Establishment profile
HUTCHENS CONSTRUCTION COMPANY
600 MILL STREET, CASSEVILLE, MO, 65625
237310 — Highway, Street, and Bridge Construction
Summary
HUTCHENS CONSTRUCTION COMPANY has accumulated 2 OSHA violations across 1 inspection over 37 years of recorded history, with $160 in total assessed penalties.
The establishment sits in the 56th percentile for violations within its industry-state peer group of 39,935 employers. The most recent enforcement activity was recorded 5 years ago.
Federal records were found in 3 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
HUTCHENS CONSTRUCTION COMPANY appears in OSHA workplace safety, WHD wage enforcement, MSHA mine safety, and FMCSA motor carrier registration records only. No matching records were found in EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
100% of inspections at this establishment produced violations,
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 2 distinct standards shown · 2 citations in this view · $160 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 1926.0021 B02 | 1 | 1 | $160 | Nov 1988 | Nov 1988 |
| 29 CFR 1904.0002 A | 1 | 1 | — | Nov 1988 | Nov 1988 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Above average violations in NAICS 2373 within MO. Peer group: 39,935 employers. This establishment has 2 OSHA violations; peer median is 1.
Safety self-report (OSHA 300A)
Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.
Reported for 89 average annual employees at this establishment.
Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for HUTCHENS CONSTRUCTION COMPANY. Verify directly with Occupational Safety and Health Administration →
OSHA accident events
Accidents, fatalities, and catastrophes documented during OSHA inspections at this employer. Each entry links to the inspection that recorded it.
| Date | Event | Injuries | Hospitalized | Fatalities | |
|---|---|---|---|---|---|
| Nov 1, 1988 | TANK TRUCK,FLAMMABLE VAPORS,WORK RULES,CONSTRUCTION,EXPLOSION,HOT ASPHALTFatality | 1 | — | 1 |
Source: OSHA accident investigations. Narratives are recorded by the inspecting officer and may be truncated.
Activity timeline
No federal enforcement activity has been recorded against this establishment in 5+ years. Most recent activity: 5 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
Department of Labor Wage & Hour Division — minimum-wage, overtime, child-labor, FMLA, and prevailing-wage enforcement.
Wage and hour breakdown by law
Per-statute totals across all closed DOL Wage & Hour cases against this employer. Backwages reflect amounts the agency assessed; civil penalty is the separate fine where applicable. Some acts (Davis-Bacon, SCA, CWHSSA, H-2B, CCPA) don't carry a civil penalty field in DOL's data. 1 statute · 2 violations · $1,049 in backwages
| Statute | Period | Cases | Violations | Workers | Backwages | Civil penalty |
|---|---|---|---|---|---|---|
| Davis-Bacon (federal construction) | Jan 2021 | 1 | 2 | 2 | $1,049 | — |
Source: DOL WHD enforcement database, aggregated per statute. Lifetime totals. A case can cite multiple statutes — so the total here may exceed the case count in the table above.
Wage and hour cases
Closed DOL Wage & Hour Division cases (FLSA, FMLA, H-2B, MSPA, and related statutes). Backwages reflect amounts the agency assessed; civil penalty (CMP) is a separate fine levied on top, where the statute provides for one (FLSA / H-1B / H-2A / MSPA / FMLA / EPPA / FLSA Child Labor; other acts have no CMP column in DOL’s data). The Statutes column lists which laws each case cited. 2 cases · 2 violations · $1,049 in backwages · 2 workers affected
| Case period | Industry | Statutes | Violations | Workers | Backwages | Civil penalty |
|---|---|---|---|---|---|---|
| Jan 2019 – Jan 2021 | Highway, Street, and Bridge Construction | Davis-Bacon | 2 | 2 | $1,049 | — |
| Jul 2009 – Apr 2010 | Asphalt Paving Mixture and Block Manufacturing | — | — | 0 | — | — |
Source: DOL WHD enforcement database. Cases shown reflect those the agency has closed and made public. A violation count is the agency’s tally of cited violations (one violation can affect many workers); the workers column counts distinct employees the agency found to be affected.
Mine safety (MSHA)
Company-level in MO — for HUTCHENS CONSTRUCTION COMPANY, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other HUTCHENS CONSTRUCTION COMPANY operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 82 citations · 15S&S · 54 contractor · $9,257 proposed / $8,564 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 9404026 | Shell Knob Quarry Barry, MO contractor: Hutchens Construction Co. | Mar 2018 | — | Yes | HighNegligence | $953 | $953 |
| 6571165 | Purdy Quarry Barry, MO contractor: Hutchens Construction Company | Nov 2010 | — | Yes | ModNegligence | $285 | $100 |
| 6211063 | Purdy Quarry Barry, MO contractor: Hutchens Construction Company | Sep 2001 | — | Yes | LowNegligence | $215 | $215 |
| 9404021 | Shell Knob Quarry Barry, MO contractor: Hutchens Construction Co. | Mar 2018 | — | No | HighNegligence | $191 | $191 |
| 7896993 | Eagle Rock Quarry Barry, MO | Jul 2008 | — | No | HighNegligence | $162 | $162 |
| 7888147 | Eagle Rock Quarry Barry, MO | Aug 2000 | — | Yes | ModNegligence | $161 | $55 |
| 7888145 | Eagle Rock Quarry Barry, MO | Aug 2000 | — | Yes | ModNegligence | $161 | $55 |
| 6242329 | Purdy Quarry Barry, MO contractor: Hutchens Construction Company | Apr 2005 | — | Yes | ModNegligence | $135 | $75 |
| 6205140 | Eagle Rock Quarry Barry, MO | Apr 2001 | — | Yes | ModNegligence | $131 | $131 |
| 6205132 | Eagle Rock Quarry Barry, MO | Apr 2001 | — | Yes | ModNegligence | $131 | $131 |
| 9407962 | Portable Plant #2 Rockster Barry, MO | Mar 2019 | — | No | ModNegligence | $121 | $121 |
| 9407961 | Purdy Quarry Barry, MO contractor: Hutchens Construction Company | Mar 2019 | — | No | ModNegligence | $121 | $121 |
| 9407960 | Purdy Quarry Barry, MO contractor: Hutchens Construction Company | Mar 2019 | — | No | ModNegligence | $121 | $121 |
| 9407959 | Purdy Quarry Barry, MO contractor: Hutchens Construction Company | Mar 2019 | — | No | LowNegligence | $121 | $121 |
| 9407872 | Shell Knob Quarry Barry, MO contractor: Hutchens Construction Co. | Nov 2018 | — | No | ModNegligence | $118 | $118 |
| 9407871 | Shell Knob Quarry Barry, MO contractor: Hutchens Construction Co. | Nov 2018 | — | No | ModNegligence | $118 | $118 |
| 9404025 | Shell Knob Quarry Barry, MO contractor: Hutchens Construction Co. | Mar 2018 | — | No | ModNegligence | $118 | $118 |
| 9404024 | Shell Knob Quarry Barry, MO contractor: Hutchens Construction Co. | Mar 2018 | — | No | ModNegligence | $118 | $118 |
| 9404023 | Shell Knob Quarry Barry, MO contractor: Hutchens Construction Co. | Mar 2018 | — | No | ModNegligence | $118 | $118 |
| 9404022 | Shell Knob Quarry Barry, MO contractor: Hutchens Construction Co. | Mar 2018 | — | No | ModNegligence | $118 | $118 |
| 9352161 | Portable Plant #2 Rockster Barry, MO | Dec 2017 | — | No | ModNegligence | $118 | $118 |
| 9352107 | Purdy Quarry Barry, MO contractor: Hutchens Construction Company | Oct 2017 | — | No | ModNegligence | $116 | $116 |
| 9352106 | Purdy Quarry Barry, MO contractor: Hutchens Construction Company | Oct 2017 | — | Yes | ModNegligence | $116 | $116 |
| 9352105 | Purdy Quarry Barry, MO contractor: Hutchens Construction Company | Oct 2017 | — | No | ModNegligence | $116 | $116 |
| 9352104 | Purdy Quarry Barry, MO contractor: Hutchens Construction Company | Oct 2017 | — | No | ModNegligence | $116 | $116 |
| 9352083 | Shell Knob Quarry Barry, MO contractor: Hutchens Construction Co. | Aug 2017 | — | No | ModNegligence | $116 | $116 |
| 8867588 | Portable Plant #2 Rockster Barry, MO | Mar 2017 | — | No | HighNegligence | $116 | $116 |
| 8867587 | Portable Plant #2 Rockster Barry, MO | Mar 2017 | — | No | HighNegligence | $116 | $116 |
| 8867586 | Portable Plant #2 Rockster Barry, MO | Mar 2017 | — | No | LowNegligence | $116 | $116 |
| 8867786 | Purdy Quarry Barry, MO contractor: Hutchens Construction Company | Mar 2017 | — | No | ModNegligence | $116 | $116 |
| 8865931 | Purdy Quarry Barry, MO contractor: Hutchens Construction Company | Sep 2016 | — | Yes | LowNegligence | $114 | $114 |
| 8865930 | Purdy Quarry Barry, MO contractor: Hutchens Construction Company | Sep 2016 | — | Yes | LowNegligence | $114 | $114 |
| 8865927 | Purdy Quarry Barry, MO contractor: Hutchens Construction Company | Sep 2016 | — | No | LowNegligence | $114 | $114 |
| 6467285 | Eagle Rock Quarry Barry, MO | Jul 2009 | — | Yes | ModNegligence | $108 | $100 |
| 6467284 | Eagle Rock Quarry Barry, MO | Jul 2009 | — | Yes | ModNegligence | $108 | $100 |
| 6205136 | Eagle Rock Quarry Barry, MO | Apr 2001 | — | Yes | ModNegligence | $104 | $104 |
| 8865903 | Shell Knob Quarry Barry, MO contractor: Hutchens Construction Co. | Mar 2016 | — | No | ModNegligence | $100 | $100 |
| 8865902 | Purdy Quarry Barry, MO contractor: Hutchens Construction Company | Mar 2016 | — | No | ModNegligence | $100 | $100 |
| 8865901 | Purdy Quarry Barry, MO contractor: Hutchens Construction Company | Mar 2016 | — | No | ModNegligence | $100 | $100 |
| 8863224 | Shell Knob Quarry Barry, MO contractor: Hutchens Construction Co. | Apr 2015 | — | No | ModNegligence | $100 | $100 |
| 8771232 | Purdy Quarry Barry, MO contractor: Hutchens Construction Company | Oct 2014 | — | No | ModNegligence | $100 | $100 |
| 8771231 | Purdy Quarry Barry, MO contractor: Hutchens Construction Company | Oct 2014 | — | No | ModNegligence | $100 | $100 |
| 8767409 | Shell Knob Quarry Barry, MO contractor: Hutchens Construction Co. | Jul 2013 | — | No | LowNegligence | $100 | $100 |
| 8767408 | Shell Knob Quarry Barry, MO contractor: Hutchens Construction Co. | Jul 2013 | — | No | LowNegligence | $100 | $100 |
| 8628792 | Purdy Quarry Barry, MO contractor: Hutchens Construction Company | Mar 2013 | — | No | LowNegligence | $100 | $100 |
| 8628698 | Purdy Quarry Barry, MO contractor: Hutchens Construction Company | Aug 2012 | — | No | ModNegligence | $100 | $100 |
| 8628697 | Purdy Quarry Barry, MO contractor: Hutchens Construction Company | Aug 2012 | — | No | LowNegligence | $100 | $100 |
| 8628690 | Shell Knob Quarry Barry, MO contractor: Hutchens Construction Co. | Jul 2012 | — | No | ModNegligence | $100 | $100 |
| 8620831 | Shell Knob Quarry Barry, MO contractor: Hutchens Construction Co. | Apr 2011 | — | No | ModNegligence | $100 | $100 |
| 8620830 | Shell Knob Quarry Barry, MO contractor: Hutchens Construction Co. | Apr 2011 | — | No | ModNegligence | $100 | $100 |
| 6571166 | Purdy Quarry Barry, MO contractor: Hutchens Construction Company | Nov 2010 | — | No | ModNegligence | $100 | $100 |
| 6566245 | Purdy Quarry Barry, MO contractor: Hutchens Construction Company | Jun 2010 | — | No | LowNegligence | $100 | $100 |
| 6467287 | Eagle Rock Quarry Barry, MO | Jul 2009 | — | No | ModNegligence | $100 | $100 |
| 6467286 | Eagle Rock Quarry Barry, MO | Jul 2009 | — | No | ModNegligence | $100 | $100 |
| 6467254 | Purdy Quarry Barry, MO contractor: Hutchens Construction Company | Apr 2009 | — | No | ModNegligence | $100 | $100 |
| 6467253 | Purdy Quarry Barry, MO contractor: Hutchens Construction Company | Apr 2009 | — | No | LowNegligence | $100 | $100 |
| 6467225 | Shell Knob Quarry Barry, MO contractor: Hutchens Construction Co. | Feb 2009 | — | No | LowNegligence | $100 | $100 |
| 6467207 | Purdy Quarry Barry, MO contractor: Hutchens Construction Company | Jan 2009 | — | No | LowNegligence | $100 | $100 |
| 6462478 | Purdy Quarry Barry, MO contractor: Hutchens Construction Company | Jun 2008 | — | No | ModNegligence | $100 | $100 |
| 7863200 | Purdy Quarry Barry, MO contractor: Hutchens Construction Company | Jun 2008 | — | No | ModNegligence | $100 | $100 |
| 6461401 | Purdy Quarry Barry, MO contractor: Hutchens Construction Company | Jun 2008 | — | No | ModNegligence | $100 | $100 |
| 6462479 | Purdy Quarry Barry, MO contractor: Hutchens Construction Company | Feb 2008 | — | No | ModNegligence | $100 | $100 |
| 6462480 | Shell Knob Quarry Barry, MO contractor: Hutchens Construction Co. | Nov 2007 | — | No | HighNegligence | $100 | $100 |
| 6205134 | Eagle Rock Quarry Barry, MO | Apr 2001 | — | Yes | LowNegligence | $66 | $66 |
| 6265311 | Purdy Quarry Barry, MO contractor: Hutchens Construction Company | Feb 2007 | — | No | ModNegligence | $60 | $60 |
| 6229330 | Purdy Quarry Barry, MO contractor: Hutchens Construction Company | Nov 2003 | — | No | LowNegligence | $60 | $60 |
| 6229945 | Purdy Quarry Barry, MO contractor: Hutchens Construction Company | Jul 2003 | — | No | ModNegligence | $60 | $60 |
| 4461110 | Purdy Quarry Barry, MO contractor: Hutchens Construction Company | Feb 2003 | — | No | ModNegligence | $55 | $55 |
| 4461070 | Purdy Quarry Barry, MO contractor: Hutchens Construction Company | Jul 2002 | — | No | ModNegligence | $55 | $55 |
| 6205145 | Eagle Rock Quarry Barry, MO | Apr 2001 | — | No | LowNegligence | $55 | — |
| 6205144 | Eagle Rock Quarry Barry, MO | Apr 2001 | — | No | ModNegligence | $55 | $55 |
| 6205143 | Eagle Rock Quarry Barry, MO | Apr 2001 | — | No | ModNegligence | $55 | $55 |
| 6205142 | Eagle Rock Quarry Barry, MO | Apr 2001 | — | No | ModNegligence | $55 | $55 |
| 6205139 | Eagle Rock Quarry Barry, MO | Apr 2001 | — | No | ModNegligence | $55 | — |
| 6205138 | Eagle Rock Quarry Barry, MO | Apr 2001 | — | No | ModNegligence | $55 | — |
| 6205137 | Eagle Rock Quarry Barry, MO | Apr 2001 | — | No | ModNegligence | $55 | $55 |
| 6205135 | Eagle Rock Quarry Barry, MO | Apr 2001 | — | No | LowNegligence | $55 | — |
| 6205133 | Eagle Rock Quarry Barry, MO | Apr 2001 | — | No | LowNegligence | $55 | $55 |
| 7888149 | Purdy Quarry Barry, MO contractor: Hutchens Construction Company | Aug 2000 | — | No | ModNegligence | $55 | $55 |
| 7888148 | Eagle Rock Quarry Barry, MO | Aug 2000 | — | No | ModNegligence | $55 | $55 |
| 7888146 | Eagle Rock Quarry Barry, MO | Aug 2000 | — | No | ModNegligence | $55 | $55 |
| 6205141 | Eagle Rock Quarry Barry, MO | Apr 2001 | — | No | ModNegligence | — | — |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for HUTCHENS CONSTRUCTION COMPANY. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for HUTCHENS CONSTRUCTION COMPANY. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for HUTCHENS CONSTRUCTION COMPANY. Verify directly with Environmental Protection Agency →
EPA-registered facilities
Every EPA ECHO facility associated with this employer, sorted most-significant first. Each row links to EPA’s Detailed Facility Report for the source-of-truth record. Permits column lists active programs (Air = Clean Air Act, Water = Clean Water Act, RCRA = hazardous waste, TRI = Toxics Release Inventory reporting). 2 facilities · 1 marked inactive.
| Facility | Permits | Status | Inspections | Formal actions | Penalties | Last inspected | ECHO |
|---|---|---|---|---|---|---|---|
HUTCHENS CONSTRUCTION CO 600 MILL ST · CASSVILLE, MO, 65625 | Water | — | 0 | 0 | — | — | View → |
HUTCHENS CONSTRUCTION COMPANY PURDY/MONETT QUARRY · CASSVILLE, MO, 65625 | Air | No Violation Identified | 0 | 0 | — | — | View → |
Source: EPA ECHO (Enforcement and Compliance History Online). Compliance status follows EPA’s own labels (“Sig Violation” = significant noncompliance; QNCR = quarters of noncompliance over the recent reporting window). Inactive facilities (struck through) retain historical enforcement records even after operations ceased.
Motor carrier safety (FMCSA)
Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for HUTCHENS CONSTRUCTION COMPANY. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
- Department of DefenseBASE YEAR - TR - PAVINGcontract · Last action 2009-03-30$701,955
- Department of DefenseIGF::OT::IGF IDIQ PAVING, FLTP PRAIRIE CREEK, DELIVERY ORDER 0004, PRAIRIE CREEK PARK, ROGERS, AR.contract · Last action 2017-01-31$326,299
- Department of DefensePAVING SERVICEScontract · Last action 2009-09-09$260,713
- Department of DefenseIGF::OT::IGF DELIVERY ORDER 0005, IDIQ PAVING FLTP, PRAIRIE CREEK, ROGERS, AR.contract · Last action 2017-01-31$249,997
- Department of DefenseTASK ORDER FOR IDIQ ROAD REPAIRS; BEAVER LAKE PARKS, ARcontract · Last action 2010-04-08$238,119
- Department of DefenseOPTION 1 PERIOD - IDIQ PAVING TABLE ROCKcontract · Last action 2012-03-28$232,120
- Department of DefenseASPHALTIC CONCRETE PAVEMENTcontract · Last action 2013-03-15$212,602
- Department of DefenseTAS::96 3135::TAS RECOVERY - MODERNIZE DAM SITE RIVER PARK DAY USE AND CAMPING AREAS ARRA::YES::ARRAcontract · Last action 2009-11-13$208,717
- Department of DefenseIGF::OT::IGF DELIVERY ORDER 0002, IDIQ PAVING, BEAVER LAKE, ROGERS, ARcontract · Last action 2015-12-15$198,720
- Department of DefenseASPHALTIC CONCRETE PAVEMENTcontract · Last action 2011-11-17$161,038
- Department of DefenseOPTION 2 - TR - ASPHALTIC CONCRETEcontract · Last action 2010-07-27$153,200
- Department of DefensePAVING SERVICEScontract · Last action 2010-07-22$152,180
- Department of DefensePAVING SERVICEScontract · Last action 2009-07-31$150,000
- Department of DefenseCAMP LOOP AND INDIVIDUAL RV PADS WILL BE OVERLAID WITH EITHER 1 -1/2 OR 2 THICKNESS OF COMPACTED HOT-MIX ASPHALT AS DIRECTED WITHIN THESE SPECIFICATIONS AND ATTACHED MAPS. FROM CAUSEWAY ENTRANCE ON MAIN PARK SIDE AND INCLUDING ENTIRE END CAMP LOOP SECTION AND RV PADS #26 AND #27 WILL BE OVERLAID WITH 2 THICKNESS OF COMPACTED HOT-MIX ASPHALT. ADDITIONALLY, THESE SITES WILL BE WIDENED TO APPROXIMATELY 20 IN WIDTH, AND WILL REQUIRE THE PLACEMENT OF ASPHALT CURBING AND ASPHALT SLOPE PROTECTION, AND THE INSTALL OF 30 TONS OF STONE PROTECTION, AND EXISTING BASE COURSE THAT HAS BEEN WASHED OVER SITES AND ROAD WILL BE REINSTALLED AND PLACED ALONG BOTH SITES. SOME OF THE EXISTING ASPHALT ON CAMP PADS #26 AND #27 MUST BE REMOVED DUE TO ITS HEAVILY ERODED AND DAMAGED CONDITION; EXISTING BASE COURSE ON THESE AREAS WILL BE RE-COMPACTED BEFORE PLACEMENT OF NEW ASPHALT. INSTALL APPROXIMATELY 75 OF STONE PROTECTION, AN ADDITIONAL 30 TONS TO REINFORCE ROAD SHOULDER AND SLOPE PROTECTION. ALL NEW ASPHALT EDGES THAT OVERLAY EXISTING ROAD OR RV PADS WILL BE BEVELED FOR BOTH INTEGRITY AND AESTHETICS. SITES #14 AND #16, NEW ASPHALT WILL BE PLACED ON RV PADS AND IMPACT TIMBERED AREAS, 2 COMPACTED THICKNESS WILL BE USED ON BOTH THESE SITES. INSTALL ASPHALT ACCESS RAMPS/WALKWAYS, (MINIMUM 48 IN WIDTH) TO ALL INDIVIDUAL ELECTRIC PEDESTALS. INSTALL ASPHALT ROADWAY SHOULDER EXTENSIONS ACCORDING TO MAP. INSTALL SWIM BEACH ACCESS WALKWAY, MINIMUM 80 X 8 . ALL ROAD SHOULDER ADDITIONS WILL BE INSTALLED WITH A MINIMUM 2 THICKNESS OF COMPACTED HOT-MIX ASPHALT. SITE #1, THIS SITE WILL REQUIRE THE ADDITION OF ASPHALT TO WIDEN SITE, NEW SITE ONCE COMPLETED WILL BE APPROXIMATELY 20 X 24 . INSTALL 2 THICKNESS OF COMPACTED HOT-MIX ASPHALT. SITE #2, WILL BE STRIPPED TO SUB GRADE, AND APPLY 2 THICKNESS OF COMPACTED HOT-MIX ASPHALT. ENTRANCE ROAD FOR SITES #1 AND 2# WILL BE OVERLAID WITH 2 OF ASPHALT, AND WIDEN TO A MINIMUM 24 IN WIDTH X 200 . BEVEL ASPHALT EDGES FOR REINFORCING, AND INSTALL APPROXIMATELY 45 TONS OF STONE PROTECTION. REMOVE AND DEMO ALL EXISTING PVC WHEEL STOPS. MANY AREAS HAVE BEEN IMPACTED BY RECENT FLOODING, SOME AREAS WILL REQUIRE RESHAPING OF BASE AND RE-COMPACTION PER CONTRACT SPECIFICATIONS BEFORE ASPHALT CAN BE PLACED. THE TOTAL AMOUNT OF STONE PROTECTION TO INSTALL IN THIS PARK IS 80 TONS. SEVERAL SITES WILL BE REINFORCED WITH REMAINING SPOT PLACEMENTS OF STONE PROTECTION.contract · Last action 2010-06-18$142,984
- Department of DefenseASPHALTIC CONCRETE PAVEMENTcontract · Last action 2011-11-17$140,074
- Department of DefenseBASE PERIOD - IDIQ PAVING TABLE ROCKcontract · Last action 2011-04-19$137,499
- Department of DefenseIGF::OT::IGF PORT OF KIMBERLING MARINA ASPHALTIC CONCRETE PAVEMENTcontract · Last action 2013-07-13$131,966
- Department of DefenseIGF::OT::IGF ASPHALTIC CONCRETE PAVEMENTcontract · Last action 2013-09-06$131,554
- Department of DefensePAVING SERVICEScontract · Last action 2009-07-31$126,053
- Department of DefenseIGF::OT::IGF DELIVERY ORDER 01 FOR IDIQ PAVING, LOCATED AT BEAVER LAKE PROJECT OFFICE, ROGERS, ARKANSAS.contract · Last action 2015-05-13$124,841
- Department of DefenseOPTION 2 PERIOD - IDIQ PAVING TABLE ROCKcontract · Last action 2012-04-26$121,000
- Department of DefenseIGF::OT::IGF DELIVERY ORDER #0013contract · Last action 2013-07-09$120,593
- Department of DefensePAVING TASK ORDER 6 : USACE SWL BEAVER LAKE PROJECT OFFICE: INDIAN CREEK PARKcontract · Last action 2013-04-04$115,616
- Department of DefenseASPHALTIC CONCRETE PAVEMENT TASK ORDER 0004contract · Last action 2012-08-02$113,758
- Department of DefenseOPTION 1 PERIOD - IDIQ PAVING TABLE ROCKcontract · Last action 2012-02-17$100,789
- Department of DefenseIGF::OT::IGF DELIVERY ORDER 0003, IDIQ PAVING LOCATED AT BEAVER LAKE PROJECT OFFICE, ROGERS, AR.contract · Last action 2016-07-20$95,811
- Department of DefenseROAD PAVING SERVICES.contract · Last action 2009-07-31$84,311
- Department of DefenseIGF::OT::IGF DO# 0019 ASPHALTIC CONCRETE PAVEMENTcontract · Last action 2013-12-10$83,813
- Department of DefenseBASE YEAR - BV -PAVEMENT REPAIRcontract · Last action 2009-06-10$77,126
- Department of DefenseBASE PERIOD - IDIQ PAVING TABLE ROCKcontract · Last action 2011-04-19$70,100
- Department of DefenseBASE PERIOD - IDIQ PAVING TABLE ROCK -contract · Last action 2011-06-21$67,560
- Department of DefenseBASE PERIOD - IDIQ PAVING TABLE ROCKcontract · Last action 2011-04-19$64,840
- Department of DefenseOPTION 2 - TR - ASPHALTIC CONCRETEcontract · Last action 2010-08-19$63,996
- Department of DefensePAVING SERVICEScontract · Last action 2008-01-23$63,984
- Department of DefenseOPTION 2 - TR - ASPHALTIC CONCRETEcontract · Last action 2010-07-26$59,911
- Department of DefenseIDIQ PAVING SERVICES, PARKING LOT REHAB, BEAVER LAKE PROJECT OFFICE, AR.contract · Last action 2010-12-22$58,731
- Department of DefensePAVING SERVICEScontract · Last action 2009-12-02$54,989
- Department of DefenseOPTION 2 - TR - ASPHALTIC CONCRETEcontract · Last action 2010-07-27$53,966
- Department of DefenseOPTION 2 - TR - ASPHALTIC CONCRETEcontract · Last action 2010-08-19$49,977
- Department of DefenseROAD PAVING SERVICEScontract · Last action 2009-08-03$48,449
- Department of DefenseBASE PERIOD - IDIQ PAVING TABLE ROCKcontract · Last action 2011-04-19$43,199
- Department of DefensePAVING SERVICEScontract · Last action 2009-07-31$43,073
- Department of DefenseIGF::OT::IGF EAGLE ROCK ASPHALTIC CONCRETE PAVEMENTcontract · Last action 2014-07-22$41,251
- Department of DefenseIGF::OT::IGF OPTION 4 PERIOD - IDIQ PAVING TABLE ROCKcontract · Last action 2013-11-25$41,186
- Department of DefenseIDIQ PAVINGcontract · Last action 2012-02-06$40,720
- Department of DefenseIGF::OT::IGF DO 0021 ASPHALTIC CONCRETE PAVEMENTcontract · Last action 2013-11-25$40,646
- Department of DefenseOPTION 1 PERIOD - IDIQ PAVING TABLE ROCKcontract · Last action 2012-10-12$40,372
- Department of DefenseIGF::OT::IGF CONCRETE SAND, DELIVEREDcontract · Last action 2017-07-28$39,500
- Department of DefenseOPTION 1 PERIOD - IDIQ PAVING TABLE ROCKcontract · Last action 2012-02-17$37,350
- Department of DefenseIDIQ ROAD PAVINGcontract · Last action 2008-12-29$36,400
Federal contract dollars to this establishment. Primary NAICS: 237310 - HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Last action: 2017-07-28. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 1988-11-03 | Accident | 2 | — | $160 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in highway, street, and bridge construction within MO, ordered by federal enforcement volume:
- CHESTER BROSS CONSTRUCTIONTROY — 3 federal enforcement records
- PACE CONSTRUCTION COMPANYWENTZVILLE — 3 federal enforcement records
- CHESTER BROSS CONSTRUCTION COMPANYHARDIN — 3 federal enforcement records
- PACE CONSTRUCTION COMPANYWILLOW SPRINGS — 3 federal enforcement records
- DLH TruckingMoscow Mills — 3 federal enforcement records
- CHESTER BROSS CONSTRUCTION CO.LA PLATA — 3 federal enforcement records
- FRED WEBER, INC.ST. LOUIS — 3 federal enforcement records
- Chester Bross Construction CompanyPalmyra — 3 federal enforcement records
- EMERY SAPP & SONS, INC.COLUMBIA — 3 federal enforcement records
- WIDEL, INC.EXCELSIOR SPRINGS — 2 federal enforcement records
Related searches
- Highway, Street, and Bridge ConstructionAll employers in this industry
- Employers in MOState-wide enforcement data
- Highway, Street, and in MOIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on HUTCHENS CONSTRUCTION COMPANY from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is HUTCHENS CONSTRUCTION COMPANY's OSHA violation history?
- HUTCHENS CONSTRUCTION COMPANY has 1 OSHA inspection on record with 2 violations and $160 in total penalties.
- How does HUTCHENS CONSTRUCTION COMPANY's safety record compare to its industry?
- HUTCHENS CONSTRUCTION COMPANY operates in the highway, street, and bridge construction industry. The industry average Total Recordable Incident Rate (TRIR) is 1.8. HUTCHENS CONSTRUCTION COMPANY's self-reported DART rate is 0 compared to an industry average of 1.
- Has HUTCHENS CONSTRUCTION COMPANY had any workplace fatalities?
- Yes. Federal records show 1 fatality investigation involving HUTCHENS CONSTRUCTION COMPANY.