Skip to main content

Establishment profile

HUTCHENS CONSTRUCTION COMPANY

600 MILL STREET, CASSEVILLE, MO, 65625
237310Highway, Street, and Bridge Construction

Download as PDF →

OSHA inspections
1
over 37 years
Violations
2
$160 in penalties
Penalties
$160
$80 avg
Violations across 3 federal agencies
Enforcement actions from multiple agencies may indicate systemic compliance issues across functions.
Accident investigations on record
1 fatality

Summary

HUTCHENS CONSTRUCTION COMPANY has accumulated 2 OSHA violations across 1 inspection over 37 years of recorded history, with $160 in total assessed penalties.

The establishment sits in the 56th percentile for violations within its industry-state peer group of 39,935 employers. The most recent enforcement activity was recorded 5 years ago.

Federal records were found in 3 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

HUTCHENS CONSTRUCTION COMPANY appears in OSHA workplace safety, WHD wage enforcement, MSHA mine safety, and FMCSA motor carrier registration records only. No matching records were found in EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.

OSHA workplace safety

Inspections
1
0.0 / yr · last 37 yrs
Violations
2
0.1 / yr
Penalties
$160
$80 avg / violation
Inspection trigger · accident
1 of 1

100% of inspections at this establishment produced violations,

Most-cited OSHA standards

Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 2 distinct standards shown · 2 citations in this view · $160 in penalties.

CFR sectionCitationsInspectionsTotal penaltyFirst citedLast cited
29 CFR 1926.0021 B0211$160Nov 1988Nov 1988
29 CFR 1904.0002 A11Nov 1988Nov 1988

Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.

Peer comparison

56th

Above average violations in NAICS 2373 within MO. Peer group: 39,935 employers. This establishment has 2 OSHA violations; peer median is 1.

Fewer violationsMore violations
Penalty percentile
74th
peer median: $0
Inspection frequency
0th
peer median: 1

Safety self-report (OSHA 300A)

Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.

DART rate
0.0
vs industry
−1.0
TRIR
0.8
vs industry
−1.0

Reported for 89 average annual employees at this establishment.

Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.

Industry benchmark

Industry avg TRIR
1.8
BLS SOII 2024
Industry avg DART
1.0
BLS SOII 2024
Self-reported TRIR
0.8
OSHA ITA Form 300A (employer self-reported)

BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.

Inspection breakdown

Accident
1

Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for HUTCHENS CONSTRUCTION COMPANY. Verify directly with Occupational Safety and Health Administration

OSHA accident events

Accidents, fatalities, and catastrophes documented during OSHA inspections at this employer. Each entry links to the inspection that recorded it.

DateEventInjuriesHospitalizedFatalities
Nov 1, 1988TANK TRUCK,FLAMMABLE VAPORS,WORK RULES,CONSTRUCTION,EXPLOSION,HOT ASPHALTFatality11

Source: OSHA accident investigations. Narratives are recorded by the inspecting officer and may be truncated.

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
5 years ago

No federal enforcement activity has been recorded against this establishment in 5+ years. Most recent activity: 5 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

Cases
2
Back wages owed
$1,049
Employees affected
2

Department of Labor Wage & Hour Division — minimum-wage, overtime, child-labor, FMLA, and prevailing-wage enforcement.

Wage and hour breakdown by law

Per-statute totals across all closed DOL Wage & Hour cases against this employer. Backwages reflect amounts the agency assessed; civil penalty is the separate fine where applicable. Some acts (Davis-Bacon, SCA, CWHSSA, H-2B, CCPA) don't carry a civil penalty field in DOL's data. 1 statute · 2 violations · $1,049 in backwages

StatutePeriodCasesViolationsWorkersBackwagesCivil penalty
Davis-Bacon (federal construction)Jan 2021122$1,049

Source: DOL WHD enforcement database, aggregated per statute. Lifetime totals. A case can cite multiple statutes — so the total here may exceed the case count in the table above.

Wage and hour cases

Closed DOL Wage & Hour Division cases (FLSA, FMLA, H-2B, MSPA, and related statutes). Backwages reflect amounts the agency assessed; civil penalty (CMP) is a separate fine levied on top, where the statute provides for one (FLSA / H-1B / H-2A / MSPA / FMLA / EPPA / FLSA Child Labor; other acts have no CMP column in DOL’s data). The Statutes column lists which laws each case cited. 2 cases · 2 violations · $1,049 in backwages · 2 workers affected

Case periodIndustryStatutesViolationsWorkersBackwagesCivil penalty
Jan 2019 – Jan 2021Highway, Street, and Bridge ConstructionDavis-Bacon22$1,049
Jul 2009 – Apr 2010Asphalt Paving Mixture and Block Manufacturing0

Source: DOL WHD enforcement database. Cases shown reflect those the agency has closed and made public. A violation count is the agency’s tally of cited violations (one violation can affect many workers); the workers column counts distinct employees the agency found to be affected.

Mine safety (MSHA)

Company-level in MO — for HUTCHENS CONSTRUCTION COMPANY, not this location alone

Violations
82
Assessed penalties
$9,257

Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other HUTCHENS CONSTRUCTION COMPANY operations in the same state.

MSHA citations

Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 82 citations · 15S&S · 54 contractor · $9,257 proposed / $8,564 paid.

CitationMineDateSectionS&SNegligenceProposedPaid
9404026
Shell Knob Quarry
Barry, MO
contractor: Hutchens Construction Co.
Mar 2018YesHighNegligence$953$953
6571165
Purdy Quarry
Barry, MO
contractor: Hutchens Construction Company
Nov 2010YesModNegligence$285$100
6211063
Purdy Quarry
Barry, MO
contractor: Hutchens Construction Company
Sep 2001YesLowNegligence$215$215
9404021
Shell Knob Quarry
Barry, MO
contractor: Hutchens Construction Co.
Mar 2018NoHighNegligence$191$191
7896993
Eagle Rock Quarry
Barry, MO
Jul 2008NoHighNegligence$162$162
7888147
Eagle Rock Quarry
Barry, MO
Aug 2000YesModNegligence$161$55
7888145
Eagle Rock Quarry
Barry, MO
Aug 2000YesModNegligence$161$55
6242329
Purdy Quarry
Barry, MO
contractor: Hutchens Construction Company
Apr 2005YesModNegligence$135$75
6205140
Eagle Rock Quarry
Barry, MO
Apr 2001YesModNegligence$131$131
6205132
Eagle Rock Quarry
Barry, MO
Apr 2001YesModNegligence$131$131
9407962
Portable Plant #2 Rockster
Barry, MO
Mar 2019NoModNegligence$121$121
9407961
Purdy Quarry
Barry, MO
contractor: Hutchens Construction Company
Mar 2019NoModNegligence$121$121
9407960
Purdy Quarry
Barry, MO
contractor: Hutchens Construction Company
Mar 2019NoModNegligence$121$121
9407959
Purdy Quarry
Barry, MO
contractor: Hutchens Construction Company
Mar 2019NoLowNegligence$121$121
9407872
Shell Knob Quarry
Barry, MO
contractor: Hutchens Construction Co.
Nov 2018NoModNegligence$118$118
9407871
Shell Knob Quarry
Barry, MO
contractor: Hutchens Construction Co.
Nov 2018NoModNegligence$118$118
9404025
Shell Knob Quarry
Barry, MO
contractor: Hutchens Construction Co.
Mar 2018NoModNegligence$118$118
9404024
Shell Knob Quarry
Barry, MO
contractor: Hutchens Construction Co.
Mar 2018NoModNegligence$118$118
9404023
Shell Knob Quarry
Barry, MO
contractor: Hutchens Construction Co.
Mar 2018NoModNegligence$118$118
9404022
Shell Knob Quarry
Barry, MO
contractor: Hutchens Construction Co.
Mar 2018NoModNegligence$118$118
9352161
Portable Plant #2 Rockster
Barry, MO
Dec 2017NoModNegligence$118$118
9352107
Purdy Quarry
Barry, MO
contractor: Hutchens Construction Company
Oct 2017NoModNegligence$116$116
9352106
Purdy Quarry
Barry, MO
contractor: Hutchens Construction Company
Oct 2017YesModNegligence$116$116
9352105
Purdy Quarry
Barry, MO
contractor: Hutchens Construction Company
Oct 2017NoModNegligence$116$116
9352104
Purdy Quarry
Barry, MO
contractor: Hutchens Construction Company
Oct 2017NoModNegligence$116$116
9352083
Shell Knob Quarry
Barry, MO
contractor: Hutchens Construction Co.
Aug 2017NoModNegligence$116$116
8867588
Portable Plant #2 Rockster
Barry, MO
Mar 2017NoHighNegligence$116$116
8867587
Portable Plant #2 Rockster
Barry, MO
Mar 2017NoHighNegligence$116$116
8867586
Portable Plant #2 Rockster
Barry, MO
Mar 2017NoLowNegligence$116$116
8867786
Purdy Quarry
Barry, MO
contractor: Hutchens Construction Company
Mar 2017NoModNegligence$116$116
8865931
Purdy Quarry
Barry, MO
contractor: Hutchens Construction Company
Sep 2016YesLowNegligence$114$114
8865930
Purdy Quarry
Barry, MO
contractor: Hutchens Construction Company
Sep 2016YesLowNegligence$114$114
8865927
Purdy Quarry
Barry, MO
contractor: Hutchens Construction Company
Sep 2016NoLowNegligence$114$114
6467285
Eagle Rock Quarry
Barry, MO
Jul 2009YesModNegligence$108$100
6467284
Eagle Rock Quarry
Barry, MO
Jul 2009YesModNegligence$108$100
6205136
Eagle Rock Quarry
Barry, MO
Apr 2001YesModNegligence$104$104
8865903
Shell Knob Quarry
Barry, MO
contractor: Hutchens Construction Co.
Mar 2016NoModNegligence$100$100
8865902
Purdy Quarry
Barry, MO
contractor: Hutchens Construction Company
Mar 2016NoModNegligence$100$100
8865901
Purdy Quarry
Barry, MO
contractor: Hutchens Construction Company
Mar 2016NoModNegligence$100$100
8863224
Shell Knob Quarry
Barry, MO
contractor: Hutchens Construction Co.
Apr 2015NoModNegligence$100$100
8771232
Purdy Quarry
Barry, MO
contractor: Hutchens Construction Company
Oct 2014NoModNegligence$100$100
8771231
Purdy Quarry
Barry, MO
contractor: Hutchens Construction Company
Oct 2014NoModNegligence$100$100
8767409
Shell Knob Quarry
Barry, MO
contractor: Hutchens Construction Co.
Jul 2013NoLowNegligence$100$100
8767408
Shell Knob Quarry
Barry, MO
contractor: Hutchens Construction Co.
Jul 2013NoLowNegligence$100$100
8628792
Purdy Quarry
Barry, MO
contractor: Hutchens Construction Company
Mar 2013NoLowNegligence$100$100
8628698
Purdy Quarry
Barry, MO
contractor: Hutchens Construction Company
Aug 2012NoModNegligence$100$100
8628697
Purdy Quarry
Barry, MO
contractor: Hutchens Construction Company
Aug 2012NoLowNegligence$100$100
8628690
Shell Knob Quarry
Barry, MO
contractor: Hutchens Construction Co.
Jul 2012NoModNegligence$100$100
8620831
Shell Knob Quarry
Barry, MO
contractor: Hutchens Construction Co.
Apr 2011NoModNegligence$100$100
8620830
Shell Knob Quarry
Barry, MO
contractor: Hutchens Construction Co.
Apr 2011NoModNegligence$100$100
6571166
Purdy Quarry
Barry, MO
contractor: Hutchens Construction Company
Nov 2010NoModNegligence$100$100
6566245
Purdy Quarry
Barry, MO
contractor: Hutchens Construction Company
Jun 2010NoLowNegligence$100$100
6467287
Eagle Rock Quarry
Barry, MO
Jul 2009NoModNegligence$100$100
6467286
Eagle Rock Quarry
Barry, MO
Jul 2009NoModNegligence$100$100
6467254
Purdy Quarry
Barry, MO
contractor: Hutchens Construction Company
Apr 2009NoModNegligence$100$100
6467253
Purdy Quarry
Barry, MO
contractor: Hutchens Construction Company
Apr 2009NoLowNegligence$100$100
6467225
Shell Knob Quarry
Barry, MO
contractor: Hutchens Construction Co.
Feb 2009NoLowNegligence$100$100
6467207
Purdy Quarry
Barry, MO
contractor: Hutchens Construction Company
Jan 2009NoLowNegligence$100$100
6462478
Purdy Quarry
Barry, MO
contractor: Hutchens Construction Company
Jun 2008NoModNegligence$100$100
7863200
Purdy Quarry
Barry, MO
contractor: Hutchens Construction Company
Jun 2008NoModNegligence$100$100
6461401
Purdy Quarry
Barry, MO
contractor: Hutchens Construction Company
Jun 2008NoModNegligence$100$100
6462479
Purdy Quarry
Barry, MO
contractor: Hutchens Construction Company
Feb 2008NoModNegligence$100$100
6462480
Shell Knob Quarry
Barry, MO
contractor: Hutchens Construction Co.
Nov 2007NoHighNegligence$100$100
6205134
Eagle Rock Quarry
Barry, MO
Apr 2001YesLowNegligence$66$66
6265311
Purdy Quarry
Barry, MO
contractor: Hutchens Construction Company
Feb 2007NoModNegligence$60$60
6229330
Purdy Quarry
Barry, MO
contractor: Hutchens Construction Company
Nov 2003NoLowNegligence$60$60
6229945
Purdy Quarry
Barry, MO
contractor: Hutchens Construction Company
Jul 2003NoModNegligence$60$60
4461110
Purdy Quarry
Barry, MO
contractor: Hutchens Construction Company
Feb 2003NoModNegligence$55$55
4461070
Purdy Quarry
Barry, MO
contractor: Hutchens Construction Company
Jul 2002NoModNegligence$55$55
6205145
Eagle Rock Quarry
Barry, MO
Apr 2001NoLowNegligence$55
6205144
Eagle Rock Quarry
Barry, MO
Apr 2001NoModNegligence$55$55
6205143
Eagle Rock Quarry
Barry, MO
Apr 2001NoModNegligence$55$55
6205142
Eagle Rock Quarry
Barry, MO
Apr 2001NoModNegligence$55$55
6205139
Eagle Rock Quarry
Barry, MO
Apr 2001NoModNegligence$55
6205138
Eagle Rock Quarry
Barry, MO
Apr 2001NoModNegligence$55
6205137
Eagle Rock Quarry
Barry, MO
Apr 2001NoModNegligence$55$55
6205135
Eagle Rock Quarry
Barry, MO
Apr 2001NoLowNegligence$55
6205133
Eagle Rock Quarry
Barry, MO
Apr 2001NoLowNegligence$55$55
7888149
Purdy Quarry
Barry, MO
contractor: Hutchens Construction Company
Aug 2000NoModNegligence$55$55
7888148
Eagle Rock Quarry
Barry, MO
Aug 2000NoModNegligence$55$55
7888146
Eagle Rock Quarry
Barry, MO
Aug 2000NoModNegligence$55$55
6205141
Eagle Rock Quarry
Barry, MO
Apr 2001NoModNegligence

Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).

Labor relations (NLRB)

No NLRB unfair labor practice charges or union representation cases on file for HUTCHENS CONSTRUCTION COMPANY. Verify directly with National Labor Relations Board

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for HUTCHENS CONSTRUCTION COMPANY. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for HUTCHENS CONSTRUCTION COMPANY. Verify directly with Environmental Protection Agency

EPA-registered facilities

Every EPA ECHO facility associated with this employer, sorted most-significant first. Each row links to EPA’s Detailed Facility Report for the source-of-truth record. Permits column lists active programs (Air = Clean Air Act, Water = Clean Water Act, RCRA = hazardous waste, TRI = Toxics Release Inventory reporting). 2 facilities · 1 marked inactive.

FacilityPermitsStatusInspectionsFormal actionsPenaltiesLast inspectedECHO
HUTCHENS CONSTRUCTION CO
600 MILL ST · CASSVILLE, MO, 65625
Water00View →
HUTCHENS CONSTRUCTION COMPANY
PURDY/MONETT QUARRY · CASSVILLE, MO, 65625
AirNo Violation Identified00View →

Source: EPA ECHO (Enforcement and Compliance History Online). Compliance status follows EPA’s own labels (“Sig Violation” = significant noncompliance; QNCR = quarters of noncompliance over the recent reporting window). Inactive facilities (struck through) retain historical enforcement records even after operations ceased.

Motor carrier safety (FMCSA)

DOT number
436864
Operation
A

Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for HUTCHENS CONSTRUCTION COMPANY. Verify directly with UVA Corporate Prosecution Registry

Federal contracts

This location

Obligated (5-yr)
$0
Obligated (all-time)
$6.6M
Awards
80
Top agency
Department of Defense
$6.6M
Top agencies by obligation (this location)
Department of Defense$6.6M
Department of Agriculture$9K
Largest awards (top 50 of 80)
  • Department of Defense
    BASE YEAR - TR - PAVING
    contract · Last action 2009-03-30
    $701,955
  • Department of Defense
    IGF::OT::IGF IDIQ PAVING, FLTP PRAIRIE CREEK, DELIVERY ORDER 0004, PRAIRIE CREEK PARK, ROGERS, AR.
    contract · Last action 2017-01-31
    $326,299
  • Department of Defense
    PAVING SERVICES
    contract · Last action 2009-09-09
    $260,713
  • Department of Defense
    IGF::OT::IGF DELIVERY ORDER 0005, IDIQ PAVING FLTP, PRAIRIE CREEK, ROGERS, AR.
    contract · Last action 2017-01-31
    $249,997
  • Department of Defense
    TASK ORDER FOR IDIQ ROAD REPAIRS; BEAVER LAKE PARKS, AR
    contract · Last action 2010-04-08
    $238,119
  • Department of Defense
    OPTION 1 PERIOD - IDIQ PAVING TABLE ROCK
    contract · Last action 2012-03-28
    $232,120
  • Department of Defense
    ASPHALTIC CONCRETE PAVEMENT
    contract · Last action 2013-03-15
    $212,602
  • Department of Defense
    TAS::96 3135::TAS RECOVERY - MODERNIZE DAM SITE RIVER PARK DAY USE AND CAMPING AREAS ARRA::YES::ARRA
    contract · Last action 2009-11-13
    $208,717
  • Department of Defense
    IGF::OT::IGF DELIVERY ORDER 0002, IDIQ PAVING, BEAVER LAKE, ROGERS, AR
    contract · Last action 2015-12-15
    $198,720
  • Department of Defense
    ASPHALTIC CONCRETE PAVEMENT
    contract · Last action 2011-11-17
    $161,038
  • Department of Defense
    OPTION 2 - TR - ASPHALTIC CONCRETE
    contract · Last action 2010-07-27
    $153,200
  • Department of Defense
    PAVING SERVICES
    contract · Last action 2010-07-22
    $152,180
  • Department of Defense
    PAVING SERVICES
    contract · Last action 2009-07-31
    $150,000
  • Department of Defense
    CAMP LOOP AND INDIVIDUAL RV PADS WILL BE OVERLAID WITH EITHER 1 -1/2 OR 2 THICKNESS OF COMPACTED HOT-MIX ASPHALT AS DIRECTED WITHIN THESE SPECIFICATIONS AND ATTACHED MAPS. FROM CAUSEWAY ENTRANCE ON MAIN PARK SIDE AND INCLUDING ENTIRE END CAMP LOOP SECTION AND RV PADS #26 AND #27 WILL BE OVERLAID WITH 2 THICKNESS OF COMPACTED HOT-MIX ASPHALT. ADDITIONALLY, THESE SITES WILL BE WIDENED TO APPROXIMATELY 20 IN WIDTH, AND WILL REQUIRE THE PLACEMENT OF ASPHALT CURBING AND ASPHALT SLOPE PROTECTION, AND THE INSTALL OF 30 TONS OF STONE PROTECTION, AND EXISTING BASE COURSE THAT HAS BEEN WASHED OVER SITES AND ROAD WILL BE REINSTALLED AND PLACED ALONG BOTH SITES. SOME OF THE EXISTING ASPHALT ON CAMP PADS #26 AND #27 MUST BE REMOVED DUE TO ITS HEAVILY ERODED AND DAMAGED CONDITION; EXISTING BASE COURSE ON THESE AREAS WILL BE RE-COMPACTED BEFORE PLACEMENT OF NEW ASPHALT. INSTALL APPROXIMATELY 75 OF STONE PROTECTION, AN ADDITIONAL 30 TONS TO REINFORCE ROAD SHOULDER AND SLOPE PROTECTION. ALL NEW ASPHALT EDGES THAT OVERLAY EXISTING ROAD OR RV PADS WILL BE BEVELED FOR BOTH INTEGRITY AND AESTHETICS. SITES #14 AND #16, NEW ASPHALT WILL BE PLACED ON RV PADS AND IMPACT TIMBERED AREAS, 2 COMPACTED THICKNESS WILL BE USED ON BOTH THESE SITES. INSTALL ASPHALT ACCESS RAMPS/WALKWAYS, (MINIMUM 48 IN WIDTH) TO ALL INDIVIDUAL ELECTRIC PEDESTALS. INSTALL ASPHALT ROADWAY SHOULDER EXTENSIONS ACCORDING TO MAP. INSTALL SWIM BEACH ACCESS WALKWAY, MINIMUM 80 X 8 . ALL ROAD SHOULDER ADDITIONS WILL BE INSTALLED WITH A MINIMUM 2 THICKNESS OF COMPACTED HOT-MIX ASPHALT. SITE #1, THIS SITE WILL REQUIRE THE ADDITION OF ASPHALT TO WIDEN SITE, NEW SITE ONCE COMPLETED WILL BE APPROXIMATELY 20 X 24 . INSTALL 2 THICKNESS OF COMPACTED HOT-MIX ASPHALT. SITE #2, WILL BE STRIPPED TO SUB GRADE, AND APPLY 2 THICKNESS OF COMPACTED HOT-MIX ASPHALT. ENTRANCE ROAD FOR SITES #1 AND 2# WILL BE OVERLAID WITH 2 OF ASPHALT, AND WIDEN TO A MINIMUM 24 IN WIDTH X 200 . BEVEL ASPHALT EDGES FOR REINFORCING, AND INSTALL APPROXIMATELY 45 TONS OF STONE PROTECTION. REMOVE AND DEMO ALL EXISTING PVC WHEEL STOPS. MANY AREAS HAVE BEEN IMPACTED BY RECENT FLOODING, SOME AREAS WILL REQUIRE RESHAPING OF BASE AND RE-COMPACTION PER CONTRACT SPECIFICATIONS BEFORE ASPHALT CAN BE PLACED. THE TOTAL AMOUNT OF STONE PROTECTION TO INSTALL IN THIS PARK IS 80 TONS. SEVERAL SITES WILL BE REINFORCED WITH REMAINING SPOT PLACEMENTS OF STONE PROTECTION.
    contract · Last action 2010-06-18
    $142,984
  • Department of Defense
    ASPHALTIC CONCRETE PAVEMENT
    contract · Last action 2011-11-17
    $140,074
  • Department of Defense
    BASE PERIOD - IDIQ PAVING TABLE ROCK
    contract · Last action 2011-04-19
    $137,499
  • Department of Defense
    IGF::OT::IGF PORT OF KIMBERLING MARINA ASPHALTIC CONCRETE PAVEMENT
    contract · Last action 2013-07-13
    $131,966
  • Department of Defense
    IGF::OT::IGF ASPHALTIC CONCRETE PAVEMENT
    contract · Last action 2013-09-06
    $131,554
  • Department of Defense
    PAVING SERVICES
    contract · Last action 2009-07-31
    $126,053
  • Department of Defense
    IGF::OT::IGF DELIVERY ORDER 01 FOR IDIQ PAVING, LOCATED AT BEAVER LAKE PROJECT OFFICE, ROGERS, ARKANSAS.
    contract · Last action 2015-05-13
    $124,841
  • Department of Defense
    OPTION 2 PERIOD - IDIQ PAVING TABLE ROCK
    contract · Last action 2012-04-26
    $121,000
  • Department of Defense
    IGF::OT::IGF DELIVERY ORDER #0013
    contract · Last action 2013-07-09
    $120,593
  • Department of Defense
    PAVING TASK ORDER 6 : USACE SWL BEAVER LAKE PROJECT OFFICE: INDIAN CREEK PARK
    contract · Last action 2013-04-04
    $115,616
  • Department of Defense
    ASPHALTIC CONCRETE PAVEMENT TASK ORDER 0004
    contract · Last action 2012-08-02
    $113,758
  • Department of Defense
    OPTION 1 PERIOD - IDIQ PAVING TABLE ROCK
    contract · Last action 2012-02-17
    $100,789
  • Department of Defense
    IGF::OT::IGF DELIVERY ORDER 0003, IDIQ PAVING LOCATED AT BEAVER LAKE PROJECT OFFICE, ROGERS, AR.
    contract · Last action 2016-07-20
    $95,811
  • Department of Defense
    ROAD PAVING SERVICES.
    contract · Last action 2009-07-31
    $84,311
  • Department of Defense
    IGF::OT::IGF DO# 0019 ASPHALTIC CONCRETE PAVEMENT
    contract · Last action 2013-12-10
    $83,813
  • Department of Defense
    BASE YEAR - BV -PAVEMENT REPAIR
    contract · Last action 2009-06-10
    $77,126
  • Department of Defense
    BASE PERIOD - IDIQ PAVING TABLE ROCK
    contract · Last action 2011-04-19
    $70,100
  • Department of Defense
    BASE PERIOD - IDIQ PAVING TABLE ROCK -
    contract · Last action 2011-06-21
    $67,560
  • Department of Defense
    BASE PERIOD - IDIQ PAVING TABLE ROCK
    contract · Last action 2011-04-19
    $64,840
  • Department of Defense
    OPTION 2 - TR - ASPHALTIC CONCRETE
    contract · Last action 2010-08-19
    $63,996
  • Department of Defense
    PAVING SERVICES
    contract · Last action 2008-01-23
    $63,984
  • Department of Defense
    OPTION 2 - TR - ASPHALTIC CONCRETE
    contract · Last action 2010-07-26
    $59,911
  • Department of Defense
    IDIQ PAVING SERVICES, PARKING LOT REHAB, BEAVER LAKE PROJECT OFFICE, AR.
    contract · Last action 2010-12-22
    $58,731
  • Department of Defense
    PAVING SERVICES
    contract · Last action 2009-12-02
    $54,989
  • Department of Defense
    OPTION 2 - TR - ASPHALTIC CONCRETE
    contract · Last action 2010-07-27
    $53,966
  • Department of Defense
    OPTION 2 - TR - ASPHALTIC CONCRETE
    contract · Last action 2010-08-19
    $49,977
  • Department of Defense
    ROAD PAVING SERVICES
    contract · Last action 2009-08-03
    $48,449
  • Department of Defense
    BASE PERIOD - IDIQ PAVING TABLE ROCK
    contract · Last action 2011-04-19
    $43,199
  • Department of Defense
    PAVING SERVICES
    contract · Last action 2009-07-31
    $43,073
  • Department of Defense
    IGF::OT::IGF EAGLE ROCK ASPHALTIC CONCRETE PAVEMENT
    contract · Last action 2014-07-22
    $41,251
  • Department of Defense
    IGF::OT::IGF OPTION 4 PERIOD - IDIQ PAVING TABLE ROCK
    contract · Last action 2013-11-25
    $41,186
  • Department of Defense
    IDIQ PAVING
    contract · Last action 2012-02-06
    $40,720
  • Department of Defense
    IGF::OT::IGF DO 0021 ASPHALTIC CONCRETE PAVEMENT
    contract · Last action 2013-11-25
    $40,646
  • Department of Defense
    OPTION 1 PERIOD - IDIQ PAVING TABLE ROCK
    contract · Last action 2012-10-12
    $40,372
  • Department of Defense
    IGF::OT::IGF CONCRETE SAND, DELIVERED
    contract · Last action 2017-07-28
    $39,500
  • Department of Defense
    OPTION 1 PERIOD - IDIQ PAVING TABLE ROCK
    contract · Last action 2012-02-17
    $37,350
  • Department of Defense
    IDIQ ROAD PAVING
    contract · Last action 2008-12-29
    $36,400

Federal contract dollars to this establishment. Primary NAICS: 237310 - HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Last action: 2017-07-28. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.

Inspection history

DateTriggerViolationsSeriousPenalty
1988-11-03Accident2$160

Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.

In the news

Other employers in this industry and state

Other employers in highway, street, and bridge construction within MO, ordered by federal enforcement volume:

Related searches

About this data

This profile aggregates federal enforcement records on HUTCHENS CONSTRUCTION COMPANY from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is HUTCHENS CONSTRUCTION COMPANY's OSHA violation history?
HUTCHENS CONSTRUCTION COMPANY has 1 OSHA inspection on record with 2 violations and $160 in total penalties.
How does HUTCHENS CONSTRUCTION COMPANY's safety record compare to its industry?
HUTCHENS CONSTRUCTION COMPANY operates in the highway, street, and bridge construction industry. The industry average Total Recordable Incident Rate (TRIR) is 1.8. HUTCHENS CONSTRUCTION COMPANY's self-reported DART rate is 0 compared to an industry average of 1.
Has HUTCHENS CONSTRUCTION COMPANY had any workplace fatalities?
Yes. Federal records show 1 fatality investigation involving HUTCHENS CONSTRUCTION COMPANY.