Establishment profile
Kovilic Construction Co.,
3721 N. Carnation St., Franklin Park, IL, 60131
237110 — Water and Sewer Line and Related Structures Construction
EIN 362716776
Summary
Kovilic Construction Co., has no OSHA inspection history on file. Federal records covering wage, environmental, labor relations, and other agencies are noted below where present.
The most recent federal enforcement activity was recorded 5 years ago.
Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
Kovilic Construction Co., appears in WHD wage enforcement, NLRB labor relations, and FMCSA motor carrier registration records only. No matching records were found in OSHA workplace safety, MSHA mine safety, EPA environmental compliance, OFLC visa and labor certification (historical), SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
No OSHA inspections, citations, or accidents on file for Kovilic Construction Co.,. Verify directly with Occupational Safety and Health Administration →
Safety self-report (OSHA 300A)
Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.
Reported for 22 average annual employees at this establishment.
Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for Kovilic Construction Co.,. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 5+ years. Most recent activity: 5 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
Department of Labor Wage & Hour Division — minimum-wage, overtime, child-labor, FMLA, and prevailing-wage enforcement.
Wage and hour cases
Closed DOL Wage & Hour Division cases (FLSA, FMLA, H-2B, MSPA, and related statutes). Backwages reflect amounts the agency assessed; civil penalty (CMP) is a separate fine levied on top, where the statute provides for one (FLSA / H-1B / H-2A / MSPA / FMLA / EPPA / FLSA Child Labor; other acts have no CMP column in DOL’s data). The Statutes column lists which laws each case cited. 1 case · $0 in backwages · 1 worker affected
| Case period | Industry | Statutes | Violations | Workers | Backwages | Civil penalty |
|---|---|---|---|---|---|---|
| Nov 2018 – Nov 2020 | Water and Sewer Line and Related Structures Construction | — | — | 1 | — | — |
Source: DOL WHD enforcement database. Cases shown reflect those the agency has closed and made public. A violation count is the agency’s tally of cited violations (one violation can affect many workers); the workers column counts distinct employees the agency found to be affected.
Mine safety (MSHA)
No MSHA mine safety violations on file for Kovilic Construction Co.,. Verify directly with Mine Safety and Health Administration →
Labor relations (NLRB)
Company-level in IL — for Kovilic Construction Co.,, not this location alone
National Labor Relations Board — unfair labor practice charges and union representation cases. The NLRB records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other Kovilic Construction Co., locations in the same state.
NLRB cases
National Labor Relations Board cases involving this employer. Includes unfair labor practice (ULP) filings and representation election proceedings. NLRB enforcement is process-driven; no per-case monetary penalty is assessed (remedies are case-by-case backpay orders, posting requirements, election re-runs, etc.). 2 cases · 2 ULP
| Case number | Type | Filed | Closed | Status | Region |
|---|---|---|---|---|---|
| 03-CA-025753 | Unfair labor practice | Feb 2006 | Apr 2006 | Closed | Region 03, Buffalo, New York |
| 13-CA-038103 | Unfair labor practice | Sep 1999 | Jul 2000 | Closed | Region 13, Chicago, Illinois |
Source: NLRB case files. Rows shown are those the agency has published. Region numbers (1–31) correspond to NLRB's geographic offices.
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for Kovilic Construction Co.,. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for Kovilic Construction Co.,. Verify directly with Environmental Protection Agency →
Motor carrier safety (FMCSA)
Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for Kovilic Construction Co.,. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
- Department of TransportationPROJECT NC NP BLRI 2A16 THE PROJECT CONSISTS OF THE REHABILITATION OF BIG PINE CREEK BRIDGE #6, BIG PINE CREEK BRIDGE #3, AND BRUSH CREEK BRIDGE #1 BETWEEN MM 223.00 AND MM 228.00. THE WORK INCLUDES REHABILITATION OF THE SUBSTRUCTURE AND SUPERSTRUCcontract · Last action 2025-11-18$13,648,375
- Department of the InteriorGAOA CHOH 241449 RESTORE CANAL PRISM AND STABILIZE HISTORIC DRY LAID STONE WALLcontract · Last action 2025-03-03$11,126,498
- Department of TransportationWV NP NERI 107(2) THE PROJECT CONSISTS OF GRANULAR BACKFILL, MSE WALL CONSTRUCTION, DEEP GEOTECHNICAL PATCHES, PIPE CULVERTS, INLETS, MANHOLES, CURB AND GUTTER, ASPHALT PAVED WATERWAY, AND GUARDRAIL REPLACEMENT. THE WORK INCLUDES ROADWAY EXCAVATION,contract · Last action 2024-08-28$10,220,645
- Department of DefenseTAINTER GATE MECHANICAL AND NEW BULKHEAD SYSTEMS, DES MOINES RIVER, LAKE RED RED RESERVOIR, MARION COUNTY, IOWA.contract · Last action 2015-08-13$6,630,213
- Department of TransportationPROJECT WI ERFO FS 2016-1(5) THE PROJECT CONSISTS OF THE REHABILITATION AND RECONSTRUCTION OF NUMEROUS STORM DAMAGED ROADWAYS, BRIDGES AND PEDESTRIAN TRAILS WITHIN THE CHEQUAMEGON-NICOLET NATIONAL FOREST. THE WORK INCLUDES EARTHWORK, ROADWAY EXCAVATION AND RECONDITIONING, AGGREGATE RESURFACING, ASPHALT PAVEMENT PAVING, DITCH RECONDITIONING, DRAINAGE IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK.contract · Last action 2021-09-14$6,077,469
- Department of DefenseIGF::OT::IGF PUMPING OF LOW DENSITY CONCRETE TO STABILIZE THE GUIDEWALLS AT LOCK AND DAMS 5&6.contract · Last action 2019-08-15$4,941,919
- Department of TransportationPROJECT NP-GUIS 15(3) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF PARK ROAD AND THE CONSTRUCTION OF PAVED SHOULDERS. THE WORK INCLUDES RECONSTRUCTION OF THE ONE LANE ENTRANCE PORTION OF PARK ROAD, CONSTRUCTION OF PAVED SHOULDERS, GUARDRAIL REPLACEcontract · Last action 2024-07-18$4,658,132
- Department of TransportationND FLAP 704(1) AND 795(1) MAGPIE &WHITETAIL CROSSINGScontract · Last action 2025-11-12$4,614,589
- Department of TransportationIGF::OT::IGF THE PROJECT CONSISTS OF THE REPLACEMENT OF THE EXISTING NATCHEZ TRACE PARKWAY BRIDGE OVER LITTLE SWAN CREEK AT MILEPOST (MP) 386.89, AND THE REHABILITATION OF THE BIG SWAN CREEK BRIDGE AT MP 391.50. THE LITTLE SWAN CREEK BRIDGE WORK INCLUDES REPLACING THE EXISTING 200-FOOT, THREE-SPAN, CONCRETE GIRDER BRIDGE WITH A 241-FOOT, TWO-SPAN, PRECAST, PRESTRESSED CONCRETE GIRDER BRIDGE ON PRECAST CONCRETE PIERS AND ABUTMENTS, WITH PRECAST CONCRETE DECK PANELS, AND OTHER MISCELLANEOUS WORK. THE BIG SWAN CREEK BRIDGE WORK INCLUDES CONCRETE REPAIRS FOR THE DECK (SURFACE AND UNDERSIDE), SUBSTRUCTURE (PIER CAP), AND RAILING (INCLUDING CURBS); EXPANSION JOINT REPAIRS AND SEALING, ASPHALT PAVEMENT MILLING AND SUPERPAVE ASPHALT CONCRETE PAVEMENT OVERLAY; AND OTHER MISCELLANEOUS WORK.contract · Last action 2019-05-15$4,604,558
- Department of TransportationPROJECT MD NP BAWA 1(12), 2(12) THE PROJECT CONSISTS OF THE REPAIR AND REHABILITATION OF STRUCTURES NO. 3530-003P, 3530-004P, AND 3530-021P WITHIN THE BALTIMORE-WASHINGTON PARKWAY. THE WORK INCLUDES DECK REPAIR, CAPSTONE, JOINTS REPAIRS, RAILING REPcontract · Last action 2025-09-22$3,775,610
- Department of DefenseIGF::OT::IGF C - SPILLWAY CHUTE SLAB REPAIR GARRISON DAMcontract · Last action 2015-10-15$3,554,605
- Department of TransportationSD FTBL BCB(1) HORSE SOLDIER ROAD TO FORT MEADEcontract · Last action 2023-11-02$3,492,916
- Department of DefenseJWF SPLLWAY BRIDGE REHABILITATION, HAYSI, VAcontract · Last action 2022-09-22$3,449,950
- Department of the InteriorMULTI-BRIDGE REPAIR AT SENEY NWRcontract · Last action 2023-06-07$3,428,950
- Department of AgricultureHUNTINGTON RAVINE WAT BRIDGES REPLACEMENTcontract · Last action 2026-03-02$2,773,205
- Department of TransportationMAMMOTH CAVE NATIONAL PARK - NP-MACA 13(1), 14(2) - THE PROJECT CONSISTS OF THE RECONSTRUCTION OF THE GREEN RIVER FERRY ROAD RAMPS NEAR MP 1.31 AND SHOULDER HARDENING ON MAMMOTH CAVE PARKWAY. THE WORK INCLUDES THE REMOVAL AND RECONSTRUCTION OF A PORTION OF THE EXISTING ROADWAY APPROACHES TO THE FERRY CROSSING, EXTENDING THE RAMPS FURTHER INTO THE RIVER, PROTECTING HISTORIC STONE WALLS ADJACENT TO THE RAMPS, DRAINAGE IMPROVEMENTS, SCOUR PROTECTION, SHOULDER HARDENING, AND OTHER MISCELLANEOUS WORK.contract · Last action 2024-08-01$2,310,452
- Department of the InteriorG:EPREF CONSTRUCTION, CONSTRUCT CANOE LAUNCH&TRAIL EXTENSIONcontract · Last action 2021-04-30$2,271,491
- Department of DefenseBASE FY20 VERMILLION EAST PIER REPAIRcontract · Last action 2021-10-05$2,183,719
- Department of DefenseWATER MAIN IN TRENCH, DUCTILE IRON 12"contract · Last action 2021-12-21$1,859,434
- Department of Homeland Security7233416 (PFA$1,761,283.00)WATERFRONT REPAIRS AT STATION GLOUCESTERcontract · Last action 2019-07-09$1,792,627
- Department of DefenseC - HEADWORKS RETROFIT MODIFICATIONScontract · Last action 2012-12-11$1,763,777
- Department of DefenseIGF::OT::IGF KEN/L MOORING CELLS REPAIRcontract · Last action 2016-09-12$1,703,000
- Department of TransportationPROJECT: FELSENTHAL WILDLIFE NATIONAL REFUGE PROJECT FW FELS-11(1) THE PROJECT CONSISTS OF THE RESURFACING PINE ISLAND ROAD AND SANDY PRAIRIE ROAD WITHIN THE FELSENTHAL NATIONAL WILDLIFE REFUGE. THE WORK INCLUDES RESURFACING WITH AGGREGATE SURFACcontract · Last action 2022-01-06$1,697,698
- Department of TransportationPROJECT VA ERFO FS GWJEF808 2020-2(2) THE PROJECT CONSISTS OF FINALIZING THE DESIGN FOR REPLACING LICK CREEK TRAIL BRIDGE AND CONSTRUCTION OF A TEMPORARY ACCESS TRAIL, TEMPORARY HELICOPTER LANDING PAD, TRAIL BRIDGE REPLACEMENT, AND OTHER MISCELLANEOcontract · Last action 2025-10-24$1,640,000
- Department of DefenseJPP GREENWAY MULTI-USE PAVED TRAILcontract · Last action 2023-02-09$1,567,900
- Department of DefenseLIFT STATION MECHANICALcontract · Last action 2009-09-09$1,562,718
- Department of the InteriorND - VALLEY CITY WETLAND MANAGEMENT DISTRICT-REHAB TOMAHAWK DAMcontract · Last action 2023-08-23$1,503,370
- Department of DefenseLOYALL CONSTRUCTION//LOYALL PHASE 1contract · Last action 2022-08-16$1,393,100
- Department of TransportationPROJECT MD ERFO NPS CHOH 2019-1(1): THE PROJECT CONSISTS OF EMBANKMENT SLOPE REPAIR WITH RIPRAP SLOPE AND ROCKERY WALL CONSTRUCTION, PAVEMENT PATCHING, GUARDRAIL, SHOULDER REPAIRS, DRAINAGE REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE WORK INCLUDEcontract · Last action 2025-09-16$1,333,895
- Department of DefenseIGF::OT::IGF GRENADA ADA FISHING PIER OUTLET CHANNELcontract · Last action 2017-04-27$1,252,518
- Department of TransportationIGF::OT::IGF PROJECT: MANA 001S(1) THE PROJECT CONSISTS OF THE REPAIR OF THE HISTORIC STONE BRIDGE WITHIN THE MANASSAS NATIONAL BATTLEFIELD PARK. THE BRIDGE SUBSTRUCTURE WORK INCLUDES REPAIRING CONCRETE SPALLS AND DETERIORATED CONCRETE AREAS WITH SHOTCRETE, REPLACING AND REPOINTING STONE MASONRY, GROUTING VOIDS UNDER THE PIER AND ABUTMENTS, PLACING RIPRAP, AND OTHER MISCELLANEOUS WORK. THE BRIDGE DECK WORK INCLUDES REMOVAL OF THE ASPHALT PAVEMENT, INSTALLATION OF A WATERPROOFING MEMBRANE, ASPHALT CONCRETE PAVEMENT OVERLAY, CHIP SEAL, AND OTHER MISCELLANEOUS WORK.contract · Last action 2020-12-10$1,211,309
- Department of TransportationND FLAP 136(1) & 145(1) TEWAUKON STRUCTUREScontract · Last action 2024-03-28$1,178,009
- Department of the InteriorIGF::OT::IGF BICYCLE TRAIL IMPROVEMENTS AT E. SHORE OF VA NWRcontract · Last action 2018-12-12$1,145,000
- Department of TransportationTHE PROJECT CONSISTS OF THE RELOCATION OF A SECTION OF LOST VALLEY ROAD, EXISTING PARKING AREA AND THE TRAILHEAD OUTSIDE THE CLARK CREEK FLOODPLAIN, AND THE RESTORATION OF A SECTION OF THE EXISTING LOST VALLEY TRAIL WITHIN THE BUFFALO NATIONAL RIVER. THE WORK INCLUDES ROADWAY OBLITERATION, ROADWAY AND TRAIL RECONDITIONING, AGGREGATE SURFACE COURSE, CULVERT INSTALLATION, SIGNING, AND OTHER MISCELLANEOUS WORK.contract · Last action 2020-03-23$1,124,150
- Department of DefenseVILLAGE OF GLEVIEW, GLEN OAK ACRES STORM SEWER IMPROVEMENT SECTION 219contract · Last action 2021-08-02$1,104,390
- Department of TransportationIGF::OT::IGF PROJECT FW-SNY 100(1) - THE PROJECT CONSISTS OF THE REPLACEMENT OF THE J TO H SPILLWAY BRIDGE ON FISHING ACCESS ROAD WITHIN THE SENEY NATIONAL WILDLIFE REFUGE. THE WORK INCLUDES THE REMOVAL OF THE EXISTING ONE-LANE, TEN-SPAN TIMBER BRIDGE, ABUTMENTS, AND PIERS, WITH THE CONSTRUCTION OF A ONE-LANE, THREE-SPAN, PRESTRESSED CONCRETE BOX GIRDER BRIDGE, RECONSTRUCTION OF THE AGGREGATE ROADWAY, AND OTHER MISCELLANEOUS WORK.contract · Last action 2020-04-20$1,063,302
- Department of DefenseBASE AWARD CAR FOR VILLAGE OF HAZEL CREST WATER MAIN IMPROVEMENTScontract · Last action 2020-12-23$1,006,244
- Department of DefenseOIL CONTAINMENT SYSTEM, BULL SHOALS POWERHOUSE, BAXTER COUNTY, AR PROJECT NO. 370506contract · Last action 2017-01-20$994,559
- Department of DefenseIGF::OT::IGF MELTON HILL LOCK RAW WATER SYSTEM REHABcontract · Last action 2018-07-31$987,000
- Department of TransportationPROJECT NP BLRI 1G28, 1N19 THE PROJECT CONSISTS OF PERFORMING MAINTENANCE REPAIRS ON TWO BRIDGES ON THE BLUE RIDGE PARKWAY. THE WORK INCLUDES THE REPLACEMENT OF BRIDGE BEARINGS, AND OTHER MISCELLANEOUS WORK.contract · Last action 2024-07-17$948,000
- Department of DefenseFRL MACHINERY PLATFORM CONCRETE REHABILITATIONcontract · Last action 2025-06-18$905,300
- Department of the InteriorMO-NEOSHO NFH-DRAIN DITCH REHABcontract · Last action 2021-12-15$860,951
- Department of TransportationIGF::OT::IGF PROJECT: NP-MACA 001T(1) - MAMMOTH CAVE NP - VISITOR CENTER BRIDGE THE PROJECT CONSISTS OF THE REPLACEMENT OF THE MAMMOTH CAVE VISITOR CENTER PEDESTRIAN BRIDGE BETWEEN THE VISITOR CENTER AND THE MAMMOTH CAVE HOTEL. THE WORK INCLUDES REPLACING THE 176-FOOT, THREE-SPAN, CONCRETE BOX GIRDER BRIDGE WITH A 176-FOOT, THREE-SPAN, PRECAST, PRESTRESSED CONCRETE GIRDER BRIDGE ON CAST-IN-PLACE CONCRETE FOOTINGS AND PRECAST CONCRETE ABUTMENTS WITH A CAST-IN-PLACE CONCRETE DECK. THE WORK ALSO INCLUDES MILLING AND OVERLAY OF ASPHALT PAVEMENT TRIAL/SIDEWALK, REPLACEMENT OF EXPOSED AGGREGATE CONCRETE TRIAL/SIDEWALK, AND OTHER MISCELLANEOUS WORK.contract · Last action 2019-05-16$859,804
- Department of DefenseIGF::OT::IGF TYGART BULKHEAD HOIST REPAIRScontract · Last action 2018-06-18$856,925
- Department of DefenseIGF::OT::IGF RICHTON PARK WATER MAIN REPLACEMENTcontract · Last action 2016-12-12$843,699
- Department of TransportationFW-CAVA 102(1), 905(1). THE PROJECT CONSISTS OF THE RECONSTRUCTION OF COUNTY ROUTE 32/18 CAMP 70 ROAD, PARKING LOT, RIVERS EDGE TRIAL. THE WORK INCLUDES AGGREGATE SURFACE COURSE, AGGREGATE BASE, CELLULAR CONFINEMENT SYSTEM, DRAINAGE IMPROVEMENTS, Acontract · Last action 2021-06-30$819,155
- Department of DefenseREPAIR GATE GUIDE G-6contract · Last action 2014-12-12$811,156
- Department of TransportationIGF::OT::IGF PROJECT: FW-OHRI 10(1), 100(1) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 0.2 MILES OF BUFFALO CREEK ROAD (ROUTE 100), THE REHABILITATION OF THE BUFFALO CREEK ROAD PARKING AREA (ROUTE 904), AND THE WIDENING OF THE HEADLAND TRAIL PARKING AREA (ROUTE 903), ALL WITHIN THE OHIO RIVER ISLANDS NATIONAL WILDLIFE REFUGE. THE WORK INCLUDES REMOVAL OF CONCRETE CEMENT TREATED BASE AND ASPHALT PAVEMENT, AGGREGATE BASE AND SURFACE COURSES, ASPHALT CONCRETE PAVEMENT PLACEMENT, GUARDRAIL REPLACEMENT, UTILITY REMOVAL AND NEW INSTALLATIONS, LANDSCAPING, AND OTHER MISCELLANEOUS WORK.contract · Last action 2020-06-08$774,117
- Department of DefenseGARRISON PROJECT SPILLWAY BRIDGE CONCRETE REPAIRScontract · Last action 2025-09-04$727,000
- Department of DefenseREMOVE AND RESET EXISTING ARMOR STONEcontract · Last action 2014-05-12$653,850
Federal contract dollars to this establishment. Primary NAICS: 237310 - HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Last action: 2026-03-02. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
In the news
Other employers in this industry and state
Other employers in water and sewer line and related structures construction within IL, ordered by federal enforcement volume:
- CONSOLIDATED MATERIALS, INCMOKENA — 3 federal enforcement records
- THELEN SAND & GRAVEL INC.WOODSTOCK — 3 federal enforcement records
- FOX EXCAVATING, INC.NORTH AURORA — 3 federal enforcement records
- UNIQUE PLUMBING CO., INC.GLEN ELLYN — 3 federal enforcement records
- ILLINOIS AMERICAN WATER COMPANYALTON — 3 federal enforcement records
- WILLIAM CHARLES CONSTRUCTION CO.ROCKFORD — 3 federal enforcement records
- SIERRA BRAVO CONTRACTORS, LLCCARTERVILLE — 3 federal enforcement records
- FISCHER EXCAVATING CO.ROCKFORD — 3 federal enforcement records
- LAYNE CHRISTENSEN COMPANYWESTERN SPRINGS — 3 federal enforcement records
- FISCHER EXCAVATING, INC.OTTAWA — 3 federal enforcement records
Related searches
- Water and Sewer Line and Related Structures ConstructionAll employers in this industry
- Employers in ILState-wide enforcement data
- Water and Sewer in ILIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on Kovilic Construction Co., from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is Kovilic Construction Co.,'s OSHA violation history?
- Kovilic Construction Co., has no OSHA inspections on record.
- How does Kovilic Construction Co.,'s safety record compare to its industry?
- Kovilic Construction Co., operates in the water and sewer line and related structures construction industry. The industry average Total Recordable Incident Rate (TRIR) is 1.9. Kovilic Construction Co.,'s self-reported DART rate is 7.06 compared to an industry average of 1.1.