MINE Raleigh, WV contractor: Powell Construction Company, Inc. | May 2007 | — | No | HighNegligence | $41,500 | $13,000 |
| 7272894 | Beckley Pocahontas Plant Raleigh, WV contractor: Powell Construction Company, Inc. | Dec 2007 | — | Yes | HighNegligence | $35,543 | $10,000 |
| 7259250 | BECKLEY POCAHONTAS MINE Raleigh, WV contractor: Powell Construction Company, Inc. | May 2007 | — | No | HighNegligence | $35,500 | $12,000 |
| 8092751 | Rum Creek Preparation Plant Logan, WV contractor: Powell Construction Company, Inc. | Jun 2010 | — | No | ModNegligence | $11,306 | $8,000 |
| 8106381 | AFFINITY MINE Raleigh, WV contractor: Powell Construction Company, Inc. | Nov 2011 | — | Yes | ModNegligence | $8,209 | $5,500 |
| 8116594 | Rum Creek Preparation Plant Logan, WV contractor: Powell Construction Company, Inc. | Mar 2011 | — | No | ModNegligence | $8,209 | $5,000 |
| 8147804 | TUG FORK PREPARATION PLANT Mingo, WV contractor: Powell Construction Company, Inc. | Dec 2011 | — | No | ModNegligence | $7,578 | $3,277 |
| 8116525 | Rum Creek Preparation Plant Logan, WV contractor: Powell Construction Company, Inc. | Jan 2011 | — | Yes | ModNegligence | $7,578 | $7,578 |
| 8116520 | Rum Creek Preparation Plant Logan, WV contractor: Powell Construction Company, Inc. | Jan 2011 | — | Yes | ModNegligence | $7,578 | $7,578 |
| 8116582 | Rum Creek Preparation Plant Logan, WV contractor: Powell Construction Company, Inc. | Feb 2011 | — | Yes | ModNegligence | $6,996 | $6,150 |
| 8116565 | Rum Creek Preparation Plant Logan, WV contractor: Powell Construction Company, Inc. | Feb 2011 | — | Yes | ModNegligence | $6,996 | $6,000 |
| 8116559 | Rum Creek Preparation Plant Logan, WV contractor: Powell Construction Company, Inc. | Feb 2011 | — | Yes | ModNegligence | $6,996 | $6,000 |
| 8116558 | Rum Creek Preparation Plant Logan, WV contractor: Powell Construction Company, Inc. | Feb 2011 | — | Yes | ModNegligence | $6,996 | $5,800 |
| 8116556 | Rum Creek Preparation Plant Logan, WV contractor: Powell Construction Company, Inc. | Feb 2011 | — | Yes | ModNegligence | $6,996 | $5,000 |
| 8116552 | Rum Creek Preparation Plant Logan, WV contractor: Powell Construction Company, Inc. | Feb 2011 | — | Yes | ModNegligence | $6,996 | $5,800 |
| 9581820 | LONGVIEW MINE Barbour, WV contractor: Powell Construction Company, Inc. | Aug 2023 | — | Yes | NoNegligence | $5,262 | — |
| 8038998 | Leer Prep Plant Taylor, WV contractor: Powell Construction Company, Inc. | Mar 2012 | — | Yes | ModNegligence | $5,080 | $5,080 |
| 8144068 | Delbarton Preparation Plant Mingo, WV contractor: Powell Construction Company, Inc. | Feb 2012 | — | Yes | ModNegligence | $3,996 | $3,996 |
| 8116564 | Rum Creek Preparation Plant Logan, WV contractor: Powell Construction Company, Inc. | Feb 2011 | — | Yes | ModNegligence | $3,143 | $3,143 |
| 8116554 | Rum Creek Preparation Plant Logan, WV contractor: Powell Construction Company, Inc. | Feb 2011 | — | Yes | ModNegligence | $3,143 | $2,600 |
| 8116543 | Rum Creek Preparation Plant Logan, WV contractor: Powell Construction Company, Inc. | Feb 2011 | — | Yes | ModNegligence | $3,143 | $3,143 |
| 8115258 | Zigmond Processing Logan, WV contractor: Powell Construction Company, Inc. | Sep 2010 | — | Yes | ModNegligence | $2,678 | $2,678 |
| 8115238 | Rum Creek Preparation Plant Logan, WV contractor: Powell Construction Company, Inc. | Sep 2010 | — | Yes | ModNegligence | $2,678 | $2,678 |
| 7279351 | Marfork Processing Raleigh, WV contractor: Powell Construction Company, Inc. | Nov 2007 | — | Yes | ModNegligence | $2,678 | $2,678 |
| 8136634 | Liberty Processing Boone, WV contractor: Powell Construction Company, Inc. | Nov 2011 | — | No | LowNegligence | $2,473 | $900 |
| 7258332 | BECKLEY POCAHONTAS MINE Raleigh, WV contractor: Powell Construction Company, Inc. | May 2007 | — | Yes | ModNegligence | $2,473 | $2,473 |
| 8147803 | TUG FORK PREPARATION PLANT Mingo, WV contractor: Powell Construction Company, Inc. | Dec 2011 | — | No | LowNegligence | $2,282 | $988 |
| 7182040 | No. 9 Logan, WV contractor: Powell Construction Company, Inc. | Apr 2008 | — | Yes | ModNegligence | $2,282 | $2,282 |
| 7272743 | Beckley Pocahontas Plant Raleigh, WV contractor: Powell Construction Company, Inc. | Apr 2008 | — | Yes | ModNegligence | $2,282 | $2,282 |
| 9586237 | LONGVIEW MINE Barbour, WV contractor: Powell Construction Company, Inc. | Sep 2023 | — | Yes | HighNegligence | $1,717 | $1,717 |
| 9581818 | LONGVIEW MINE Barbour, WV contractor: Powell Construction Company, Inc. | Aug 2023 | — | Yes | ModNegligence | $1,585 | $1,585 |
| 8116519 | Rum Creek Preparation Plant Logan, WV contractor: Powell Construction Company, Inc. | Jan 2011 | — | No | LowNegligence | $1,530 | $1,000 |
| 8106556 | KIAH CREEK PREPARATION PLANT Wayne, WV contractor: Powell Construction Company, Inc. | Mar 2010 | — | Yes | ModNegligence | $1,530 | $1,530 |
| 8116563 | Rum Creek Preparation Plant Logan, WV contractor: Powell Construction Company, Inc. | Feb 2011 | — | Yes | LowNegligence | $1,412 | $1,412 |
| 8091548 | Pineville Processing Wyoming, WV contractor: Powell Construction Company, Inc. | Jan 2011 | — | Yes | NoNegligence | $1,304 | $1,304 |
| 9580159 | LONGVIEW MINE Barbour, WV contractor: Powell Construction Company, Inc. | Jul 2022 | — | Yes | ModNegligence | $1,246 | $1,246 |
| 8116959 | Zigmond Processing Logan, WV contractor: Powell Construction Company, Inc. | Sep 2010 | — | Yes | ModNegligence | $1,203 | $1,203 |
| 8115253 | Rum Creek Preparation Plant Logan, WV contractor: Powell Construction Company, Inc. | Sep 2010 | — | Yes | ModNegligence | $807 | $807 |
| 8115252 | Rum Creek Preparation Plant Logan, WV contractor: Powell Construction Company, Inc. | Sep 2010 | — | Yes | ModNegligence | $807 | $807 |
| 8115246 | Rum Creek Preparation Plant Logan, WV contractor: Powell Construction Company, Inc. | Sep 2010 | — | Yes | ModNegligence | $807 | $807 |
| 7272890 | Beckley Pocahontas Plant Raleigh, WV contractor: Powell Construction Company, Inc. | Dec 2007 | — | No | ModNegligence | $807 | $807 |
| 7272888 | Beckley Pocahontas Plant Raleigh, WV contractor: Powell Construction Company, Inc. | Dec 2007 | — | No | ModNegligence | $807 | $807 |
| 7272886 | Beckley Pocahontas Plant Raleigh, WV contractor: Powell Construction Company, Inc. | Dec 2007 | — | No | ModNegligence | $807 | $807 |
| 8106552 | KIAH CREEK PREPARATION PLANT Wayne, WV contractor: Powell Construction Company, Inc. | Mar 2010 | — | Yes | LowNegligence | $687 | $687 |
| 8103207 | Aracoma Alma Mine #1 Logan, WV contractor: Powell Construction Company, Inc. | Jan 2010 | — | Yes | ModNegligence | $687 | $687 |
| 8106375 | AFFINITY MINE Raleigh, WV contractor: Powell Construction Company, Inc. | Sep 2011 | — | No | ModNegligence | $585 | $585 |
| 9583389 | LONGVIEW MINE Barbour, WV contractor: Powell Construction Company, Inc. | Feb 2023 | — | Yes | LowNegligence | $558 | $558 |
| 7272506 | Beckley Pocahontas Plant Raleigh, WV contractor: Powell Construction Company, Inc. | Nov 2007 | — | No | ModNegligence | $540 | $540 |
| 8136635 | Liberty Processing Boone, WV contractor: Powell Construction Company, Inc. | Nov 2011 | — | No | ModNegligence | $499 | $499 |
| 8101276 | Affinity Preparation Plant Raleigh, WV contractor: Powell Construction Company, Inc. | Mar 2010 | — | No | NoNegligence | $460 | $100 |
| 7272745 | Beckley Pocahontas Plant Raleigh, WV contractor: Powell Construction Company, Inc. | Apr 2008 | — | No | ModNegligence | $460 | $460 |
| 8116557 | Rum Creek Preparation Plant Logan, WV contractor: Powell Construction Company, Inc. | Feb 2011 | — | No | ModNegligence | $425 | $350 |
| 8116555 | Rum Creek Preparation Plant Logan, WV contractor: Powell Construction Company, Inc. | Feb 2011 | — | No | ModNegligence | $425 | $350 |
| 8116553 | Rum Creek Preparation Plant Logan, WV contractor: Powell Construction Company, Inc. | Feb 2011 | — | No | ModNegligence | $425 | $350 |
| 8136674 | NORTH EAGLE MINE Boone, WV contractor: Powell Construction Company, Inc. | Apr 2013 | — | No | ModNegligence | $392 | $392 |
| 9580143 | LONGVIEW MINE Barbour, WV contractor: Powell Construction Company, Inc. | Aug 2022 | — | Yes | ModNegligence | $378 | $378 |
| 9582561 | LONGVIEW MINE Barbour, WV contractor: Powell Construction Company, Inc. | Jul 2022 | — | Yes | ModNegligence | $376 | $376 |
| 8115255 | Rum Creek Preparation Plant Logan, WV contractor: Powell Construction Company, Inc. | Sep 2010 | — | Yes | LowNegligence | $362 | $362 |
| 9580144 | LONGVIEW MINE Barbour, WV contractor: Powell Construction Company, Inc. | Aug 2022 | — | Yes | ModNegligence | $349 | $349 |
| 9581819 | LONGVIEW MINE Barbour, WV contractor: Powell Construction Company, Inc. | Aug 2023 | — | No | ModNegligence | $318 | $318 |
| 8106553 | KIAH CREEK PREPARATION PLANT Wayne, WV contractor: Powell Construction Company, Inc. | Mar 2010 | — | No | NoNegligence | $308 | $250 |
| 8106550 | KIAH CREEK PREPARATION PLANT Wayne, WV contractor: Powell Construction Company, Inc. | Mar 2010 | — | Yes | LowNegligence | $308 | $308 |
| 7197641 | Liberty Processing Boone, WV contractor: Powell Construction Company, Inc. | Dec 2000 | — | Yes | ModNegligence | $281 | $281 |
| 8080287 | Homer III Processing Boone, WV contractor: Powell Construction Company, Inc. | Feb 2009 | — | No | ModNegligence | $243 | $243 |
| 7188669 | Rum Creek Preparation Plant Logan, WV contractor: Powell Construction Company, Inc. | Jun 2000 | — | Yes | ModNegligence | $242 | $242 |
| 7258334 | BECKLEY POCAHONTAS MINE Raleigh, WV contractor: Powell Construction Company, Inc. | May 2007 | — | No | ModNegligence | $224 | $224 |
| 9411701 | Amrize Millville Quarry Jefferson, WV contractor: Powell Construction Company, Inc. | Feb 2018 | — | No | ModNegligence | $208 | $208 |
| 7170652 | Pond Fork Processing Boone, WV contractor: Powell Construction Company, Inc. | May 2001 | — | Yes | ModNegligence | $196 | $196 |
| 7170651 | Pond Fork Processing Boone, WV contractor: Powell Construction Company, Inc. | May 2001 | — | Yes | ModNegligence | $196 | $196 |
| 9016594 | Kepler No. 1 Prep Plant Wyoming, WV contractor: Powell Construction Company, Inc. | Jun 2014 | — | No | ModNegligence | $190 | $190 |
| 7113635 | Leer Prep Plant Taylor, WV contractor: Powell Construction Company, Inc. | Apr 2012 | — | No | ModNegligence | $190 | $190 |
| 7113634 | Leer Prep Plant Taylor, WV contractor: Powell Construction Company, Inc. | Apr 2012 | — | No | ModNegligence | $190 | $190 |
| 7116511 | Leer Prep Plant Taylor, WV contractor: Powell Construction Company, Inc. | May 2012 | — | No | ModNegligence | $176 | $176 |
| 9583391 | LONGVIEW MINE Barbour, WV contractor: Powell Construction Company, Inc. | Feb 2023 | — | Yes | LowNegligence | $167 | $167 |
| 7250102 | Justice #1 Boone, WV contractor: Powell Construction Company, Inc. | Dec 2006 | — | Yes | ModNegligence | $164 | $164 |
| 8116960 | Zigmond Processing Logan, WV contractor: Powell Construction Company, Inc. | Sep 2010 | — | No | ModNegligence | $162 | $162 |
| 8118369 | KIAH CREEK PREPARATION PLANT Wayne, WV contractor: Powell Construction Company, Inc. | Aug 2010 | — | No | ModNegligence | $162 | $162 |
| 8104552 | Mammoth Coal Processing Pl & Riv Tipple Kanawha, WV contractor: Powell Construction Company, Inc. | Jul 2010 | — | No | ModNegligence | $162 | $162 |
| 8104551 | Mammoth Coal Processing Pl & Riv Tipple Kanawha, WV contractor: Powell Construction Company, Inc. | Jul 2010 | — | No | ModNegligence | $162 | $162 |
| 9580146 | LONGVIEW MINE Barbour, WV contractor: Powell Construction Company, Inc. | Aug 2022 | — | Yes | LowNegligence | $155 | $155 |
| 4191845 | Justice #1 Boone, WV contractor: Powell Construction Company, Inc. | Sep 2003 | — | Yes | ModNegligence | $154 | $154 |
| 9016659 | Kepler No. 1 Prep Plant Wyoming, WV contractor: Powell Construction Company, Inc. | Dec 2014 | — | No | ModNegligence | $150 | $150 |
| 7258333 | BECKLEY POCAHONTAS MINE Raleigh, WV contractor: Powell Construction Company, Inc. | May 2007 | — | No | ModNegligence | $150 | $150 |
| 7193106 | Rum Creek Preparation Plant Logan, WV contractor: Powell Construction Company, Inc. | Apr 2000 | — | Yes | LowNegligence | $150 | $150 |
| 7250140 | Justice #1 Boone, WV contractor: Powell Construction Company, Inc. | Mar 2007 | — | Yes | ModNegligence | $144 | $144 |
| 7229743 | Superior Preparation Plant Logan, WV contractor: Powell Construction Company, Inc. | Mar 2004 | — | Yes | ModNegligence | $144 | $144 |
| 9586221 | LONGVIEW MINE Barbour, WV contractor: Powell Construction Company, Inc. | Jun 2023 | — | No | LowNegligence | $143 | $143 |
| 9583390 | LONGVIEW MINE Barbour, WV contractor: Powell Construction Company, Inc. | Feb 2023 | — | No | LowNegligence | $143 | $143 |
| 9259143 | LONGVIEW MINE Barbour, WV contractor: Powell Construction Company, Inc. | Oct 2022 | — | No | LowNegligence | $143 | $143 |
| 7170634 | Toms Fork Prep Plant and Loadout Kanawha, WV contractor: Powell Construction Company, Inc. | Nov 2000 | — | Yes | ModNegligence | $140 | $140 |
| 7184556 | Marfork Processing Raleigh, WV contractor: Powell Construction Company, Inc. | Sep 2000 | — | Yes | ModNegligence | $140 | $140 |
| 7188673 | Rum Creek Preparation Plant Logan, WV contractor: Powell Construction Company, Inc. | Jul 2000 | — | Yes | ModNegligence | $140 | $140 |
| 9244907 | South Hollow Prep Plant and Loadout Kanawha, WV contractor: Powell Construction Company, Inc. | Feb 2020 | — | No | ModNegligence | $123 | $123 |
| 7212379 | Pond Fork Processing Boone, WV contractor: Powell Construction Company, Inc. | Feb 2003 | — | Yes | ModNegligence | $122 | $122 |
| 7212377 | Pond Fork Processing Boone, WV contractor: Powell Construction Company, Inc. | Feb 2003 | — | Yes | ModNegligence | $122 | $122 |
| 7212376 | Pond Fork Processing Boone, WV contractor: Powell Construction Company, Inc. | Feb 2003 | — | Yes | ModNegligence | $122 | $122 |
| 7212374 | Pond Fork Processing Boone, WV contractor: Powell Construction Company, Inc. | Feb 2003 | — | Yes | ModNegligence | $122 | $122 |
| 9179848 | Elk Creek Plant Logan, WV contractor: Powell Construction Company, Inc. | Jan 2019 | — | No | LowNegligence | $121 | $121 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for POWELL CONSTRUCTION COMPANY. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for POWELL CONSTRUCTION COMPANY. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for POWELL CONSTRUCTION COMPANY. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for POWELL CONSTRUCTION COMPANY. Verify directly with UVA Corporate Prosecution Registry →
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 1984-10-17 | Planned | 4 | — | $0 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Part of a larger organization
POWELL CONSTRUCTION COMPANY is one of 50 establishments rolled up under the parent organization Powell Construction Company, Inc.
Federal enforcement records on this page represent activity at this specific establishment only. The full enforcement footprint of Powell Construction Company, Inc across all 50 of its tracked locations is viewable on the parent profile.
Other locations under this parent
Other establishments operated by Powell Construction Company, Inc, ordered by federal enforcement volume:
- POWELL CONSTRUCTION COMPANY INCLOUDON, TN — 1 federal enforcement record
- POWELL CONSTRUCTION COMPANY INCKNOXVILLE, TN — 1 federal enforcement record
- POWELL CONSTRUCTION COMPANY INCKINGSPORT, TN — 1 federal enforcement record
- POWELL CONSTRUCTION COMPANY INCELIZABETHTON, TN — 1 federal enforcement record
- POWELL CONSTRUCTION COMPANY INCKNOXVILLE, TN — 1 federal enforcement record
- POWELL CONSTRUCTION COMPANY INCJOHNSON CITY, TN — 1 federal enforcement record
- POWELL CONSTRUCTION COMPANY INCELIZABETHTON, TN — 1 federal enforcement record
- POWELL CONSTRUCTION COMPANY INCJOHNSON CITY, TN — 1 federal enforcement record
- POWELL CONSTRUCTION COMPANY INCMOUNT CARMEL, TN — 1 federal enforcement record
- POWELL CONSTRUCTION COMPANY INCNASHVILLE, TN — 1 federal enforcement record
Related searches
- All Powell Construction Company, Inc locationsParent rollup
- Employers in WVState-wide enforcement data
About this data
This profile aggregates federal enforcement records on POWELL CONSTRUCTION COMPANY from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code. This establishment resolves to the parent rollup Powell Construction Company, Inc, which operates 50 establishments in our dataset.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is POWELL CONSTRUCTION COMPANY's OSHA violation history?
- POWELL CONSTRUCTION COMPANY has 1 OSHA inspection on record with 4 violations and $0 in total penalties.