Establishment profile
HAP TAYLOR & SONS INC
FORBES RD, BEND, OR, 97702
237310 — Highway, Street, and Bridge Construction
Summary
HAP TAYLOR & SONS INC has accumulated 3 OSHA violations across 3 inspections over 31 years of recorded history, with $2,525 in total assessed penalties.
The establishment sits in the 71st percentile for violations within its industry-state peer group of 705 employers. Inspection frequency runs at the 80th percentile. The most recent enforcement activity was recorded 23 years ago.
Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
HAP TAYLOR & SONS INC appears in OSHA workplace safety and MSHA mine safety records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
67% of inspections at this establishment produced violations, with 2 inspections producing serious-or-greater violations.
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 2 distinct standards shown · 3 citations in this view · $2,525 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 7030.42001 | 2 | 2 | $2,350 | Jul 2002 | Apr 2003 |
| 29 CFR 7030.128 | 1 | 1 | $175 | Apr 2003 | Apr 2003 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Above average violations in NAICS 2373 within OR. Peer group: 705 employers. This establishment has 3 OSHA violations; peer median is 1.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for HAP TAYLOR & SONS INC. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for HAP TAYLOR & SONS INC. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 23+ years. Most recent activity: 23 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for HAP TAYLOR & SONS INC. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in OR — for HAP TAYLOR & SONS INC, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other HAP TAYLOR & SONS INC operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 26S&S · 76 contractor · $16,858 proposed / $16,858 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 6378935 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Feb 2006 | — | Yes | HighNegligence | $1,566 | $1,566 |
| 6196508 | Portable Crusher Deschutes, OR | Mar 2008 | — | Yes | HighNegligence | $1,530 | $1,530 |
| 6346201 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Nov 2002 | — | Yes | HighNegligence | $1,086 | $1,086 |
| 7994404 | SISTERS/SECTION III SITE Deschutes, OR | Jan 2001 | — | Yes | ModNegligence | $1,000 | $1,000 |
| 6342023 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Oct 2006 | — | Yes | ModNegligence | $838 | $838 |
| 7994405 | SISTERS/SECTION III SITE Deschutes, OR | Jan 2001 | — | Yes | HighNegligence | $750 | $750 |
| 6346205 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Nov 2002 | — | No | HighNegligence | $453 | $453 |
| 6383224 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Sep 2005 | — | Yes | ModNegligence | $440 | $440 |
| 6383216 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Sep 2005 | — | Yes | ModNegligence | $440 | $440 |
| 6378818 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Oct 2005 | — | No | ModNegligence | $383 | $383 |
| 6346208 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Nov 2002 | — | Yes | ModNegligence | $340 | $340 |
| 6346207 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Nov 2002 | — | Yes | ModNegligence | $340 | $340 |
| 6383223 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Sep 2005 | — | Yes | ModNegligence | $324 | $324 |
| 6362520 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Oct 2004 | — | Yes | ModNegligence | $286 | $286 |
| 6383215 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Sep 2005 | — | Yes | ModNegligence | $247 | $247 |
| 7994527 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Jul 2001 | — | Yes | ModNegligence | $224 | $224 |
| 6342024 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Oct 2006 | — | No | ModNegligence | $217 | $217 |
| 7994525 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Jul 2001 | — | Yes | ModNegligence | $184 | $184 |
| 7994523 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Jul 2001 | — | Yes | ModNegligence | $184 | $184 |
| 6368806 | Portable Crusher Deschutes, OR | Dec 2004 | — | Yes | ModNegligence | $154 | $154 |
| 6368910 | CENTRAL OREGON PORTABLE #2 Deschutes, OR contractor: Hap Taylor & Sons | Mar 2005 | — | Yes | ModNegligence | $144 | $144 |
| 6368907 | CENTRAL OREGON PORTABLE #2 Deschutes, OR contractor: Hap Taylor & Sons | Mar 2005 | — | Yes | ModNegligence | $144 | $144 |
| 6346989 | CENTRAL OREGON PORTABLE #2 Deschutes, OR contractor: Hap Taylor & Sons | Apr 2004 | — | Yes | ModNegligence | $144 | $144 |
| 7994522 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Jul 2001 | — | Yes | ModNegligence | $140 | $140 |
| 6343376 | Portable Crusher Deschutes, OR | Jan 2003 | — | Yes | ModNegligence | $131 | $131 |
| 7994401 | SISTERS/SECTION III SITE Deschutes, OR | Jan 2001 | — | Yes | ModNegligence | $131 | $131 |
| 7986800 | SISTERS/SECTION III SITE Deschutes, OR | Jan 2001 | — | Yes | ModNegligence | $131 | $131 |
| 6346892 | Portable Crusher Deschutes, OR | Nov 2003 | — | Yes | ModNegligence | $114 | $114 |
| 7978346 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Aug 2000 | — | Yes | ModNegligence | $113 | $113 |
| 6486446 | CENTRAL OREGON PORTABLE #2 Deschutes, OR contractor: Hap Taylor & Sons | Jul 2010 | — | No | ModNegligence | $100 | $100 |
| 6438693 | CENTRAL OREGON PORTABLE #2 Deschutes, OR contractor: Hap Taylor & Sons | May 2009 | — | No | LowNegligence | $100 | $100 |
| 6438625 | CENTRAL OREGON PORTABLE #2 Deschutes, OR contractor: Hap Taylor & Sons | Nov 2008 | — | No | LowNegligence | $100 | $100 |
| 6438609 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Oct 2008 | — | No | ModNegligence | $100 | $100 |
| 6438608 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Oct 2008 | — | No | ModNegligence | $100 | $100 |
| 6438786 | Crusher #3 Deschutes, OR | Jul 2008 | — | No | LowNegligence | $100 | $100 |
| 6430198 | CENTRAL OREGON PORTABLE #2 Deschutes, OR contractor: Hap Taylor & Sons | Dec 2007 | — | No | LowNegligence | $100 | $100 |
| 6342993 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Dec 2007 | — | No | ModNegligence | $100 | $100 |
| 6342992 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Dec 2007 | — | No | LowNegligence | $100 | $100 |
| 6342990 | Portable Crusher Deschutes, OR | Dec 2007 | — | No | LowNegligence | $100 | $100 |
| 6342989 | Portable Crusher Deschutes, OR | Dec 2007 | — | No | LowNegligence | $100 | $100 |
| 7970428 | CENTRAL OREGON PORTABLE #2 Deschutes, OR contractor: Hap Taylor & Sons | Jun 2007 | — | No | ModNegligence | $100 | $100 |
| 6342053 | CENTRAL OREGON PORTABLE #2 Deschutes, OR contractor: Hap Taylor & Sons | Dec 2006 | — | No | HighNegligence | $60 | $60 |
| 6342052 | CENTRAL OREGON PORTABLE #2 Deschutes, OR contractor: Hap Taylor & Sons | Dec 2006 | — | No | HighNegligence | $60 | $60 |
| 6342051 | CENTRAL OREGON PORTABLE #2 Deschutes, OR contractor: Hap Taylor & Sons | Dec 2006 | — | No | LowNegligence | $60 | $60 |
| 6342030 | ROGUE PORTABLE #8 Deschutes, OR contractor: Hap Taylor and Sons | Nov 2006 | — | No | LowNegligence | $60 | $60 |
| 6378942 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Feb 2006 | — | No | ModNegligence | $60 | $60 |
| 6378941 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Feb 2006 | — | No | ModNegligence | $60 | $60 |
| 6378940 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Feb 2006 | — | No | ModNegligence | $60 | $60 |
| 6378939 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Feb 2006 | — | No | ModNegligence | $60 | $60 |
| 6378938 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Feb 2006 | — | No | ModNegligence | $60 | $60 |
| 6378934 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Feb 2006 | — | No | ModNegligence | $60 | $60 |
| 6378892 | CENTRAL OREGON PORTABLE #2 Deschutes, OR contractor: Hap Taylor & Sons | Jan 2006 | — | No | LowNegligence | $60 | $60 |
| 6378891 | CENTRAL OREGON PORTABLE #2 Deschutes, OR contractor: Hap Taylor & Sons | Jan 2006 | — | No | ModNegligence | $60 | $60 |
| 6383222 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Sep 2005 | — | No | ModNegligence | $60 | $60 |
| 6383221 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Sep 2005 | — | No | ModNegligence | $60 | $60 |
| 6383220 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Sep 2005 | — | No | ModNegligence | $60 | $60 |
| 6383219 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Sep 2005 | — | No | ModNegligence | $60 | $60 |
| 6383218 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Sep 2005 | — | No | ModNegligence | $60 | $60 |
| 6383217 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Sep 2005 | — | No | ModNegligence | $60 | $60 |
| 6378804 | CENTRAL OREGON PORTABLE #2 Deschutes, OR contractor: Hap Taylor & Sons | Sep 2005 | — | No | ModNegligence | $60 | $60 |
| 6378803 | CENTRAL OREGON PORTABLE #2 Deschutes, OR contractor: Hap Taylor & Sons | Sep 2005 | — | No | ModNegligence | $60 | $60 |
| 6368916 | CENTRAL OREGON PORTABLE #2 Deschutes, OR contractor: Hap Taylor & Sons | Mar 2005 | — | No | ModNegligence | $60 | $60 |
| 6368915 | CENTRAL OREGON PORTABLE #2 Deschutes, OR contractor: Hap Taylor & Sons | Mar 2005 | — | No | ModNegligence | $60 | $60 |
| 6368914 | CENTRAL OREGON PORTABLE #2 Deschutes, OR contractor: Hap Taylor & Sons | Mar 2005 | — | No | ModNegligence | $60 | $60 |
| 6368913 | CENTRAL OREGON PORTABLE #2 Deschutes, OR contractor: Hap Taylor & Sons | Mar 2005 | — | No | ModNegligence | $60 | $60 |
| 6368912 | CENTRAL OREGON PORTABLE #2 Deschutes, OR contractor: Hap Taylor & Sons | Mar 2005 | — | No | ModNegligence | $60 | $60 |
| 6368911 | CENTRAL OREGON PORTABLE #2 Deschutes, OR contractor: Hap Taylor & Sons | Mar 2005 | — | No | ModNegligence | $60 | $60 |
| 6368909 | CENTRAL OREGON PORTABLE #2 Deschutes, OR contractor: Hap Taylor & Sons | Mar 2005 | — | No | HighNegligence | $60 | $60 |
| 6368908 | CENTRAL OREGON PORTABLE #2 Deschutes, OR contractor: Hap Taylor & Sons | Mar 2005 | — | No | ModNegligence | $60 | $60 |
| 6368808 | Portable Crusher Deschutes, OR | Dec 2004 | — | No | ModNegligence | $60 | $60 |
| 6368807 | Portable Crusher Deschutes, OR | Dec 2004 | — | No | ModNegligence | $60 | $60 |
| 6368805 | Portable Crusher Deschutes, OR | Dec 2004 | — | No | ModNegligence | $60 | $60 |
| 6362523 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Oct 2004 | — | No | ModNegligence | $60 | $60 |
| 6362522 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Oct 2004 | — | No | ModNegligence | $60 | $60 |
| 6362521 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Oct 2004 | — | No | NoNegligence | $60 | $60 |
| 6362225 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Jun 2004 | — | No | ModNegligence | $60 | $60 |
| 6346990 | CENTRAL OREGON PORTABLE #2 Deschutes, OR contractor: Hap Taylor & Sons | Apr 2004 | — | No | ModNegligence | $60 | $60 |
| 6352468 | Portable Crusher Deschutes, OR | Apr 2004 | — | No | ModNegligence | $60 | $60 |
| 6346976 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Apr 2004 | — | No | HighNegligence | $60 | $60 |
| 6346951 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Feb 2004 | — | No | ModNegligence | $60 | $60 |
| 6346950 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Feb 2004 | — | No | ModNegligence | $60 | $60 |
| 6346900 | Crusher #3 Deschutes, OR | Nov 2003 | — | No | ModNegligence | $60 | $60 |
| 6346891 | Portable Crusher Deschutes, OR | Nov 2003 | — | No | ModNegligence | $60 | $60 |
| 6346890 | Portable Crusher Deschutes, OR | Nov 2003 | — | No | LowNegligence | $60 | $60 |
| 6346324 | CENTRAL OREGON PORTABLE #2 Deschutes, OR contractor: Hap Taylor & Sons | Jul 2003 | — | No | ModNegligence | $60 | $60 |
| 6346323 | CENTRAL OREGON PORTABLE #2 Deschutes, OR contractor: Hap Taylor & Sons | Jul 2003 | — | No | LowNegligence | $60 | $60 |
| 6346322 | CENTRAL OREGON PORTABLE #2 Deschutes, OR contractor: Hap Taylor & Sons | Jul 2003 | — | No | ModNegligence | $60 | $60 |
| 6346321 | CENTRAL OREGON PORTABLE #2 Deschutes, OR contractor: Hap Taylor & Sons | Jul 2003 | — | No | ModNegligence | $60 | $60 |
| 6343135 | Portable Crusher Deschutes, OR | Feb 2003 | — | No | LowNegligence | $55 | $55 |
| 6343136 | Portable Crusher Deschutes, OR | Feb 2003 | — | No | ModNegligence | $55 | $55 |
| 6343377 | Portable Crusher Deschutes, OR | Jan 2003 | — | No | ModNegligence | $55 | $55 |
| 6346210 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Nov 2002 | — | No | ModNegligence | $55 | $55 |
| 6346209 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Nov 2002 | — | No | ModNegligence | $55 | $55 |
| 6346206 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Nov 2002 | — | No | ModNegligence | $55 | $55 |
| 6346204 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Nov 2002 | — | No | HighNegligence | $55 | $55 |
| 6346203 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Nov 2002 | — | No | ModNegligence | $55 | $55 |
| 6346202 | WOODWARD PLANT Crook, OR contractor: Hap Taylor & Sons | Nov 2002 | — | No | HighNegligence | $55 | $55 |
| 6338903 | Portable Crusher Deschutes, OR | Jul 2002 | — | No | ModNegligence | $55 | $55 |
| 6338902 | Portable Crusher Deschutes, OR | Jul 2002 | — | No | ModNegligence | $55 | $55 |
| 6338901 | Portable Crusher Deschutes, OR | Jul 2002 | — | No | ModNegligence | $55 | $55 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for HAP TAYLOR & SONS INC. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for HAP TAYLOR & SONS INC. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for HAP TAYLOR & SONS INC. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for HAP TAYLOR & SONS INC. Verify directly with UVA Corporate Prosecution Registry →
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2003-03-14 | Referral | 2 | 1 | $1,925 | |
| 2002-06-18 | Planned | 1 | — | $600 | |
| 1995-04-11 | Planned | 0 | — | $0 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in highway, street, and bridge construction within OR, ordered by federal enforcement volume:
- MID-VALLEY GRAVEL COMPANYPHILOMATH — 3 federal enforcement records
- LASKEY-CLIFTON CORPORATIONCOOS BAY — 3 federal enforcement records
- SPECIALIZED PAVEMENT MARKING INCTUALATIN — 3 federal enforcement records
- LTM INCMEDFORD — 3 federal enforcement records
- LASKEY-CLIFTON CORPORATIONREEDSPORT — 3 federal enforcement records
- LASKEY-CLIFTON CORPORATIONMYRTLE POINT — 2 federal enforcement records
- KIEWIT PACIFIC COPORTLAND — 2 federal enforcement records
- KERR CONTRACTORS INCTIGARD — 2 federal enforcement records
- JIM TURIN & SONS INCRHODODENDRON — 2 federal enforcement records
- JAL CONSTRUCTION INCREDMOND — 2 federal enforcement records
Related searches
- Highway, Street, and Bridge ConstructionAll employers in this industry
- Employers in ORState-wide enforcement data
- Highway, Street, and in ORIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on HAP TAYLOR & SONS INC from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is HAP TAYLOR & SONS INC's OSHA violation history?
- HAP TAYLOR & SONS INC has 3 OSHA inspections on record with 3 violations and $2,525 in total penalties.
- How does HAP TAYLOR & SONS INC's safety record compare to its industry?
- HAP TAYLOR & SONS INC operates in the highway, street, and bridge construction industry. The industry average Total Recordable Incident Rate (TRIR) is 2.5.