Establishment profile
MICHEL'S PIPELINE CONSTRUCTION INC.
1449 EAST PARK PLACE, MILWAUKEE, WI, 53211
Summary
MICHEL'S PIPELINE CONSTRUCTION INC. has accumulated 6 OSHA violations across 2 inspections over 39 years of recorded history, with $290 in total assessed penalties.
The establishment sits in the 77th percentile for violations within its industry-state peer group of 35,316 employers. Inspection frequency runs at the 76th percentile. The most recent enforcement activity was recorded 33 years ago.
Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
MICHEL'S PIPELINE CONSTRUCTION INC. appears in OSHA workplace safety and MSHA mine safety records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
50% of inspections at this establishment produced violations,
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 5 distinct standards shown · 6 citations in this view · $290 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 1926.0450 A05 | 2 | 1 | $140 | Apr 1987 | Apr 1987 |
| 29 CFR 1926.0403 I02 I | 1 | 1 | $150 | Apr 1987 | Apr 1987 |
| 29 CFR 1926.0302 B07 | 1 | 1 | — | Apr 1987 | Apr 1987 |
| 29 CFR 1926.0404 B01 I | 1 | 1 | — | Apr 1987 | Apr 1987 |
| 29 CFR 1926.0800 C01 I | 1 | 1 | — | Apr 1987 | Apr 1987 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Above average violations. Peer group: 35,316 employers. This establishment has 6 OSHA violations; peer median is 2.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for MICHEL'S PIPELINE CONSTRUCTION INC.. Verify directly with OSHA Injury Tracking Application →
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for MICHEL'S PIPELINE CONSTRUCTION INC.. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 33+ years. Most recent activity: 33 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for MICHEL'S PIPELINE CONSTRUCTION INC.. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in WI — for MICHEL'S PIPELINE CONSTRUCTION INC., not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other MICHEL'S PIPELINE CONSTRUCTION INC. operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 38S&S · 100 contractor · $65,491 proposed / $49,341 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 6177695 | PLANT #2 Dodge, WI contractor: Michels Pipeline Construction Inc | May 2005 | — | Yes | ModNegligence | $23,500 | $15,000 |
| 6177694 | PLANT #2 Dodge, WI contractor: Michels Pipeline Construction Inc | May 2005 | — | Yes | ModNegligence | $16,000 | $8,500 |
| 7817895 | PLANT #4 Dodge, WI contractor: Michels Pipeline Construction Inc | Apr 2001 | — | Yes | LowNegligence | $8,000 | $8,000 |
| 6137086 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Oct 2001 | — | No | ModNegligence | $872 | $872 |
| 6137082 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Oct 2001 | — | No | ModNegligence | $872 | $872 |
| 7841700 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Aug 2001 | — | Yes | ModNegligence | $872 | $872 |
| 7841663 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Jul 2001 | — | Yes | ModNegligence | $872 | $872 |
| 6177188 | PLANT #2 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2005 | — | Yes | HighNegligence | $625 | $625 |
| 6137092 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Oct 2001 | — | No | ModNegligence | $557 | $557 |
| 6137091 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Oct 2001 | — | No | ModNegligence | $557 | $557 |
| 6137090 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Oct 2001 | — | No | ModNegligence | $557 | $557 |
| 6137081 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Oct 2001 | — | No | ModNegligence | $557 | $557 |
| 6137093 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Oct 2001 | — | Yes | ModNegligence | $475 | $475 |
| 6137088 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Oct 2001 | — | Yes | ModNegligence | $475 | $475 |
| 7841669 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Jul 2001 | — | Yes | ModNegligence | $475 | $475 |
| 7841667 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Jul 2001 | — | Yes | ModNegligence | $475 | $475 |
| 7841666 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Jul 2001 | — | Yes | ModNegligence | $475 | $475 |
| 7841665 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Jul 2001 | — | Yes | ModNegligence | $475 | $475 |
| 7841661 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Jul 2001 | — | Yes | ModNegligence | $475 | $475 |
| 6177696 | PLANT #2 Dodge, WI contractor: Michels Pipeline Construction Inc | Jun 2005 | — | Yes | ModNegligence | $350 | $200 |
| 6144670 | Plant #12 Dodge, WI contractor: Michels Pipeline Construction Inc | Jun 2003 | — | Yes | ModNegligence | $346 | $346 |
| 6137087 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Oct 2001 | — | No | ModNegligence | $317 | $317 |
| 6137085 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Oct 2001 | — | No | ModNegligence | $317 | $317 |
| 6137084 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Oct 2001 | — | No | ModNegligence | $317 | $317 |
| 6137080 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Oct 2001 | — | No | ModNegligence | $317 | $317 |
| 7841668 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Jul 2001 | — | No | ModNegligence | $317 | $317 |
| 7841664 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Jul 2001 | — | No | ModNegligence | $317 | $317 |
| 7841662 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Jul 2001 | — | No | ModNegligence | $317 | $317 |
| 7841660 | Fond du Lac Stone, Inc. Fond Du Lac, WI contractor: Michels Pipeline Construction Inc | Jul 2001 | — | No | ModNegligence | $317 | $317 |
| 6163032 | Plant #1 Dodge, WI contractor: Michels Pipeline Construction Inc | Aug 2004 | — | Yes | ModNegligence | $144 | $144 |
| 6177190 | PLANT #2 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2005 | — | Yes | ModNegligence | $135 | $135 |
| 6162156 | Plant #3 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2004 | — | No | ModNegligence | $135 | $135 |
| 7807354 | Plant #5 Dodge, WI contractor: Michels Pipeline Construction Inc | Mar 2000 | — | Yes | ModNegligence | $131 | $131 |
| 6137030 | Plant #12 Dodge, WI contractor: Michels Pipeline Construction Inc | Aug 2001 | — | Yes | ModNegligence | $122 | $122 |
| 6137016 | Plant #12 Dodge, WI contractor: Michels Pipeline Construction Inc | Aug 2001 | — | Yes | ModNegligence | $122 | $122 |
| 7840870 | PLANT #8 Dodge, WI contractor: Michels Pipeline Construction Inc | Nov 2000 | — | Yes | ModNegligence | $122 | $122 |
| 7840868 | PLANT #8 Dodge, WI contractor: Michels Pipeline Construction Inc | Nov 2000 | — | Yes | ModNegligence | $122 | $122 |
| 7807712 | Plant #9 Dodge, WI contractor: Michels Pipeline Construction Inc | Sep 2000 | — | Yes | ModNegligence | $104 | $104 |
| 7807355 | Plant #5 Dodge, WI contractor: Michels Pipeline Construction Inc | Mar 2000 | — | Yes | ModNegligence | $104 | $104 |
| 7840953 | PLANT #2 Dodge, WI contractor: Michels Pipeline Construction Inc | Apr 2001 | — | Yes | ModNegligence | $90 | $90 |
| 6165075 | Plant #1 Dodge, WI contractor: Michels Pipeline Construction Inc | Nov 2004 | — | Yes | ModNegligence | $84 | $84 |
| 6139353 | PLANT #13 Dodge, WI contractor: Michels Pipeline Construction Inc | Mar 2004 | — | Yes | ModNegligence | $84 | $84 |
| 6162056 | PLANT #11 Dodge, WI contractor: Michels Pipeline Construction Inc | Dec 2003 | — | Yes | ModNegligence | $76 | $76 |
| 7841694 | Plant #10 Dodge, WI contractor: Michels Pipeline Construction Inc | Aug 2001 | — | Yes | ModNegligence | $76 | $76 |
| 7841693 | Plant #10 Dodge, WI contractor: Michels Pipeline Construction Inc | Aug 2001 | — | Yes | ModNegligence | $76 | $76 |
| 7840817 | PLANT #4 Dodge, WI contractor: Michels Pipeline Construction Inc | Oct 2000 | — | Yes | ModNegligence | $76 | $76 |
| 6144005 | PLANT #6 Dodge, WI contractor: Michels Pipeline Construction Inc | Apr 2002 | — | Yes | LowNegligence | $69 | $69 |
| 6137034 | Plant #12 Dodge, WI contractor: Michels Pipeline Construction Inc | Aug 2001 | — | Yes | ModNegligence | $69 | $69 |
| 6137024 | Plant #12 Dodge, WI contractor: Michels Pipeline Construction Inc | Aug 2001 | — | Yes | ModNegligence | $69 | $69 |
| 6137023 | Plant #12 Dodge, WI contractor: Michels Pipeline Construction Inc | Aug 2001 | — | Yes | ModNegligence | $69 | $69 |
| 6137018 | Plant #12 Dodge, WI contractor: Michels Pipeline Construction Inc | Aug 2001 | — | Yes | ModNegligence | $69 | $69 |
| 7841440 | Plant #3 Dodge, WI contractor: Michels Pipeline Construction Inc | Jun 2001 | — | Yes | ModNegligence | $69 | $69 |
| 7840985 | Plant #5 Dodge, WI contractor: Michels Pipeline Construction Inc | Jun 2001 | — | Yes | LowNegligence | $66 | $66 |
| 6184077 | Plant #3 Dodge, WI contractor: Michels Pipeline Construction Inc | Nov 2005 | — | No | ModNegligence | $60 | $60 |
| 6184075 | Plant #10 Dodge, WI contractor: Michels Pipeline Construction Inc | Nov 2005 | — | No | ModNegligence | $60 | $60 |
| 6184074 | Plant #10 Dodge, WI contractor: Michels Pipeline Construction Inc | Nov 2005 | — | No | ModNegligence | $60 | $60 |
| 6184070 | Plant #5 Dodge, WI contractor: Michels Pipeline Construction Inc | Nov 2005 | — | No | ModNegligence | $60 | $60 |
| 6184069 | Plant #5 Dodge, WI contractor: Michels Pipeline Construction Inc | Nov 2005 | — | No | ModNegligence | $60 | $60 |
| 6184244 | Plant #12 Dodge, WI contractor: Michels Pipeline Construction Inc | Sep 2005 | — | No | ModNegligence | $60 | $60 |
| 6184243 | Plant #12 Dodge, WI contractor: Michels Pipeline Construction Inc | Sep 2005 | — | No | LowNegligence | $60 | $60 |
| 6184221 | Plant #5 Dodge, WI contractor: Michels Pipeline Construction Inc | Aug 2005 | — | No | ModNegligence | $60 | $60 |
| 6184220 | Plant #5 Dodge, WI contractor: Michels Pipeline Construction Inc | Aug 2005 | — | No | LowNegligence | $60 | $60 |
| 6183198 | Plant #10 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2005 | — | No | ModNegligence | $60 | $60 |
| 6183196 | Plant #10 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2005 | — | No | ModNegligence | $60 | $60 |
| 6183194 | Plant #10 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2005 | — | No | LowNegligence | $60 | $60 |
| 6183193 | Plant #10 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2005 | — | No | ModNegligence | $60 | $60 |
| 6183192 | Plant #10 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2005 | — | No | ModNegligence | $60 | $60 |
| 6183191 | Plant #10 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2005 | — | No | ModNegligence | $60 | $60 |
| 6183190 | Plant #10 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2005 | — | No | ModNegligence | $60 | $60 |
| 6183189 | Plant #10 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2005 | — | No | LowNegligence | $60 | $60 |
| 6183188 | Plant #10 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2005 | — | No | ModNegligence | $60 | $60 |
| 6177191 | PLANT #2 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2005 | — | No | HighNegligence | $60 | $60 |
| 6177189 | PLANT #2 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2005 | — | No | ModNegligence | $60 | $60 |
| 6140124 | Plant #3 Dodge, WI contractor: Michels Pipeline Construction Inc | Apr 2005 | — | No | ModNegligence | $60 | $60 |
| 6162370 | PLANT #2 Dodge, WI contractor: Michels Pipeline Construction Inc | Feb 2005 | — | No | ModNegligence | $60 | $60 |
| 6165074 | Plant #1 Dodge, WI contractor: Michels Pipeline Construction Inc | Nov 2004 | — | No | LowNegligence | $60 | $60 |
| 6165073 | Plant #1 Dodge, WI contractor: Michels Pipeline Construction Inc | Nov 2004 | — | No | ModNegligence | $60 | $60 |
| 6165072 | Plant #1 Dodge, WI contractor: Michels Pipeline Construction Inc | Nov 2004 | — | No | LowNegligence | $60 | $60 |
| 6163049 | Plant #12 Dodge, WI contractor: Michels Pipeline Construction Inc | Sep 2004 | — | No | ModNegligence | $60 | $60 |
| 6163048 | Plant #12 Dodge, WI contractor: Michels Pipeline Construction Inc | Sep 2004 | — | No | ModNegligence | $60 | $60 |
| 6163045 | Plant #9 Dodge, WI contractor: Michels Pipeline Construction Inc | Aug 2004 | — | No | ModNegligence | $60 | $60 |
| 6163031 | Plant #1 Dodge, WI contractor: Michels Pipeline Construction Inc | Aug 2004 | — | No | ModNegligence | $60 | $60 |
| 6163030 | Plant #1 Dodge, WI contractor: Michels Pipeline Construction Inc | Aug 2004 | — | No | ModNegligence | $60 | $60 |
| 6162159 | Plant #3 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2004 | — | No | ModNegligence | $60 | $60 |
| 6162158 | Plant #3 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2004 | — | No | ModNegligence | $60 | $60 |
| 6162157 | Plant #3 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2004 | — | No | ModNegligence | $60 | $60 |
| 6162155 | Plant #3 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2004 | — | No | HighNegligence | $60 | $60 |
| 6162154 | Plant #3 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2004 | — | No | ModNegligence | $60 | $60 |
| 6162153 | Plant #3 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2004 | — | No | ModNegligence | $60 | $60 |
| 6162152 | Plant #3 Dodge, WI contractor: Michels Pipeline Construction Inc | Jul 2004 | — | No | ModNegligence | $60 | $60 |
| 6163202 | PLANT #7 Dodge, WI contractor: Michels Pipeline Construction Inc | Apr 2004 | — | No | ModNegligence | $60 | $60 |
| 6163201 | PLANT #7 Dodge, WI contractor: Michels Pipeline Construction Inc | Apr 2004 | — | No | ModNegligence | $60 | $60 |
| 6162839 | PLANT #2 Dodge, WI contractor: Michels Pipeline Construction Inc | Apr 2004 | — | No | ModNegligence | $60 | $60 |
| 6162057 | PLANT #11 Dodge, WI contractor: Michels Pipeline Construction Inc | Dec 2003 | — | No | ModNegligence | $60 | $60 |
| 6144718 | Plant #9 Dodge, WI contractor: Michels Pipeline Construction Inc | Sep 2003 | — | No | ModNegligence | $60 | $60 |
| 6144716 | Plant #9 Dodge, WI contractor: Michels Pipeline Construction Inc | Sep 2003 | — | No | LowNegligence | $60 | $60 |
| 6144669 | Plant #12 Dodge, WI contractor: Michels Pipeline Construction Inc | Jun 2003 | — | No | ModNegligence | $60 | $60 |
| 6144668 | Plant #12 Dodge, WI contractor: Michels Pipeline Construction Inc | Jun 2003 | — | No | ModNegligence | $60 | $60 |
| 6139238 | Plant #10 Dodge, WI contractor: Michels Pipeline Construction Inc | Mar 2003 | — | No | ModNegligence | $55 | $55 |
| 6139225 | PLANT #11 Dodge, WI contractor: Michels Pipeline Construction Inc | Dec 2002 | — | No | ModNegligence | $55 | $55 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for MICHEL'S PIPELINE CONSTRUCTION INC.. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for MICHEL'S PIPELINE CONSTRUCTION INC.. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for MICHEL'S PIPELINE CONSTRUCTION INC.. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for MICHEL'S PIPELINE CONSTRUCTION INC.. Verify directly with UVA Corporate Prosecution Registry →
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 1992-07-01 | Planned | 0 | — | $0 | |
| 1987-04-09 | Planned | 6 | 4 | $290 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Related searches
- Employers in WIState-wide enforcement data
About this data
This profile aggregates federal enforcement records on MICHEL'S PIPELINE CONSTRUCTION INC. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is MICHEL'S PIPELINE CONSTRUCTION INC.'s OSHA violation history?
- MICHEL'S PIPELINE CONSTRUCTION INC. has 2 OSHA inspections on record with 6 violations and $290 in total penalties.