Establishment profile
JC STONE, INC.
539 ROCKLAND ROAD, JEFFERSON, ME, 04348
327991 — Cut Stone and Stone Product Manufacturing
Summary
JC STONE, INC. has accumulated 6 OSHA violations across 2 inspections over 13 years of recorded history, with $3,280 in total assessed penalties.
The establishment sits in the 74th percentile for violations within its industry-state peer group of 35 employers. Inspection frequency runs at the 74th percentile. The most recent enforcement activity was recorded 12 years ago.
Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
JC STONE, INC. appears in OSHA workplace safety and MSHA mine safety records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
100% of inspections at this establishment produced violations, with 2 inspections producing serious-or-greater violations.
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 6 distinct standards shown · 6 citations in this view · $3,280 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 1910.0104 B08 VI | 1 | 1 | $1,750 | Sep 2012 | Sep 2012 |
| 29 CFR 1910.0184 D | 1 | 1 | $850 | Jan 2014 | Jan 2014 |
| 29 CFR 1910.0037 A03 | 1 | 1 | $680 | Jan 2014 | Jan 2014 |
| 29 CFR 1910.0037 B05 | 1 | 1 | — | Jan 2014 | Jan 2014 |
| 29 CFR 1910.0335 B01 | 1 | 1 | — | Jan 2014 | Jan 2014 |
| 29 CFR 1910.0104 B10 | 1 | 1 | — | Sep 2012 | Sep 2012 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Above average violations in NAICS 3279 within ME. Peer group: 35 employers. This establishment has 6 OSHA violations; peer median is 1.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for JC STONE, INC.. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for JC STONE, INC.. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 12+ years. Most recent activity: 12 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for JC STONE, INC.. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in ME — for JC STONE, INC., not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other JC STONE, INC. operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 95 citations · 23S&S · 17 contractor · $11,319 proposed / $11,319 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 9806751 | ENGLISHMEN'S BAY QUARRY Washington, ME | Oct 2024 | — | Yes | ModNegligence | $397 | $397 |
| 9806746 | ENGLISHMEN'S BAY QUARRY Washington, ME | Oct 2024 | — | Yes | ModNegligence | $357 | $357 |
| 9467516 | ENGLISHMEN'S BAY QUARRY Washington, ME | Oct 2019 | — | Yes | ModNegligence | $319 | $319 |
| 9417806 | ENGLISHMEN'S BAY QUARRY Washington, ME | Oct 2018 | — | Yes | ModNegligence | $311 | $311 |
| 9418795 | North Jay White Quarry Franklin, ME contractor: J.C. Stone Inc. | May 2019 | — | Yes | ModNegligence | $293 | $293 |
| 9418794 | North Jay White Quarry Franklin, ME contractor: J.C. Stone Inc. | May 2019 | — | Yes | ModNegligence | $293 | $293 |
| 8806328 | NORTH JAY QUARRY Franklin, ME | Oct 2014 | — | Yes | ModNegligence | $270 | $270 |
| 8806331 | NORTH JAY QUARRY Franklin, ME | Oct 2014 | — | Yes | ModNegligence | $243 | $243 |
| 8651639 | JONESBORO RED QUARRY Washington, ME | Sep 2011 | — | Yes | ModNegligence | $243 | $243 |
| 8651637 | JONESBORO RED QUARRY Washington, ME | Sep 2011 | — | Yes | ModNegligence | $243 | $243 |
| 9806749 | ENGLISHMEN'S BAY QUARRY Washington, ME | Oct 2024 | — | Yes | ModNegligence | $161 | $161 |
| 9806754 | ENGLISHMEN'S BAY QUARRY Washington, ME | Oct 2024 | — | No | LowNegligence | $147 | $147 |
| 9806753 | ENGLISHMEN'S BAY QUARRY Washington, ME | Oct 2024 | — | No | LowNegligence | $147 | $147 |
| 9806752 | ENGLISHMEN'S BAY QUARRY Washington, ME | Oct 2024 | — | No | ModNegligence | $147 | $147 |
| 9806750 | ENGLISHMEN'S BAY QUARRY Washington, ME | Oct 2024 | — | No | LowNegligence | $147 | $147 |
| 9806748 | ENGLISHMEN'S BAY QUARRY Washington, ME | Oct 2024 | — | No | ModNegligence | $147 | $147 |
| 9806747 | ENGLISHMEN'S BAY QUARRY Washington, ME | Oct 2024 | — | No | LowNegligence | $147 | $147 |
| 9851479 | ENGLISHMEN'S BAY QUARRY Washington, ME | Oct 2023 | — | No | ModNegligence | $143 | $143 |
| 9851478 | ENGLISHMEN'S BAY QUARRY Washington, ME | Oct 2023 | — | No | HighNegligence | $143 | $143 |
| 9851480 | ENGLISHMEN'S BAY QUARRY Washington, ME | Dec 2022 | — | No | HighNegligence | $143 | $143 |
| 9717616 | ENGLISHMEN'S BAY QUARRY Washington, ME | Dec 2022 | — | No | LowNegligence | $143 | $143 |
| 9661276 | ENGLISHMEN'S BAY QUARRY Washington, ME | Nov 2021 | — | No | LowNegligence | $139 | $139 |
| 9661280 | ENGLISHMEN'S BAY QUARRY Washington, ME | Sep 2021 | — | No | ModNegligence | $139 | $139 |
| 9661279 | ENGLISHMEN'S BAY QUARRY Washington, ME | Jun 2021 | — | No | ModNegligence | $139 | $139 |
| 9661278 | ENGLISHMEN'S BAY QUARRY Washington, ME | Nov 2021 | — | Yes | ModNegligence | $136 | $136 |
| 9661277 | ENGLISHMEN'S BAY QUARRY Washington, ME | Nov 2021 | — | Yes | ModNegligence | $136 | $136 |
| 9710648 | ENGLISHMEN'S BAY QUARRY Washington, ME | Jun 2022 | — | No | LowNegligence | $133 | $133 |
| 9710647 | ENGLISHMEN'S BAY QUARRY Washington, ME | Mar 2022 | — | No | LowNegligence | $133 | $133 |
| 9710646 | ENGLISHMEN'S BAY QUARRY Washington, ME | Dec 2021 | — | No | LowNegligence | $133 | $133 |
| 9417810 | ENGLISHMEN'S BAY QUARRY Washington, ME | Oct 2018 | — | No | ModNegligence | $132 | $132 |
| 9417809 | ENGLISHMEN'S BAY QUARRY Washington, ME | Oct 2018 | — | No | ModNegligence | $132 | $132 |
| 9523435 | ENGLISHMEN'S BAY QUARRY Washington, ME | Oct 2020 | — | No | ModNegligence | $123 | $123 |
| 9523434 | ENGLISHMEN'S BAY QUARRY Washington, ME | Oct 2020 | — | No | LowNegligence | $123 | $123 |
| 9467519 | ENGLISHMEN'S BAY QUARRY Washington, ME | Oct 2019 | — | No | ModNegligence | $121 | $121 |
| 9467517 | ENGLISHMEN'S BAY QUARRY Washington, ME | Oct 2019 | — | No | ModNegligence | $121 | $121 |
| 9418797 | North Jay White Quarry Franklin, ME contractor: J.C. Stone Inc. | May 2019 | — | No | ModNegligence | $121 | $121 |
| 9418796 | North Jay White Quarry Franklin, ME contractor: J.C. Stone Inc. | May 2019 | — | No | LowNegligence | $121 | $121 |
| 9418793 | North Jay White Quarry Franklin, ME contractor: J.C. Stone Inc. | May 2019 | — | Yes | ModNegligence | $121 | $121 |
| 9417808 | ENGLISHMEN'S BAY QUARRY Washington, ME | Oct 2018 | — | No | LowNegligence | $118 | $118 |
| 9417807 | ENGLISHMEN'S BAY QUARRY Washington, ME | Oct 2018 | — | No | ModNegligence | $118 | $118 |
| 9417812 | ENGLISHMEN'S BAY QUARRY Washington, ME | Sep 2018 | — | No | LowNegligence | $118 | $118 |
| 9417811 | ENGLISHMEN'S BAY QUARRY Washington, ME | Jun 2018 | — | No | LowNegligence | $118 | $118 |
| 9366133 | ENGLISHMEN'S BAY QUARRY Washington, ME | Nov 2017 | — | No | ModNegligence | $116 | $116 |
| 9366132 | ENGLISHMEN'S BAY QUARRY Washington, ME | Nov 2017 | — | No | ModNegligence | $116 | $116 |
| 9366131 | ENGLISHMEN'S BAY QUARRY Washington, ME | Nov 2017 | — | No | LowNegligence | $116 | $116 |
| 9366129 | ENGLISHMEN'S BAY QUARRY Washington, ME | Nov 2017 | — | No | ModNegligence | $116 | $116 |
| 9366128 | ENGLISHMEN'S BAY QUARRY Washington, ME | Nov 2017 | — | No | ModNegligence | $116 | $116 |
| 8807163 | Pike Washington Knox, ME contractor: J.C. Stone Inc. | May 2015 | — | No | ModNegligence | $112 | $112 |
| 8806330 | NORTH JAY QUARRY Franklin, ME | Oct 2014 | — | No | ModNegligence | $112 | $112 |
| 8806329 | NORTH JAY QUARRY Franklin, ME | Oct 2014 | — | Yes | ModNegligence | $112 | $112 |
| 8806327 | NORTH JAY QUARRY Franklin, ME | Oct 2014 | — | Yes | ModNegligence | $112 | $112 |
| 8655210 | JONESBORO RED QUARRY Washington, ME | Nov 2011 | — | Yes | ModNegligence | $108 | $108 |
| 8583209 | Stinchfield Quarry Kennebec, ME contractor: J.C. Stone Inc. | Oct 2010 | — | Yes | ModNegligence | $108 | $108 |
| 8575874 | Stinchfield Quarry Kennebec, ME contractor: J.C. Stone Inc. | Jun 2010 | — | Yes | ModNegligence | $108 | $108 |
| 8575873 | Stinchfield Quarry Kennebec, ME contractor: J.C. Stone Inc. | Jun 2010 | — | Yes | ModNegligence | $108 | $108 |
| 8807162 | Pike Washington Knox, ME contractor: J.C. Stone Inc. | Apr 2015 | — | No | ModNegligence | $100 | $100 |
| 8805415 | ENGLISHMEN'S BAY QUARRY Washington, ME | Oct 2014 | — | No | ModNegligence | $100 | $100 |
| 8805411 | ENGLISHMEN'S BAY QUARRY Washington, ME | Oct 2014 | — | No | ModNegligence | $100 | $100 |
| 8805413 | ENGLISHMEN'S BAY QUARRY Washington, ME | Mar 2014 | — | No | ModNegligence | $100 | $100 |
| 8805414 | ENGLISHMEN'S BAY QUARRY Washington, ME | Dec 2013 | — | No | ModNegligence | $100 | $100 |
| 8648594 | JONESBORO RED QUARRY Washington, ME | Nov 2011 | — | No | ModNegligence | $100 | $100 |
| 8648593 | JONESBORO RED QUARRY Washington, ME | Nov 2011 | — | No | ModNegligence | $100 | $100 |
| 8706469 | ENGLISHMEN'S BAY QUARRY Washington, ME | Sep 2011 | — | No | LowNegligence | $100 | $100 |
| 8648595 | JONESBORO RED QUARRY Washington, ME | Sep 2011 | — | No | LowNegligence | $100 | $100 |
| 8651641 | JONESBORO RED QUARRY Washington, ME | Sep 2011 | — | No | ModNegligence | $100 | $100 |
| 8651640 | JONESBORO RED QUARRY Washington, ME | Sep 2011 | — | Yes | ModNegligence | $100 | $100 |
| 8651638 | JONESBORO RED QUARRY Washington, ME | Sep 2011 | — | No | ModNegligence | $100 | $100 |
| 8651636 | JONESBORO RED QUARRY Washington, ME | Sep 2011 | — | No | ModNegligence | $100 | $100 |
| 8650517 | NORTH JAY QUARRY Franklin, ME | Aug 2011 | — | No | ModNegligence | $100 | $100 |
| 8650516 | NORTH JAY QUARRY Franklin, ME | Aug 2011 | — | No | ModNegligence | $100 | $100 |
| 8650515 | NORTH JAY QUARRY Franklin, ME | Aug 2011 | — | No | ModNegligence | $100 | $100 |
| 8648596 | JONESBORO RED QUARRY Washington, ME | Dec 2010 | — | No | LowNegligence | $100 | $100 |
| 8580459 | Stinchfield Quarry Kennebec, ME contractor: J.C. Stone Inc. | Oct 2010 | — | No | ModNegligence | $100 | $100 |
| 8580458 | Stinchfield Quarry Kennebec, ME contractor: J.C. Stone Inc. | Oct 2010 | — | No | ModNegligence | $100 | $100 |
| 8580457 | Stinchfield Quarry Kennebec, ME contractor: J.C. Stone Inc. | Oct 2010 | — | No | ModNegligence | $100 | $100 |
| 8580456 | Stinchfield Quarry Kennebec, ME contractor: J.C. Stone Inc. | Oct 2010 | — | Yes | ModNegligence | $100 | $100 |
| 8580455 | Stinchfield Quarry Kennebec, ME contractor: J.C. Stone Inc. | Oct 2010 | — | No | ModNegligence | $100 | $100 |
| 8575872 | Stinchfield Quarry Kennebec, ME contractor: J.C. Stone Inc. | Jun 2010 | — | No | ModNegligence | $100 | $100 |
| 8575871 | Stinchfield Quarry Kennebec, ME contractor: J.C. Stone Inc. | Jun 2010 | — | No | ModNegligence | $100 | $100 |
| 8575041 | ENGLISHMEN'S BAY QUARRY Washington, ME | May 2010 | — | No | ModNegligence | $100 | $100 |
| 8575040 | ENGLISHMEN'S BAY QUARRY Washington, ME | May 2010 | — | No | ModNegligence | $100 | $100 |
| 5075450 | JONESBORO RED QUARRY Washington, ME | Apr 2026 | — | No | ModNegligence | — | — |
| 5075448 | ENGLISHMEN'S BAY QUARRY Washington, ME | Apr 2026 | — | Yes | ModNegligence | — | — |
| 5075446 | ENGLISHMEN'S BAY QUARRY Washington, ME | Apr 2026 | — | No | LowNegligence | — | — |
| 5075445 | ENGLISHMEN'S BAY QUARRY Washington, ME | Apr 2026 | — | No | ModNegligence | — | — |
| 5075447 | ENGLISHMEN'S BAY QUARRY Washington, ME | Apr 2026 | — | No | ModNegligence | — | — |
| 5075444 | ENGLISHMEN'S BAY QUARRY Washington, ME | Oct 2025 | — | No | ModNegligence | — | — |
| 9806766 | ENGLISHMEN'S BAY QUARRY Washington, ME | Nov 2024 | — | No | — | — | — |
| 9661281 | ENGLISHMEN'S BAY QUARRY Washington, ME | Dec 2021 | — | No | — | — | — |
| 9661283 | ENGLISHMEN'S BAY QUARRY Washington, ME | Sep 2021 | — | No | — | — | — |
| 9661282 | ENGLISHMEN'S BAY QUARRY Washington, ME | Jun 2021 | — | No | — | — | — |
| 8806355 | NORTH JAY QUARRY Franklin, ME | Oct 2014 | — | No | — | — | — |
| 8806354 | NORTH JAY QUARRY Franklin, ME | Oct 2014 | — | No | — | — | — |
| 8806353 | NORTH JAY QUARRY Franklin, ME | Oct 2014 | — | No | — | — | — |
| 8806352 | NORTH JAY QUARRY Franklin, ME | Oct 2014 | — | No | — | — | — |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for JC STONE, INC.. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for JC STONE, INC.. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for JC STONE, INC.. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for JC STONE, INC.. Verify directly with UVA Corporate Prosecution Registry →
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2014-01-07 | Planned | 4 | 3 | $1,530 | |
| 2012-09-05 | Complaint | 2 | 2 | $1,750 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in cut stone and stone product manufacturing within ME, ordered by federal enforcement volume:
- BLUE ROCK INDUSTRIESWESTBROOK — 2 federal enforcement records
- ROCKPORT GRANITE INC.ROCKPORT — 2 federal enforcement records
- ZEN STONEWORKSYORK — 1 federal enforcement record
- HARPSWELL HOUSE INC.TOPSHAM — 1 federal enforcement record
- SURFACE CREATIONS OF MAINE, LLC.PORTLAND — 1 federal enforcement record
- HARPSWELL HOUSE, INC.BRUNSWICK — 1 federal enforcement record
- ROCKERS, INC.ROCKPORT — 1 federal enforcement record
- GDS SERVICES INC.BRIDGTON — 1 federal enforcement record
- FUNKY ROCK DESIGNSELIOT — 1 federal enforcement record
- KITCHEN CONCEPTSWESTBROOK — 1 federal enforcement record
Related searches
- Cut Stone and Stone Product ManufacturingAll employers in this industry
- Employers in MEState-wide enforcement data
- Cut Stone and in MEIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on JC STONE, INC. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is JC STONE, INC.'s OSHA violation history?
- JC STONE, INC. has 2 OSHA inspections on record with 6 violations and $3,280 in total penalties.
- How does JC STONE, INC.'s safety record compare to its industry?
- JC STONE, INC. operates in the cut stone and stone product manufacturing industry. The industry average Total Recordable Incident Rate (TRIR) is 6.2.