Establishment profile
LANE CONSTRUCTION
MAIN STREET, EDGECOMB, ME, 04556
237310 — Highway, Street, and Bridge Construction
Summary
LANE CONSTRUCTION has accumulated 0 OSHA violations across 3 inspections over 16 years of recorded history.
The most recent federal enforcement activity was recorded 16 years ago.
Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
LANE CONSTRUCTION appears in OSHA workplace safety and MSHA mine safety records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
Peer comparison
Fewer violations than most other employers in NAICS 2373 within ME. Peer group: 394 employers. This establishment has 0 OSHA violations; peer median is 1.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for LANE CONSTRUCTION. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for LANE CONSTRUCTION. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 16+ years. Most recent activity: 16 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for LANE CONSTRUCTION. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in ME — for LANE CONSTRUCTION, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other LANE CONSTRUCTION operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 60S&S · 81 contractor · $24,293 proposed / $24,266 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 9361756 | Presque Isle Quarry & Mill Aroostook, ME contractor: Lane Construction Corp | Jun 2017 | — | Yes | ModNegligence | $2,438 | $2,438 |
| 9361755 | Presque Isle Quarry & Mill Aroostook, ME contractor: Lane Construction Corp | Jun 2017 | — | Yes | ModNegligence | $2,438 | $2,438 |
| 6059913 | Bangor Portable Plant Penobscot, ME | Jun 2008 | — | Yes | HighNegligence | $1,337 | $1,337 |
| 6041643 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Oct 2006 | — | Yes | HighNegligence | $838 | $838 |
| 9412604 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Apr 2018 | — | Yes | ModNegligence | $502 | $502 |
| 8576874 | Diester Screen Waldo, ME contractor: Lane Construction Corp. | Sep 2010 | — | Yes | HighNegligence | $473 | $473 |
| 6038486 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Jul 2006 | — | Yes | ModNegligence | $375 | $375 |
| 6038485 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Jul 2006 | — | Yes | ModNegligence | $375 | $375 |
| 6038523 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Apr 2006 | — | Yes | ModNegligence | $375 | $375 |
| 9413964 | Presque Isle Quarry & Mill Aroostook, ME contractor: Lane Construction Corp | Aug 2018 | — | Yes | ModNegligence | $363 | $363 |
| 8577189 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Sep 2010 | — | Yes | ModNegligence | $362 | $362 |
| 6539160 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Sep 2009 | — | Yes | ModNegligence | $362 | $362 |
| 6534969 | Presque Isle Quarry & Mill Aroostook, ME contractor: Lane Construction Corp | Sep 2009 | — | Yes | ModNegligence | $334 | $334 |
| 6038487 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Jul 2006 | — | Yes | ModNegligence | $324 | $324 |
| 6013779 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Jun 2004 | — | Yes | ModNegligence | $324 | $324 |
| 6013778 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Jun 2004 | — | Yes | ModNegligence | $324 | $324 |
| 8570320 | Belfast Quarry & Mill Waldo, ME contractor: Lane Construction Corporation | Oct 2009 | — | Yes | ModNegligence | $308 | $308 |
| 6022872 | Portable #50 Plant Hancock, ME | Aug 2004 | — | Yes | HighNegligence | $286 | $286 |
| 8648418 | Bangor Portable Plant Penobscot, ME | Apr 2011 | — | Yes | ModNegligence | $285 | $285 |
| 8648416 | Bangor Portable Plant Penobscot, ME | Apr 2011 | — | Yes | ModNegligence | $285 | $285 |
| 8576869 | Belfast Quarry & Mill Waldo, ME contractor: Lane Construction Corporation | Sep 2010 | — | Yes | ModNegligence | $285 | $285 |
| 8575990 | 30X42 Cedar Rapids Jaw Crusher Waldo, ME | Jun 2010 | — | Yes | ModNegligence | $285 | $285 |
| 6013789 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Jun 2004 | — | Yes | ModNegligence | $268 | $268 |
| 6013788 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Jun 2004 | — | Yes | ModNegligence | $268 | $268 |
| 6013787 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Jun 2004 | — | Yes | ModNegligence | $268 | $268 |
| 6013786 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Jun 2004 | — | Yes | ModNegligence | $268 | $268 |
| 6013784 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Jun 2004 | — | Yes | ModNegligence | $268 | $268 |
| 6013782 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Jun 2004 | — | Yes | ModNegligence | $268 | $268 |
| 6001678 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Oct 2002 | — | Yes | ModNegligence | $242 | $242 |
| 8648415 | Bangor Portable Plant Penobscot, ME | Apr 2011 | — | No | HighNegligence | $212 | $212 |
| 6050421 | MOSQUITO MOUNTAIN PIT AND MILL Waldo, ME | Jun 2007 | — | No | HighNegligence | $207 | $207 |
| 6013783 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Jun 2004 | — | Yes | ModNegligence | $203 | $203 |
| 6001677 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Oct 2002 | — | Yes | ModNegligence | $196 | $196 |
| 6042129 | Sunrise Materials Medway Plant Penobscot, ME | Aug 2006 | — | Yes | ModNegligence | $191 | $191 |
| 6042125 | Sunrise Materials Medway Plant Penobscot, ME | Aug 2006 | — | Yes | ModNegligence | $191 | $191 |
| 6022871 | Portable #50 Plant Hancock, ME | Aug 2004 | — | Yes | HighNegligence | $191 | $191 |
| 9413251 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Nov 2018 | — | No | LowNegligence | $177 | $177 |
| 9312654 | Presque Isle Quarry & Mill Aroostook, ME contractor: Lane Construction Corp | Oct 2016 | — | Yes | ModNegligence | $171 | $171 |
| 8577185 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Sep 2010 | — | Yes | LowNegligence | $162 | $162 |
| 6539166 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Sep 2009 | — | Yes | ModNegligence | $162 | $162 |
| 6062166 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Sep 2008 | — | Yes | LowNegligence | $162 | $162 |
| 6050397 | Presque Isle Quarry & Mill Aroostook, ME contractor: Lane Construction Corp | Aug 2007 | — | Yes | ModNegligence | $162 | $162 |
| 9311399 | Hancock Plant Hancock, ME contractor: Lane Construction Corp | Nov 2016 | — | No | HighNegligence | $145 | $145 |
| 8570318 | Belfast Quarry & Mill Waldo, ME contractor: Lane Construction Corporation | Oct 2009 | — | Yes | ModNegligence | $138 | $138 |
| 7740338 | Belfast Quarry & Mill Waldo, ME contractor: Lane Construction Corporation | May 2002 | — | Yes | ModNegligence | $131 | $131 |
| 7733658 | Bangor Portable Plant Penobscot, ME | Aug 2000 | — | Yes | ModNegligence | $131 | $131 |
| 8582885 | 30X42 Cedar Rapids Jaw Crusher Waldo, ME | Jun 2010 | — | Yes | ModNegligence | $127 | $127 |
| 8571104 | MOSQUITO MOUNTAIN PIT AND MILL Waldo, ME | Nov 2009 | — | Yes | ModNegligence | $127 | $100 |
| 6538337 | Bangor Portable Plant Penobscot, ME | Sep 2009 | — | Yes | ModNegligence | $127 | $127 |
| 6538333 | Bangor Portable Plant Penobscot, ME | Sep 2009 | — | Yes | ModNegligence | $127 | $127 |
| 7731149 | Hancock Plant Hancock, ME contractor: Lane Construction Corp | May 2000 | — | Yes | ModNegligence | $122 | $122 |
| 7731144 | Hancock Plant Hancock, ME contractor: Lane Construction Corp | May 2000 | — | Yes | ModNegligence | $122 | $122 |
| 9413963 | Presque Isle Quarry & Mill Aroostook, ME contractor: Lane Construction Corp | Aug 2018 | — | No | ModNegligence | $118 | $118 |
| 9412605 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Apr 2018 | — | No | ModNegligence | $118 | $118 |
| 9412603 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Apr 2018 | — | No | ModNegligence | $118 | $118 |
| 9366856 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Nov 2017 | — | No | LowNegligence | $118 | $118 |
| 9366855 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Nov 2017 | — | No | LowNegligence | $118 | $118 |
| 9366854 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Nov 2017 | — | Yes | LowNegligence | $118 | $118 |
| 9366853 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Nov 2017 | — | No | LowNegligence | $118 | $118 |
| 9366852 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Nov 2017 | — | No | LowNegligence | $118 | $118 |
| 9366851 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Nov 2017 | — | No | ModNegligence | $118 | $118 |
| 9366850 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Nov 2017 | — | No | LowNegligence | $118 | $118 |
| 9366849 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Nov 2017 | — | No | ModNegligence | $118 | $118 |
| 9367730 | Belfast Quarry & Mill Waldo, ME contractor: Lane Construction Corporation | Nov 2017 | — | No | ModNegligence | $118 | $118 |
| 8796460 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Nov 2013 | — | Yes | ModNegligence | $117 | $117 |
| 9365559 | Belfast Quarry & Mill Waldo, ME contractor: Lane Construction Corporation | Oct 2017 | — | No | LowNegligence | $116 | $116 |
| 9366740 | Hancock Plant Hancock, ME contractor: Lane Construction Corp | Oct 2017 | — | No | ModNegligence | $116 | $116 |
| 9366739 | Hancock Plant Hancock, ME contractor: Lane Construction Corp | Oct 2017 | — | Yes | ModNegligence | $116 | $116 |
| 9366738 | Hancock Plant Hancock, ME contractor: Lane Construction Corp | Oct 2017 | — | No | ModNegligence | $116 | $116 |
| 9366737 | Hancock Plant Hancock, ME contractor: Lane Construction Corp | Oct 2017 | — | No | ModNegligence | $116 | $116 |
| 9317786 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Jul 2017 | — | No | ModNegligence | $116 | $116 |
| 9317785 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Jul 2017 | — | No | ModNegligence | $116 | $116 |
| 9317784 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Jul 2017 | — | No | LowNegligence | $116 | $116 |
| 9317783 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Jul 2017 | — | No | ModNegligence | $116 | $116 |
| 6756401 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Nov 2016 | — | No | ModNegligence | $114 | $114 |
| 9311398 | Hancock Plant Hancock, ME contractor: Lane Construction Corp | Nov 2016 | — | No | ModNegligence | $114 | $114 |
| 9312664 | Presque Isle Quarry & Mill Aroostook, ME contractor: Lane Construction Corp | Oct 2016 | — | No | LowNegligence | $114 | $114 |
| 9312663 | Presque Isle Quarry & Mill Aroostook, ME contractor: Lane Construction Corp | Oct 2016 | — | No | LowNegligence | $114 | $114 |
| 9312662 | Presque Isle Quarry & Mill Aroostook, ME contractor: Lane Construction Corp | Oct 2016 | — | Yes | LowNegligence | $114 | $114 |
| 9312661 | Presque Isle Quarry & Mill Aroostook, ME contractor: Lane Construction Corp | Oct 2016 | — | Yes | LowNegligence | $114 | $114 |
| 9312660 | Presque Isle Quarry & Mill Aroostook, ME contractor: Lane Construction Corp | Oct 2016 | — | No | LowNegligence | $114 | $114 |
| 9312659 | Presque Isle Quarry & Mill Aroostook, ME contractor: Lane Construction Corp | Oct 2016 | — | No | LowNegligence | $114 | $114 |
| 9312658 | Presque Isle Quarry & Mill Aroostook, ME contractor: Lane Construction Corp | Oct 2016 | — | No | LowNegligence | $114 | $114 |
| 9312657 | Presque Isle Quarry & Mill Aroostook, ME contractor: Lane Construction Corp | Oct 2016 | — | No | ModNegligence | $114 | $114 |
| 9312656 | Presque Isle Quarry & Mill Aroostook, ME contractor: Lane Construction Corp | Oct 2016 | — | No | LowNegligence | $114 | $114 |
| 9312655 | Presque Isle Quarry & Mill Aroostook, ME contractor: Lane Construction Corp | Oct 2016 | — | No | ModNegligence | $114 | $114 |
| 9312653 | Presque Isle Quarry & Mill Aroostook, ME contractor: Lane Construction Corp | Oct 2016 | — | No | LowNegligence | $114 | $114 |
| 6002220 | Orono Plant Penobscot, ME | Jul 2002 | — | Yes | ModNegligence | $113 | $113 |
| 7739903 | Presque Isle Quarry & Mill Aroostook, ME contractor: Lane Construction Corp | Jul 2001 | — | Yes | ModNegligence | $113 | $113 |
| 7736656 | Sunrise Materials Medway Plant Penobscot, ME | Aug 2000 | — | Yes | ModNegligence | $113 | $113 |
| 7736646 | Sunrise Materials Medway Plant Penobscot, ME | Aug 2000 | — | Yes | ModNegligence | $113 | $113 |
| 7730121 | Belfast Quarry & Mill Waldo, ME contractor: Lane Construction Corporation | Apr 2000 | — | Yes | ModNegligence | $113 | $113 |
| 7730099 | Belfast Quarry & Mill Waldo, ME contractor: Lane Construction Corporation | Apr 2000 | — | Yes | ModNegligence | $113 | $113 |
| 8796463 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Nov 2013 | — | No | LowNegligence | $112 | $112 |
| 8707573 | Hancock Plant Hancock, ME contractor: Lane Construction Corp | May 2013 | — | No | ModNegligence | $112 | $112 |
| 8571106 | MOSQUITO MOUNTAIN PIT AND MILL Waldo, ME | Nov 2009 | — | No | ModNegligence | $112 | $112 |
| 6539159 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | Sep 2009 | — | Yes | ModNegligence | $108 | $108 |
| 8922931 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | May 2016 | — | No | ModNegligence | $100 | $100 |
| 8922930 | Odlin Road Mill & Quarry Penobscot, ME contractor: Lane Construction Corp | May 2016 | — | No | ModNegligence | $100 | $100 |
| 8921824 | Hancock Plant Hancock, ME contractor: Lane Construction Corp | Oct 2015 | — | No | LowNegligence | $100 | $100 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for LANE CONSTRUCTION. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for LANE CONSTRUCTION. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for LANE CONSTRUCTION. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for LANE CONSTRUCTION. Verify directly with UVA Corporate Prosecution Registry →
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2009-09-22 | Planned | 0 | — | $0 | |
| 2009-08-06 | Planned | 0 | — | $0 | |
| 2009-06-22 | Planned | 0 | — | $0 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in highway, street, and bridge construction within ME, ordered by federal enforcement volume:
- THE LANE CONSTRUCTION CORP.CASWELL — 3 federal enforcement records
- THE LANE CONSTRUCTION CORP.LINCOLN — 3 federal enforcement records
- LANE CONSTRUCTION CORPBANGOR — 3 federal enforcement records
- THE LANE CONSTRUCTION CORPBUCKSPORT — 3 federal enforcement records
- THE LANE CONSTRUCTION CORP.BANGOR — 3 federal enforcement records
- MARRINERS, INC.BELFAST — 2 federal enforcement records
- SARGENT CORPORATIONGRAY — 2 federal enforcement records
- CIANBRO CORPORATIONHERMON — 2 federal enforcement records
- THE LANE CONSTRUCTION CORPORATIONMORO PLANTATION — 2 federal enforcement records
- VAUGHN THIBODEAU & SONS, INC.BANGOR — 2 federal enforcement records
Related searches
- Highway, Street, and Bridge ConstructionAll employers in this industry
- Employers in MEState-wide enforcement data
- Highway, Street, and in MEIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on LANE CONSTRUCTION from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is LANE CONSTRUCTION's OSHA violation history?
- LANE CONSTRUCTION has 3 OSHA inspections on record with 0 violations and $0 in total penalties.
- How does LANE CONSTRUCTION's safety record compare to its industry?
- LANE CONSTRUCTION operates in the highway, street, and bridge construction industry. The industry average Total Recordable Incident Rate (TRIR) is 2.5.