Summary
HAWKEYE CONTRACTING has no OSHA inspection history on file. Federal records covering wage, environmental, labor relations, and other agencies are noted below where present.
The most recent federal enforcement activity was recorded 0 days ago.
Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
HAWKEYE CONTRACTING appears in MSHA mine safety record only. No matching records were found in OSHA workplace safety, WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls. Single-agency enforcement records typically indicate either a discrete incident-based inspection or a low-risk operational profile.
OSHA workplace safety
No OSHA inspections, citations, or accidents on file for HAWKEYE CONTRACTING. Verify directly with Occupational Safety and Health Administration →
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for HAWKEYE CONTRACTING. Verify directly with OSHA Injury Tracking Application →
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for HAWKEYE CONTRACTING. Verify directly with Occupational Safety and Health Administration →
Activity timeline
Most recent federal enforcement activity recorded 0 days ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for HAWKEYE CONTRACTING. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in WV — for HAWKEYE CONTRACTING, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other HAWKEYE CONTRACTING operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 44S&S · 100 contractor · $310,815 proposed / $186,283 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 9068191 | Glancy Surface Mine Wyoming, WV contractor: Hawkeye Contracting Co., LLC | Aug 2017 | — | Yes | ModNegligence | $59,957 | $7,624 |
| 9290538 | Holden #22 Surface Logan, WV contractor: Hawkeye Contracting Co., LLC | Jun 2020 | — | Yes | HighNegligence | $31,789 | $15,894 |
| 9177921 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Oct 2018 | — | No | HighNegligence | $13,348 | $5,600 |
| 9224039 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Apr 2019 | — | Yes | HighNegligence | $12,632 | $12,632 |
| 9291265 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Jun 2020 | — | Yes | ModNegligence | $11,867 | $5,933 |
| 9220816 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Dec 2018 | — | Yes | ModNegligence | $9,173 | $2,994 |
| 9220817 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Dec 2018 | — | Yes | HighNegligence | $8,947 | $3,000 |
| 9220802 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Nov 2018 | — | Yes | HighNegligence | $8,947 | $2,994 |
| 9164316 | Blue Creek Prep Plant Kanawha, WV contractor: Hawkeye Contracting Co., LLC | Jun 2019 | — | No | HighNegligence | $7,817 | $7,817 |
| 9054240 | Harris Prep Plant Boone, WV contractor: Hawkeye Contracting Co., LLC | Aug 2016 | — | Yes | ModNegligence | $7,352 | $5,270 |
| 8083556 | Samples Surface Mine Kanawha, WV contractor: Hawkeye Contracting Co., LLC | Jul 2009 | — | Yes | LowNegligence | $6,996 | $6,300 |
| 7170460 | Fanco Logan, WV contractor: Hawkeye Contracting Co., LLC | May 2017 | — | Yes | ModNegligence | $6,896 | $6,896 |
| 9177925 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Oct 2018 | — | Yes | LowNegligence | $6,664 | $3,332 |
| 9059780 | Harris Prep Plant Boone, WV contractor: Hawkeye Contracting Co., LLC | Jul 2016 | — | Yes | ModNegligence | $3,876 | $3,040 |
| 9291266 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Jun 2020 | — | Yes | ModNegligence | $3,871 | $3,871 |
| 9111599 | Blue Creek Prep Plant Kanawha, WV contractor: Hawkeye Contracting Co., LLC | Dec 2016 | — | No | ModNegligence | $2,861 | $1,344 |
| 9228247 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Jan 2020 | — | Yes | ModNegligence | $2,811 | $2,811 |
| 9220808 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Dec 2018 | — | Yes | ModNegligence | $2,694 | $2,694 |
| 9177917 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Oct 2018 | — | Yes | LowNegligence | $2,694 | $1,211 |
| 9177152 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Jul 2018 | — | No | ModNegligence | $2,694 | $1,952 |
| 9177151 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Jul 2018 | — | No | LowNegligence | $2,694 | $1,211 |
| 9177150 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Jul 2018 | — | Yes | ModNegligence | $2,694 | $2,694 |
| 9176540 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Jul 2018 | — | No | ModNegligence | $2,694 | $558 |
| 9176539 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Jul 2018 | — | No | ModNegligence | $2,694 | $558 |
| 9062296 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Jun 2015 | — | Yes | LowNegligence | $2,473 | $1,918 |
| 9292357 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Jul 2020 | — | No | ModNegligence | $2,394 | $1,531 |
| 9291269 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Jun 2020 | — | No | ModNegligence | $2,394 | $1,208 |
| 9291268 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Jun 2020 | — | No | ModNegligence | $2,394 | $1,208 |
| 9245961 | South Hollow Prep Plant and Loadout Kanawha, WV contractor: Hawkeye Contracting Co., LLC | Feb 2020 | — | No | ModNegligence | $2,394 | $2,394 |
| 9067865 | Guyan Mine Logan, WV contractor: Hawkeye Contracting Co., LLC | Jun 2017 | — | Yes | ModNegligence | $2,250 | $2,250 |
| 7170459 | Fanco Logan, WV contractor: Hawkeye Contracting Co., LLC | May 2017 | — | Yes | ModNegligence | $2,077 | $2,077 |
| 9062217 | Daniel Hollow Logan, WV contractor: Hawkeye Contracting Co., LLC | Dec 2014 | — | No | ModNegligence | $1,944 | $1,263 |
| 9062215 | Daniel Hollow Logan, WV contractor: Hawkeye Contracting Co., LLC | Dec 2014 | — | Yes | ModNegligence | $1,944 | $1,944 |
| 9062212 | Daniel Hollow Logan, WV contractor: Hawkeye Contracting Co., LLC | Dec 2014 | — | Yes | ModNegligence | $1,944 | $1,944 |
| 7182534 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Apr 2017 | — | Yes | ModNegligence | $1,917 | $1,917 |
| 9054273 | Harris Prep Plant Boone, WV contractor: Hawkeye Contracting Co., LLC | Dec 2016 | — | Yes | ModNegligence | $1,917 | $1,917 |
| 9220801 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Nov 2018 | — | No | HighNegligence | $1,806 | $872 |
| 9228260 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Feb 2020 | — | No | LowNegligence | $1,605 | $1,605 |
| 9169619 | South Hollow Prep Plant and Loadout Kanawha, WV contractor: Hawkeye Contracting Co., LLC | Feb 2019 | — | No | ModNegligence | $1,577 | $1,577 |
| 8142935 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Dec 2015 | — | Yes | ModNegligence | $1,530 | $1,530 |
| 8142934 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Dec 2015 | — | Yes | ModNegligence | $1,530 | $1,530 |
| 8127998 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Dec 2015 | — | Yes | ModNegligence | $1,530 | $1,530 |
| 8127996 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Dec 2015 | — | Yes | ModNegligence | $1,530 | $1,530 |
| 9169618 | South Hollow Prep Plant and Loadout Kanawha, WV contractor: Hawkeye Contracting Co., LLC | Feb 2019 | — | Yes | ModNegligence | $1,457 | $1,457 |
| 9169617 | South Hollow Prep Plant and Loadout Kanawha, WV contractor: Hawkeye Contracting Co., LLC | Feb 2019 | — | Yes | ModNegligence | $1,457 | $1,457 |
| 9177920 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Oct 2018 | — | Yes | LowNegligence | $1,346 | $1,346 |
| 9062216 | Daniel Hollow Logan, WV contractor: Hawkeye Contracting Co., LLC | Dec 2014 | — | No | HighNegligence | $1,304 | $1,304 |
| 9228244 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Jan 2020 | — | Yes | LowNegligence | $1,263 | $1,263 |
| 9245844 | Coal Clean Prep Plant Kanawha, WV contractor: Hawkeye Contracting Co., LLC | Dec 2019 | — | No | LowNegligence | $1,263 | $1,263 |
| 9245823 | Samples Surface Mine Kanawha, WV contractor: Hawkeye Contracting Co., LLC | Nov 2019 | — | No | LowNegligence | $1,242 | $605 |
| 9220832 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Dec 2018 | — | Yes | LowNegligence | $1,211 | $620 |
| 9220826 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Dec 2018 | — | Yes | LowNegligence | $1,211 | $800 |
| 9177919 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Oct 2018 | — | No | LowNegligence | $1,211 | $1,211 |
| 9120722 | Speed Mine Kanawha, WV contractor: Hawkeye Contracting Co., LLC | Jun 2018 | — | No | LowNegligence | $1,211 | $1,211 |
| 9175504 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Apr 2018 | — | Yes | LowNegligence | $1,211 | $1,211 |
| 9242743 | Fola Surface Mine No 2 Clay, WV contractor: Hawkeye Contracting Co., LLC | Jun 2021 | — | No | ModNegligence | $1,179 | $1,179 |
| 9296368 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Jan 2021 | — | Yes | ModNegligence | $1,179 | $1,179 |
| 9224040 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Apr 2019 | — | Yes | ModNegligence | $1,146 | $1,146 |
| 9291273 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Jun 2020 | — | No | LowNegligence | $1,076 | $1,076 |
| 9291271 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Jun 2020 | — | No | LowNegligence | $1,076 | $1,076 |
| 9291267 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Jun 2020 | — | No | LowNegligence | $1,076 | $1,076 |
| 7170456 | Fanco Logan, WV contractor: Hawkeye Contracting Co., LLC | May 2017 | — | Yes | LowNegligence | $934 | $934 |
| 9246582 | Fola Surface Mine No 2 Clay, WV contractor: Hawkeye Contracting Co., LLC | Mar 2022 | — | No | ModNegligence | $909 | $909 |
| 9226158 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Oct 2019 | — | No | LowNegligence | $902 | $902 |
| 9226157 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Oct 2019 | — | No | LowNegligence | $902 | $902 |
| 9226156 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Oct 2019 | — | No | LowNegligence | $902 | $902 |
| 9163742 | Coal Clean Prep Plant Kanawha, WV contractor: Hawkeye Contracting Co., LLC | Feb 2018 | — | No | ModNegligence | $880 | $880 |
| 9163741 | Coal Clean Prep Plant Kanawha, WV contractor: Hawkeye Contracting Co., LLC | Feb 2018 | — | No | ModNegligence | $880 | $880 |
| 9173282 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Feb 2018 | — | No | ModNegligence | $880 | $880 |
| 9173281 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Feb 2018 | — | No | ModNegligence | $880 | $880 |
| 9173280 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Feb 2018 | — | No | ModNegligence | $880 | $880 |
| 9173218 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Feb 2018 | — | No | ModNegligence | $880 | $880 |
| 9173217 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Feb 2018 | — | No | ModNegligence | $880 | $880 |
| 8094411 | Samples Surface Mine Kanawha, WV contractor: Hawkeye Contracting Co., LLC | Oct 2009 | — | Yes | ModNegligence | $873 | $650 |
| 9296426 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Mar 2021 | — | Yes | ModNegligence | $791 | $791 |
| 9224778 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Aug 2019 | — | No | ModNegligence | $708 | $708 |
| 8127999 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Dec 2015 | — | Yes | LowNegligence | $687 | $687 |
| 8127995 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Dec 2015 | — | Yes | LowNegligence | $687 | $687 |
| 8127994 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Dec 2015 | — | Yes | LowNegligence | $687 | $687 |
| 9177916 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Oct 2018 | — | No | ModNegligence | $638 | $638 |
| 9060944 | Blue Creek Prep Plant Kanawha, WV contractor: Hawkeye Contracting Co., LLC | Jun 2017 | — | No | ModNegligence | $625 | $147 |
| 9062214 | Daniel Hollow Logan, WV contractor: Hawkeye Contracting Co., LLC | Dec 2014 | — | Yes | ModNegligence | $585 | $585 |
| 8077296 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Apr 2017 | — | No | LowNegligence | $577 | $577 |
| 7193114 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Apr 2017 | — | No | ModNegligence | $577 | $577 |
| 9114537 | Samples Surface Mine Kanawha, WV contractor: Hawkeye Contracting Co., LLC | Feb 2017 | — | No | ModNegligence | $577 | $462 |
| 9226155 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Oct 2019 | — | No | ModNegligence | $558 | $558 |
| 9168722 | Samples Surface Mine Kanawha, WV contractor: Hawkeye Contracting Co., LLC | Dec 2018 | — | No | ModNegligence | $544 | $448 |
| 9220821 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Dec 2018 | — | No | ModNegligence | $544 | $544 |
| 9220820 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Dec 2018 | — | No | ModNegligence | $544 | $544 |
| 9220803 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Nov 2018 | — | No | ModNegligence | $544 | $400 |
| 9177918 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Oct 2018 | — | No | ModNegligence | $544 | $544 |
| 9177922 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Oct 2018 | — | No | ModNegligence | $544 | $544 |
| 9175241 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Sep 2018 | — | No | ModNegligence | $544 | $544 |
| 9174945 | Fanco Logan, WV contractor: Hawkeye Contracting Co., LLC | Jun 2018 | — | No | ModNegligence | $544 | $544 |
| 9173686 | Flying Eagle Wyoming, WV contractor: Hawkeye Contracting Co., LLC | Jun 2018 | — | No | ModNegligence | $544 | $544 |
| 9174397 | Cardinal Preparation Plant Logan, WV contractor: Hawkeye Contracting Co., LLC | Apr 2018 | — | No | ModNegligence | $544 | $544 |
| 9163740 | Coal Clean Prep Plant Kanawha, WV contractor: Hawkeye Contracting Co., LLC | Feb 2018 | — | No | ModNegligence | $544 | $544 |
| 9163739 | Coal Clean Prep Plant Kanawha, WV contractor: Hawkeye Contracting Co., LLC | Feb 2018 | — | No | ModNegligence | $544 | $544 |
| 9163733 | Coal Clean Prep Plant Kanawha, WV contractor: Hawkeye Contracting Co., LLC | Feb 2018 | — | No | ModNegligence | $544 | $544 |
| 9117350 | NORTH EAGLE MINE Boone, WV contractor: Hawkeye Contracting Co., LLC | Apr 2017 | — | No | ModNegligence | $533 | $533 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for HAWKEYE CONTRACTING. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for HAWKEYE CONTRACTING. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for HAWKEYE CONTRACTING. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for HAWKEYE CONTRACTING. Verify directly with UVA Corporate Prosecution Registry →
In the news
Related searches
- Employers in WVState-wide enforcement data
About this data
This profile aggregates federal enforcement records on HAWKEYE CONTRACTING from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is HAWKEYE CONTRACTING's OSHA violation history?
- HAWKEYE CONTRACTING has no OSHA inspections on record.