Establishment profile
LANE CONSTRUCTION
RTE 202 & 10, WESTFIELD, MA, 01085
237310 — Highway, Street, and Bridge Construction
Summary
LANE CONSTRUCTION has accumulated 0 OSHA violations across 1 inspection over 17 years of recorded history.
The most recent federal enforcement activity was recorded 17 years ago.
Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
LANE CONSTRUCTION appears in OSHA workplace safety, MSHA mine safety, and NLRB labor relations records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
Peer comparison
Fewer violations than most other employers in NAICS 2373 within MA. Peer group: 624 employers. This establishment has 0 OSHA violations; peer median is 1.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for LANE CONSTRUCTION. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for LANE CONSTRUCTION. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 17+ years. Most recent activity: 17 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for LANE CONSTRUCTION. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in MA — for LANE CONSTRUCTION, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other LANE CONSTRUCTION operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 91 citations · 20S&S · 91 contractor · $9,965 proposed / $9,965 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 9361884 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | Nov 2017 | — | Yes | ModNegligence | $363 | $363 |
| 6048462 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Jun 2007 | — | Yes | ModNegligence | $362 | $362 |
| 6536519 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | Jun 2009 | — | Yes | ModNegligence | $334 | $334 |
| 8707019 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Jul 2012 | — | Yes | ModNegligence | $308 | $308 |
| 6062064 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Oct 2008 | — | Yes | ModNegligence | $308 | $308 |
| 6023700 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Oct 2004 | — | Yes | ModNegligence | $165 | $165 |
| 6023698 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Oct 2004 | — | Yes | ModNegligence | $165 | $165 |
| 6038520 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | Apr 2006 | — | Yes | ModNegligence | $154 | $154 |
| 7749918 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Oct 2002 | — | Yes | ModNegligence | $140 | $140 |
| 7749917 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Oct 2002 | — | Yes | ModNegligence | $140 | $140 |
| 8581302 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | Oct 2010 | — | Yes | LowNegligence | $138 | $138 |
| 6023703 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Oct 2004 | — | Yes | ModNegligence | $135 | $135 |
| 6018428 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Jun 2004 | — | Yes | ModNegligence | $135 | $135 |
| 7749293 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | May 2002 | — | Yes | ModNegligence | $122 | $122 |
| 9361885 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | Nov 2017 | — | No | LowNegligence | $118 | $118 |
| 9361883 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | Nov 2017 | — | No | LowNegligence | $118 | $118 |
| 9366528 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Oct 2017 | — | Yes | ModNegligence | $116 | $116 |
| 9361444 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | May 2017 | — | No | LowNegligence | $116 | $116 |
| 9361443 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | May 2017 | — | No | ModNegligence | $116 | $116 |
| 9314327 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Oct 2016 | — | No | LowNegligence | $114 | $114 |
| 9314326 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Oct 2016 | — | No | LowNegligence | $114 | $114 |
| 9314325 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Oct 2016 | — | No | ModNegligence | $114 | $114 |
| 9314324 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Oct 2016 | — | No | LowNegligence | $114 | $114 |
| 9314323 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Oct 2016 | — | No | LowNegligence | $114 | $114 |
| 6004739 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | Jul 2003 | — | Yes | ModNegligence | $114 | $114 |
| 6048461 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Jun 2007 | — | No | HighNegligence | $108 | $108 |
| 8806461 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | Nov 2014 | — | No | ModNegligence | $100 | $100 |
| 8801724 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | Jun 2014 | — | No | LowNegligence | $100 | $100 |
| 8801723 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | Jun 2014 | — | No | ModNegligence | $100 | $100 |
| 8801722 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | Jun 2014 | — | No | LowNegligence | $100 | $100 |
| 8801721 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | Jun 2014 | — | No | ModNegligence | $100 | $100 |
| 8798676 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Apr 2014 | — | No | ModNegligence | $100 | $100 |
| 8798675 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Apr 2014 | — | No | ModNegligence | $100 | $100 |
| 8798678 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | Sep 2013 | — | No | ModNegligence | $100 | $100 |
| 8794808 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | Aug 2013 | — | No | ModNegligence | $100 | $100 |
| 8794807 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | Aug 2013 | — | No | LowNegligence | $100 | $100 |
| 8715547 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | May 2013 | — | No | LowNegligence | $100 | $100 |
| 8715546 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | May 2013 | — | No | ModNegligence | $100 | $100 |
| 8707022 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Jul 2012 | — | No | ModNegligence | $100 | $100 |
| 8707021 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Jul 2012 | — | Yes | LowNegligence | $100 | $100 |
| 8707020 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Jul 2012 | — | Yes | ModNegligence | $100 | $100 |
| 8707018 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Jul 2012 | — | No | LowNegligence | $100 | $100 |
| 8707017 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Jul 2012 | — | No | LowNegligence | $100 | $100 |
| 8650248 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | Nov 2011 | — | No | ModNegligence | $100 | $100 |
| 8650247 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | Nov 2011 | — | No | LowNegligence | $100 | $100 |
| 8648360 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Aug 2011 | — | No | ModNegligence | $100 | $100 |
| 8648359 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Aug 2011 | — | No | HighNegligence | $100 | $100 |
| 8581303 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | Oct 2010 | — | Yes | ModNegligence | $100 | $100 |
| 8581301 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | Oct 2010 | — | No | HighNegligence | $100 | $100 |
| 8573741 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | May 2010 | — | Yes | LowNegligence | $100 | $100 |
| 8573740 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | May 2010 | — | No | ModNegligence | $100 | $100 |
| 8573739 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | May 2010 | — | No | ModNegligence | $100 | $100 |
| 8573738 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | May 2010 | — | No | ModNegligence | $100 | $100 |
| 8573140 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | Apr 2010 | — | No | ModNegligence | $100 | $100 |
| 8573139 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | Apr 2010 | — | No | ModNegligence | $100 | $100 |
| 8573138 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | Apr 2010 | — | No | ModNegligence | $100 | $100 |
| 8573137 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | Apr 2010 | — | No | LowNegligence | $100 | $100 |
| 6536520 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | Jun 2009 | — | No | ModNegligence | $100 | $100 |
| 6536518 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | Jun 2009 | — | No | ModNegligence | $100 | $100 |
| 6536517 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | Jun 2009 | — | No | ModNegligence | $100 | $100 |
| 6062063 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Oct 2008 | — | No | ModNegligence | $100 | $100 |
| 6062062 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Oct 2008 | — | No | ModNegligence | $100 | $100 |
| 6053927 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | Oct 2007 | — | No | LowNegligence | $100 | $100 |
| 6053926 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | Oct 2007 | — | No | LowNegligence | $100 | $100 |
| 6053924 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | Oct 2007 | — | No | LowNegligence | $100 | $100 |
| 6048083 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Oct 2007 | — | No | LowNegligence | $100 | $100 |
| 6048466 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Jun 2007 | — | No | ModNegligence | $100 | $100 |
| 6048465 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Jun 2007 | — | No | LowNegligence | $100 | $100 |
| 6048464 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Jun 2007 | — | No | ModNegligence | $100 | $100 |
| 6048463 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Jun 2007 | — | No | ModNegligence | $100 | $100 |
| 6038521 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | Apr 2006 | — | No | LowNegligence | $60 | $60 |
| 6027585 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Oct 2005 | — | No | ModNegligence | $60 | $60 |
| 6027584 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Oct 2005 | — | No | ModNegligence | $60 | $60 |
| 6027583 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Oct 2005 | — | No | ModNegligence | $60 | $60 |
| 6027582 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Oct 2005 | — | No | ModNegligence | $60 | $60 |
| 6027581 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Oct 2005 | — | No | ModNegligence | $60 | $60 |
| 6027580 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Oct 2005 | — | No | ModNegligence | $60 | $60 |
| 6023704 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Oct 2004 | — | No | ModNegligence | $60 | $60 |
| 6023702 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Oct 2004 | — | No | ModNegligence | $60 | $60 |
| 6023701 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Oct 2004 | — | No | LowNegligence | $60 | $60 |
| 6023699 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Oct 2004 | — | No | ModNegligence | $60 | $60 |
| 6004738 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | Jul 2003 | — | No | LowNegligence | $60 | $60 |
| 6004737 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | Jul 2003 | — | No | ModNegligence | $60 | $60 |
| 7749919 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Oct 2002 | — | No | ModNegligence | $55 | $55 |
| 4427662 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | May 2002 | — | No | ModNegligence | $55 | $55 |
| 4427661 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | May 2002 | — | No | ModNegligence | $55 | $55 |
| 7749292 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | May 2002 | — | No | ModNegligence | $55 | $55 |
| 7749291 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | May 2002 | — | No | ModNegligence | $55 | $55 |
| 7740291 | Northfield Plant #38 Franklin, MA contractor: Lane Construction Corporation | Sep 2001 | — | No | ModNegligence | $55 | $55 |
| 7723597 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Apr 2000 | — | No | ModNegligence | $55 | $55 |
| 7723596 | Lenox Dale Plant Berkshire, MA contractor: Lane Construction Corporation | Apr 2000 | — | No | ModNegligence | $55 | $55 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
Company-level in MA — for LANE CONSTRUCTION, not this location alone
National Labor Relations Board — unfair labor practice charges and union representation cases. The NLRB records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other LANE CONSTRUCTION locations in the same state.
NLRB cases
National Labor Relations Board cases involving this employer. Includes unfair labor practice (ULP) filings and representation election proceedings. NLRB enforcement is process-driven; no per-case monetary penalty is assessed (remedies are case-by-case backpay orders, posting requirements, election re-runs, etc.). 1 case · 1 ULP
| Case number | Type | Filed | Closed | Status | Region |
|---|---|---|---|---|---|
| 01-CA-037459 | Unfair labor practice | Jul 1999 | Nov 2000 | Closed | Region 01, Boston, Massachusetts |
Source: NLRB case files. Rows shown are those the agency has published. Region numbers (1–31) correspond to NLRB's geographic offices.
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for LANE CONSTRUCTION. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for LANE CONSTRUCTION. Verify directly with Environmental Protection Agency →
EPA-registered facilities
Every EPA ECHO facility associated with this employer, sorted most-significant first. Each row links to EPA’s Detailed Facility Report for the source-of-truth record. Permits column lists active programs (Air = Clean Air Act, Water = Clean Water Act, RCRA = hazardous waste, TRI = Toxics Release Inventory reporting). 1 facility.
| Facility | Permits | Status | Inspections | Formal actions | Penalties | Last inspected | ECHO |
|---|---|---|---|---|---|---|---|
LANE CONSTRUCTION CORP 311 EAST MOUNTAIN ROAD · WESTFIELD, MA, 01085 | AirWaterRCRA | No Violation Identified | 0 | 0 | — | Apr 2010 | View → |
Source: EPA ECHO (Enforcement and Compliance History Online). Compliance status follows EPA’s own labels (“Sig Violation” = significant noncompliance; QNCR = quarters of noncompliance over the recent reporting window). Inactive facilities (struck through) retain historical enforcement records even after operations ceased.
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2009-05-08 | Referral | 0 | — | $0 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in highway, street, and bridge construction within MA, ordered by federal enforcement volume:
- WALSH CONTRACTING CORPORATIONBOSTON — 3 federal enforcement records
- PALMER PAVING CORPORATIONPALMER — 3 federal enforcement records
- WALSH CONTRACTING CORPORATIONHINGHAM — 3 federal enforcement records
- D.W. WHITE CONSTRUCTION, INCORPORATEDFALL RIVER — 2 federal enforcement records
- P.A. LANDERS, INC.MASHPEE — 2 federal enforcement records
- ATLANTIC BRIDGE AND ENGINEERING, INC.HAVERHILL — 2 federal enforcement records
- N GRANESE & SONS INCMarblehead — 2 federal enforcement records
- NORTHERN CONSTRUCTION SERVICE, LLCAGAWAM — 2 federal enforcement records
- D. W. WHITE CONSTRUCTION INC.DANVERS — 2 federal enforcement records
- A.F. AMORELLO & SONS INC.SHREWSBURY — 2 federal enforcement records
Related searches
- Highway, Street, and Bridge ConstructionAll employers in this industry
- Employers in MAState-wide enforcement data
- Highway, Street, and in MAIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on LANE CONSTRUCTION from every major federal compliance and enforcement source. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is LANE CONSTRUCTION's OSHA violation history?
- LANE CONSTRUCTION has 1 OSHA inspection on record with 0 violations and $0 in total penalties.
- How does LANE CONSTRUCTION's safety record compare to its industry?
- LANE CONSTRUCTION operates in the highway, street, and bridge construction industry. The industry average Total Recordable Incident Rate (TRIR) is 2.5.