HIGHWAY MATERIALS, INC.

W. BAINBRIDGE & RUTTS RD, ELIZABETHTOWN, PA, 17022
Operated by Highway Materials, Inc · 1 of 3 establishments
237310Highway, Street, and Bridge Construction

Download as PDF →

OSHA inspections
1
over 9 years
Violations
4
$8,872 in penalties
Penalties
$8,872
$2,218 avg
Violations across 2 federal agencies
Enforcement actions from multiple agencies may indicate systemic compliance issues across functions.

Summary

HIGHWAY MATERIALS, INC. has accumulated 4 OSHA violations across 1 inspection over 9 years of recorded history, with $8,872 in total assessed penalties.

The establishment sits in the 91st percentile for violations within its industry-state peer group of 1,316 employers. The most recent enforcement activity was recorded 9 years ago.

Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

HIGHWAY MATERIALS, INC. appears in OSHA workplace safety and MSHA mine safety records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.

OSHA workplace safety

Inspections
1
0.1 / yr · last 9 yrs
Violations
4
0.4 / yr
Penalties
$8,872
$2,218 avg / violation
25% serious75% other
Inspection trigger · complaint
1 of 1

100% of inspections at this establishment produced violations,

Most-cited OSHA standards

Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 4 distinct standards shown · 4 citations in this view · $8,872 in penalties.

CFR sectionCitationsInspectionsTotal penaltyFirst citedLast cited
29 CFR 1926.1408 B0311$5,070Aug 2017Aug 2017
29 CFR 1926.1203 A11$3,802Aug 2017Aug 2017
29 CFR 1926.0251 A0111Aug 2017Aug 2017
29 CFR 1926.0501 B0611Aug 2017Aug 2017

Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.

Peer comparison

91st

Worse on violations than most other employers in NAICS 2373 within PA. Peer group: 1,316 employers. This establishment has 4 OSHA violations; peer median is 0.

Fewer violationsMore violations
Penalty percentile
96th
peer median: $0
Inspection frequency
0th
peer median: 1

Safety self-report (OSHA 300A)

Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.

DART rate
5.3
vs industry
+3.8
TRIR
5.3
vs industry
+2.8

Reported for 28 average annual employees at this establishment.

Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.

Industry benchmark

Industry avg TRIR
2.5
BLS SOII 2024
Industry avg DART
1.5
BLS SOII 2024
Self-reported TRIR
5.3
OSHA ITA Form 300A (employer self-reported)

BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.

Inspection breakdown

Complaint
1

Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for HIGHWAY MATERIALS, INC.. Verify directly with Occupational Safety and Health Administration

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
9 years ago

No federal enforcement activity has been recorded against this establishment in 9+ years. Most recent activity: 9 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

No WHD wage, overtime, or child-labor enforcement cases on file for HIGHWAY MATERIALS, INC.. Verify directly with Wage and Hour Division

Mine safety (MSHA)

Company-level in PA — for Highway Materials, Inc, not this location alone

Violations
301
Assessed penalties
$67,886

Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other Highway Materials, Inc operations in the same state.

MSHA citations

Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 50S&S · 79 contractor · $51,688 proposed / $41,546 paid.

CitationMineDateSectionS&SNegligenceProposedPaid
6047378
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Jun 2007YesModNegligence$11,306$3,405
9660854
Perkiomenville Quarry
Montgomery, PA
contractor: HIGHWAY MATERIALS, LLC.
Nov 2021NoModNegligence$6,620$6,620
6047379
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Jun 2007YesModNegligence$3,405$3,405
6047377
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Jun 2007YesModNegligence$3,405$3,405
9660847
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Oct 2021YesHighNegligence$1,907$1,907
9660858
Perkiomenville Quarry
Montgomery, PA
contractor: HIGHWAY MATERIALS, LLC.
Nov 2021YesLowNegligence$1,156$559
9660855
Perkiomenville Quarry
Montgomery, PA
contractor: HIGHWAY MATERIALS, LLC.
Nov 2021YesLowNegligence$1,156$559
6053187
Temple Quarry
Berks, PA
Dec 2007NoHighNegligence$873$873
7729580
Temple Quarry
Berks, PA
Mar 2001YesHighNegligence$760$560
6049017
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Aug 2007NoHighNegligence$687$687
6049019
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Aug 2007NoHighNegligence$634$634
6015098
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Jun 2004NoHighNegligence$625$625
6065986
Perkiomenville Quarry
Montgomery, PA
contractor: HIGHWAY MATERIALS, LLC.
Aug 2009YesHighNegligence$585$585
9319790
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Jul 2017YesModNegligence$533$533
9314160
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Dec 2016YesModNegligence$533$533
9521077
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Jan 2021YesModNegligence$530$530
8709948
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Oct 2012YesLowNegligence$499$499
8717614
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Jul 2013YesModNegligence$425$425
8717613
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Jul 2013YesModNegligence$425$425
8658007
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Mar 2012YesModNegligence$425$425
8647825
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Jun 2011YesModNegligence$425$425
8570613
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Nov 2009YesModNegligence$425$425
8570611
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Nov 2009YesModNegligence$425$425
8570610
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Nov 2009YesHighNegligence$425$425
8580173
Perkiomenville Quarry
Montgomery, PA
contractor: HIGHWAY MATERIALS, LLC.
Jan 2011YesModNegligence$392$392
8570578
Perkiomenville Quarry
Montgomery, PA
contractor: HIGHWAY MATERIALS, LLC.
Mar 2010YesHighNegligence$392$392
6054517
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Nov 2007NoHighNegligence$362$362
8575461
Temple Quarry
Berks, PA
Aug 2010YesModNegligence$334$334
6056699
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
May 2008NoModNegligence$334$334
6054516
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Nov 2007NoHighNegligence$334$334
7729579
Temple Quarry
Berks, PA
Mar 2001YesModNegligence$277$154
7729578
Temple Quarry
Berks, PA
Mar 2001YesModNegligence$277$277
7729577
Temple Quarry
Berks, PA
Mar 2001YesModNegligence$277$277
7729575
Temple Quarry
Berks, PA
Mar 2001YesModNegligence$277$100
7729574
Temple Quarry
Berks, PA
Mar 2001YesModNegligence$277$100
6053186
Temple Quarry
Berks, PA
Dec 2007NoHighNegligence$263$263
6053185
Temple Quarry
Berks, PA
Dec 2007NoHighNegligence$263$263
9410062
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Apr 2018YesModNegligence$243$243
9463797
Perkiomenville Quarry
Montgomery, PA
contractor: HIGHWAY MATERIALS, LLC.
Jan 2020YesModNegligence$234$234
8575463
Temple Quarry
Berks, PA
Aug 2010NoModNegligence$224$100
7729576
Temple Quarry
Berks, PA
Mar 2001YesModNegligence$224$224
6041005
Perkiomenville Quarry
Montgomery, PA
contractor: HIGHWAY MATERIALS, LLC.
Jun 2006YesHighNegligence$217$217
7729573
Temple Quarry
Berks, PA
Mar 2001YesModNegligence$207$85
6033505
Temple Quarry
Berks, PA
Feb 2006YesModNegligence$191$191
8658006
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Mar 2012YesModNegligence$190$190
6048120
Temple Quarry
Berks, PA
May 2007YesModNegligence$190$190
8709930
Perkiomenville Quarry
Montgomery, PA
contractor: HIGHWAY MATERIALS, LLC.
Nov 2012YesModNegligence$176$176
9529833
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
May 2021NoLowNegligence$172$172
6016819
Temple Quarry
Berks, PA
Mar 2004YesModNegligence$165$165
8916772
Temple Quarry
Berks, PA
Aug 2015YesModNegligence$162$162
8914346
Perkiomenville Quarry
Montgomery, PA
contractor: HIGHWAY MATERIALS, LLC.
Apr 2015YesModNegligence$162$162
8803888
Perkiomenville Quarry
Montgomery, PA
contractor: HIGHWAY MATERIALS, LLC.
Jan 2015YesModNegligence$162$162
7730313
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
May 2000YesLowNegligence$161$161
9290275
Perkiomenville Quarry
Montgomery, PA
contractor: HIGHWAY MATERIALS, LLC.
Sep 2020YesModNegligence$157$157
9419652
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Jun 2019YesModNegligence$154$154
9807981
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Mar 2025NoModNegligence$151$151
9809216
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Feb 2025YesLowNegligence$151$151
9804698
Perkiomenville Quarry
Montgomery, PA
contractor: HIGHWAY MATERIALS, LLC.
Jan 2025NoModNegligence$151$151
9809217
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Oct 2024NoLowNegligence$151$151
8651772
Temple Quarry
Berks, PA
Jan 2012NoModNegligence$150$150
8651771
Temple Quarry
Berks, PA
Jan 2012NoModNegligence$150$150
8575470
Temple Quarry
Berks, PA
Aug 2010YesModNegligence$150$150
8575459
Temple Quarry
Berks, PA
Aug 2010NoLowNegligence$150$100
9804189
PORTABLE 519104
Adams, PA
contractor: HIGHWAY MATERIALS, LLC.
Nov 2024NoLowNegligence$147$111
9209576
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Jul 2024NoLowNegligence$147$147
9802016
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Apr 2024NoModNegligence$147$147
9850695
PORTABLE 517
Montgomery, PA
contractor: Highway Materials LLC
Feb 2024NoModNegligence$147$147
9851913
Perkiomenville Quarry
Montgomery, PA
contractor: HIGHWAY MATERIALS, LLC.
Aug 2023NoLowNegligence$143$143
9851912
Perkiomenville Quarry
Montgomery, PA
contractor: HIGHWAY MATERIALS, LLC.
Aug 2023NoLowNegligence$143$143
8005877
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
May 2023NoModNegligence$143$143
8005861
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Jan 2023NoModNegligence$143$143
8005460
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Jan 2023NoModNegligence$143$143
6047376
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Jun 2007NoModNegligence$138$100
9667124
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Apr 2022NoModNegligence$133$133
9667123
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Apr 2022NoModNegligence$133$133
9667122
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Apr 2022NoLowNegligence$133$133
9667121
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Apr 2022NoLowNegligence$133$133
9667120
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Apr 2022NoLowNegligence$133$133
8005224
Perkiomenville Quarry
Montgomery, PA
contractor: HIGHWAY MATERIALS, LLC.
Jan 2022NoModNegligence$133$133
8794375
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Jan 2014YesModNegligence$127$127
8717615
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Jul 2013YesModNegligence$127$127
8580172
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Jan 2011YesModNegligence$127$127
8570612
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Nov 2009YesModNegligence$127$127
9660848
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Oct 2021NoLowNegligence$125$125
9529835
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
May 2021NoModNegligence$125$125
9529834
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
May 2021NoLowNegligence$125$125
9521078
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Jan 2021NoLowNegligence$125$125
6015101
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Jun 2004YesModNegligence$124$124
9290278
Perkiomenville Quarry
Montgomery, PA
contractor: HIGHWAY MATERIALS, LLC.
Sep 2020NoLowNegligence$123$123
9290276
Perkiomenville Quarry
Montgomery, PA
contractor: HIGHWAY MATERIALS, LLC.
Sep 2020NoLowNegligence$123$123
9294108
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Aug 2020NoModNegligence$123$123
9294107
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Aug 2020NoLowNegligence$123$123
9294106
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Aug 2020NoLowNegligence$123$123
9294105
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Aug 2020NoLowNegligence$123$123
9469666
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Feb 2020NoModNegligence$123$123
9469665
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Feb 2020NoModNegligence$123$123
9469664
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Feb 2020NoModNegligence$123$123
9463798
Perkiomenville Quarry
Montgomery, PA
contractor: HIGHWAY MATERIALS, LLC.
Jan 2020NoModNegligence$123$123
9469667
Plymouth Meeting Quarry
Montgomery, PA
contractor: Highway Materials LLC
Jul 2019NoModNegligence$123$123
9464148
Perkiomenville Quarry
Montgomery, PA
contractor: HIGHWAY MATERIALS, LLC.
Aug 2019NoModNegligence$121$121

Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).

Labor relations (NLRB)

No NLRB unfair labor practice charges or union representation cases on file for HIGHWAY MATERIALS, INC.. Verify directly with National Labor Relations Board

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for HIGHWAY MATERIALS, INC.. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for HIGHWAY MATERIALS, INC.. Verify directly with Environmental Protection Agency

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for HIGHWAY MATERIALS, INC.. Verify directly with UVA Corporate Prosecution Registry

Inspection history

DateTriggerViolationsSeriousPenalty
2017-05-10Complaint41$8,872

Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.

In the news

Part of a larger organization

HIGHWAY MATERIALS, INC. is one of 3 establishments rolled up under the parent organization Highway Materials, Inc.

Federal enforcement records on this page represent activity at this specific establishment only. The full enforcement footprint of Highway Materials, Inc across all 3 of its tracked locations is viewable on the parent profile.

Other employers in this industry and state

Other employers in highway, street, and bridge construction within PA, ordered by federal enforcement volume:

Other locations under this parent

Other establishments operated by Highway Materials, Inc, ordered by federal enforcement volume:

Related searches

About this data

This profile aggregates federal enforcement records on HIGHWAY MATERIALS, INC. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code. This establishment resolves to the parent rollup Highway Materials, Inc, which operates 3 establishments in our dataset.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is HIGHWAY MATERIALS, INC.'s OSHA violation history?
HIGHWAY MATERIALS, INC. has 1 OSHA inspection on record with 4 violations and $8,872 in total penalties.
How does HIGHWAY MATERIALS, INC.'s safety record compare to its industry?
HIGHWAY MATERIALS, INC. operates in the highway, street, and bridge construction industry. The industry average Total Recordable Incident Rate (TRIR) is 2.5. HIGHWAY MATERIALS, INC.'s self-reported DART rate is 5.32 compared to an industry average of 1.5.