Skip to main content

Establishment profile

LAFORGE & BUDD CONSTRUCTION COMPANY INC.

1630 N. LINCOLN, PARSONS, KS, 67357
237110Water and Sewer Line and Related Structures Construction
EIN 480665612

Download as PDF →

OSHA inspections
2
over 26 years
Violations
1
Penalties
$0
$0 avg
Violations across 2 federal agencies
Enforcement actions from multiple agencies may indicate systemic compliance issues across functions.

Summary

LAFORGE & BUDD CONSTRUCTION COMPANY INC. has accumulated 1 OSHA violation across 2 inspections over 26 years of recorded history.

The establishment sits in the 54th percentile for violations within its industry-state peer group of 258 employers. Inspection frequency runs at the 85th percentile. The most recent enforcement activity was recorded 3 years ago.

Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

LAFORGE & BUDD CONSTRUCTION COMPANY INC. appears in OSHA workplace safety, WHD wage enforcement, and FMCSA motor carrier registration records only. No matching records were found in MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.

OSHA workplace safety

Inspections
2
0.1 / yr · last 26 yrs
Violations
1
0.0 / yr
Penalties
$0
Inspection trigger · planned
1 of 2

50% of inspections at this establishment produced violations,

Most-cited OSHA standards

Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 1 distinct standard shown · 1 citation in this view.

CFR sectionCitationsInspectionsTotal penaltyFirst citedLast cited
29 CFR 1926.0021 B0211Apr 2000Apr 2000

Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.

Peer comparison

54th

Above average violations in NAICS 2371 within KS. Peer group: 258 employers. This establishment has 1 OSHA violation; peer median is 0.

Fewer violationsMore violations
Penalty percentile
0th
peer median: $0
Inspection frequency
85th
peer median: 1

Safety self-report (OSHA 300A)

Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.

DART rate
15.6
vs industry
+14.5
TRIR
15.6
vs industry
+13.7

Reported for 14 average annual employees at this establishment.

Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.

Industry benchmark

Industry avg TRIR
1.9
BLS SOII 2024
Industry avg DART
1.1
BLS SOII 2024
Self-reported TRIR
15.6
OSHA ITA Form 300A (employer self-reported)

BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.

Inspection breakdown

Planned
1

Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for LAFORGE & BUDD CONSTRUCTION COMPANY INC.. Verify directly with Occupational Safety and Health Administration

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
3 years ago

No federal enforcement activity has been recorded against this establishment in 3+ years. Most recent activity: 3 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

Cases
2
Back wages owed
$0

Department of Labor Wage & Hour Division — minimum-wage, overtime, child-labor, FMLA, and prevailing-wage enforcement.

Wage and hour cases

Closed DOL Wage & Hour Division cases (FLSA, FMLA, H-2B, MSPA, and related statutes). Backwages reflect amounts the agency assessed; civil penalty (CMP) is a separate fine levied on top, where the statute provides for one (FLSA / H-1B / H-2A / MSPA / FMLA / EPPA / FLSA Child Labor; other acts have no CMP column in DOL’s data). The Statutes column lists which laws each case cited. 2 cases · $0 in backwages

Case periodIndustryStatutesViolationsWorkersBackwagesCivil penalty
Nov 2020 – Nov 2022Highway, Street, and Bridge Construction0
Aug 2019 – Aug 2021Highway, Street, and Bridge Construction0

Source: DOL WHD enforcement database. Cases shown reflect those the agency has closed and made public. A violation count is the agency’s tally of cited violations (one violation can affect many workers); the workers column counts distinct employees the agency found to be affected.

Mine safety (MSHA)

No MSHA mine safety violations on file for LAFORGE & BUDD CONSTRUCTION COMPANY INC.. Verify directly with Mine Safety and Health Administration

Labor relations (NLRB)

No NLRB unfair labor practice charges or union representation cases on file for LAFORGE & BUDD CONSTRUCTION COMPANY INC.. Verify directly with National Labor Relations Board

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for LAFORGE & BUDD CONSTRUCTION COMPANY INC.. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for LAFORGE & BUDD CONSTRUCTION COMPANY INC.. Verify directly with Environmental Protection Agency

Motor carrier safety (FMCSA)

DOT number
87444
Operation
A

Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for LAFORGE & BUDD CONSTRUCTION COMPANY INC.. Verify directly with UVA Corporate Prosecution Registry

Federal contracts

This location

Obligated (5-yr)
$-1560546.97
Obligated (all-time)
$96.9M
Awards
29
Top agency
Department of Transportation
$66.2M
Top agencies by obligation (this location)
Department of Transportation$66.2M
Department of Defense$25.1M
Department of Agriculture$3.1M
Department of Justice$2.5M
Largest awards
  • Department of Defense
    SOLDIER CREEK CONSTRUCTION REPAIR PROJECT
    contract · Last action 2013-01-11
    $10,527,278
  • Department of Transportation
    CONSTRUCTION CONTRACT: WY PFH 26-1(2), SAGE CREEK ROAD SOLICITATION NUMBER: DTFH68-11-B-00009
    contract · Last action 2015-07-13
    $9,112,765
  • Department of Defense
    CONST CONTRACT FLW WASTE WATER TREATMENT
    contract · Last action 2012-04-05
    $8,261,178
  • Department of Transportation
    IGF::CT::IGF TX FLAP FM409(1) FM 409 REHABILITATION THIS IS FOR A WIDENING AND DOUBLE CHIP ON FM 409
    contract · Last action 2019-01-10
    $6,887,444
  • Department of Transportation
    IGF::CT::IGF OK TRIP WIMO SH49(1) WICHITA MOUNTAINS TRAIL DTFH68-15-B-00025 CONSTRUCT NATURE TRAIL IN WICHITA MOUNTAINS NWR
    contract · Last action 2019-11-27
    $6,561,583
  • Department of Transportation
    NM FTBL 2004(1) WILD RIVERS ROAD PROJECT CONSTRUCTION CONTRACT FOR SCHEDULE A
    contract · Last action 2023-06-01
    $6,111,338
  • Department of Transportation
    IGF::CT::IGF BEARTOOTH HIGHWAY 4-1(7) CONSTRUCTION DTFH68-12-B-00012 $5,500,000
    contract · Last action 2015-08-11
    $5,666,872
  • Department of Transportation
    IGF::OT::IGF PROJECT: FW-NLS 10(1) THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 4.75 MILES OF PACIFIC STREET (ROUTE 10) AND ASSOCIATED PULL-OFFS WITH WIDENING AND CONSTRUCTION OF NEW PARKING AREAS, THE REPLACEMENT OF THE ENTRY ROAD NORTH BRIDGE, AND THE REHABILITATION OF THE ENTRY ROAD SOUTH BRIDGE, ALL WITHIN THE NEAL SMITH NATIONAL WILDLIFE REFUGE. THE ROADWAY WORK INCLUDES ASPHALT PAVEMENT REMOVAL, GRADING, AGGREGATE BASE, SUPERPAVE ASPHALT CONCRETE PAVEMENT OVERLAY, DRAINAGE, AND OTHER MISCELLANEOUS WORK. THE NORTH BRIDGE REPLACEMENT WORK INCLUDES THE REMOVAL OF THE EXISTING SINGLE-SPAN, TIMBER BRIDGE WITH DOWEL LAMINATED DECK PANELS AND THE CONSTRUCTION OF A SINGLE-SPAN, PRECAST, PRESTRESSED CONCRETE SLAB BRIDGE WITH STEEL H-PILES, STRUCTURAL CONCRETE, AND RIPRAP PLACEMENT. THE SOUTH BRIDGE REHABILITATION WORK INCLUDES CONCRETE REPAIRS, TIMBER DECK REPLACEMENT AND AN ASPHALT WEARING SURFACE OVERLAY, TIMBER RAILING REPLACEMENT, AND RIPRAP PLACEMENT.
    contract · Last action 2019-01-11
    $4,301,205
  • Department of Transportation
    IGF::OT::IGF THE PROJECT CONSISTS OF THE CONSTRUCTION OF A NEW ENTRANCE ROAD TO THE SHADY LAKE RECREATION AREA. THE PROJECT INCLUDES THE RELOCATION OF COUNTY ROAD 64 (BIG FORK ATHENS ROAD) AND A BRIDGE OVER THE SALINE RIVER, WITHIN THE OUACHITA NATIONAL FOREST. THE WORK INCLUDES EARTHWORK, AGGREGATE BASE, MECHANICALLY STABILIZED EARTH RETAINING WALLS WITH STONE MASONRY AND PRECAST CONCRETE PANEL FACES, A SINGLE-SPAN BRIDGE WITH WEATHERING STEEL GIRDERS, GUARDRAIL, DRAINAGE, AND OTHER MISCELLANEOUS WORK.
    contract · Last action 2017-09-29
    $2,983,237
  • Department of Transportation
    IGF::CT::IGF NM FLAP TRAIL 77000(1), EL CAMINO REAL TRAIL
    contract · Last action 2019-12-17
    $2,838,613
  • Department of Transportation
    NE FTFW VALE 13(1)&100(1) AUTO TOUR RTE #013&RTE #100
    contract · Last action 2022-03-14
    $2,827,571
  • Department of Defense
    TAS::21 2022::TAS RECOVERYPROJECT#::37500::RP# D6240 REPAIR LAKE GEORGE DAM, FORT SILL, OKLAHOMA.
    contract · Last action 2012-03-29
    $2,775,928
  • Department of Transportation
    IGF::CT::IGF TX FLAP CR1099(1) HAGERMAN REFUGE ROAD PULVERIZATION, WIDENING AND RESURFACING OF COUNTY ROAD.
    contract · Last action 2019-06-11
    $2,773,699
  • Department of Transportation
    CLIN 00002 OK FLAP 2460(1) CANTONMENT ROAD CONSTRUCTION CONTRACT FOR ROAD RECONSTRUCTION AND WIDENING 6982AF18B000022
    contract · Last action 2020-10-21
    $2,771,952
  • Department of Justice
    151003 UPGRADE WATER SYSTEM, FCI SEAGOVILLE, TEXAS
    contract · Last action 2011-09-08
    $2,474,029
  • Department of Agriculture
    WASTE WATER TREATMENT PLANT UPGRADE, MOORE AIR BASE, EDINBURG, TEXAS
    contract · Last action 2022-02-01
    $2,056,319
  • Department of Transportation
    NM FTFW RIMO 10(1) ENTRANCE ROAD AND PARKING AREAS
    contract · Last action 2021-11-12
    $2,027,568
  • Department of Transportation
    OK RRP WIMO 11(1) & 10(1) ROAD CONSTRUCTION
    contract · Last action 2011-02-18
    $1,949,131
  • Department of Defense
    TAS::96 3135::TAS RECOVERYPROJECT#::6000::RP# TAS::96 3135::TAS RECOVERYPROJECT#::8530::RP# PROJECT NUMBER 6000, REPLACE CORRUGATED METAL PIPE IN FORT GIBSON DIKE, FORT GIBSON LAKE, OKLAHOMA; PROJECT NUMBER 8530, CONSTRUCT INVERTED FILTER FOR HARTFORD LEVEE PONDING AREA, JOHN REDMOND DAM & RESERVOIR, KANSAS, AND PROJECT NUMBER 6000, REMOVE TREES FROM WYANDOTTE LEVEE, FORT GIBSON LAKE, OKLAHOMA
    contract · Last action 2011-09-19
    $1,896,735
  • Department of Transportation
    PROJECT KS FTFW KIRW 14(1), 104(1) THE PROJECT CONSISTS OF ROADWAY RECONDITIONING, AGGREGATE BASE, RIPRAP INSTALLATION, LARGE PIPE CULVERT REPLACEMENT, DITCH RECONDITIONING, SIGNING AND OTHER MISCELLANEOUS WORK.
    contract · Last action 2023-09-20
    $1,747,150
  • Department of Defense
    IGF::OT::IGF BLUE RIVER FINAL ACCESS CHANNEL TRANSITION
    contract · Last action 2017-01-17
    $1,659,249
  • Department of Transportation
    PROJECT FW-WHRI 13(1)WHITE RIVER NATIONAL WILDLIFE REFUGE. THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 4.39 MILES OF JACKS BAY LANDING ROAD (ROUTE 013). THE WORK INCLUDES AGGREGATE RESURFACING OF THE ROADWAY, DRAINAGE IMPROVEMENTS,
    contract · Last action 2024-06-12
    $1,622,180
  • Department of Transportation
    KS FLAP RS 376(1) 19000 ROAD 3R 12406817B00022 / 6982AF18B000006 CONSTRUCTION AWARD
    contract · Last action 2019-04-26
    $1,554,115
  • Department of Transportation
    PROJECT TX FTFW INDA 10(1), 11(1) THE PROJECT CONSISTS OF THE REHABILITATION OR RECONSTRUCTION OF RIVER VIEW ROAD, HATCHERY ENTRANCE ROAD, HATCHERY ENTRANCE SOUTH ROAD, EDUCATION BUILDING ROAD, AND ASSOCIATED PARKING AREAS WITHIN THE INKS DAM NATIO
    contract · Last action 2024-07-17
    $1,443,180
  • Department of Transportation
    IGF::OT::IGF THE PROJECT CONSISTS OF THE REPLACEMENT OF SEVERAL FLOOD DAMAGED CULVERT PIPES AND ROADWAY EMBANKMENTS, INCLUDING THE RESURFACING OF THE AGGREGATE ROADWAY, AT SEVEN LOCATIONS WITHIN THE OZARK-ST. FRANCIS NATIONAL FOREST. THE WORK INCLUDES CLEARING, ROADWAY EXCAVATION AND EMBANKMENT, AGGREGATE RESURFACING, REINFORCED CONCRETE PAVEMENT, REINFORCED CONCRETE BOX CULVERTS AND OTHER DRAINAGE IMPROVEMENTS, STONE MASONRY, AND OTHER MISCELLANEOUS WORK.
    contract · Last action 2014-06-06
    $1,210,616
  • Department of Transportation
    IGF::CT::IGF TX ERFO LAKE TEXOMA 2015 VARIOUS ROUTES DTFH6816C00033 ERFO SPOT REPAIRS
    contract · Last action 2017-11-07
    $1,142,683
  • Department of Agriculture
    REPAIRS TO WATER TREATMENT FACILITY, MOORE AIR BASE, EDINBERG, TEXAS
    contract · Last action 2024-09-03
    $1,004,202
  • Department of Transportation
    IGF::CT::IGF KS FLAP RSR 236(1) CAWKER CITY CAUSEWAY DTFH6817ROOO4 BASED ON 100% PS&E. CN BEGINS 10 JULY28 THRU 1 OCT 18 THIS MOVES THE PR FROM LEGACY SYSTEM TO ESC PRISM.
    contract · Last action 2020-07-29
    $542,713
  • Department of Transportation
    KS FLAP MRS 10(1) LAKE ROAD SAFETY PROJECT
    contract · Last action 2023-02-14
    $144,100

Federal contract dollars to this establishment. Primary NAICS: 237310 - HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Last action: 2024-09-03. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.

Inspection history

DateTriggerViolationsSeriousPenalty
2005-01-20Planned0$0
2000-01-21Unprogrammed Related1$0

Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.

In the news

Other employers in this industry and state

Other employers in water and sewer line and related structures construction within KS, ordered by federal enforcement volume:

Related searches

About this data

This profile aggregates federal enforcement records on LAFORGE & BUDD CONSTRUCTION COMPANY INC. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is LAFORGE & BUDD CONSTRUCTION COMPANY INC.'s OSHA violation history?
LAFORGE & BUDD CONSTRUCTION COMPANY INC. has 2 OSHA inspections on record with 1 violation and $0 in total penalties.
How does LAFORGE & BUDD CONSTRUCTION COMPANY INC.'s safety record compare to its industry?
LAFORGE & BUDD CONSTRUCTION COMPANY INC. operates in the water and sewer line and related structures construction industry. The industry average Total Recordable Incident Rate (TRIR) is 1.9. LAFORGE & BUDD CONSTRUCTION COMPANY INC.'s self-reported DART rate is 15.62 compared to an industry average of 1.1.