Establishment profile
NATIONAL MAINTENANCE & REPAIR, INC.
401 W HAWTHORNE AVE, HARTFORD, IL, 62048
336611 — Ship Building and Repairing
Summary
NATIONAL MAINTENANCE & REPAIR, INC. has accumulated 46 OSHA violations across 23 inspections over 33 years of recorded history, with $91,138 in total assessed penalties.
The establishment sits in the 100th percentile for violations within its industry-state peer group of 26 employers. Inspection frequency runs at the 100th percentile. The most recent enforcement activity was recorded 1 year ago.
Federal records were found in 4 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
NATIONAL MAINTENANCE & REPAIR, INC. appears in OSHA workplace safety, WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), and FMCSA motor carrier registration records only. No matching records were found in MSHA mine safety, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
65% of inspections at this establishment produced violations, with 14 inspections producing serious-or-greater violations.
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 20 distinct standards shown · 26 citations in this view · $81,633 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 5A0001 | 4 | 4 | $12,548 | Jun 1997 | May 2013 |
| 29 CFR 1915.0091 A | 2 | 1 | $8,950 | Sep 2011 | Sep 2011 |
| 29 CFR 1910.0212 A01 | 2 | 2 | $7,840 | May 2007 | Jul 2016 |
| 29 CFR 1915.0007 C02 | 2 | 1 | $1,313 | Jun 1993 | Jun 1993 |
| 29 CFR 1910.0176 B | 1 | 1 | $7,502 | Aug 2019 | Aug 2019 |
| 29 CFR 1915.0089 D01 | 1 | 1 | $6,223 | Apr 2024 | Apr 2024 |
| 29 CFR 1915.0114 B | 1 | 1 | $5,000 | May 2013 | May 2013 |
| 29 CFR 1915.0152 E01 I | 1 | 1 | $4,000 | May 1994 | May 1994 |
| 29 CFR 1915.0014 A01 | 1 | 1 | $3,750 | Jun 1993 | Jun 1993 |
| 29 CFR 1910.0179 L03 I | 1 | 1 | $2,945 | Dec 2012 | Dec 2012 |
| 29 CFR 1910.1025 C01 | 1 | 1 | $2,800 | Jul 1998 | Jul 1998 |
| 29 CFR 1910.1025 D02 | 1 | 1 | $2,800 | Jul 1998 | Jul 1998 |
| 29 CFR 1910.1025 F01 | 1 | 1 | $2,800 | Jul 1998 | Jul 1998 |
| 29 CFR 1915.0094 | 1 | 1 | $2,400 | May 1994 | May 1994 |
| 29 CFR 1915.0051 D01 | 1 | 1 | $2,400 | May 1994 | May 1994 |
| 29 CFR 1915.0073 D | 1 | 1 | $2,000 | Dec 2008 | Dec 2008 |
| 29 CFR 1910.1200 F05 | 1 | 1 | $1,768 | Dec 2012 | Dec 2012 |
| 29 CFR 1910.0151 B | 1 | 1 | $1,575 | Jun 1997 | Jun 1997 |
| 29 CFR 1915.0134 B | 1 | 1 | $1,510 | Sep 2011 | Sep 2011 |
| 29 CFR 1915.0132 D | 1 | 1 | $1,510 | Sep 2011 | Sep 2011 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Worse on violations than nearly every other employer in NAICS 3366 within IL. Peer group: 26 employers. This establishment has 46 OSHA violations; peer median is 4.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for NATIONAL MAINTENANCE & REPAIR, INC.. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
Self-reported events under 29 CFR 1904.39 (24-hour notification of hospitalization, amputation, or loss of an eye) · Apr 2016 – Feb 2019
Most frequent event: Caught in running equipment or machinery during regular operation
Source: OSHA Severe Injury Reports (federal OSHA only; state-plan states like California, Oregon, and Washington maintain their own programs and do not consistently report into this feed).
Severe injury reports — events
Each row is a hospitalization, amputation, or eye-loss event the employer self-reported to OSHA under 29 CFR 1904.39. Narratives are written by the reporting employer.
| Date | Event | Body part | Outcome | |
|---|---|---|---|---|
| Feb 21, 2019 | Struck by object falling from vehicle or machinery-other than vehicle part | Leg(s), unspecified | Hospitalized | |
| Feb 8, 2019 | Other fall to lower level 11 to 15 feet | Brain | Hospitalized | |
| Jan 30, 2019 | Compressed or pinched by shifting objects or equipment | Fingertip(s) | Amputation | |
| Apr 12, 2016 | Caught in running equipment or machinery during regular operation | Hand(s), n.e.c. | Amputation |
Source: OSHA Severe Injury Reports. Federal-OSHA jurisdiction only by default; some state-plan programs report voluntarily.
OSHA accident events
Accidents, fatalities, and catastrophes documented during OSHA inspections at this employer. Each entry links to the inspection that recorded it.
| Date | Event | Injuries | Hospitalized | Fatalities | |
|---|---|---|---|---|---|
| Feb 21, 2019 | Crane,Fracture,Hoist,Leg,Struck By | 1 | 1 | — | |
| Feb 8, 2019 | Air Pressure,Back,Boat,Brain,Contusion,Fall,Fracture,Rib,Shipyard,Tank,Vertebra | 1 | 1 | — | |
| Nov 15, 2012 | Chest,Equipment Failure,Falling Object,Hoist,Rigging,Ship,Shipyard,Struck ByFatality | 1 | — | 1 | |
| Dec 5, 2000 | LOCKOUT,CRUSHED,MECH MALFUNCTIONFatality | 1 | — | 1 |
Source: OSHA accident investigations. Narratives are recorded by the inspecting officer and may be truncated.
Activity timeline
Most recent federal enforcement activity recorded 1 year ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
Department of Labor Wage & Hour Division — minimum-wage, overtime, child-labor, FMLA, and prevailing-wage enforcement.
Wage and hour breakdown by law
Per-statute totals across all closed DOL Wage & Hour cases against this employer. Backwages reflect amounts the agency assessed; civil penalty is the separate fine where applicable. Some acts (Davis-Bacon, SCA, CWHSSA, H-2B, CCPA) don't carry a civil penalty field in DOL's data. 1 statute · 12 violations · $7,878 in backwages
| Statute | Period | Cases | Violations | Workers | Backwages | Civil penalty |
|---|---|---|---|---|---|---|
| Service Contract Act (federal services) | Jul 2020 | 1 | 12 | 11 | $7,878 | — |
Source: DOL WHD enforcement database, aggregated per statute. Lifetime totals. A case can cite multiple statutes — so the total here may exceed the case count in the table above.
Wage and hour cases
Closed DOL Wage & Hour Division cases (FLSA, FMLA, H-2B, MSPA, and related statutes). Backwages reflect amounts the agency assessed; civil penalty (CMP) is a separate fine levied on top, where the statute provides for one (FLSA / H-1B / H-2A / MSPA / FMLA / EPPA / FLSA Child Labor; other acts have no CMP column in DOL’s data). The Statutes column lists which laws each case cited. 1 case · 12 violations · $7,878 in backwages · 11 workers affected
| Case period | Industry | Statutes | Violations | Workers | Backwages | Civil penalty |
|---|---|---|---|---|---|---|
| Jul 2018 – Jul 2020 | All Other Specialty Trade Contractors | SCA | 12 | 11 | $7,878 | — |
Source: DOL WHD enforcement database. Cases shown reflect those the agency has closed and made public. A violation count is the agency’s tally of cited violations (one violation can affect many workers); the workers column counts distinct employees the agency found to be affected.
Mine safety (MSHA)
No MSHA mine safety violations on file for NATIONAL MAINTENANCE & REPAIR, INC.. Verify directly with Mine Safety and Health Administration →
Labor relations (NLRB)
Company-level in IL — for NATIONAL MAINTENANCE & REPAIR, INC., not this location alone
National Labor Relations Board — unfair labor practice charges and union representation cases. The NLRB records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other NATIONAL MAINTENANCE & REPAIR, INC. locations in the same state.
NLRB cases
National Labor Relations Board cases involving this employer. Includes unfair labor practice (ULP) filings and representation election proceedings. NLRB enforcement is process-driven; no per-case monetary penalty is assessed (remedies are case-by-case backpay orders, posting requirements, election re-runs, etc.). 8 cases · 8 ULP
| Case number | Type | Filed | Closed | Status | Region |
|---|---|---|---|---|---|
| 14-CA-246252 | Unfair labor practice | Aug 2019 | Aug 2019 | Closed | Region 14, Saint Louis, Missouri |
| 14-CA-242746 | Unfair labor practice | Jun 2019 | Jul 2019 | Closed | Region 14, Saint Louis, Missouri |
| 14-CA-136602 | Unfair labor practice | Sep 2014 | Nov 2014 | Closed | Region 14, Saint Louis, Missouri |
| 14-CA-131414 | Unfair labor practice | Jun 2014 | Sep 2014 | Closed | Region 14, Saint Louis, Missouri |
| 14-CA-122159 | Unfair labor practice | Feb 2014 | Feb 2014 | Closed | Region 14, Saint Louis, Missouri |
| 14-CA-029774 | Unfair labor practice | Jun 2009 | Jul 2009 | Closed | Region 14, Saint Louis, Missouri |
| 14-CA-029234 | Unfair labor practice | Feb 2008 | Feb 2008 | Closed | Region 14, Saint Louis, Missouri |
| 14-CA-029056 | Unfair labor practice | Aug 2007 | Oct 2007 | Closed | Region 14, Saint Louis, Missouri |
Source: NLRB case files. Rows shown are those the agency has published. Region numbers (1–31) correspond to NLRB's geographic offices.
Visa & labor certification (OFLC) — historical
Office of Foreign Labor Certification — labor condition applications for H-1B, H-2A, H-2B visa programs. Wage ratio = offered / prevailing wage. Historical data only: DOL ended OFLC Performance Data Disclosure publication in 2026, so the figures above reflect filings through the last ingested cycle and are not being refreshed. Treat as a historical snapshot, not a current signal.
Environmental compliance (EPA)
EPA Enforcement and Compliance History — Clean Air Act, Clean Water Act, RCRA, Safe Drinking Water Act. Status: Violation Identified.
EPA-registered facilities
Every EPA ECHO facility associated with this employer, sorted most-significant first. Each row links to EPA’s Detailed Facility Report for the source-of-truth record. Permits column lists active programs (Air = Clean Air Act, Water = Clean Water Act, RCRA = hazardous waste, TRI = Toxics Release Inventory reporting). 1 facility.
| Facility | Permits | Status | Inspections | Formal actions | Penalties | Last inspected | ECHO |
|---|---|---|---|---|---|---|---|
NATIONAL MAINTENANCE AND REPAIR FOOT OF SEVENTH ST · HARTFORD, IL, 62048 | AirWaterRCRA | Violation Identified QNCR 9 | 4 | 0 | — | Aug 2024 | View → |
Source: EPA ECHO (Enforcement and Compliance History Online). Compliance status follows EPA’s own labels (“Sig Violation” = significant noncompliance; QNCR = quarters of noncompliance over the recent reporting window). Inactive facilities (struck through) retain historical enforcement records even after operations ceased.
Motor carrier safety (FMCSA)
Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for NATIONAL MAINTENANCE & REPAIR, INC.. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
Consolidated across all USAspending recipient entities under this corporate parent — not attributable to this single location.
- Department of DefenseMDC PROJECT 3168-EQUIP FOR CRUMP REPOWERcontract · Last action 2020-12-17$2,650,771
- Department of DefenseFY23 DREDGE POTTER DRY DOCKcontract · Last action 2025-02-06$1,135,124
- Department of DefenseMASTERSHIP AGREEMENTcontract · Last action 2013-05-16$1,036,940
- Department of DefenseIGF::OT::IGF MASTERSHIP AGREEMENTcontract · Last action 2015-12-03$1,010,837
- Department of DefenseFY18 DRY DOCK MAINTENANCE AND REPAIRScontract · Last action 2018-07-05$994,944
- Department of DefenseIGF::OT::IGF MASTERSHIP AGREEMENT DRY DOCKING NATIONAL MAINTENANCE ST. LOUIS DREDGE POTTER, ST. LOUIS, MO 63118contract · Last action 2015-07-01$937,745
- Department of DefenseFY25 DREDGE POTTER DRYDOCK INSPECTIONScontract · Last action 2025-02-12$740,718
- Department of DefenseDRY DOCKING OF DREDGE POTTERcontract · Last action 2020-05-07$652,903
- Department of DefenseIGF::OT::IGF JUMBO REPOWER INSTALL OF COMPONENTScontract · Last action 2019-04-30$607,911
- Department of DefenseIGF::OT::IGF DRY DOCK 3 DECK BARGES - LITTLE ROCK/SWLcontract · Last action 2017-09-26$595,356
- Department of DefenseDREDGE GOETZ FLEET DRY DOCK INSPECTION, REPAIR, AND MAINTENANCEcontract · Last action 2023-04-26$571,007
- Department of DefenseTASK ORDER 0023contract · Last action 2012-08-13$528,765
- Department of DefenseIGF::OT::IGF REPOWER OF NWK JUMBOcontract · Last action 2017-09-12$504,761
- Department of DefenseKIMMSWICKcontract · Last action 2022-09-14$433,693
- Department of DefenseMASTERSHIP AGREEMENTcontract · Last action 2009-04-02$407,143
- Department of DefenseDRY DOCK DREDGE POTTERcontract · Last action 2021-05-25$305,001
- Department of DefenseMASTERSHIP AGREEMENT, PHYSICAL SUPPORT & SERV BASE, US ARMY ENGR DIST ST LOUIS, FOOT OF ARSENAL STREET, ST LOUIS MO - TASK ORDER 0009contract · Last action 2009-05-08$299,317
- Department of DefenseMFI STELLITE POWER ASSY. 121X1338contract · Last action 2016-02-17$287,494
- Department of DefenseIGF::OT::IGF KIMMSWICK DRYDOCK AND INSPECTIONcontract · Last action 2018-07-27$265,727
- Department of DefenseDRY DOCKING PATHFINDERcontract · Last action 2020-10-16$254,092
- Department of DefenseUPPER ASSEMBLY 24-47 (GE POWER PACKS)contract · Last action 2015-07-09$248,311
- Department of DefenseM/V BRANDY FITZHUGH DRYDOCK REPAIRScontract · Last action 2022-09-19$242,339
- Department of DefenseURGENT DRY DOCK&REPAIR OF MV BETTENDORF, IN SUPPORT OF THE US ARMY CORPS OF ENGINEERD, ROCK ISLAND DISTRICT, MISSISSIPPI RIVER PROJECT OFFICEcontract · Last action 2018-05-03$222,388
- Department of DefenseANCHOR 6 DRY-DOCKINGcontract · Last action 2020-05-18$213,585
- Department of DefenseDRY DOCKINGcontract · Last action 2019-08-15$212,450
- Department of DefenseIGF::OT::IGF PRAIRIE DU ROCHER DRY DOCKcontract · Last action 2017-03-07$180,365
- Department of DefenseCE-407 FUEL BARGE DRY DOCKcontract · Last action 2021-05-25$165,737
- Department of DefenseTASK ORDER 0007contract · Last action 2013-02-08$163,040
- Department of DefenseIGF::OT::IGF DRY DOCK FOR KIMMSWICKcontract · Last action 2017-05-03$151,042
- Department of DefenseIGF::OT::IGF CE64 FUEL BARGE MODIFICATIONScontract · Last action 2018-06-07$143,196
- Department of DefenseEMERGENCY CONTRACTcontract · Last action 2020-10-23$138,170
- Department of DefenseIGF::OT::IGF VESSEL REPAIR TO THE MV PRAIRIE DU ROCHERcontract · Last action 2017-05-12$132,288
- Department of DefenseMASTERSHIP AGREEMENTcontract · Last action 2012-09-19$107,600
- Department of DefensePATHFINDER REPAIR CRITICAL SPARE COMPONEcontract · Last action 2021-03-12$105,254
- Department of DefenseTASK ORDER 0024contract · Last action 2012-03-06$98,626
- Department of DefenseMV CREVE COEUR HYDRAULIC CYLINDER REPAIRcontract · Last action 2009-07-10$96,953
- Department of DefenseIGF::OT::IGF BARGE 56 - STOREcontract · Last action 2018-04-19$92,918
- Department of DefenseEMERGENCY - MV BETTENDORF DRY DOCK - INSPECT - REPAIRcontract · Last action 2025-02-26$88,780
- Department of DefensePROVIDE EQUIPMENT, AND MATERIALS TO COMPLETE INSPECTION ON VESSEL FOR MASTERSHIP AGREEMENT 0015.contract · Last action 2010-05-04$72,869
- Department of DefenseMASTERSHIP AGREEMENTcontract · Last action 2012-06-14$66,092
- Department of DefenseMASTERSHIP AGREEMENTcontract · Last action 2009-03-20$54,452
- Department of DefensePROVIDE LABOR, EUIPMENT, AND MATERIALS TO PERFORMANCE INSPECTION ON VESSEL MASTERSHIP AGREEMENT 0014.contract · Last action 2010-04-22$54,335
- Department of DefenseMASTERSHIP AGREEMENTcontract · Last action 2009-05-21$41,931
- Department of DefenseDREDGE POTTER PLC REPAIRScontract · Last action 2019-04-03$40,604
- Department of DefenseMASTERSHIP AGREEMENTcontract · Last action 2009-08-07$40,438
- Department of DefenseMASTERSHIP AGREEMENTcontract · Last action 2013-02-05$38,433
- Department of DefensePROVIDE LABOR, EQUIPMENT AND MATERIAL FOR INSPECTION OF VESSEL ON MASTERSHIP AGREEMENT 0016.contract · Last action 2010-04-21$38,271
- Department of DefenseCE-407 FUEL BARGE - WENCHES/WIREScontract · Last action 2020-07-22$36,472
- Department of DefenseTASK ORDER 0020contract · Last action 2011-08-02$35,928
- Department of DefenseDRYDOCK INSPECTION AND REAPIR OF MV QUINCYcontract · Last action 2021-09-20$35,700
Federal contract dollars to this establishment. Primary NAICS: 336611 - SHIP BUILDING AND REPAIRING. Last action: 2025-05-14. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2024-10-08 | Follow-up | 0 | — | $0 | |
| 2023-11-20 | Referral | 2 | 2 | $6,223 | |
| 2020-05-07 | Complaint | 0 | — | $0 | |
| 2019-02-27 | Referral | 0 | — | $0 | |
| 2019-02-27 | Referral | 1 | 1 | $7,502 | |
| 2016-04-20 | Referral | 1 | 1 | $6,930 | |
| 2014-09-02 | Complaint | 0 | — | $0 | |
| 2014-02-10 | Complaint | 0 | — | $0 | |
| 2012-11-16 | Fatality/Catastrophe | 2 | 2 | $10,000 | |
| 2012-08-16 | Complaint | 2 | 2 | $4,713 | |
| 2011-03-18 | Complaint | 5 | 5 | $11,970 | |
| 2009-07-22 | Complaint | 1 | 1 | $500 | |
| 2008-09-02 | Complaint | 1 | 1 | $2,000 | |
| 2007-08-14 | Unprogrammed Related | 0 | — | $0 | |
| 2007-02-08 | Planned | 7 | 7 | $5,915 | |
| 2000-12-06 | Accident | 1 | 1 | $2,000 | |
| 1998-09-03 | Complaint | 1 | — | $0 | |
| 1998-05-18 | Complaint | 7 | 5 | $9,600 | |
| 1997-05-29 | Complaint | 2 | 2 | $5,985 | |
| 1994-02-24 | Complaint | 3 | 3 | $8,800 | |
| 1993-11-08 | Complaint | 0 | — | $0 | |
| 1993-08-17 | Complaint | 0 | — | $0 | |
| 1993-03-11 | Complaint | 10 | 7 | $9,000 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in ship building and repairing within IL, ordered by federal enforcement volume:
- MATERIAL SERVICE CORPORATIONROMEOVILLE — 3 federal enforcement records
- CALUMET RIVER FLEETING, INC.CHICAGO — 2 federal enforcement records
- MIKES, INC.WOOD RIVER — 1 federal enforcement record
- AMERICAN TUGS INCORPORATEDALTON — 1 federal enforcement record
- KASKASKIA SHIPBUILDING, INC.RED BUD — 1 federal enforcement record
- SERVICE WELDING & SHIP BUILDING LLCLEMONT — 1 federal enforcement record
- CONTAINER-CARE INTERNATIONAL, INC.ELWOOD — 1 federal enforcement record
- HOLIDAY HARBOR, INC.CHILLICOTHE — 1 federal enforcement record
- ILLINOIS MARINE TOWING, INC.LEMONT — 1 federal enforcement record
- EAGLE FABRICATION, LLCSAUGET — 1 federal enforcement record
Related searches
- Ship Building and RepairingAll employers in this industry
- Employers in ILState-wide enforcement data
- Ship Building and in ILIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on NATIONAL MAINTENANCE & REPAIR, INC. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is NATIONAL MAINTENANCE & REPAIR, INC.'s OSHA violation history?
- NATIONAL MAINTENANCE & REPAIR, INC. has 23 OSHA inspections on record with 46 violations and $91,138 in total penalties.
- How does NATIONAL MAINTENANCE & REPAIR, INC.'s safety record compare to its industry?
- NATIONAL MAINTENANCE & REPAIR, INC. operates in the ship building and repairing industry. The industry average Total Recordable Incident Rate (TRIR) is 4.8.
- Has NATIONAL MAINTENANCE & REPAIR, INC. had any workplace fatalities?
- Yes. Federal records show 2 fatality investigations involving NATIONAL MAINTENANCE & REPAIR, INC..