Establishment profile
MCDONALD CONSTRUCTION CORPORATION
SR 640, BARTOW, FL, 33830
Operated by McDonald Construction Corporation · 1 of 2 establishments
Summary
MCDONALD CONSTRUCTION CORPORATION has accumulated 0 OSHA violations across 1 inspection over 38 years of recorded history.
The most recent federal enforcement activity was recorded 39 years ago.
Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
MCDONALD CONSTRUCTION CORPORATION appears in OSHA workplace safety and MSHA mine safety records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
Peer comparison
Fewer violations than most other employers. Peer group: 71,900 employers. This establishment has 0 OSHA violations; peer median is 2.
Safety self-report (OSHA 300A)
Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.
Reported for 48 average annual employees at this establishment.
Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for MCDONALD CONSTRUCTION CORPORATION. Verify directly with Occupational Safety and Health Administration →
OSHA accident events
Accidents, fatalities, and catastrophes documented during OSHA inspections at this employer. Each entry links to the inspection that recorded it.
| Date | Event | Injuries | Hospitalized | Fatalities | |
|---|---|---|---|---|---|
| Jun 23, 1987 | HEAT,FATIGUE,HEAT EXHAUSTION,UNTRAINED,HIGH TEMPERATUREFatality | 2 | — | 1 |
Source: OSHA accident investigations. Narratives are recorded by the inspecting officer and may be truncated.
Activity timeline
No federal enforcement activity has been recorded against this establishment in 39+ years. Most recent activity: 39 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for MCDONALD CONSTRUCTION CORPORATION. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in FL — for McDonald Construction Corporation, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other McDonald Construction Corporation operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 66S&S · 100 contractor · $243,863 proposed / $134,026 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 6098415 | Hookers Prairie Mine Polk, FL contractor: Mcdonald Construction Co | May 2006 | — | Yes | HighNegligence | $34,000 | $22,000 |
| 3876726 | Hookers Prairie Mine Polk, FL contractor: Mcdonald Construction Co | May 2006 | — | Yes | ModNegligence | $34,000 | $12,000 |
| 7752580 | Wingate Creek Mine Manatee, FL contractor: Mcdonald Construction Co | Feb 2009 | — | Yes | HighNegligence | $27,259 | $100 |
| 8543590 | South Pasture Mine Hardee, FL contractor: Mcdonald Construction Co | Feb 2011 | — | Yes | ModNegligence | $16,867 | $11,807 |
| 7752531 | Four Corners Polk, FL contractor: Mcdonald Construction Co | Apr 2008 | — | Yes | HighNegligence | $16,867 | $3,405 |
| 8553490 | South Pasture Mine Hardee, FL contractor: Mcdonald Construction Co | Mar 2011 | — | Yes | ModNegligence | $12,248 | $3,135 |
| 8553485 | South Pasture Mine Hardee, FL contractor: Mcdonald Construction Co | Mar 2011 | — | Yes | ModNegligence | $10,437 | $2,671 |
| 8553484 | South Pasture Mine Hardee, FL contractor: Mcdonald Construction Co | Mar 2011 | — | Yes | ModNegligence | $10,437 | $2,671 |
| 8639759 | Hookers Prairie Mine Polk, FL contractor: Mcdonald Construction Co | Jul 2012 | — | Yes | ModNegligence | $8,893 | $3,996 |
| 6119540 | Kingsford Polk, FL contractor: Mcdonald Construction Co | Jul 2006 | — | No | HighNegligence | $5,000 | $5,000 |
| 7752530 | Four Corners Polk, FL contractor: Mcdonald Construction Co | Apr 2008 | — | No | HighNegligence | $3,405 | $3,405 |
| 8553483 | South Pasture Mine Hardee, FL contractor: Mcdonald Construction Co | Mar 2011 | — | Yes | ModNegligence | $3,143 | $2,671 |
| 7752316 | South Fort Meade Mine Polk, FL contractor: Mcdonald Construction Co | Jan 2008 | — | No | HighNegligence | $2,678 | $2,678 |
| 7752446 | South Fort Meade Mine Polk, FL contractor: Mcdonald Construction Co | Aug 2008 | — | Yes | ModNegligence | $2,282 | $2,282 |
| 7774475 | South Fort Meade Mine Polk, FL contractor: Mcdonald Construction Co | Jun 2007 | — | No | HighNegligence | $2,282 | $2,282 |
| 7774474 | South Fort Meade Mine Polk, FL contractor: Mcdonald Construction Co | Jun 2007 | — | No | HighNegligence | $2,282 | $2,282 |
| 6598721 | Four Corners Polk, FL contractor: Mcdonald Construction Co | Jan 2010 | — | Yes | ModNegligence | $2,106 | $2,106 |
| 6072395 | Hookers Prairie Mine Polk, FL contractor: Mcdonald Construction Co | Feb 2005 | — | Yes | HighNegligence | $2,003 | $2,003 |
| 6068401 | Hookers Prairie Mine Polk, FL contractor: Mcdonald Construction Co | Mar 2001 | — | Yes | HighNegligence | $1,603 | $1,603 |
| 7752450 | South Fort Meade Mine Polk, FL contractor: Mcdonald Construction Co | Aug 2008 | — | No | HighNegligence | $1,530 | $1,530 |
| 7752449 | South Fort Meade Mine Polk, FL contractor: Mcdonald Construction Co | Aug 2008 | — | No | HighNegligence | $1,530 | $1,530 |
| 7752447 | South Fort Meade Mine Polk, FL contractor: Mcdonald Construction Co | Aug 2008 | — | No | HighNegligence | $1,530 | $1,530 |
| 7766176 | South Pasture Mine Hardee, FL contractor: Mcdonald Construction Co | Dec 2007 | — | No | ModNegligence | $1,530 | $1,530 |
| 6073503 | Hookers Prairie Mine Polk, FL contractor: Mcdonald Construction Co | Feb 2005 | — | Yes | HighNegligence | $1,402 | $1,402 |
| 6073659 | Hookers Prairie Mine Polk, FL contractor: Mcdonald Construction Co | Jul 2005 | — | Yes | HighNegligence | $1,376 | $1,376 |
| 7752529 | Four Corners Polk, FL contractor: Mcdonald Construction Co | Apr 2008 | — | No | ModNegligence | $1,026 | $1,026 |
| 6070962 | South Fort Meade Mine Polk, FL contractor: Mcdonald Construction Co | May 2003 | — | Yes | ModNegligence | $1,022 | $1,022 |
| 6072330 | South Fort Meade Mine Polk, FL contractor: Mcdonald Construction Co | Sep 2004 | — | Yes | ModNegligence | $963 | $963 |
| 6072325 | South Fort Meade Mine Polk, FL contractor: Mcdonald Construction Co | Sep 2004 | — | Yes | ModNegligence | $963 | $963 |
| 6072408 | FORT GREEN Polk, FL contractor: Mcdonald Construction Co | Jul 2004 | — | Yes | ModNegligence | $963 | $963 |
| 6071617 | Hookers Prairie Mine Polk, FL contractor: Mcdonald Construction Co | Sep 2003 | — | Yes | HighNegligence | $953 | $953 |
| 8551565 | South Pasture Mine Hardee, FL contractor: Mcdonald Construction Co | Mar 2011 | — | Yes | ModNegligence | $946 | $804 |
| 7758961 | Four Corners Polk, FL contractor: Mcdonald Construction Co | Mar 2000 | — | Yes | HighNegligence | $936 | $936 |
| 6125825 | Hookers Prairie Mine Polk, FL contractor: Mcdonald Construction Co | Aug 2006 | — | Yes | HighNegligence | $838 | $838 |
| 6097980 | Hookers Prairie Mine Polk, FL contractor: Mcdonald Construction Co | Jul 2006 | — | Yes | HighNegligence | $838 | $838 |
| 6119542 | Kingsford Polk, FL contractor: Mcdonald Construction Co | Jul 2006 | — | Yes | HighNegligence | $838 | $838 |
| 7752323 | South Fort Meade Mine Polk, FL contractor: Mcdonald Construction Co | Jan 2008 | — | No | ModNegligence | $807 | $807 |
| 7752322 | South Fort Meade Mine Polk, FL contractor: Mcdonald Construction Co | Jan 2008 | — | No | ModNegligence | $807 | $807 |
| 7752321 | South Fort Meade Mine Polk, FL contractor: Mcdonald Construction Co | Jan 2008 | — | No | ModNegligence | $807 | $807 |
| 7752320 | South Fort Meade Mine Polk, FL contractor: Mcdonald Construction Co | Jan 2008 | — | No | ModNegligence | $807 | $807 |
| 7752319 | South Fort Meade Mine Polk, FL contractor: Mcdonald Construction Co | Jan 2008 | — | No | ModNegligence | $807 | $807 |
| 7752318 | South Fort Meade Mine Polk, FL contractor: Mcdonald Construction Co | Jan 2008 | — | No | ModNegligence | $807 | $807 |
| 7752317 | South Fort Meade Mine Polk, FL contractor: Mcdonald Construction Co | Jan 2008 | — | No | ModNegligence | $807 | $807 |
| 8543563 | South Pasture Mine Hardee, FL contractor: Mcdonald Construction Co | Feb 2011 | — | No | ModNegligence | $687 | $687 |
| 3873908 | South Pasture Mine Hardee, FL contractor: Mcdonald Construction Co | Jun 2006 | — | Yes | HighNegligence | $614 | $614 |
| 6072528 | Hookers Prairie Mine Polk, FL contractor: Mcdonald Construction Co | Jun 2006 | — | Yes | HighNegligence | $614 | $614 |
| 6087799 | LONESOME Hillsborough, FL contractor: Mcdonald Construction Co | Dec 2005 | — | Yes | HighNegligence | $614 | $614 |
| 6072329 | South Fort Meade Mine Polk, FL contractor: Mcdonald Construction Co | Sep 2004 | — | Yes | ModNegligence | $614 | $614 |
| 6508015 | South Pasture Mine Hardee, FL contractor: Mcdonald Construction Co | Sep 2009 | — | No | HighNegligence | $585 | $585 |
| 7752579 | Wingate Creek Mine Manatee, FL contractor: Mcdonald Construction Co | Feb 2009 | — | No | ModNegligence | $585 | $585 |
| 8728643 | South Pasture Mine Hardee, FL contractor: Mcdonald Construction Co | Aug 2013 | — | No | ModNegligence | $540 | $540 |
| 7752315 | South Fort Meade Mine Polk, FL contractor: Mcdonald Construction Co | Jan 2008 | — | No | ModNegligence | $540 | $540 |
| 3873950 | Noralyn Polk, FL contractor: Mcdonald Construction Co | Sep 2006 | — | No | HighNegligence | $536 | $536 |
| 6072765 | Wingate Creek Mine Manatee, FL contractor: Mcdonald Construction Co | Jul 2005 | — | Yes | ModNegligence | $536 | $536 |
| 8642400 | South Pasture Mine Hardee, FL contractor: Mcdonald Construction Co | Nov 2011 | — | No | ModNegligence | $499 | $499 |
| 6597513 | South Pasture Mine Hardee, FL contractor: Mcdonald Construction Co | Dec 2009 | — | No | HighNegligence | $499 | $499 |
| 6093044 | South Fort Meade Mine Polk, FL contractor: Mcdonald Construction Co | Jan 2009 | — | No | ModNegligence | $499 | $499 |
| 9330835 | South Pasture Mine Hardee, FL contractor: Mcdonald Construction Co | Mar 2017 | — | Yes | ModNegligence | $492 | $492 |
| 7758780 | Kingsford Polk, FL contractor: Mcdonald Construction Co | Sep 2000 | — | Yes | ModNegligence | $475 | $475 |
| 7758958 | Four Corners Polk, FL contractor: Mcdonald Construction Co | Mar 2000 | — | Yes | ModNegligence | $475 | $475 |
| 7759649 | FORT GREEN Polk, FL contractor: Mcdonald Construction Co | Mar 2000 | — | Yes | ModNegligence | $475 | $475 |
| 6072393 | Hookers Prairie Mine Polk, FL contractor: Mcdonald Construction Co | Feb 2005 | — | Yes | ModNegligence | $440 | $440 |
| 6071618 | Hookers Prairie Mine Polk, FL contractor: Mcdonald Construction Co | Sep 2003 | — | Yes | ModNegligence | $435 | $435 |
| 9425081 | Four Corners Polk, FL contractor: Mcdonald Construction Co | Dec 2018 | — | Yes | ModNegligence | $429 | $429 |
| 8551429 | Four Corners Polk, FL contractor: Mcdonald Construction Co | Aug 2010 | — | Yes | ModNegligence | $425 | $425 |
| 6598727 | Four Corners Polk, FL contractor: Mcdonald Construction Co | Jan 2010 | — | No | ModNegligence | $425 | $425 |
| 6598726 | Four Corners Polk, FL contractor: Mcdonald Construction Co | Jan 2010 | — | No | ModNegligence | $425 | $425 |
| 6087842 | LONESOME Hillsborough, FL contractor: Mcdonald Construction Co | Dec 2005 | — | Yes | ModNegligence | $375 | $375 |
| 8549428 | Hookers Prairie Mine Polk, FL contractor: Mcdonald Construction Co | Sep 2010 | — | No | ModNegligence | $362 | $362 |
| 6072577 | South Pasture Mine Hardee, FL contractor: Mcdonald Construction Co | Mar 2007 | — | Yes | ModNegligence | $350 | $350 |
| 8820543 | South Fort Meade Mine Polk, FL contractor: Mcdonald Construction Co | Feb 2015 | — | No | ModNegligence | $334 | $334 |
| 3873996 | Hookers Prairie Mine Polk, FL contractor: Mcdonald Construction Co | Nov 2006 | — | Yes | ModNegligence | $324 | $324 |
| 6072768 | Wingate Creek Mine Manatee, FL contractor: Mcdonald Construction Co | Jul 2005 | — | Yes | ModNegligence | $324 | $324 |
| 6072766 | Wingate Creek Mine Manatee, FL contractor: Mcdonald Construction Co | Jul 2005 | — | Yes | ModNegligence | $324 | $324 |
| 6069462 | South Pasture Mine Hardee, FL contractor: Mcdonald Construction Co | Sep 2002 | — | Yes | ModNegligence | $321 | $321 |
| 6069854 | Hookers Prairie Mine Polk, FL contractor: Mcdonald Construction Co | Sep 2002 | — | Yes | ModNegligence | $321 | $321 |
| 6069227 | FORT GREEN Polk, FL contractor: Mcdonald Construction Co | Apr 2002 | — | Yes | ModNegligence | $321 | $321 |
| 6070883 | South Fort Meade Mine Polk, FL contractor: Mcdonald Construction Co | Dec 2002 | — | Yes | ModNegligence | $317 | $317 |
| 7752532 | Four Corners Polk, FL contractor: Mcdonald Construction Co | Apr 2008 | — | No | HighNegligence | $308 | $308 |
| 6072394 | Hookers Prairie Mine Polk, FL contractor: Mcdonald Construction Co | Feb 2005 | — | Yes | ModNegligence | $305 | $305 |
| 9425569 | Four Corners Polk, FL contractor: Mcdonald Construction Co | Dec 2018 | — | No | ModNegligence | $286 | $286 |
| 7752312 | South Fort Meade Mine Polk, FL contractor: Mcdonald Construction Co | Jan 2008 | — | No | LowNegligence | $243 | $243 |
| 6069295 | FORT GREEN Polk, FL contractor: Mcdonald Construction Co | Sep 2002 | — | Yes | ModNegligence | $224 | $224 |
| 6069862 | Hookers Prairie Mine Polk, FL contractor: Mcdonald Construction Co | Sep 2002 | — | Yes | ModNegligence | $224 | $224 |
| 6070213 | South Fort Meade Mine Polk, FL contractor: Mcdonald Construction Co | Sep 2002 | — | Yes | ModNegligence | $224 | $224 |
| 6069853 | Hookers Prairie Mine Polk, FL contractor: Mcdonald Construction Co | Sep 2002 | — | Yes | ModNegligence | $224 | $224 |
| 6069851 | Hookers Prairie Mine Polk, FL contractor: Mcdonald Construction Co | Sep 2002 | — | Yes | ModNegligence | $224 | $224 |
| 6069850 | Hookers Prairie Mine Polk, FL contractor: Mcdonald Construction Co | Sep 2002 | — | Yes | ModNegligence | $224 | $224 |
| 6069849 | Hookers Prairie Mine Polk, FL contractor: Mcdonald Construction Co | Sep 2002 | — | Yes | ModNegligence | $224 | $224 |
| 6070010 | Hopewell Polk, FL contractor: Mcdonald Construction Co | May 2002 | — | Yes | ModNegligence | $224 | $224 |
| 6070009 | Hopewell Polk, FL contractor: Mcdonald Construction Co | May 2002 | — | Yes | ModNegligence | $224 | $224 |
| 6069083 | Four Corners Polk, FL contractor: Mcdonald Construction Co | Apr 2002 | — | Yes | ModNegligence | $224 | $224 |
| 6069082 | Four Corners Polk, FL contractor: Mcdonald Construction Co | Apr 2002 | — | Yes | ModNegligence | $224 | $224 |
| 6069079 | Four Corners Polk, FL contractor: Mcdonald Construction Co | Apr 2002 | — | Yes | ModNegligence | $224 | $224 |
| 6069078 | Four Corners Polk, FL contractor: Mcdonald Construction Co | Apr 2002 | — | Yes | ModNegligence | $224 | $224 |
| 6069077 | Four Corners Polk, FL contractor: Mcdonald Construction Co | Apr 2002 | — | Yes | ModNegligence | $224 | $224 |
| 6069073 | Four Corners Polk, FL contractor: Mcdonald Construction Co | Apr 2002 | — | Yes | ModNegligence | $224 | $224 |
| 6071613 | Hookers Prairie Mine Polk, FL contractor: Mcdonald Construction Co | Sep 2003 | — | Yes | LowNegligence | $214 | $214 |
| 7751304 | Hookers Prairie Mine Polk, FL contractor: Mcdonald Construction Co | Jul 2008 | — | No | LowNegligence | $207 | $207 |
| 6069861 | Hookers Prairie Mine Polk, FL contractor: Mcdonald Construction Co | Sep 2002 | — | Yes | ModNegligence | $184 | $184 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for MCDONALD CONSTRUCTION CORPORATION. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for MCDONALD CONSTRUCTION CORPORATION. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for MCDONALD CONSTRUCTION CORPORATION. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for MCDONALD CONSTRUCTION CORPORATION. Verify directly with UVA Corporate Prosecution Registry →
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 1987-06-24 | Accident | 0 | — | $0 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Part of a larger organization
MCDONALD CONSTRUCTION CORPORATION is one of 2 establishments rolled up under the parent organization McDonald Construction Corporation.
Federal enforcement records on this page represent activity at this specific establishment only. The full enforcement footprint of McDonald Construction Corporation across all 2 of its tracked locations is viewable on the parent profile.
Other locations under this parent
Other establishments operated by McDonald Construction Corporation, ordered by federal enforcement volume:
- MCDONALD CONSTRUCTION CORPORATIONBAY LAKE, FL — 2 federal enforcement records
Related searches
- All McDonald Construction Corporation locationsParent rollup
- Employers in FLState-wide enforcement data
About this data
This profile aggregates federal enforcement records on MCDONALD CONSTRUCTION CORPORATION from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code. This establishment resolves to the parent rollup McDonald Construction Corporation, which operates 2 establishments in our dataset.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is MCDONALD CONSTRUCTION CORPORATION's OSHA violation history?
- MCDONALD CONSTRUCTION CORPORATION has 1 OSHA inspection on record with 0 violations and $0 in total penalties.
- Has MCDONALD CONSTRUCTION CORPORATION had any workplace fatalities?
- Yes. Federal records show 1 fatality investigation involving MCDONALD CONSTRUCTION CORPORATION.