Skip to main content

Establishment profile

JACKSON EXCAVATION

UT, 84715

Download as PDF →

OSHA inspections
0
Violations
0
Penalties
$0
Context
No OSHA inspections on record. This does not mean the employer is violation-free — OSHA inspects a small fraction of workplaces annually.

Summary

JACKSON EXCAVATION has no OSHA inspection history on file. Federal records covering wage, environmental, labor relations, and other agencies are noted below where present.

The most recent federal enforcement activity was recorded 0 days ago.

Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

JACKSON EXCAVATION appears in MSHA mine safety and FMCSA motor carrier registration records only. No matching records were found in OSHA workplace safety, WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.

OSHA workplace safety

No OSHA inspections, citations, or accidents on file for JACKSON EXCAVATION. Verify directly with Occupational Safety and Health Administration

Safety self-report (OSHA 300A)

No self-reported injury rates filed with OSHA's Injury Tracking Application for JACKSON EXCAVATION. Verify directly with OSHA Injury Tracking Application

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for JACKSON EXCAVATION. Verify directly with Occupational Safety and Health Administration

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
0 days ago

Most recent federal enforcement activity recorded 0 days ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

No WHD wage, overtime, or child-labor enforcement cases on file for JACKSON EXCAVATION. Verify directly with Wage and Hour Division

Mine safety (MSHA)

Company-level in UT — for JACKSON EXCAVATION, not this location alone

Violations
12
Assessed penalties
$1,486

Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other JACKSON EXCAVATION operations in the same state.

Labor relations (NLRB)

No NLRB unfair labor practice charges or union representation cases on file for JACKSON EXCAVATION. Verify directly with National Labor Relations Board

Visa & labor certification (OFLC)

No H-1B, H-2A, or H-2B labor condition applications on file for JACKSON EXCAVATION. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for JACKSON EXCAVATION. Verify directly with Environmental Protection Agency

Motor carrier safety (FMCSA)

DOT number
743012
Operation
C

Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for JACKSON EXCAVATION. Verify directly with UVA Corporate Prosecution Registry

Federal contracts

This location

Obligated (5-yr)
$9.1M
Obligated (all-time)
$17.7M
Awards
167
Top agency
Department of Agriculture
$14.6M
Top agencies by obligation (this location)
Department of Agriculture$14.6M
Department of the Interior$3.1M
Largest awards (top 50 of 167)
  • Department of Agriculture
    RECONSTRUCTION OF PINE VALLEY DAM, DIXIE NATIONAL FOREST, UTAH (GAOA)
    contract · Last action 2025-09-30
    $3,641,664
  • Department of the Interior
    CALF CREEK BRIDGE REPLACEMENT
    contract · Last action 2026-02-09
    $2,519,355
  • Department of Agriculture
    LAKE FORK ERFO ROAD REPAIR
    contract · Last action 2025-02-27
    $1,183,728
  • Department of Agriculture
    WO CMRD CIP: MANTI-LA SAL ROAD IMPROVEMENT CABIN HOLLOW CRUSHING CONTRACT PIT DEVELOPMENT AND CRUSHING OF 28,000 CY (CUBIC YARDS) OF SPEC AGGREGATE AND PLACING IT IN STOCKPILES WITHIN OR NEAR THE PIT LOCATION
    contract · Last action 2023-08-01
    $607,102
  • Department of Agriculture
    IGF::CL::IGF DIXIE BAER GROUP 1 ROAD MAINTENANCE
    contract · Last action 2018-07-18
    $422,853
  • Department of Agriculture
    PINE VALLEY RESERVOIR TOE DRAIN. INCLUDES BASE AND ALL OPTIONS. PER SPECIFICATIONS, DRAWINGS, AND COST PROPOSAL.
    contract · Last action 2021-07-02
    $391,405
  • Department of Agriculture
    IGF::OT::IGF - CLAY SPRINGS BAER ROAD/STREAM REHABILITATION PROJECT ON THE FISHLAKE N.F., REGION 4.
    contract · Last action 2013-08-08
    $318,849
  • Department of Agriculture
    COVE MOUNTAIN REROUTES AND ROAD WORK
    contract · Last action 2026-02-20
    $301,235
  • Department of Agriculture
    DOCTOR CREEK WATER SYSTEM RECONSTRUCTION
    contract · Last action 2009-12-28
    $286,380
  • Department of Agriculture
    IGF::OT::IGF WATER FLAT CULVERT REPLACEMENT AND ROAD RECONDITIONING
    contract · Last action 2013-11-15
    $236,548
  • Department of Agriculture
    GAOA 4DN FY23 ROTOMILL FISHLAKE NF-FREMONT RD
    contract · Last action 2023-04-20
    $236,468
  • Department of Agriculture
    NEW HARMONY-PAGE RANCH ROAD MILLING CONSIST OF ROTO-MILLING OF THE 30029 ROAD ON THE DIXIE NATIONAL FOREST, PINE VALLEY RANGER DISTRICT.
    contract · Last action 2023-06-14
    $214,616
  • Department of Agriculture
    AWARD OF ROAD MILLING PROJECT ON THE FISHLAKE NATIONAL FOREST. PERIOD OF PERFORMANCE IS 60 DAYS FROM NOTICE TO PROCEED.
    contract · Last action 2012-08-31
    $214,332
  • Department of Agriculture
    TASK ORDER FOR FISHLAKE NF FOR BUTTERFIELD AND MONROE ROTOMILL PROJECT SOUTHERN UTAH ROTOMILL IDIQ
    contract · Last action 2019-07-12
    $209,684
  • Department of Agriculture
    IGF::CL::IGF BRIAN HEAD BAER - GROUP 2 TASK ORDER THE 2018 CEDAR CITY RANGER DISTRICT BAER ROAD MAINTENANCE PROJECT GROUP 2 CONSIST OF WORK TO PERFORM ROAD MAINTENANCE ASSOCIATED WITH THE RECENT BRIAN HEAD FIRE. THE WORK INCLUDES (BUT IS NOT LIMITED TO); OUT SLOPING OF ROADWAYS, DRAINAGE STRUCTURES (GRADE DIPS AND LINEAR ROAD DITCHES), REMOVING NON-FUNCTIONING CULVERTS, INSTALL NEW CULVERTS WITH ITS ADJACENT CATCH BASIN, CLEANING NON-FUNCTIONING CATCH BASINS AND ROADWAY LINEAR DITCHES, ROADSIDE STREAM BANK STABILIZATION (RIPRAP PROTECTION), AND ROAD TEMPLATE RESHAPING (GRADING AND BORROW/FILL PLACEMENT). ALL REQUIRED WORK IS SHOWN IN THE SCHEDULE OF ITEMS. THE PROJECT IS LOCATED ON THE CEDAR CITY RANGER DISTRICT OF THE DIXIE NATIONAL FOREST, IRON COUNTY, UTAH. ALL FOREST SERVICE ROADS HAVE BEEN IDENTIFIED AND ARE LISTED WITHIN THE SCHEDULE OF ITEMS. THE PROJECT IS LOCATED ON THE IDIQ WEST ZONE, FOR THIS TASK ORDER. PERIOD OF PERFORMANCE: 03/01/2018 - 03/14/2019 365 CALENDAR DAYS
    contract · Last action 2018-03-01
    $176,582
  • Department of Agriculture
    PINE CREEK FISH PASSAGE - REPLACEMENT OF 2 EXISTING CULVERTS WITH NEW STRUCTURES FOR APOP, PLUS STREAMBED RESTORATION
    contract · Last action 2010-08-23
    $175,876
  • Department of Agriculture
    1.SINGLE LANE ROAD ROTOMILLING. PERFORM ON THE FOLLOWING ROUTES AS SHOWN ON THE ATTACHED EXHIBITS. BUCK RIDGE RT. #580, BUCK RIDGE, BEGIN AT SR #153, SEE EXHIBIT 2.3 MILE BIG FLAT RT. #582, SEE EXHIBIT 0.7 MILE RT. #2367,
    contract · Last action 2021-04-12
    $171,503
  • Department of the Interior
    IGF::OT::IGF HOG SPRINGS SITE IMPROVEMENTS
    contract · Last action 2014-04-14
    $166,537
  • Department of Agriculture
    AWARD OF TASK ORDER FOR ROAD MAINTENANCE WORK ON THE PINE VALLEY RANGER DISTRICT, DIXIE NATIONAL FOREST ACCORDING TO THE ATTACHED SCHEDULE OF ITEMS. PERIOD OF PERFORMANCE: NOTICE TO PROCEED THROUGH JULY 31, 2012.
    contract · Last action 2013-02-01
    $166,432
  • Department of the Interior
    LOWER DRY FORK TRAILHEAD CONSTRUCTION FOR BLM-UT
    contract · Last action 2019-12-04
    $158,108
  • Department of Agriculture
    FISHLAKE RAC ROTOMILLING 2022
    contract · Last action 2023-04-05
    $157,574
  • Department of Agriculture
    BOX CREEK ROTOMILLING TASK ORDER WITH MAGNESIUM CHLORIDE APPLICATION. FISHLAKE NATIONAL FOREST SOUTHERN UTAH ROTOMILLING IDIQ
    contract · Last action 2020-09-04
    $156,986
  • Department of Agriculture
    INACCORDANCE WITH TERMS, CONDITIONS, AND CLAUSES OF IDIQ CONTRACT AG-84N8-C-08-0005, AWARD OF TASK ORDER FOR ESCALANTE&TEASDALE RANGER DISTRICT ROAD MAINTENANCE DESCRIPTION OF WORK: THIS TASK IS TO (1) DECOMMISSION ROADS THAT HAVE BEEN IDENTIFIED IN THE MOTORIZED TRAVEL PLAN THIS WILL BE DONE WITH MANY DIFFERENT TYPES OF CLOSURES, USING ROCKS HAULED IN RIPPING THE OLD ROADBED, AND (2) MAINTENANCE TO EXISTING ROADS IN ORDER TO KEEP ROADS TO A DRIVABLE STANDARD. PROJECT LOCATION: THIS PROJECT IS LOCATED IN GARFIELD COUNTY ON THE ESCALANTE RANGER DISTRICT. PERIOD OF PERFORMANCE: JUNE 20, 2012 THRU JUNE 19, 2013
    contract · Last action 2013-12-30
    $144,497
  • Department of Agriculture
    IGF::CT::IGF SHINGLE CREEK CROSSING (FISHLAKE NF)
    contract · Last action 2014-08-15
    $140,796
  • Department of Agriculture
    SKYLINE DRIVE ROTOMILL TASK ORDER SOUTHERN UTAH ROTOMILL IDIQ
    contract · Last action 2019-08-26
    $135,273
  • Department of Agriculture
    GAOA BEAVER RD ROCK BARRIER 2022
    contract · Last action 2023-03-08
    $135,165
  • Department of Agriculture
    IGF::OT::IGF OTHER FUNCTION AWARD OF BOX CREEK ROAD PULVERIZING&RECONDITIONING AWARDED OF BASE IN THE AMOUNT OF $131,650.00 LINE ITEM 1 - MOIBILIZAITON IN THE AMOUNT OF $20,500.00 LINE ITEM 2 - PULVERIZING&RECONDITIONING OF 6.5 MILES @ $17,100.00 PER MILE = $111,150.00 PERIOD OF PERFORMANCE IS 30 CALENDAR DAYS FROM NOTICE TO PROCEED.
    contract · Last action 2012-08-22
    $131,650
  • Department of Agriculture
    LEFT FORK BAER ROAD WORK-DIXIE NF
    contract · Last action 2024-07-30
    $130,752
  • Department of Agriculture
    IGF::OT::IGF OTHER FUNCTION INACCORDANCE WITH THE TERMS AND CONDITIONS OF CONTRACT AG-84N8-C-12-0011, AWARD OF TASK ORDER FOR ROAD REPAIR AND CULVERT INSTALLATION ON AREA AFFECTED BY THE SHINGLE CREEK FIRE. SEE ATTACHED SOW&SOI. PERIOD OF PERFORMANCE: 14-AUG-2012 THROUGH 13-AUG-2013.
    contract · Last action 2012-09-11
    $130,598
  • Department of Agriculture
    ROAD DECOMMISSIONING FOR CEDAR CITY RANGER DISTRICT TASK #4
    contract · Last action 2012-07-24
    $129,988
  • Department of Agriculture
    IGF::CL::IGF 2017 CEDAR CITY RANGER DISTRICT ROAD MAINTENANCE PROJECT
    contract · Last action 2017-04-21
    $123,061
  • Department of Agriculture
    0408 GAOA 4CZ KENTS LK. RD. CORRIDOR DM REDUCE FS IDIQ ROAD MILLING 2023
    contract · Last action 2023-09-15
    $122,947
  • Department of Agriculture
    IGF::CL::IGF BAER ROTOMILLING TASK ORDER
    contract · Last action 2018-01-30
    $122,164
  • Department of the Interior
    IGF::OT::IGF STARR SPRINGS CAMPGROUND IMPROVEMENTS
    contract · Last action 2019-06-19
    $122,008
  • Department of Agriculture
    IGF::OT::IGF STEEPLE SPRING ROADMILLING PROJECT
    contract · Last action 2014-07-17
    $109,435
  • Department of Agriculture
    IGF::OT::IGF ROTOMILLING FISHLAKE NATIONAL FOREST
    contract · Last action 2014-06-23
    $104,636
  • Department of Agriculture
    ROTO-MILL 5.5 MILES OF GEYSER PASS ROAD STARTING AT LA SAL LOOP ROAD. ROTO-MILLING WILL INCORPORATE ROCK FROM THE DITCH AND NATIVE CLAY BELOW THE EXISTING SURFACE GRAVEL MATERIAL. THE ROTO-MILLED SURFACE WILL BE WATERED, GRADED AND RECOMPACTED TO CRE
    contract · Last action 2021-07-01
    $104,580
  • Department of Agriculture
    IGF::OT::IGF D2 SWAINS CREEK ATV BOX CULVERT INSTALLATION OF A CONCRETE BOX CULVERT APPROXIMATELY 0.10 MILES EAST OF THE INTERSECTION OF FS ROAD 30290 AND THE MARKAGUNT PLATEAU OHV TRAIL (32000.1). THIS PROJECT INCLUDES STRUCTURE EXCAVATION, ROADWAY EMBANKMENT, BACKFILLING, COMPACTING, FURNISHING AND INSTALLING A NEW PRECAST REINFORCED CONCRETE BOX CULVERT WITH PRECAST CONCRETE WINGWALLS, RIPRAP, AND HAULING AND PLACING CRUSHED AGGREGATE SURFACING. AWARD AMOUNT: $97,048.00 PERIOD OF PERFORMANCE: 45 CALENDAR DAYS GOVERNMENT POINT OF CONTACT: JAMES REDHOUSE PHONE: 435.865.3759
    contract · Last action 2017-10-19
    $104,048
  • Department of Agriculture
    BOX CR. RD. WIDENING PROJECT 2019 ITEM 622(D) 161-200 FWHP EXCAVATOR 160 HOURS AT $145.00 X 2 PIECES OF EQUIPMENT TOTAL OF $46,400.00 ITEM 622(6) LOADER 160 HOURS AT $140.00 TOTAL OF $22,400.00 ITEM 602(9)B CULVERT 24" CMP 400 LF A
    contract · Last action 2019-08-20
    $94,886
  • Department of Agriculture
    IGF::OT::IGF
    contract · Last action 2013-08-14
    $93,442
  • Department of Agriculture
    NORTH CREEK ROAD REPAIRS - INSTALLATION OF GABION WALLS, DRAINAGE STRUCTURES, AND RESURFACING 1600 FEET OF FR30149 ON THE DIXIE NATIONAL FOREST.
    contract · Last action 2009-09-01
    $93,298
  • Department of Agriculture
    IGF::OT::IGF
    contract · Last action 2013-08-30
    $90,110
  • Department of Agriculture
    FISHLAKE ROUTE DECOMMISSIONING CONTRACT 2010
    contract · Last action 2010-09-22
    $88,820
  • Department of Agriculture
    IGF::OT::IGF
    contract · Last action 2014-09-23
    $87,836
  • Department of Agriculture
    IGF::CL:IGF SECOND LEFT HAND PROJECT, DIXIE NF
    contract · Last action 2018-05-31
    $85,055
  • Department of the Interior
    IGF::CT::IGF CARE WASTERWATER SYSTEM REPAIRS
    contract · Last action 2013-11-21
    $84,506
  • Department of Agriculture
    IGF::CL::IGF DUTTON ROTOMILLING PROJECT
    contract · Last action 2016-08-01
    $81,540
  • Department of Agriculture
    IGF::CL::IGF
    contract · Last action 2013-06-27
    $79,339
  • Department of Agriculture
    OLSEN CLAY BENCH ROTOMILL- TO ALLOW FOR LOGGING EQUIPMENT ACCESS AND HAULING (APPROXIMATELY 1.8 MILES EACH). THE ROTOMILL IS NEEDED TO BREAK UP THE COBBLE AND ALLOW FOR A MORE ACCESSIBLE TRAVEL SURFACE. THE ROAD GRADIENTS ARE MILD WITH FEW SURFACE F
    contract · Last action 2021-07-14
    $77,110
  • Department of Agriculture
    EAST FORK FLOOD (BAER)
    contract · Last action 2010-08-23
    $75,431

Federal contract dollars to this establishment. Primary NAICS: 237310 - HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Last action: 2026-02-20. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.

In the news

Related searches

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

About this data

This profile aggregates federal enforcement records on JACKSON EXCAVATION from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Frequently asked

What is JACKSON EXCAVATION's OSHA violation history?
JACKSON EXCAVATION has no OSHA inspections on record.