Establishment profile
MICHELS PIPELINE CONSTRUCTION
INTERSECTION OF 6TH ST & CLOUG, Superior, WI, 54880
237130 — Power and Communication Line and Related Structures Construction
Summary
MICHELS PIPELINE CONSTRUCTION has accumulated 7 OSHA violations across 1 inspection over 50 years of recorded history, with $35 in total assessed penalties.
The establishment sits in the 81st percentile for violations within its industry-state peer group of 35,314 employers. The most recent enforcement activity was recorded 50 years ago.
Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
MICHELS PIPELINE CONSTRUCTION appears in OSHA workplace safety and MSHA mine safety records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
100% of inspections at this establishment produced violations,
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 7 distinct standards shown · 7 citations in this view · $35 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 1926.0651 I01 | 1 | 1 | $35 | May 1976 | May 1976 |
| 29 CFR 1926.0051 A01 | 1 | 1 | — | May 1976 | May 1976 |
| 29 CFR 1926.0150 C01 I | 1 | 1 | — | May 1976 | May 1976 |
| 29 CFR 1926.0050 F | 1 | 1 | — | May 1976 | May 1976 |
| 29 CFR 1926.0251 C04 IV | 1 | 1 | — | May 1976 | May 1976 |
| 29 CFR 1926.0652 A | 1 | 1 | — | May 1976 | May 1976 |
| 29 CFR 1926.0152 A01 | 1 | 1 | — | May 1976 | May 1976 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Worse on violations than most other employers in NAICS 2371 within WI. Peer group: 35,314 employers. This establishment has 7 OSHA violations; peer median is 2.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for MICHELS PIPELINE CONSTRUCTION. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
Self-reported events under 29 CFR 1904.39 (24-hour notification of hospitalization, amputation, or loss of an eye) · Dec 2017
Most frequent event: Other fall to lower level, unspecified
Source: OSHA Severe Injury Reports (federal OSHA only; state-plan states like California, Oregon, and Washington maintain their own programs and do not consistently report into this feed).
Severe injury reports — events
Each row is a hospitalization, amputation, or eye-loss event the employer self-reported to OSHA under 29 CFR 1904.39. Narratives are written by the reporting employer.
| Date | Event | Body part | Outcome | |
|---|---|---|---|---|
| Dec 29, 2017 | Other fall to lower level, unspecified | Pelvis | Hospitalized |
Source: OSHA Severe Injury Reports. Federal-OSHA jurisdiction only by default; some state-plan programs report voluntarily.
Activity timeline
No federal enforcement activity has been recorded against this establishment in 50+ years. Most recent activity: 50 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for MICHELS PIPELINE CONSTRUCTION. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in WI — for MICHELS PIPELINE CONSTRUCTION, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other MICHELS PIPELINE CONSTRUCTION operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 38S&S · 100 contractor · $65,491 proposed / $49,341 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 6177695 | PLANT #2 Dodge, WI contractor: Michels Pipeline Construction Inc | May 2005 | — | Yes | ModNegligence | $23,500 | $15,000 |
| 6177694 | PLANT #2 Dodge, WI contractor: Michels Pipeline Construction Inc | May 2005 | — | Yes | ModNegligence | $16,000 | $8,500 |
| 7817895 | PLANT #4 Dodge, WI contractor: Michels Pipeline Construction Inc | Apr 2001 | — | Yes | LowNegligence | $8,000 | $8,000 |
| 6137086 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Oct 2001 | — | No | ModNegligence | $872 | $872 |
| 6137082 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Oct 2001 | — | No | ModNegligence | $872 | $872 |
| 7841700 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Aug 2001 | — | Yes | ModNegligence | $872 | $872 |
| 7841663 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Jul 2001 | — | Yes | ModNegligence | $872 | $872 |
| 6177188 | PLANT #2 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2005 | — | Yes | HighNegligence | $625 | $625 |
| 6137092 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Oct 2001 | — | No | ModNegligence | $557 | $557 |
| 6137091 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Oct 2001 | — | No | ModNegligence | $557 | $557 |
| 6137090 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Oct 2001 | — | No | ModNegligence | $557 | $557 |
| 6137081 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Oct 2001 | — | No | ModNegligence | $557 | $557 |
| 6137093 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Oct 2001 | — | Yes | ModNegligence | $475 | $475 |
| 6137088 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Oct 2001 | — | Yes | ModNegligence | $475 | $475 |
| 7841669 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Jul 2001 | — | Yes | ModNegligence | $475 | $475 |
| 7841667 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Jul 2001 | — | Yes | ModNegligence | $475 | $475 |
| 7841666 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Jul 2001 | — | Yes | ModNegligence | $475 | $475 |
| 7841665 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Jul 2001 | — | Yes | ModNegligence | $475 | $475 |
| 7841661 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Jul 2001 | — | Yes | ModNegligence | $475 | $475 |
| 6177696 | PLANT #2 Dodge, WI contractor: Michels Pipeline Construction Inc | Jun 2005 | — | Yes | ModNegligence | $350 | $200 |
| 6144670 | Plant #12 Dodge, WI contractor: Michels Pipeline Construction Inc | Jun 2003 | — | Yes | ModNegligence | $346 | $346 |
| 6137087 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Oct 2001 | — | No | ModNegligence | $317 | $317 |
| 6137085 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Oct 2001 | — | No | ModNegligence | $317 | $317 |
| 6137084 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Oct 2001 | — | No | ModNegligence | $317 | $317 |
| 6137080 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Oct 2001 | — | No | ModNegligence | $317 | $317 |
| 7841668 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Jul 2001 | — | No | ModNegligence | $317 | $317 |
| 7841664 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Jul 2001 | — | No | ModNegligence | $317 | $317 |
| 7841662 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Jul 2001 | — | No | ModNegligence | $317 | $317 |
| 7841660 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Jul 2001 | — | No | ModNegligence | $317 | $317 |
| 6163032 | Plant #1 Dodge, WI contractor: Michels Pipeline Construction Inc | Aug 2004 | — | Yes | ModNegligence | $144 | $144 |
| 6177190 | PLANT #2 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2005 | — | Yes | ModNegligence | $135 | $135 |
| 6162156 | Plant #3 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2004 | — | No | ModNegligence | $135 | $135 |
| 7807354 | Plant #5 Dodge, WI contractor: Michels Pipeline Construction Inc | Mar 2000 | — | Yes | ModNegligence | $131 | $131 |
| 6137030 | Plant #12 Dodge, WI contractor: Michels Pipeline Construction Inc | Aug 2001 | — | Yes | ModNegligence | $122 | $122 |
| 6137016 | Plant #12 Dodge, WI contractor: Michels Pipeline Construction Inc | Aug 2001 | — | Yes | ModNegligence | $122 | $122 |
| 7840870 | PLANT #8 Dodge, WI contractor: Michels Pipeline Construction Inc | Nov 2000 | — | Yes | ModNegligence | $122 | $122 |
| 7840868 | PLANT #8 Dodge, WI contractor: Michels Pipeline Construction Inc | Nov 2000 | — | Yes | ModNegligence | $122 | $122 |
| 7807712 | Plant #9 Dodge, WI contractor: Michels Pipeline Construction Inc | Sep 2000 | — | Yes | ModNegligence | $104 | $104 |
| 7807355 | Plant #5 Dodge, WI contractor: Michels Pipeline Construction Inc | Mar 2000 | — | Yes | ModNegligence | $104 | $104 |
| 7840953 | PLANT #2 Dodge, WI contractor: Michels Pipeline Construction Inc | Apr 2001 | — | Yes | ModNegligence | $90 | $90 |
| 6165075 | Plant #1 Dodge, WI contractor: Michels Pipeline Construction Inc | Nov 2004 | — | Yes | ModNegligence | $84 | $84 |
| 6139353 | PLANT #13 Dodge, WI contractor: Michels Pipeline Construction Inc | Mar 2004 | — | Yes | ModNegligence | $84 | $84 |
| 6162056 | PLANT #11 Dodge, WI contractor: Michels Pipeline Construction Inc | Dec 2003 | — | Yes | ModNegligence | $76 | $76 |
| 7841694 | Plant #10 Dodge, WI contractor: Michels Pipeline Construction Inc | Aug 2001 | — | Yes | ModNegligence | $76 | $76 |
| 7841693 | Plant #10 Dodge, WI contractor: Michels Pipeline Construction Inc | Aug 2001 | — | Yes | ModNegligence | $76 | $76 |
| 7840817 | PLANT #4 Dodge, WI contractor: Michels Pipeline Construction Inc | Oct 2000 | — | Yes | ModNegligence | $76 | $76 |
| 6144005 | PLANT #6 Dodge, WI contractor: Michels Pipeline Construction Inc | Apr 2002 | — | Yes | LowNegligence | $69 | $69 |
| 6137034 | Plant #12 Dodge, WI contractor: Michels Pipeline Construction Inc | Aug 2001 | — | Yes | ModNegligence | $69 | $69 |
| 6137024 | Plant #12 Dodge, WI contractor: Michels Pipeline Construction Inc | Aug 2001 | — | Yes | ModNegligence | $69 | $69 |
| 6137023 | Plant #12 Dodge, WI contractor: Michels Pipeline Construction Inc | Aug 2001 | — | Yes | ModNegligence | $69 | $69 |
| 6137018 | Plant #12 Dodge, WI contractor: Michels Pipeline Construction Inc | Aug 2001 | — | Yes | ModNegligence | $69 | $69 |
| 7841440 | Plant #3 Dodge, WI contractor: Michels Pipeline Construction Inc | Jun 2001 | — | Yes | ModNegligence | $69 | $69 |
| 7840985 | Plant #5 Dodge, WI contractor: Michels Pipeline Construction Inc | Jun 2001 | — | Yes | LowNegligence | $66 | $66 |
| 6184077 | Plant #3 Dodge, WI contractor: Michels Pipeline Construction Inc | Nov 2005 | — | No | ModNegligence | $60 | $60 |
| 6184075 | Plant #10 Dodge, WI contractor: Michels Pipeline Construction Inc | Nov 2005 | — | No | ModNegligence | $60 | $60 |
| 6184074 | Plant #10 Dodge, WI contractor: Michels Pipeline Construction Inc | Nov 2005 | — | No | ModNegligence | $60 | $60 |
| 6184070 | Plant #5 Dodge, WI contractor: Michels Pipeline Construction Inc | Nov 2005 | — | No | ModNegligence | $60 | $60 |
| 6184069 | Plant #5 Dodge, WI contractor: Michels Pipeline Construction Inc | Nov 2005 | — | No | ModNegligence | $60 | $60 |
| 6184244 | Plant #12 Dodge, WI contractor: Michels Pipeline Construction Inc | Sep 2005 | — | No | ModNegligence | $60 | $60 |
| 6184243 | Plant #12 Dodge, WI contractor: Michels Pipeline Construction Inc | Sep 2005 | — | No | LowNegligence | $60 | $60 |
| 6184221 | Plant #5 Dodge, WI contractor: Michels Pipeline Construction Inc | Aug 2005 | — | No | ModNegligence | $60 | $60 |
| 6184220 | Plant #5 Dodge, WI contractor: Michels Pipeline Construction Inc | Aug 2005 | — | No | LowNegligence | $60 | $60 |
| 6183198 | Plant #10 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2005 | — | No | ModNegligence | $60 | $60 |
| 6183196 | Plant #10 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2005 | — | No | ModNegligence | $60 | $60 |
| 6183194 | Plant #10 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2005 | — | No | LowNegligence | $60 | $60 |
| 6183193 | Plant #10 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2005 | — | No | ModNegligence | $60 | $60 |
| 6183192 | Plant #10 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2005 | — | No | ModNegligence | $60 | $60 |
| 6183191 | Plant #10 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2005 | — | No | ModNegligence | $60 | $60 |
| 6183190 | Plant #10 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2005 | — | No | ModNegligence | $60 | $60 |
| 6183189 | Plant #10 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2005 | — | No | LowNegligence | $60 | $60 |
| 6183188 | Plant #10 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2005 | — | No | ModNegligence | $60 | $60 |
| 6177191 | PLANT #2 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2005 | — | No | HighNegligence | $60 | $60 |
| 6177189 | PLANT #2 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2005 | — | No | ModNegligence | $60 | $60 |
| 6140124 | Plant #3 Dodge, WI contractor: Michels Pipeline Construction Inc | Apr 2005 | — | No | ModNegligence | $60 | $60 |
| 6162370 | PLANT #2 Dodge, WI contractor: Michels Pipeline Construction Inc | Feb 2005 | — | No | ModNegligence | $60 | $60 |
| 6165074 | Plant #1 Dodge, WI contractor: Michels Pipeline Construction Inc | Nov 2004 | — | No | LowNegligence | $60 | $60 |
| 6165073 | Plant #1 Dodge, WI contractor: Michels Pipeline Construction Inc | Nov 2004 | — | No | ModNegligence | $60 | $60 |
| 6165072 | Plant #1 Dodge, WI contractor: Michels Pipeline Construction Inc | Nov 2004 | — | No | LowNegligence | $60 | $60 |
| 6163049 | Plant #12 Dodge, WI contractor: Michels Pipeline Construction Inc | Sep 2004 | — | No | ModNegligence | $60 | $60 |
| 6163048 | Plant #12 Dodge, WI contractor: Michels Pipeline Construction Inc | Sep 2004 | — | No | ModNegligence | $60 | $60 |
| 6163045 | Plant #9 Dodge, WI contractor: Michels Pipeline Construction Inc | Aug 2004 | — | No | ModNegligence | $60 | $60 |
| 6163031 | Plant #1 Dodge, WI contractor: Michels Pipeline Construction Inc | Aug 2004 | — | No | ModNegligence | $60 | $60 |
| 6163030 | Plant #1 Dodge, WI contractor: Michels Pipeline Construction Inc | Aug 2004 | — | No | ModNegligence | $60 | $60 |
| 6162159 | Plant #3 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2004 | — | No | ModNegligence | $60 | $60 |
| 6162158 | Plant #3 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2004 | — | No | ModNegligence | $60 | $60 |
| 6162157 | Plant #3 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2004 | — | No | ModNegligence | $60 | $60 |
| 6162155 | Plant #3 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2004 | — | No | HighNegligence | $60 | $60 |
| 6162154 | Plant #3 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2004 | — | No | ModNegligence | $60 | $60 |
| 6162153 | Plant #3 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2004 | — | No | ModNegligence | $60 | $60 |
| 6162152 | Plant #3 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2004 | — | No | ModNegligence | $60 | $60 |
| 6163202 | PLANT #7 Dodge, WI contractor: Michels Pipeline Construction Inc | Apr 2004 | — | No | ModNegligence | $60 | $60 |
| 6163201 | PLANT #7 Dodge, WI contractor: Michels Pipeline Construction Inc | Apr 2004 | — | No | ModNegligence | $60 | $60 |
| 6162839 | PLANT #2 Dodge, WI contractor: Michels Pipeline Construction Inc | Apr 2004 | — | No | ModNegligence | $60 | $60 |
| 6162057 | PLANT #11 Dodge, WI contractor: Michels Pipeline Construction Inc | Dec 2003 | — | No | ModNegligence | $60 | $60 |
| 6144718 | Plant #9 Dodge, WI contractor: Michels Pipeline Construction Inc | Sep 2003 | — | No | ModNegligence | $60 | $60 |
| 6144716 | Plant #9 Dodge, WI contractor: Michels Pipeline Construction Inc | Sep 2003 | — | No | LowNegligence | $60 | $60 |
| 6144669 | Plant #12 Dodge, WI contractor: Michels Pipeline Construction Inc | Jun 2003 | — | No | ModNegligence | $60 | $60 |
| 6144668 | Plant #12 Dodge, WI contractor: Michels Pipeline Construction Inc | Jun 2003 | — | No | ModNegligence | $60 | $60 |
| 6139238 | Plant #10 Dodge, WI contractor: Michels Pipeline Construction Inc | Mar 2003 | — | No | ModNegligence | $55 | $55 |
| 6139225 | PLANT #11 Dodge, WI contractor: Michels Pipeline Construction Inc | Dec 2002 | — | No | ModNegligence | $55 | $55 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for MICHELS PIPELINE CONSTRUCTION. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for MICHELS PIPELINE CONSTRUCTION. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for MICHELS PIPELINE CONSTRUCTION. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for MICHELS PIPELINE CONSTRUCTION. Verify directly with UVA Corporate Prosecution Registry →
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 1976-05-12 | Planned | 7 | — | $35 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in power and communication line and related structures construction within WI, ordered by federal enforcement volume:
- INTERCON CONSTRUCTION, INC.MADISON — 2 federal enforcement records
- ALLIANT ENERGYSHEBOYGAN — 2 federal enforcement records
- MP SYSTEMS, INC.PLEASANT PRAIRIE — 2 federal enforcement records
- MICHELS CORPORATIONEAGLE RIVER — 2 federal enforcement records
- MICHELS PIPELINE CONSTRUCTION, INC.MADISON — 2 federal enforcement records
- TIME WARNER CABLESOMERS — 2 federal enforcement records
- MASTEC NORTH AMERICA, INC.FREDERIC — 1 federal enforcement record
- MASTEC NORTH AMERICA INC.MUSKEGO — 1 federal enforcement record
- INTERCON CONSTRUCTION, INC.MADISON — 1 federal enforcement record
- INTERCON CONSTRUCTION, INC.STEVENS POINT — 1 federal enforcement record
Related searches
- Power and Communication Line and Related Structures ConstructionAll employers in this industry
- Employers in WIState-wide enforcement data
- Power and Communication in WIIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on MICHELS PIPELINE CONSTRUCTION from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is MICHELS PIPELINE CONSTRUCTION's OSHA violation history?
- MICHELS PIPELINE CONSTRUCTION has 1 OSHA inspection on record with 7 violations and $35 in total penalties.
- How does MICHELS PIPELINE CONSTRUCTION's safety record compare to its industry?
- MICHELS PIPELINE CONSTRUCTION operates in the power and communication line and related structures construction industry. The industry average Total Recordable Incident Rate (TRIR) is 1.5.