Establishment profile
PACIFICORP
825 NE MULTNOMAH STE 1560, PORTLAND, OR, 97232
Operated by PacifiCorp · 1 of 72 establishments
221122 — Electric Power Distribution
EIN 930246090
Summary
PACIFICORP has accumulated 0 OSHA violations across 3 inspections over 25 years of recorded history.
The most recent federal enforcement activity was recorded 17 years ago.
Federal records were found in 3 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
PACIFICORP appears in OSHA workplace safety, OFLC visa and labor certification, and UVA Corporate Prosecution Registry records only. No matching records were found in WHD wage enforcement, MSHA mine safety, EPA environmental compliance, NLRB labor relations, FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
Peer comparison
Fewer violations than most other employers in NAICS 2211 within OR. Peer group: 205 employers. This establishment has 0 OSHA violations; peer median is 1.
Safety self-report (OSHA 300A)
Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.
Reported for 59 average annual employees at this establishment.
Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for PACIFICORP. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 17+ years. Most recent activity: 17 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for PACIFICORP. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
No MSHA mine safety violations on file for PACIFICORP. Verify directly with Mine Safety and Health Administration →
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for PACIFICORP. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC)
Office of Foreign Labor Certification — labor condition applications for H-1B, H-2A, H-2B visa programs. Wage ratio = offered / prevailing wage.
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for PACIFICORP. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
First case: 2014-12-22. Most recent: 2014-12-22. Source: UVA Corporate Prosecution Registry — federal pleas, DPAs, and NPAs.
Federal contracts
This location
Consolidated across all USAspending recipient entities under this corporate parent — not attributable to this single location.
- Department of DefenseELECTRICAL SERVICEcontract · Last action 2018-07-31$13,602,697
- Department of the TreasuryIGF::OT::IGF OTHER FUNCTIONS - ELECTRIC POWER FROM UTILITY. DAcontract · Last action 2021-02-05$4,714,947
- Department of DefenseELECTRICAL SERVICEScontract · Last action 2018-07-31$4,332,422
- Department of the TreasuryELECTRIC SERVICE / UTILITYcontract · Last action 2012-06-21$4,087,482
- Department of the TreasuryIGF::OT::IGF FOR OTHER FUNCTIONS - UTILITY SERVICEScontract · Last action 2023-03-28$3,840,032
- Department of the TreasuryUTILITY POWER/ ELECTRICAL SERVICE - FISCAL YEAR 2023 OGDEN SERVICE CENTER MAIN BUILDING, UTAHcontract · Last action 2026-04-02$3,408,845
- General Services AdministrationTHIS FORM 300 PURCHASE ORDER GS-08P-14-JE-C-0019 IS BEING PROCESSED FOR PAYMENT AND OBLIGATION PURPOSES ONLY. IT IS TO PROVIDE FY 2014 FUNDING FOR ELECTRIC UTILITY METERING SERVICE FOR THE FEDERAL BUILDING AND COURTHOUSE, 351 (SOUTH) WEST TEMPLE, SALT LAKE CITY, UTAH 84101. THIS ORDER REPRESENTS A 10 YEAR ACTION FROM MARCH 20, 2014 THROUGH MARCH 19, 2024. THE CURRENT PERIOD OF PERFORMANCE AND FUNDING OBLIGATION IS FROM MARCH 20, 2014 THROUGH MARCH 19, 2015 AND IS FOR PAYMENT AND OBLIGATION PURPOSES ONLY. AS THE CONTRACTOR IS A REGULATED UTILITY AND THE ONLY SOURCE FOR UTILITY SERVICE AVAILABLE, THE RATE IS CONSIDERED TO BE FAIR AND REASONABLE IGF::OT::IGFcontract · Last action 2020-03-30$3,300,000
- General Services AdministrationTO ESTABLISH A NEW 10 YEAR ELECTRIC UTILITY SUPPORT CONTRACT FOR 125 S STATE ST, SALT LAKE CITY, UT. BLDG#: UT0032ZZcontract · Last action 2020-03-30$2,425,000
- General Services AdministrationUTILITY SERVICES WATER AND SEWER SERVICES CONTRACT PERIOD FROM 10/01/2007 TO 9/30/2017.contract · Last action 2017-11-20$1,771,076
- Department of EnergyTAS::89 0219::TAS FE, RMOTC, WY - ELECTRICAL SERVICE TO NPR#3 FIELDcontract · Last action 2013-06-10$1,478,821
- General Services AdministrationUTILITY SERVICES. WATER AND SEWER SERVICE CONTRACT PERIOD FROM 10/01/2007 TO 09/30/2017.contract · Last action 2016-10-25$1,273,800
- Department of EnergyIGF::OT::IGF ELECTRICAL UTILITY SERVICES FOR THE NAVAL PETROLEUM RESERVE #3 IN WYOMING. FE-RMTOCcontract · Last action 2015-03-09$787,309
- Department of Veterans AffairsELECTRIC SERVICEScontract · Last action 2007-10-01$700,755
- Department of Veterans AffairsELECTRICITY UTILITY SERVICE FOR THE ROSEBURG VAMC 12 MONTHScontract · Last action 2020-08-20$689,875
- General Services AdministrationESTABLISH NEW 10 YEAR CONTRACT FOR ELECTRICAL SERVICE AT 100 E. B. STREET, CASPER, WY 82601-1962contract · Last action 2017-07-24$680,158
- Department of EnergyFE WY NPR3 ELECTRICAL POWERcontract · Last action 2010-09-07$663,866
- Department of Health and Human ServicesWSSU UTILITY SERVICE - BASE YEARcontract · Last action 2025-12-31$605,000
- Department of EnergyELECTRICAL POWERcontract · Last action 2009-09-17$600,000
- Department of the InteriorPOWER SERVICE FOR KLAMATH FACILITIEScontract · Last action 2015-07-23$560,054
- Department of the InteriorPROVIDE ELECTRICAL UTILITY SERVICE FOR MULTIPLE LOCATIONS IN KLAMATH FALLS, OREGON TO INCLUDE KLAMATH BASIN AREA OFFICES, PUMPING PLANTS, AND A CANAL STRUCTUREScontract · Last action 2026-01-20$506,874
- Department of the InteriorELECTRIC UTILITY SERVICE FOR COLUMBIA CASCADES AREA OFFICE.contract · Last action 2026-02-02$499,665
- Department of the TreasuryIGF::OT::IGF FOR OTHER FUNCTIONS - BRIDGE CONTRACT FOR UTILITY SERVICES: ELECTRICALcontract · Last action 2020-07-24$471,058
- Department of DefensePROVIDE ELECTRICAL POWER SERVICE (08-187contract · Last action 2018-02-14$442,487
- Department of Health and Human ServicesIGF::OT::IGF:: PACIFIC POWER ELECTRIC SERVICES FOR WSSUcontract · Last action 2023-08-10$436,000
- General Services AdministrationUTILITY CONTRACT - ELECTRICAL SERVICEScontract · Last action 2013-12-11$400,000
- Department of DefenseUTILITIES CONTRACT TO CONNECT UTILITIES SERVICES TO THE MINTO FISH LADDER FACILITYcontract · Last action 2011-08-10$387,328
- General Services AdministrationPROVIDE ELECTRICAL SERVICE TO 111 S. WOLCOTT ST, CASPER, WYcontract · Last action 2020-03-31$380,677
- General Services AdministrationTHIS ORDER REPRESENTS A NEW 10 YEAR ACTION FROM OCTOBER 01, 2016 THROUGH SEPTEMBER 30, 2026. IGF::OT::IGFcontract · Last action 2020-03-31$312,881
- General Services AdministrationIGF::OT::IGF OTHER FUNCTIONS - NEW CONTRACT ELECTRIC UTILITY SERVICE GUS SOLOMON FB&911 FB - PORTLAND, ORcontract · Last action 2017-07-28$288,554
- Department of the InteriorELECTRICAL SERVICES FOR KLAMATH BASIN AREA OFFICE (KBAO)contract · Last action 2026-02-10$258,000
- General Services AdministrationTHIS ORDER REPRESENTS A 10 YEAR ACTION FROM OCTOBER 01, 2017 THROUGH SEPTEMBER 30, 2027. THE CURRENT PERIOD OF PERFORMANCE AND FUNDING OBLIGATION IS FROM OCTOBER 01, 2017 THROUGH SEPTEMBER 30, 2018 AND IS FOR PAYMENT AND OBLIGATION PURPOSES ONLY. THIS IS FOR THE JAMES V. HANSE BUILDING, 324 25TH STREET, OGDEN, UTAH BLDG#: UT0035ZZcontract · Last action 2020-03-30$254,000
- General Services AdministrationELECTRICAL SERVICES FOR FOREST SERVIOE BUILDING, 507 25TH STREET OGDEN UTAH - CONTRACT PERIOD 10/01/07 - 9/30/17contract · Last action 2016-11-01$248,000
- Department of the InteriorIGF::CT::IGF ELECTRICAL SERVICES - KLAMATH BASIN AREA OFFICE (KBAO)contract · Last action 2020-04-22$245,393
- Department of the InteriorIGF::CT::IGF POWER UTILITY FOR KBAOcontract · Last action 2018-10-12$241,918
- General Services AdministrationELECTRICAL SERVICEScontract · Last action 2011-02-03$226,589
- Department of the InteriorIGF::OT::IGF KLAMATH BASIN AREA OFFICE ELECTRICAL UTILITY SERVICEcontract · Last action 2017-08-31$211,795
- General Services AdministrationIGF::OT::IGF OTHER FUNCTIONS. ELECTRIC UTILITY SERVICES, 911 BUILDING, PACIFIC POWERcontract · Last action 2016-07-28$205,444
- Department of the InteriorPACIFIC POWER UTILITY SERVICE FOR KLAMATH BASIN AREA OFFICE (KBAO)contract · Last action 2021-01-12$201,008
- General Services AdministrationTHIS ORDER REPRESENTS A 10 YEAR ACTION FROM OCTOBER 01, 2017 THROUGH SEPTEMBER 30, 2027. THE CURRENT PERIOD OF PERFORMANCE AND FUNDING OBLIGATION IS FROM OCTOBER 01, 2017 THROUGH SEPTEMBER 30, 2018 AND IS FOR PAYMENT AND OBLIGATION PURPOSES ONLY. IGF::OT::IGFcontract · Last action 2020-03-30$200,000
- Department of the InteriorIGF::OT::IGF ELECTRICAL UTILITY SERVICES, RIRIE DAM LOCATIONS: FIELD STATION, JUNIPER LAUNCH, OPPOSITE DUMP STATION, SAND CREEK, WILLOW CREEK, AND RIRIE FLOOD CONTROLcontract · Last action 2025-04-30$180,600
- Department of the InteriorIGF::OT::IGF PURCHASE ELECTRIC POWER FOR KLAMATH BASIN AREA OFFICE AND PUMPING STATIONS FROM UTILITY COMPANY PACIFIC CORP.contract · Last action 2017-03-15$166,850
- Department of DefenseELECTRIC SERVICE, COOS BAY ORcontract · Last action 2023-08-17$131,388
- Department of DefenseIGF::OT::IGF FSC: 7777 NAME: INTERCONNECTIO PART NUMBER:contract · Last action 2015-03-25$130,000
- Department of the InteriorIGF::OT::IGF PACIFIC POWERcontract · Last action 2015-01-30$127,953
- Department of DefenseMARKER BALL REMOVALcontract · Last action 2008-07-15$120,095
- Department of the InteriorELECTRIC SERVICE.contract · Last action 2014-02-14$118,989
- General Services AdministrationIGF::OT::IGF OTHER FUNCTIONS. ELECTRICAL UTILITY SERVICES, GUS SOLOMON COURTHOUSE, PACIFICORP,PACIFIC POWERcontract · Last action 2015-12-29$115,000
- Department of the InteriorIGF::OT::IGF:: TO SUPPLY POWER TO KBAO AREA OFFICE.contract · Last action 2016-06-09$112,697
- General Services AdministrationIGF::OT::IGF OTHER FUNCTIONS. ELECTRIC UTILITY SERVICES, GUS SOLOMON BUILDING, PACIFIC POWERcontract · Last action 2016-05-26$112,437
- Department of the InteriorUTILITIES - ELECTRICITY SERVICEcontract · Last action 2024-09-09$104,536
Federal contract dollars to this establishment. Primary NAICS: 221122 - ELECTRIC POWER DISTRIBUTION. Last action: 2026-04-13. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2009-05-13 | Planned | 0 | — | $0 | |
| 2004-05-13 | Planned | 0 | — | $0 | |
| 2001-04-26 | Planned | 0 | — | $0 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Part of a larger organization
PACIFICORP is one of 72 establishments rolled up under the parent organization PacifiCorp.
Federal enforcement records on this page represent activity at this specific establishment only. The full enforcement footprint of PacifiCorp across all 72 of its tracked locations is viewable on the parent profile.
Other employers in this industry and state
Other employers in electric power distribution within OR, ordered by federal enforcement volume:
- PORTLAND GENERAL ELECTRIC COMPANYLAKE OSWEGO — 2 federal enforcement records
- CONSUMERS POWER INCLEBANON — 2 federal enforcement records
- PORTLAND GENERAL ELECTRIC COMPANYWILSONVILLE — 2 federal enforcement records
- CONSUMERS POWER INCPHILOMATH — 2 federal enforcement records
- PORTLAND GENERAL ELECTRIC COMPANYALOHA — 2 federal enforcement records
- PORTLAND GENERAL ELECTRIC COMPANYTIGARD — 2 federal enforcement records
- CONSUMERS POWER INCMONROE — 2 federal enforcement records
- PORTLAND GENERAL ELECTRIC COMPANYSILVERTON — 2 federal enforcement records
- DOUGLAS ELECTRIC COOPERATIVE INCROSEBURG — 2 federal enforcement records
- AVANGRID RENEWABLES LLCWASCO — 2 federal enforcement records
Other locations under this parent
Other establishments operated by PacifiCorp, ordered by federal enforcement volume:
- PACIFICORPGLENROCK, WY — 2 federal enforcement records
- PACIFICORPGILLETTE, WY — 2 federal enforcement records
- PACIFICORPMILLS, WY — 2 federal enforcement records
- PACIFICORPPOINT OF ROCKS, WY — 2 federal enforcement records
- PACIFICORPBEND, OR — 1 federal enforcement record
- PACIFICORPASHLAND, OR — 1 federal enforcement record
- PACIFICORPINDEPENDENCE, OR — 1 federal enforcement record
- PACIFICORPMEDFORD, OR — 1 federal enforcement record
- PACIFICORPMEDFORD, OR — 1 federal enforcement record
- PACIFICORPALBANY, OR — 1 federal enforcement record
Related searches
- All PacifiCorp locationsParent rollup
- Electric Power DistributionAll employers in this industry
- Employers in ORState-wide enforcement data
- Electric Power Distribution in ORIndustry × state cross-filter
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →About this data
This profile aggregates federal enforcement records on PACIFICORP from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code. This establishment resolves to the parent rollup PacifiCorp, which operates 72 establishments in our dataset.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Frequently asked
- What is PACIFICORP's OSHA violation history?
- PACIFICORP has 3 OSHA inspections on record with 0 violations and $0 in total penalties.
- How does PACIFICORP's safety record compare to its industry?
- PACIFICORP operates in the electric power distribution industry. The industry average Total Recordable Incident Rate (TRIR) is 2.1. PACIFICORP's self-reported DART rate is 0 compared to an industry average of 1.2.