Establishment profile
Luhr Bros. Inc.
250 W. Sand Bank Rd., Columbia, IL, 62236
237990 — Other Heavy and Civil Engineering Construction
Summary
Luhr Bros. Inc. has no OSHA inspection history on file. Federal records covering wage, environmental, labor relations, and other agencies are noted below where present.
The most recent federal enforcement activity was recorded 5 years ago.
Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
Luhr Bros. Inc. appears in WHD wage enforcement, NLRB labor relations, and FMCSA motor carrier registration records only. No matching records were found in OSHA workplace safety, MSHA mine safety, EPA environmental compliance, OFLC visa and labor certification, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
No OSHA inspections, citations, or accidents on file for Luhr Bros. Inc.. Verify directly with Occupational Safety and Health Administration →
Safety self-report (OSHA 300A)
Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.
Reported for 153 average annual employees at this establishment.
Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for Luhr Bros. Inc.. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 5+ years. Most recent activity: 5 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
Department of Labor Wage & Hour Division — minimum-wage, overtime, child-labor, FMLA, and prevailing-wage enforcement.
Wage and hour breakdown by law
Per-statute totals across all closed DOL Wage & Hour cases against this employer. Backwages reflect amounts the agency assessed; civil penalty is the separate fine where applicable. Some acts (Davis-Bacon, SCA, CWHSSA, H-2B, CCPA) don't carry a civil penalty field in DOL's data. 2 statutes · 3 violations · $0 in backwages
| Statute | Period | Cases | Violations | Workers | Backwages | Civil penalty |
|---|---|---|---|---|---|---|
| FLSA — minimum wage & overtime | Feb 2016 – Sep 2020 | 2 | 2 | — | — | — |
| Davis-Bacon (federal construction) | Sep 2020 | 1 | 1 | — | — | — |
Source: DOL WHD enforcement database, aggregated per statute. Lifetime totals. A case can cite multiple statutes — so the total here may exceed the case count in the table above.
Wage and hour cases
Closed DOL Wage & Hour Division cases (FLSA, FMLA, H-2B, MSPA, and related statutes). Backwages reflect amounts the agency assessed; final payment may differ. 2 cases · $0 in backwages · 0 workers affected
| Case period | Industry | Backwages | Workers |
|---|---|---|---|
| Sep 2019 – Sep 2020 | Other Heavy and Civil Engineering Construction | — | 0 |
| Nov 2015 – Feb 2016 | Other Heavy and Civil Engineering Construction | — | 0 |
Source: DOL WHD enforcement database. Cases shown reflect those the agency has closed and made public.
Mine safety (MSHA)
No MSHA mine safety violations on file for Luhr Bros. Inc.. Verify directly with Mine Safety and Health Administration →
Labor relations (NLRB)
Company-level in IL — for Luhr Bros. Inc., not this location alone
National Labor Relations Board — unfair labor practice charges and union representation cases. The NLRB records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other Luhr Bros. Inc. locations in the same state.
Visa & labor certification (OFLC)
No H-1B, H-2A, or H-2B labor condition applications on file for Luhr Bros. Inc.. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for Luhr Bros. Inc.. Verify directly with Environmental Protection Agency →
Motor carrier safety (FMCSA)
Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for Luhr Bros. Inc.. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
- Department of DefenseFUNDING 2017contract · Last action 2022-02-04$52,202,422
- Department of DefenseMONROE BANK STABILIZATIONcontract · Last action 2021-12-03$34,231,352
- Department of DefenseTAS::96 3135::TAS (NO ARRA OBLIGATION ON BASE AWARD) MAINTENANCE DREDGING OF THE OHIO RIVER, TRIBUTARIES, AND UPPER MISSISSIPPI RIVER (RM 0.0 -195.0) FOR THE LOUISVILLE DISTRICT, U.S. ARMY CORPS OF ENGINEERScontract · Last action 2013-04-05$25,232,490
- Department of DefenseLPV MANCHAC MITIGATIONcontract · Last action 2014-03-06$22,964,925
- Department of DefenseIGF::OT::IGF STONE SUBAQUEOUS PAVINGcontract · Last action 2020-02-13$20,313,099
- Department of DefenseHOUSTON-GALVESTON NAVIGATION CHANNEL, TX, PLACEMENT AREA NOS. 14 AND 15 IN CHAMBERS COUNTY, TX, LEVEE CONSTRUCTION.contract · Last action 2010-10-25$17,970,550
- Department of DefenseOPTION YEAR 2 REGIONAL HYDRAULIC DREDGING TASK ORDERcontract · Last action 2023-01-05$14,003,691
- Department of DefenseGRADED STONE A (SHOOFLY)contract · Last action 2014-09-30$12,789,968
- Department of DefenseB4L1430 FLOOD CONTROL, MISSISSIPPI RIVER AND TRIBUTARIES, MISSISSIPPI RIVER, STONE DIKE CONSTRUCTION, YUCATAN, LA., RM 411.1-R, AHPcontract · Last action 2014-04-17$12,712,373
- Department of DefenseSECOND TASK ORDER, STONE/ROCK PLACEMENT 2019contract · Last action 2020-11-05$12,494,314
- Department of DefenseGRADED STONE C - WOLF ISLANDcontract · Last action 2023-05-24$12,152,480
- Department of DefenseB411000 - STONE DIKE CONSTRUCTION, VICTORIA BENDcontract · Last action 2015-02-27$11,527,137
- Department of DefenseUPPER DIKE&REVETMENT - MRM 300-0contract · Last action 2021-08-11$11,447,975
- Department of DefenseMISSISSIPPI RIVER STONE STRUCTUREScontract · Last action 2022-07-17$11,145,953
- Department of DefenseOLDTOWN REVETMENT MAINTENANCEcontract · Last action 2021-07-16$11,002,560
- Department of DefenseDIKE & REVETMENT 300-0contract · Last action 2024-08-22$10,342,307
- Department of DefenseIGF::OT::IGF JBJW STONE REPAIRS TO REVETMENTS&DIKEScontract · Last action 2019-01-11$10,072,123
- Department of DefenseFIRST TASK ORDER, ROCK PLACEMENT 2019contract · Last action 2020-04-20$9,606,166
- Department of DefenseMISSISSIPPI RIVER STONE STRUCTUREScontract · Last action 2021-06-15$9,437,880
- Department of DefenseMISSISSIPPI RIVER STONE STRUCTUREScontract · Last action 2021-09-10$9,307,620
- Department of DefenseOHIO RIVER DIKES AT WABASHcontract · Last action 2024-01-18$8,849,721
- Department of DefenseTAS::96 3113::TAS ARRA::YES::ARRA RECOVERYPROJECT#::107046::RP# PROJECT TITLE: DIKE CONSTRUCTION AT VARIOUS POINTS ALONG THE MISSISSIPPI RIVER. STONE DIKE CONSTRUCTION AT VARIOUS POINTS ALONG THE MISSISSIPPI RIVER INCLUDING AT FRIARS POINT, LOOSAHATCHIE, ROBINSON, AND COW ISLAND. ALSO INCLUDED ARE CORRECTIONS TO DEFICIENCIES DUE TO NEEDED REPAIRS.contract · Last action 2012-06-26$8,748,396
- Department of DefenseFLOOD CONTROL, MISSISSIPPI RIVER AND TRIBUTARIES, INDEFINITE DELIVERY - INDEFINITE QUANTITY CONTRACT, 2011 STONE PLACEMENT, MISSISSIPPI, ATCHAFALAYA, AND RED RIVERS AND OLDER RIVER CONTROL CHANNELScontract · Last action 2012-06-30$8,673,283
- Department of DefenseSTONE DIKE CONTRACT TASK ORDER-STONE PLACEMENTcontract · Last action 2023-03-29$8,484,600
- Department of DefenseGRADED STONE Acontract · Last action 2009-02-18$8,475,573
- Department of DefenseREGIONAL HYDRAULIC DREDGING-OPTION YR 1contract · Last action 2021-12-29$8,397,646
- Department of DefenseGRADED STONE C (QUARRY)contract · Last action 2024-05-08$8,292,600
- Department of DefenseSCOUR REPAIR, LOCK & DAM 25contract · Last action 2012-04-20$8,102,352
- Department of DefenseIGF::OT::IGF B4L1620 STEELE BAYOU OUTLET STRUCTURE REPAIRcontract · Last action 2015-02-06$7,770,409
- Department of DefenseSTONE SUBAQUEOUScontract · Last action 2020-08-21$7,726,145
- Department of DefenseIGF::OT::IGF-FAIR LANDING BENDWAY WEIRScontract · Last action 2015-02-24$7,635,995
- Department of DefenseDREDGING NAVIGATION CHANNELS OHIO RIVERcontract · Last action 2020-04-08$7,268,263
- Department of DefenseIGF::OT::IGF-PRESIDENT'S ISLAND STONE CAP-THE WORK UNDER THIS TASK ORDER CONSISTS OF FURNISHING ALL PLANT, LABOR AND MATERIALScontract · Last action 2015-04-02$7,118,125
- Department of DefenseSCHEDULE A - BASE YEAR (2012)- CACHE-CAIRO REVETMENT STONE PAVING/TOE, ALEXANDER COUNTY, IL OHIO RIVER MILE 978Rcontract · Last action 2012-09-25$6,864,960
- Department of DefenseB4L1600 SCHEDULE A - BASE YEAR (2010), BELOW BELLE ISLAND, MARSHALL BROWN POINT, MS, WARREN COUNTY, MScontract · Last action 2011-09-09$6,788,145
- Department of DefenseSTONE SUBAQUEOUS PAVINGcontract · Last action 2011-03-30$6,782,501
- Department of DefensePIASA&EAGLE'S NEST ISLAND'S REST/REHABcontract · Last action 2022-05-24$6,644,211
- Department of DefenseDREDGING TASK ORDER FOR BASE YEARcontract · Last action 2020-12-22$6,333,033
- Department of Defense3001AE STONE DELIVERYcontract · Last action 2022-12-01$6,084,400
- Department of DefenseSTONE SUBAQUEOUS PAVING, MISSISSIPPI RIVE AND INFLOW CHANNELS -- "GRADE STONE B" (OPTIONAL)contract · Last action 2011-12-22$5,825,399
- Department of DefenseIGF::OT::IGF -BASE YEAR - GUARANTEED MINIMUMcontract · Last action 2018-10-04$5,784,963
- Department of DefenseBARFIELD REVETMENT MAINTENANCEcontract · Last action 2022-07-17$5,765,725
- Department of Defense200512!501353!96CE!W912QR!USA ENGINEER DIST LOUISVILLE !W912QR05C0011 !A!N! !Y! ! !20050602!20100506!007849169!007849169!007849169!N!LUHR BROS INC !250 W SAND BANK ROAD !COLUMBIA !IL!62236!48000!111!21!LOUISVILLE !JEFFERSON !KENTUCKY !+000004014308!N!N!000021903518!Z216!DREDGING, EXCL. DUSTPAN AND SEA-GOING HOPPERS !C2 !CONSTRUCTION !000 !* !237990!E! !3! ! ! ! ! !20200930!B! ! !A! !A!U!J!2!001!A! !D!N!Z! ! !N!C!Y! ! ! !Z!Z!A!A!000!A!B!Y! !N! ! ! ! !0001! !contract · Last action 2013-04-16$5,690,957
- Department of DefenseIGF::OT::IGF B4L1440 CONSTRUCTION, WILSON POINT, LA, RM 500.8contract · Last action 2015-11-13$5,661,077
- Department of DefenseGRADED STONE Ccontract · Last action 2022-07-20$5,340,800
- Department of DefenseFOR FUNDING PURPOSES ONLYcontract · Last action 2018-12-12$5,210,884
- Department of DefenseRANDOLPH DIKE CONSTRUCTION THE ADDITIONAL WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, AND MATERIALS FOR RAISING EXISTING RANDOLPH TRAIL DIKE NO. 1T AN ADDITIONAL 250 FEET BEYOND THE ORIGINAL LIMITS (ST 97+50) AS OUTLINED ON THE ATTACHED REVISED DRAWING BY PLACEMENT OF GRADED STONE A AND GRADED STONE C IN THE SAME MANNER AS PREVIOUSLY SPECIFIED IN THE TASK ORDER PLANS AND SPECIFICATIONS. IN ADDITION, THE WORK CONSISTS OF RAISING THE EXISTING BASED IN TRAIL DIKE TO A -10 LWRP (ELEVATION 186.80 FT NAVD88) AND WIDENING FROM EXISTING APPROXIMATE 40-FOOT CROWN WIDTH BASE TO APPROXIMATELY 100-FOOT CROWN WIDTH FOR A DISTANCE OF APPROXIMATELY 200 LINEAR FEET DOWNSTREAM FROM ST 101+00 TO ST 103+00 ALONG THE TRAIL DIKE USING GRADED STONE A. THE WIDENING OF THE CROWN WIDTH SHOULD BE TOWARDS THE LANDSIDE OF THE EXISTING FOOTPRINT OF STONE AND SHOULD TIE INTO THE EXISTING 40-FOOT BASE SO AS TO MAKE A CONTINUOUS 100 FT-WIDE BASE DIKE AT A -10 LWRP ELEVATION. THE WIDENING OF THE BASE STONE SECTION CAN BE COMPLETED TO FULL GRADE AND SECTION IN A SINGLE LIFT OF STONE. THE ADDITIONAL QUANTITIES TO BE PLACED FOR THIS WORK ARE AS FOLLOWS: GRADED STONE A 42,200 TN GRADED STONE C 4,500 TN THE REVISED TOTAL QUANTITIES OF STONE FOR THE TASK ORDER WILL BE 255,200 TN OF GRADED STONE A AND 22,500 TN OF GRADED STONE C. IN ADDITION, THE NUMBER OF CALENDAR DAYS FOR COMPLETION OF THE ENTIRE WORK IS INCREASED BY 15 DAYS FROM A TOTAL OF 80 CALENDAR DAYS TO 95 CALENDAR DAYS.contract · Last action 2014-06-05$5,120,497
- Department of DefenseDREDGING NAVIGATION CHANNELS OHIO RIVERcontract · Last action 2018-12-19$5,079,189
- Department of DefenseIGF::OT::IGF RANDOLPH-HATCHIE TOWHEAD DIKEcontract · Last action 2018-08-26$4,977,670
- Department of DefenseCONSTRUCTION OF RIVER DIKES 8-13contract · Last action 2020-06-23$4,910,748
Federal contract dollars to this establishment. Primary NAICS: 237990 - OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION. Last action: 2025-05-13. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
In the news
Other employers in this industry and state
Other employers in other heavy and civil engineering construction within IL, ordered by federal enforcement volume:
- MICHELS CONSTRUCTION, INC.HAMILTON — 3 federal enforcement records
- KENNY CONSTRUCTION COMPANYHODGKINS — 3 federal enforcement records
- WALSH CONSTRUCTION COMPANYTHORNTON — 3 federal enforcement records
- WALSH CONSTRUCTION COMPANYLOCKPORT — 3 federal enforcement records
- IHC CONSTRUCTION COMPANIES, L.L.C.WILMETTE — 2 federal enforcement records
- KENNY CONSTRUCTION COMPANYDES PLAINES — 2 federal enforcement records
- GREAT LAKES DREDGE & DOCK CO., LLCDECATUR — 2 federal enforcement records
- HOLLAND, L.P.UNIVERSITY PARK — 2 federal enforcement records
- Meade ElectricMC COOK — 2 federal enforcement records
- STARK EXCAVATING, INC.NORMAL — 2 federal enforcement records
Related searches
- Other Heavy and Civil Engineering ConstructionAll employers in this industry
- Employers in ILState-wide enforcement data
- Other Heavy and in ILIndustry × state cross-filter
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →About this data
This profile aggregates federal enforcement records on Luhr Bros. Inc. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Frequently asked
- What is Luhr Bros. Inc.'s OSHA violation history?
- Luhr Bros. Inc. has no OSHA inspections on record.
- How does Luhr Bros. Inc.'s safety record compare to its industry?
- Luhr Bros. Inc. operates in the other heavy and civil engineering construction industry. The industry average Total Recordable Incident Rate (TRIR) is 1.8. Luhr Bros. Inc.'s self-reported DART rate is 0.45 compared to an industry average of 1.