Establishment profile
MCCARTNEY CONSTRUCTION
HWY EXT # 77-I-59 GADSDEN, ATTALLA, AL, 35954
Operated by McCartney Construction Company Inc · 1 of 6 establishments
EIN 630374825
Summary
MCCARTNEY CONSTRUCTION has accumulated 2 OSHA violations across 2 inspections over 41 years of recorded history, with $2,250 in total assessed penalties.
The establishment sits in the 47th percentile for violations within its industry-state peer group of 27,145 employers. Inspection frequency runs at the 77th percentile. The most recent enforcement activity was recorded 26 years ago.
Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
MCCARTNEY CONSTRUCTION appears in OSHA workplace safety and MSHA mine safety records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
50% of inspections at this establishment produced violations,
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 2 distinct standards shown · 2 citations in this view · $2,250 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 1926.0652 B02 | 1 | 1 | $1,665 | Dec 1999 | Dec 1999 |
| 29 CFR 1926.0651 C02 | 1 | 1 | $585 | Dec 1999 | Dec 1999 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Below average violations. Peer group: 27,145 employers. This establishment has 2 OSHA violations; peer median is 2.
Safety self-report (OSHA 300A)
Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.
Reported for 47 average annual employees at this establishment.
Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for MCCARTNEY CONSTRUCTION. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 26+ years. Most recent activity: 26 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for MCCARTNEY CONSTRUCTION. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in AL — for McCartney Construction Company Inc, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other McCartney Construction Company Inc operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 28S&S · 100 contractor · $31,985 proposed / $31,145 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 8906194 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | May 2017 | — | Yes | HighNegligence | $12,300 | $12,300 |
| 7788729 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Dec 2007 | — | Yes | ModNegligence | $3,700 | $3,700 |
| 8906195 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | May 2017 | — | Yes | HighNegligence | $2,314 | $2,314 |
| 6505262 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Nov 2008 | — | No | HighNegligence | $1,203 | $363 |
| 8834814 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Sep 2014 | — | Yes | ModNegligence | $436 | $436 |
| 8906128 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Jan 2017 | — | Yes | ModNegligence | $420 | $420 |
| 8834815 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Sep 2014 | — | Yes | ModNegligence | $392 | $392 |
| 8731627 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Jul 2013 | — | Yes | ModNegligence | $362 | $362 |
| 6518318 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Jan 2010 | — | Yes | HighNegligence | $362 | $362 |
| 6505261 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Nov 2008 | — | No | ModNegligence | $362 | $362 |
| 8906198 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | May 2017 | — | Yes | ModNegligence | $356 | $356 |
| 6505417 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | May 2009 | — | Yes | ModNegligence | $249 | $249 |
| 6086938 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Jun 2008 | — | No | ModNegligence | $243 | $243 |
| 6095059 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Dec 2004 | — | Yes | ModNegligence | $228 | $228 |
| 6095052 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Nov 2004 | — | Yes | ModNegligence | $228 | $228 |
| 8552681 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Mar 2011 | — | No | ModNegligence | $224 | $224 |
| 8552680 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Mar 2011 | — | No | ModNegligence | $224 | $224 |
| 6086940 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Jun 2008 | — | No | ModNegligence | $207 | $207 |
| 8906125 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Jan 2017 | — | Yes | ModNegligence | $188 | $188 |
| 8731630 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Jul 2013 | — | Yes | ModNegligence | $181 | $181 |
| 7786260 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | May 2007 | — | Yes | ModNegligence | $176 | $176 |
| 8901899 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Apr 2016 | — | Yes | ModNegligence | $162 | $162 |
| 7763324 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Mar 2001 | 104(a) | Yes | ModNegligence | $161 | $161 |
| 6087548 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Dec 2005 | — | Yes | ModNegligence | $154 | $154 |
| 6087547 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Dec 2005 | — | Yes | ModNegligence | $154 | $154 |
| 6087546 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Dec 2005 | — | Yes | ModNegligence | $154 | $154 |
| 6087545 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Dec 2005 | — | Yes | ModNegligence | $154 | $154 |
| 6087544 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Dec 2005 | — | Yes | ModNegligence | $154 | $154 |
| 7761864 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Apr 2000 | — | Yes | ModNegligence | $131 | $131 |
| 8906196 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | May 2017 | — | Yes | LowNegligence | $126 | $126 |
| 9336591 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Feb 2019 | — | No | LowNegligence | $121 | $121 |
| 8910767 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Mar 2018 | — | No | LowNegligence | $118 | $118 |
| 8901829 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Sep 2015 | — | Yes | ModNegligence | $117 | $117 |
| 8811593 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Mar 2014 | — | Yes | ModNegligence | $117 | $117 |
| 8545900 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Jul 2010 | — | No | ModNegligence | $117 | $117 |
| 8545899 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Jul 2010 | — | No | ModNegligence | $117 | $117 |
| 6505414 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | May 2009 | — | Yes | ModNegligence | $117 | $117 |
| 8906197 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | May 2017 | — | No | ModNegligence | $116 | $116 |
| 8906127 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Jan 2017 | — | No | LowNegligence | $116 | $116 |
| 8906126 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Jan 2017 | — | No | ModNegligence | $116 | $116 |
| 6090613 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Nov 2001 | — | Yes | ModNegligence | $113 | $113 |
| 8901900 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Apr 2016 | — | No | ModNegligence | $100 | $100 |
| 8901898 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Apr 2016 | — | No | ModNegligence | $100 | $100 |
| 8901831 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Sep 2015 | — | No | LowNegligence | $100 | $100 |
| 8901830 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Sep 2015 | — | No | LowNegligence | $100 | $100 |
| 8814708 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Jul 2015 | — | No | ModNegligence | $100 | $100 |
| 8834816 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Sep 2014 | — | No | ModNegligence | $100 | $100 |
| 8834813 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Sep 2014 | — | No | ModNegligence | $100 | $100 |
| 8811592 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Mar 2014 | — | No | ModNegligence | $100 | $100 |
| 8811591 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Mar 2014 | — | No | ModNegligence | $100 | $100 |
| 8811590 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Mar 2014 | — | No | ModNegligence | $100 | $100 |
| 8731626 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Jul 2013 | — | No | ModNegligence | $100 | $100 |
| 8728992 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Mar 2013 | — | No | ModNegligence | $100 | $100 |
| 8728991 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Mar 2013 | — | No | ModNegligence | $100 | $100 |
| 8728990 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Mar 2013 | — | No | ModNegligence | $100 | $100 |
| 7771092 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Aug 2012 | — | No | LowNegligence | $100 | $100 |
| 7771091 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Aug 2012 | — | No | ModNegligence | $100 | $100 |
| 7771090 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Aug 2012 | — | No | ModNegligence | $100 | $100 |
| 8633454 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Mar 2012 | — | No | ModNegligence | $100 | $100 |
| 8633453 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Mar 2012 | — | No | ModNegligence | $100 | $100 |
| 8552716 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Jul 2011 | — | No | ModNegligence | $100 | $100 |
| 8545901 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Jul 2010 | — | No | ModNegligence | $100 | $100 |
| 6518317 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Jan 2010 | — | No | HighNegligence | $100 | $100 |
| 6518316 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Jan 2010 | — | No | ModNegligence | $100 | $100 |
| 6518315 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Jan 2010 | — | No | ModNegligence | $100 | $100 |
| 6518314 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Jan 2010 | — | No | ModNegligence | $100 | $100 |
| 6505415 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | May 2009 | — | No | ModNegligence | $100 | $100 |
| 6505263 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Nov 2008 | — | No | ModNegligence | $100 | $100 |
| 7752245 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Jan 2008 | — | No | ModNegligence | $100 | $100 |
| 7788728 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Dec 2007 | — | No | ModNegligence | $100 | $100 |
| 7788727 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Dec 2007 | — | No | ModNegligence | $100 | $100 |
| 7786264 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | May 2007 | — | No | ModNegligence | $100 | $100 |
| 7786263 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | May 2007 | — | No | ModNegligence | $100 | $100 |
| 7786262 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | May 2007 | — | No | ModNegligence | $100 | $100 |
| 7786261 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | May 2007 | — | No | ModNegligence | $100 | $100 |
| 7786259 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | May 2007 | — | No | ModNegligence | $100 | $100 |
| 7786258 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | May 2007 | — | No | ModNegligence | $100 | $100 |
| 7786257 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | May 2007 | — | No | ModNegligence | $100 | $100 |
| 6087549 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Dec 2005 | — | No | ModNegligence | $60 | $60 |
| 6088109 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Aug 2005 | — | No | ModNegligence | $60 | $60 |
| 6095058 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Nov 2004 | — | No | ModNegligence | $60 | $60 |
| 6095057 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Nov 2004 | — | No | ModNegligence | $60 | $60 |
| 6095055 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Nov 2004 | — | No | ModNegligence | $60 | $60 |
| 6095054 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Nov 2004 | — | No | ModNegligence | $60 | $60 |
| 6095053 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Nov 2004 | — | No | ModNegligence | $60 | $60 |
| 6095051 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Nov 2004 | — | No | ModNegligence | $60 | $60 |
| 6094445 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Jul 2004 | — | No | ModNegligence | $60 | $60 |
| 6093145 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Mar 2004 | — | No | ModNegligence | $60 | $60 |
| 6093144 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Mar 2004 | — | No | ModNegligence | $60 | $60 |
| 6093143 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Mar 2004 | — | No | ModNegligence | $60 | $60 |
| 6093142 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Mar 2004 | — | No | ModNegligence | $60 | $60 |
| 6092392 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Jul 2003 | — | No | ModNegligence | $60 | $60 |
| 6092391 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Jul 2003 | — | No | ModNegligence | $60 | $60 |
| 6092390 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Jul 2003 | — | No | ModNegligence | $60 | $60 |
| 6092389 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Jul 2003 | — | No | ModNegligence | $60 | $60 |
| 6091239 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Feb 2003 | — | No | ModNegligence | $55 | $55 |
| 6091157 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Sep 2002 | — | No | ModNegligence | $55 | $55 |
| 6091156 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Sep 2002 | — | No | ModNegligence | $55 | $55 |
| 6090614 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Nov 2001 | — | No | LowNegligence | $55 | $55 |
| 6090612 | Speedway Quarry Talladega, AL contractor: McCartney Construction Co., Inc. | Nov 2001 | — | No | ModNegligence | $55 | $55 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for MCCARTNEY CONSTRUCTION. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for MCCARTNEY CONSTRUCTION. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for MCCARTNEY CONSTRUCTION. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for MCCARTNEY CONSTRUCTION. Verify directly with UVA Corporate Prosecution Registry →
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 1999-12-07 | Referral | 2 | 2 | $2,250 | |
| 1985-04-15 | Planned | 0 | — | $0 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Part of a larger organization
MCCARTNEY CONSTRUCTION is one of 6 establishments rolled up under the parent organization McCartney Construction Company Inc.
Federal enforcement records on this page represent activity at this specific establishment only. The full enforcement footprint of McCartney Construction Company Inc across all 6 of its tracked locations is viewable on the parent profile.
Other locations under this parent
Other establishments operated by McCartney Construction Company Inc, ordered by federal enforcement volume:
- MCCARTNEY CONSTRUCTION CO.LINCOLN, AL — 2 federal enforcement records
- MCCARTNEY CONSTRUCTION COMPANY, INC.GLENCOE, AL — 1 federal enforcement record
- McCartney Construction Co. Inc.CULLMAN, AL — 1 federal enforcement record
- MCCARTNEY CONSTRUCTION CO., INC.LINCOLN, AL — 1 federal enforcement record
- MCCARTNEY CONSTRUCTION CO.GADSDEN, AL — 1 federal enforcement record
Related searches
- All McCartney Construction Company Inc locationsParent rollup
- Employers in ALState-wide enforcement data
About this data
This profile aggregates federal enforcement records on MCCARTNEY CONSTRUCTION from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code. This establishment resolves to the parent rollup McCartney Construction Company Inc, which operates 6 establishments in our dataset.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is MCCARTNEY CONSTRUCTION's OSHA violation history?
- MCCARTNEY CONSTRUCTION has 2 OSHA inspections on record with 2 violations and $2,250 in total penalties.