Skip to main content

Establishment profile

INGRAM READYMIX, INC.

10400 W. LOOP 1604, SAN ANTONIO, TX, 78227
Operated by INGRAM READYMIX, INC · 1 of 16 establishments
327320Ready-Mix Concrete Manufacturing
EIN 741550251

Download as PDF →

OSHA inspections
1
over 3 years
Violations
1
$12,500 in penalties
Penalties
$12,500
$12,500 avg
Violations across 2 federal agencies
Enforcement actions from multiple agencies may indicate systemic compliance issues across functions.
Accident investigations on record
1 National Emphasis Program inspections

Summary

INGRAM READYMIX, INC. has accumulated 1 OSHA violation across 1 inspection over 3 years of recorded history, with $12,500 in total assessed penalties.

The establishment sits in the 36th percentile for violations within its industry-state peer group of 503 employers. The most recent enforcement activity was recorded 3 years ago.

Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

INGRAM READYMIX, INC. appears in OSHA workplace safety and MSHA mine safety records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.

OSHA workplace safety

Inspections
1
0.3 / yr · last 3 yrs
Violations
1
0.3 / yr
Penalties
$12,500
$12,500 avg / violation
Inspection trigger · referral
1 of 1

100% of inspections at this establishment produced violations,

Peer comparison

36th

Below average violations in NAICS 3273 within TX. Peer group: 503 employers. This establishment has 1 OSHA violation; peer median is 2.

Fewer violationsMore violations
Penalty percentile
85th
peer median: $1,800
Inspection frequency
0th
peer median: 1

Safety self-report (OSHA 300A)

Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.

DART rate
0.0
vs industry
−1.6
TRIR
0.0
vs industry
−2.5

Reported for 11 average annual employees at this establishment.

Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.

Industry benchmark

Industry avg TRIR
2.5
BLS SOII 2024
Industry avg DART
1.6
BLS SOII 2024
Self-reported TRIR
0.0
OSHA ITA Form 300A (employer self-reported)

BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.

Inspection breakdown

Referral
1

Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.

OSHA severe injury reports

Self-reported events under 29 CFR 1904.39 (24-hour notification of hospitalization, amputation, or loss of an eye) · Jun 2023

Reports
1
Hospitalizations
1
Amputations
0
Eye losses
0

Most frequent event: Struck or run over by rolling powered vehicle

Source: OSHA Severe Injury Reports (federal OSHA only; state-plan states like California, Oregon, and Washington maintain their own programs and do not consistently report into this feed).

Severe injury reports — events

Each row is a hospitalization, amputation, or eye-loss event the employer self-reported to OSHA under 29 CFR 1904.39. Narratives are written by the reporting employer.

DateEventBody partOutcome
Jun 1, 2023Struck or run over by rolling powered vehicleLeg(s), unspecifiedHospitalized

Source: OSHA Severe Injury Reports. Federal-OSHA jurisdiction only by default; some state-plan programs report voluntarily.

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
3 years ago

No federal enforcement activity has been recorded against this establishment in 3+ years. Most recent activity: 3 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

No WHD wage, overtime, or child-labor enforcement cases on file for INGRAM READYMIX, INC.. Verify directly with Wage and Hour Division

Mine safety (MSHA)

Company-level in TX — for INGRAM READYMIX, INC, not this location alone

Violations
135
Assessed penalties
$30,844

Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other INGRAM READYMIX, INC operations in the same state.

MSHA citations

Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 23S&S · 97 contractor · $27,689 proposed / $24,901 paid.

CitationMineDateSectionS&SNegligenceProposedPaid
6576227
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc
May 2010NoHighNegligence$3,493$705
9743596
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Aug 2023YesModNegligence$3,340$3,340
6472958
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc
Feb 2010YesModNegligence$2,106$2,106
9676294
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Oct 2022YesModNegligence$1,156$1,156
9676291
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Oct 2022YesModNegligence$1,156$1,156
9676289
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Oct 2022YesModNegligence$1,156$1,156
9745534
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jun 2024YesModNegligence$1,039$1,039
9676295
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Oct 2022NoModNegligence$518$518
9642523
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Sep 2021YesHighNegligence$453$453
6464674
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc
Feb 2009YesHighNegligence$425$425
9749734
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jun 2024YesModNegligence$421$421
5005045
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Aug 2025NoModNegligence$313$313
5005040
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Aug 2025NoModNegligence$226$226
5005038
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Aug 2025NoModNegligence$226$226
9743595
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Aug 2023NoModNegligence$203$203
6576226
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc
May 2010NoModNegligence$190$190
6576225
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc
May 2010NoModNegligence$190$190
6472959
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc
Feb 2010NoModNegligence$190$190
6464669
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc
Feb 2009NoHighNegligence$190$190
9796303
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Oct 2024NoModNegligence$189$189
9749738
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jun 2024YesModNegligence$189$189
9749737
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jun 2024YesModNegligence$189$189
9749614
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Dec 2023NoModNegligence$189$189
9749613
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Dec 2023NoModNegligence$189$189
9749612
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Dec 2023NoModNegligence$189$189
9673427
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jun 2022NoModNegligence$188$188
9743598
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Aug 2023NoModNegligence$182$182
9676293
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Oct 2022NoModNegligence$155$155
9676292
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Oct 2022NoModNegligence$155$155
9676290
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Oct 2022NoModNegligence$155$155
9673426
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jun 2022NoModNegligence$155$155
5006465
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Dec 2025NoModNegligence$151$151
5005039
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Aug 2025NoModNegligence$151$151
9749739
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jun 2024NoModNegligence$147$147
9749736
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jun 2024NoModNegligence$147$147
9749735
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jun 2024NoModNegligence$147$147
9749733
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jun 2024NoModNegligence$147$147
9791277
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
May 2024NoHighNegligence$147$147
9519871
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Dec 2020NoModNegligence$146$146
9519870
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Dec 2020NoModNegligence$146$146
9519869
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Dec 2020NoModNegligence$146$146
9519868
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Dec 2020NoModNegligence$146$146
9457853
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jul 2019NoHighNegligence$135$135
9350761
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jul 2017YesModNegligence$135$135
9676301
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Oct 2022NoModNegligence$133$133
9676300
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Oct 2022NoModNegligence$133$133
9673425
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jun 2022NoModNegligence$133$133
9640551
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Dec 2021NoHighNegligence$133$133
9640549
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Dec 2021NoModNegligence$133$133
9640548
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Dec 2021NoModNegligence$133$133
9640550
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Dec 2021YesModNegligence$133$133
9640547
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Dec 2021NoModNegligence$133$133
9640546
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Dec 2021NoModNegligence$133$133
9640545
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Dec 2021NoModNegligence$133$133
9640544
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Dec 2021NoModNegligence$133$133
9401404
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jan 2018NoHighNegligence$128$128
9401403
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jan 2018NoModNegligence$128$128
9643383
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Sep 2021NoModNegligence$125$125
9643382
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Sep 2021NoModNegligence$125$125
9643381
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Sep 2021NoLowNegligence$125$125
9510059
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jan 2020NoHighNegligence$123$123
9510058
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jan 2020NoHighNegligence$123$123
9510057
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jan 2020NoModNegligence$123$123
9510056
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jan 2020YesModNegligence$123$123
9457854
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jul 2019NoHighNegligence$121$121
9457852
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jul 2019NoModNegligence$121$121
9457851
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jul 2019NoModNegligence$121$121
9457850
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jul 2019NoModNegligence$121$121
9457849
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jul 2019NoModNegligence$121$121
9455884
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jul 2019YesModNegligence$121$121
9455883
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jul 2019NoModNegligence$121$121
8618142
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc
Jun 2011YesModNegligence$117$117
6572047
Hondo S & G #89
Medina, TX
Mar 2010YesModNegligence$117$117
9350765
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jul 2017YesModNegligence$116$116
9350764
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jul 2017NoModNegligence$116$116
9350763
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jul 2017YesModNegligence$116$116
9350762
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jul 2017NoModNegligence$116$116
9350760
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jul 2017NoModNegligence$116$116
9350759
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jul 2017NoModNegligence$116$116
9350758
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jul 2017YesModNegligence$116$116
9350757
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jul 2017NoModNegligence$116$116
9350756
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jul 2017NoModNegligence$116$116
9350755
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jul 2017YesModNegligence$116$116
9350754
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jul 2017NoModNegligence$116$116
9350753
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jul 2017NoModNegligence$116$116
9350752
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jul 2017NoModNegligence$116$116
9350751
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jul 2017NoModNegligence$116$116
9350750
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jul 2017YesModNegligence$116$116
9350749
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jul 2017NoModNegligence$116$116
9350748
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jul 2017NoModNegligence$116$116
9350747
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jul 2017NoModNegligence$116$116
8969216
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Sep 2016NoModNegligence$114$114
8969215
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Sep 2016NoHighNegligence$114$114
8857565
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jul 2015NoModNegligence$100$100
8688520
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Jul 2014NoHighNegligence$100$100
8687793
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Feb 2014YesModNegligence$100$100
8687792
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Feb 2014NoModNegligence$100$100
8687791
Del Rio Pit & Plant #87
Val Verde, TX
contractor: Ingram Readymix Inc.
Feb 2014NoModNegligence$100$100
8765938
Hondo S & G #89
Medina, TX
Apr 2013NoModNegligence$100$100
8682003
Hondo S & G #89
Medina, TX
Jul 2012NoModNegligence$100$100

Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).

Labor relations (NLRB)

No NLRB unfair labor practice charges or union representation cases on file for INGRAM READYMIX, INC.. Verify directly with National Labor Relations Board

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for INGRAM READYMIX, INC.. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for INGRAM READYMIX, INC.. Verify directly with Environmental Protection Agency

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for INGRAM READYMIX, INC.. Verify directly with UVA Corporate Prosecution Registry

Inspection history

DateTriggerViolationsSeriousPenalty
2023-06-02Referral1$12,500

Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.

In the news

Part of a larger organization

INGRAM READYMIX, INC. is one of 16 establishments rolled up under the parent organization INGRAM READYMIX, INC.

Federal enforcement records on this page represent activity at this specific establishment only. The full enforcement footprint of INGRAM READYMIX, INC across all 16 of its tracked locations is viewable on the parent profile.

Other employers in this industry and state

Other employers in ready-mix concrete manufacturing within TX, ordered by federal enforcement volume:

Other locations under this parent

Other establishments operated by INGRAM READYMIX, INC, ordered by federal enforcement volume:

Related searches

About this data

This profile aggregates federal enforcement records on INGRAM READYMIX, INC. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code. This establishment resolves to the parent rollup INGRAM READYMIX, INC, which operates 16 establishments in our dataset.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is INGRAM READYMIX, INC.'s OSHA violation history?
INGRAM READYMIX, INC. has 1 OSHA inspection on record with 1 violation and $12,500 in total penalties.
How does INGRAM READYMIX, INC.'s safety record compare to its industry?
INGRAM READYMIX, INC. operates in the ready-mix concrete manufacturing industry. The industry average Total Recordable Incident Rate (TRIR) is 2.5. INGRAM READYMIX, INC.'s self-reported DART rate is 0 compared to an industry average of 1.6.