Skip to main content

Establishment profile

Kovilic Construction Co.,

3721 N. Carnation St., Franklin Park, IL, 60131
237110Water and Sewer Line and Related Structures Construction
EIN 362716776

Download as PDF →

OSHA inspections
0
over 5 years
Violations
0
Penalties
$0
Violations across 2 federal agencies
Enforcement actions from multiple agencies may indicate systemic compliance issues across functions.
Context
No OSHA inspections on record. This does not mean the employer is violation-free — OSHA inspects a small fraction of workplaces annually.

Summary

Kovilic Construction Co., has no OSHA inspection history on file. Federal records covering wage, environmental, labor relations, and other agencies are noted below where present.

The most recent federal enforcement activity was recorded 5 years ago.

Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

Kovilic Construction Co., appears in WHD wage enforcement, NLRB labor relations, and FMCSA motor carrier registration records only. No matching records were found in OSHA workplace safety, MSHA mine safety, EPA environmental compliance, OFLC visa and labor certification (historical), SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.

OSHA workplace safety

No OSHA inspections, citations, or accidents on file for Kovilic Construction Co.,. Verify directly with Occupational Safety and Health Administration

Safety self-report (OSHA 300A)

Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.

DART rate
7.1
vs industry
+6.0
TRIR
7.1
vs industry
+5.2

Reported for 22 average annual employees at this establishment.

Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.

Industry benchmark

Industry avg TRIR
1.9
BLS SOII 2024
Industry avg DART
1.1
BLS SOII 2024
Self-reported TRIR
7.1
OSHA ITA Form 300A (employer self-reported)

BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for Kovilic Construction Co.,. Verify directly with Occupational Safety and Health Administration

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
5 years ago

No federal enforcement activity has been recorded against this establishment in 5+ years. Most recent activity: 5 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

Cases
1
Back wages owed
$0
Employees affected
1

Department of Labor Wage & Hour Division — minimum-wage, overtime, child-labor, FMLA, and prevailing-wage enforcement.

Wage and hour cases

Closed DOL Wage & Hour Division cases (FLSA, FMLA, H-2B, MSPA, and related statutes). Backwages reflect amounts the agency assessed; civil penalty (CMP) is a separate fine levied on top, where the statute provides for one (FLSA / H-1B / H-2A / MSPA / FMLA / EPPA / FLSA Child Labor; other acts have no CMP column in DOL’s data). The Statutes column lists which laws each case cited. 1 case · $0 in backwages · 1 worker affected

Case periodIndustryStatutesViolationsWorkersBackwagesCivil penalty
Nov 2018 – Nov 2020Water and Sewer Line and Related Structures Construction1

Source: DOL WHD enforcement database. Cases shown reflect those the agency has closed and made public. A violation count is the agency’s tally of cited violations (one violation can affect many workers); the workers column counts distinct employees the agency found to be affected.

Mine safety (MSHA)

No MSHA mine safety violations on file for Kovilic Construction Co.,. Verify directly with Mine Safety and Health Administration

Labor relations (NLRB)

Company-level in IL — for Kovilic Construction Co.,, not this location alone

Total cases
2
Unfair labor practice
2

National Labor Relations Board — unfair labor practice charges and union representation cases. The NLRB records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other Kovilic Construction Co., locations in the same state.

NLRB cases

National Labor Relations Board cases involving this employer. Includes unfair labor practice (ULP) filings and representation election proceedings. NLRB enforcement is process-driven; no per-case monetary penalty is assessed (remedies are case-by-case backpay orders, posting requirements, election re-runs, etc.). 2 cases · 2 ULP

Case numberTypeFiledClosedStatusRegion
03-CA-025753Unfair labor practiceFeb 2006Apr 2006ClosedRegion 03, Buffalo, New York
13-CA-038103Unfair labor practiceSep 1999Jul 2000ClosedRegion 13, Chicago, Illinois

Source: NLRB case files. Rows shown are those the agency has published. Region numbers (1–31) correspond to NLRB's geographic offices.

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for Kovilic Construction Co.,. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for Kovilic Construction Co.,. Verify directly with Environmental Protection Agency

Motor carrier safety (FMCSA)

DOT number
1483174
Operation
A

Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for Kovilic Construction Co.,. Verify directly with UVA Corporate Prosecution Registry

Federal contracts

This location

Obligated (5-yr)
$64.7M
Obligated (all-time)
$144.6M
Awards
88
Top agency
Department of Transportation
$71.9M
Top agencies by obligation (this location)
Department of Transportation$71.9M
Department of Defense$44.4M
Department of the Interior$23.8M
Department of Agriculture$2.8M
Department of Homeland Security$1.8M
Largest awards (top 50 of 88)
  • Department of Transportation
    PROJECT NC NP BLRI 2A16 THE PROJECT CONSISTS OF THE REHABILITATION OF BIG PINE CREEK BRIDGE #6, BIG PINE CREEK BRIDGE #3, AND BRUSH CREEK BRIDGE #1 BETWEEN MM 223.00 AND MM 228.00. THE WORK INCLUDES REHABILITATION OF THE SUBSTRUCTURE AND SUPERSTRUC
    contract · Last action 2025-11-18
    $13,648,375
  • Department of the Interior
    GAOA CHOH 241449 RESTORE CANAL PRISM AND STABILIZE HISTORIC DRY LAID STONE WALL
    contract · Last action 2025-03-03
    $11,126,498
  • Department of Transportation
    WV NP NERI 107(2) THE PROJECT CONSISTS OF GRANULAR BACKFILL, MSE WALL CONSTRUCTION, DEEP GEOTECHNICAL PATCHES, PIPE CULVERTS, INLETS, MANHOLES, CURB AND GUTTER, ASPHALT PAVED WATERWAY, AND GUARDRAIL REPLACEMENT. THE WORK INCLUDES ROADWAY EXCAVATION,
    contract · Last action 2024-08-28
    $10,220,645
  • Department of Defense
    TAINTER GATE MECHANICAL AND NEW BULKHEAD SYSTEMS, DES MOINES RIVER, LAKE RED RED RESERVOIR, MARION COUNTY, IOWA.
    contract · Last action 2015-08-13
    $6,630,213
  • Department of Transportation
    PROJECT WI ERFO FS 2016-1(5) THE PROJECT CONSISTS OF THE REHABILITATION AND RECONSTRUCTION OF NUMEROUS STORM DAMAGED ROADWAYS, BRIDGES AND PEDESTRIAN TRAILS WITHIN THE CHEQUAMEGON-NICOLET NATIONAL FOREST. THE WORK INCLUDES EARTHWORK, ROADWAY EXCAVATION AND RECONDITIONING, AGGREGATE RESURFACING, ASPHALT PAVEMENT PAVING, DITCH RECONDITIONING, DRAINAGE IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK.
    contract · Last action 2021-09-14
    $6,077,469
  • Department of Defense
    IGF::OT::IGF PUMPING OF LOW DENSITY CONCRETE TO STABILIZE THE GUIDEWALLS AT LOCK AND DAMS 5&6.
    contract · Last action 2019-08-15
    $4,941,919
  • Department of Transportation
    PROJECT NP-GUIS 15(3) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF PARK ROAD AND THE CONSTRUCTION OF PAVED SHOULDERS. THE WORK INCLUDES RECONSTRUCTION OF THE ONE LANE ENTRANCE PORTION OF PARK ROAD, CONSTRUCTION OF PAVED SHOULDERS, GUARDRAIL REPLACE
    contract · Last action 2024-07-18
    $4,658,132
  • Department of Transportation
    ND FLAP 704(1) AND 795(1) MAGPIE &WHITETAIL CROSSINGS
    contract · Last action 2025-11-12
    $4,614,589
  • Department of Transportation
    IGF::OT::IGF THE PROJECT CONSISTS OF THE REPLACEMENT OF THE EXISTING NATCHEZ TRACE PARKWAY BRIDGE OVER LITTLE SWAN CREEK AT MILEPOST (MP) 386.89, AND THE REHABILITATION OF THE BIG SWAN CREEK BRIDGE AT MP 391.50. THE LITTLE SWAN CREEK BRIDGE WORK INCLUDES REPLACING THE EXISTING 200-FOOT, THREE-SPAN, CONCRETE GIRDER BRIDGE WITH A 241-FOOT, TWO-SPAN, PRECAST, PRESTRESSED CONCRETE GIRDER BRIDGE ON PRECAST CONCRETE PIERS AND ABUTMENTS, WITH PRECAST CONCRETE DECK PANELS, AND OTHER MISCELLANEOUS WORK. THE BIG SWAN CREEK BRIDGE WORK INCLUDES CONCRETE REPAIRS FOR THE DECK (SURFACE AND UNDERSIDE), SUBSTRUCTURE (PIER CAP), AND RAILING (INCLUDING CURBS); EXPANSION JOINT REPAIRS AND SEALING, ASPHALT PAVEMENT MILLING AND SUPERPAVE ASPHALT CONCRETE PAVEMENT OVERLAY; AND OTHER MISCELLANEOUS WORK.
    contract · Last action 2019-05-15
    $4,604,558
  • Department of Transportation
    PROJECT MD NP BAWA 1(12), 2(12) THE PROJECT CONSISTS OF THE REPAIR AND REHABILITATION OF STRUCTURES NO. 3530-003P, 3530-004P, AND 3530-021P WITHIN THE BALTIMORE-WASHINGTON PARKWAY. THE WORK INCLUDES DECK REPAIR, CAPSTONE, JOINTS REPAIRS, RAILING REP
    contract · Last action 2025-09-22
    $3,775,610
  • Department of Defense
    IGF::OT::IGF C - SPILLWAY CHUTE SLAB REPAIR GARRISON DAM
    contract · Last action 2015-10-15
    $3,554,605
  • Department of Transportation
    SD FTBL BCB(1) HORSE SOLDIER ROAD TO FORT MEADE
    contract · Last action 2023-11-02
    $3,492,916
  • Department of Defense
    JWF SPLLWAY BRIDGE REHABILITATION, HAYSI, VA
    contract · Last action 2022-09-22
    $3,449,950
  • Department of the Interior
    MULTI-BRIDGE REPAIR AT SENEY NWR
    contract · Last action 2023-06-07
    $3,428,950
  • Department of Agriculture
    HUNTINGTON RAVINE WAT BRIDGES REPLACEMENT
    contract · Last action 2026-03-02
    $2,773,205
  • Department of Transportation
    MAMMOTH CAVE NATIONAL PARK - NP-MACA 13(1), 14(2) - THE PROJECT CONSISTS OF THE RECONSTRUCTION OF THE GREEN RIVER FERRY ROAD RAMPS NEAR MP 1.31 AND SHOULDER HARDENING ON MAMMOTH CAVE PARKWAY. THE WORK INCLUDES THE REMOVAL AND RECONSTRUCTION OF A PORTION OF THE EXISTING ROADWAY APPROACHES TO THE FERRY CROSSING, EXTENDING THE RAMPS FURTHER INTO THE RIVER, PROTECTING HISTORIC STONE WALLS ADJACENT TO THE RAMPS, DRAINAGE IMPROVEMENTS, SCOUR PROTECTION, SHOULDER HARDENING, AND OTHER MISCELLANEOUS WORK.
    contract · Last action 2024-08-01
    $2,310,452
  • Department of the Interior
    G:EPREF CONSTRUCTION, CONSTRUCT CANOE LAUNCH&TRAIL EXTENSION
    contract · Last action 2021-04-30
    $2,271,491
  • Department of Defense
    BASE FY20 VERMILLION EAST PIER REPAIR
    contract · Last action 2021-10-05
    $2,183,719
  • Department of Defense
    WATER MAIN IN TRENCH, DUCTILE IRON 12"
    contract · Last action 2021-12-21
    $1,859,434
  • Department of Homeland Security
    7233416 (PFA$1,761,283.00)WATERFRONT REPAIRS AT STATION GLOUCESTER
    contract · Last action 2019-07-09
    $1,792,627
  • Department of Defense
    C - HEADWORKS RETROFIT MODIFICATIONS
    contract · Last action 2012-12-11
    $1,763,777
  • Department of Defense
    IGF::OT::IGF KEN/L MOORING CELLS REPAIR
    contract · Last action 2016-09-12
    $1,703,000
  • Department of Transportation
    PROJECT: FELSENTHAL WILDLIFE NATIONAL REFUGE PROJECT FW FELS-11(1) THE PROJECT CONSISTS OF THE RESURFACING PINE ISLAND ROAD AND SANDY PRAIRIE ROAD WITHIN THE FELSENTHAL NATIONAL WILDLIFE REFUGE. THE WORK INCLUDES RESURFACING WITH AGGREGATE SURFAC
    contract · Last action 2022-01-06
    $1,697,698
  • Department of Transportation
    PROJECT VA ERFO FS GWJEF808 2020-2(2) THE PROJECT CONSISTS OF FINALIZING THE DESIGN FOR REPLACING LICK CREEK TRAIL BRIDGE AND CONSTRUCTION OF A TEMPORARY ACCESS TRAIL, TEMPORARY HELICOPTER LANDING PAD, TRAIL BRIDGE REPLACEMENT, AND OTHER MISCELLANEO
    contract · Last action 2025-10-24
    $1,640,000
  • Department of Defense
    JPP GREENWAY MULTI-USE PAVED TRAIL
    contract · Last action 2023-02-09
    $1,567,900
  • Department of Defense
    LIFT STATION MECHANICAL
    contract · Last action 2009-09-09
    $1,562,718
  • Department of the Interior
    ND - VALLEY CITY WETLAND MANAGEMENT DISTRICT-REHAB TOMAHAWK DAM
    contract · Last action 2023-08-23
    $1,503,370
  • Department of Defense
    LOYALL CONSTRUCTION//LOYALL PHASE 1
    contract · Last action 2022-08-16
    $1,393,100
  • Department of Transportation
    PROJECT MD ERFO NPS CHOH 2019-1(1): THE PROJECT CONSISTS OF EMBANKMENT SLOPE REPAIR WITH RIPRAP SLOPE AND ROCKERY WALL CONSTRUCTION, PAVEMENT PATCHING, GUARDRAIL, SHOULDER REPAIRS, DRAINAGE REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE WORK INCLUDE
    contract · Last action 2025-09-16
    $1,333,895
  • Department of Defense
    IGF::OT::IGF GRENADA ADA FISHING PIER OUTLET CHANNEL
    contract · Last action 2017-04-27
    $1,252,518
  • Department of Transportation
    IGF::OT::IGF PROJECT: MANA 001S(1) THE PROJECT CONSISTS OF THE REPAIR OF THE HISTORIC STONE BRIDGE WITHIN THE MANASSAS NATIONAL BATTLEFIELD PARK. THE BRIDGE SUBSTRUCTURE WORK INCLUDES REPAIRING CONCRETE SPALLS AND DETERIORATED CONCRETE AREAS WITH SHOTCRETE, REPLACING AND REPOINTING STONE MASONRY, GROUTING VOIDS UNDER THE PIER AND ABUTMENTS, PLACING RIPRAP, AND OTHER MISCELLANEOUS WORK. THE BRIDGE DECK WORK INCLUDES REMOVAL OF THE ASPHALT PAVEMENT, INSTALLATION OF A WATERPROOFING MEMBRANE, ASPHALT CONCRETE PAVEMENT OVERLAY, CHIP SEAL, AND OTHER MISCELLANEOUS WORK.
    contract · Last action 2020-12-10
    $1,211,309
  • Department of Transportation
    ND FLAP 136(1) & 145(1) TEWAUKON STRUCTURES
    contract · Last action 2024-03-28
    $1,178,009
  • Department of the Interior
    IGF::OT::IGF BICYCLE TRAIL IMPROVEMENTS AT E. SHORE OF VA NWR
    contract · Last action 2018-12-12
    $1,145,000
  • Department of Transportation
    THE PROJECT CONSISTS OF THE RELOCATION OF A SECTION OF LOST VALLEY ROAD, EXISTING PARKING AREA AND THE TRAILHEAD OUTSIDE THE CLARK CREEK FLOODPLAIN, AND THE RESTORATION OF A SECTION OF THE EXISTING LOST VALLEY TRAIL WITHIN THE BUFFALO NATIONAL RIVER. THE WORK INCLUDES ROADWAY OBLITERATION, ROADWAY AND TRAIL RECONDITIONING, AGGREGATE SURFACE COURSE, CULVERT INSTALLATION, SIGNING, AND OTHER MISCELLANEOUS WORK.
    contract · Last action 2020-03-23
    $1,124,150
  • Department of Defense
    VILLAGE OF GLEVIEW, GLEN OAK ACRES STORM SEWER IMPROVEMENT SECTION 219
    contract · Last action 2021-08-02
    $1,104,390
  • Department of Transportation
    IGF::OT::IGF PROJECT FW-SNY 100(1) - THE PROJECT CONSISTS OF THE REPLACEMENT OF THE J TO H SPILLWAY BRIDGE ON FISHING ACCESS ROAD WITHIN THE SENEY NATIONAL WILDLIFE REFUGE. THE WORK INCLUDES THE REMOVAL OF THE EXISTING ONE-LANE, TEN-SPAN TIMBER BRIDGE, ABUTMENTS, AND PIERS, WITH THE CONSTRUCTION OF A ONE-LANE, THREE-SPAN, PRESTRESSED CONCRETE BOX GIRDER BRIDGE, RECONSTRUCTION OF THE AGGREGATE ROADWAY, AND OTHER MISCELLANEOUS WORK.
    contract · Last action 2020-04-20
    $1,063,302
  • Department of Defense
    BASE AWARD CAR FOR VILLAGE OF HAZEL CREST WATER MAIN IMPROVEMENTS
    contract · Last action 2020-12-23
    $1,006,244
  • Department of Defense
    OIL CONTAINMENT SYSTEM, BULL SHOALS POWERHOUSE, BAXTER COUNTY, AR PROJECT NO. 370506
    contract · Last action 2017-01-20
    $994,559
  • Department of Defense
    IGF::OT::IGF MELTON HILL LOCK RAW WATER SYSTEM REHAB
    contract · Last action 2018-07-31
    $987,000
  • Department of Transportation
    PROJECT NP BLRI 1G28, 1N19 THE PROJECT CONSISTS OF PERFORMING MAINTENANCE REPAIRS ON TWO BRIDGES ON THE BLUE RIDGE PARKWAY. THE WORK INCLUDES THE REPLACEMENT OF BRIDGE BEARINGS, AND OTHER MISCELLANEOUS WORK.
    contract · Last action 2024-07-17
    $948,000
  • Department of Defense
    FRL MACHINERY PLATFORM CONCRETE REHABILITATION
    contract · Last action 2025-06-18
    $905,300
  • Department of the Interior
    MO-NEOSHO NFH-DRAIN DITCH REHAB
    contract · Last action 2021-12-15
    $860,951
  • Department of Transportation
    IGF::OT::IGF PROJECT: NP-MACA 001T(1) - MAMMOTH CAVE NP - VISITOR CENTER BRIDGE THE PROJECT CONSISTS OF THE REPLACEMENT OF THE MAMMOTH CAVE VISITOR CENTER PEDESTRIAN BRIDGE BETWEEN THE VISITOR CENTER AND THE MAMMOTH CAVE HOTEL. THE WORK INCLUDES REPLACING THE 176-FOOT, THREE-SPAN, CONCRETE BOX GIRDER BRIDGE WITH A 176-FOOT, THREE-SPAN, PRECAST, PRESTRESSED CONCRETE GIRDER BRIDGE ON CAST-IN-PLACE CONCRETE FOOTINGS AND PRECAST CONCRETE ABUTMENTS WITH A CAST-IN-PLACE CONCRETE DECK. THE WORK ALSO INCLUDES MILLING AND OVERLAY OF ASPHALT PAVEMENT TRIAL/SIDEWALK, REPLACEMENT OF EXPOSED AGGREGATE CONCRETE TRIAL/SIDEWALK, AND OTHER MISCELLANEOUS WORK.
    contract · Last action 2019-05-16
    $859,804
  • Department of Defense
    IGF::OT::IGF TYGART BULKHEAD HOIST REPAIRS
    contract · Last action 2018-06-18
    $856,925
  • Department of Defense
    IGF::OT::IGF RICHTON PARK WATER MAIN REPLACEMENT
    contract · Last action 2016-12-12
    $843,699
  • Department of Transportation
    FW-CAVA 102(1), 905(1). THE PROJECT CONSISTS OF THE RECONSTRUCTION OF COUNTY ROUTE 32/18 CAMP 70 ROAD, PARKING LOT, RIVERS EDGE TRIAL. THE WORK INCLUDES AGGREGATE SURFACE COURSE, AGGREGATE BASE, CELLULAR CONFINEMENT SYSTEM, DRAINAGE IMPROVEMENTS, A
    contract · Last action 2021-06-30
    $819,155
  • Department of Defense
    REPAIR GATE GUIDE G-6
    contract · Last action 2014-12-12
    $811,156
  • Department of Transportation
    IGF::OT::IGF PROJECT: FW-OHRI 10(1), 100(1) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 0.2 MILES OF BUFFALO CREEK ROAD (ROUTE 100), THE REHABILITATION OF THE BUFFALO CREEK ROAD PARKING AREA (ROUTE 904), AND THE WIDENING OF THE HEADLAND TRAIL PARKING AREA (ROUTE 903), ALL WITHIN THE OHIO RIVER ISLANDS NATIONAL WILDLIFE REFUGE. THE WORK INCLUDES REMOVAL OF CONCRETE CEMENT TREATED BASE AND ASPHALT PAVEMENT, AGGREGATE BASE AND SURFACE COURSES, ASPHALT CONCRETE PAVEMENT PLACEMENT, GUARDRAIL REPLACEMENT, UTILITY REMOVAL AND NEW INSTALLATIONS, LANDSCAPING, AND OTHER MISCELLANEOUS WORK.
    contract · Last action 2020-06-08
    $774,117
  • Department of Defense
    GARRISON PROJECT SPILLWAY BRIDGE CONCRETE REPAIRS
    contract · Last action 2025-09-04
    $727,000
  • Department of Defense
    REMOVE AND RESET EXISTING ARMOR STONE
    contract · Last action 2014-05-12
    $653,850

Federal contract dollars to this establishment. Primary NAICS: 237310 - HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Last action: 2026-03-02. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.

In the news

Other employers in this industry and state

Other employers in water and sewer line and related structures construction within IL, ordered by federal enforcement volume:

Related searches

About this data

This profile aggregates federal enforcement records on Kovilic Construction Co., from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is Kovilic Construction Co.,'s OSHA violation history?
Kovilic Construction Co., has no OSHA inspections on record.
How does Kovilic Construction Co.,'s safety record compare to its industry?
Kovilic Construction Co., operates in the water and sewer line and related structures construction industry. The industry average Total Recordable Incident Rate (TRIR) is 1.9. Kovilic Construction Co.,'s self-reported DART rate is 7.06 compared to an industry average of 1.1.