Establishment profile
HANSON ELECTRIC OF BEMIDJI, INC.
1417 5TH ST., N.E., BEMIDJI, MN, 56601
Summary
HANSON ELECTRIC OF BEMIDJI, INC. has accumulated 5 OSHA violations across 2 inspections over 34 years of recorded history, with $105 in total assessed penalties.
The establishment sits in the 80th percentile for violations within its industry-state peer group of 43,053 employers. Inspection frequency runs at the 78th percentile. The most recent enforcement activity was recorded 27 years ago.
Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
HANSON ELECTRIC OF BEMIDJI, INC. appears in OSHA workplace safety and FMCSA motor carrier registration records only. No matching records were found in WHD wage enforcement, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
100% of inspections at this establishment produced violations,
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 5 distinct standards shown · 5 citations in this view · $105 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 1926.0405 A02 IIF | 1 | 1 | $105 | Aug 1999 | Aug 1999 |
| 29 CFR 1910.0169 B03 I | 1 | 1 | — | Sep 1991 | Sep 1991 |
| 29 CFR 5205.067502 | 1 | 1 | — | Sep 1991 | Sep 1991 |
| 29 CFR 5206.070001 B | 1 | 1 | — | Sep 1991 | Sep 1991 |
| 29 CFR 5210.063001 | 1 | 1 | — | Sep 1991 | Sep 1991 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Worse on violations than most other employers. Peer group: 43,053 employers. This establishment has 5 OSHA violations; peer median is 1.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for HANSON ELECTRIC OF BEMIDJI, INC.. Verify directly with OSHA Injury Tracking Application →
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for HANSON ELECTRIC OF BEMIDJI, INC.. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 27+ years. Most recent activity: 27 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for HANSON ELECTRIC OF BEMIDJI, INC.. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
No MSHA mine safety violations on file for HANSON ELECTRIC OF BEMIDJI, INC.. Verify directly with Mine Safety and Health Administration →
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for HANSON ELECTRIC OF BEMIDJI, INC.. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for HANSON ELECTRIC OF BEMIDJI, INC.. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for HANSON ELECTRIC OF BEMIDJI, INC.. Verify directly with Environmental Protection Agency →
Motor carrier safety (FMCSA)
Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for HANSON ELECTRIC OF BEMIDJI, INC.. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
- Department of TransportationRECOVERY/ARRA - DESIGN AND INSTALLATION WORK FOR TH ELECTRICAL LINE DISTRIBUTION (ELD) AND POWER CABLE REPLACEMENT AT THE SAN JUAN (SJU) LUIS MUNOZ MARTIN INTERNATIONAL AIRPORT IN ACCORDANCE WITH THE STATEMENT OF WORK AND THE ADDITIONAL REPORTING REQUIRED BY THE ATTACHED ARRA CLAUSES.contract · Last action 2011-01-13$3,596,981
- Department of TransportationRECOVERY/ARRA - DESIGN AND INSTALLATION WORK FOR THE ELECTRICAL LINE DISTRIBUTION (ELD) AND POWER CABLE REPLACEMENT AT THE NEW ORLEANS, LA (MSY) LOUIS ARMSTRONG INTERNATIONAL AIRPORT IN ACCORDANCE WITH THE STATEMENT OF WORK AND THE ADDITIONAL REPORTING REQUIRED BY THE ATTACHED ARRA CLAUSES.contract · Last action 2011-01-13$712,142
- Department of TransportationINSTALL 21.5 KW PHOTO VOLTAIC ARRAY AT PAHOA NDB, BIG ISLAND, HI, INCLUDING GROUND MOUNT RACKING SYSTEM, 3 SMA SB7000US SUNNY BOY INVERTERS, DEKA UNIGY 2 BATTERY BACK UP POWER SYSTEM, 3 SMA SI 5048 5.0 KW BATTERY BASED INVERTERS, STRUCTURAL AND ELECTRICAL ENGINEERING, DOCUMENTATION, TRAINING AND 5 YEAR PARTS AND LABOR WARRANTY FOR SYSTEM, 10 X 12 BATTERY/INVERTER BUILDING WITH REMOVABLE WALL SECTION FOR BATTERY ACCESS. INSTALLATION OF PHOTO VOLTAIC POWER AND NET METERING WHICH WILL ELIMINATE THE EXPENSIVE HAWAIIAN UTILITY POWER BILL AND INCREASE THE FACILITY SYSTEM RELIABILITY AND AVAILABILITY DUE TO THE GRID TIED BACKUP POWER PROVIDED TO THE ELECTRICAL DISTRIBUTION.contract · Last action 2009-06-23$393,422
- Department of TransportationINSTALL 21.5 KW PHOTO VOLTAIC ARRAY AT HAMAKUA RCAG, BIG ISLAND, HI, INCLUDING GROUND MOUNT RACKING SYSTEM, 3 SMA SB7000US SUNNY BOY INVERTERS, STRUCTURAL AND ELECTRICAL ENGINEERING, DOCUMENTATION, TRAINING AND 5 YEAR PARTS AND LABOR WARRANTY FOR SYSTEM. INSTALLATION OF PHOTO VOLTAIC POWER AND NET METERING WHICH WILL ELIMINATE THE EXPENSIVE HAWAIIAN UTILITY POWER BILL AND INCREASE THE FACILITY SYSTEM RELIABILITY AND AVAILABILITY DUE TO THE GRID TIED BACKUP POWER PROVIDED TO THE ELECTRICAL DISTRIBUTION.contract · Last action 2009-07-08$269,800
- Department of TransportationSITE SURVEY FOR ADEQUACY OF EXISTING POWER SYSTEM EQUIPMENT AND PHYSICAL FACILITY TO ACCOMMODATE THE NEW PHOTOVOLTAIC SYSTEM REQUIREMENTS AT ABIQUIU, NM. SURVEY WILL INCLUDE ARCHITECTURAL FLOOR PLAN AND LAYOUT OF FACILITY, DISPOSAL OF BATTERIES AND RACKS, AND COMMMENTS ON ACCESSIBILITY OF SITE FOR MATERIAL DELIVERIES.contract · Last action 2009-06-23$64,377
- Department of TransportationMILESTONE SCHEDULE AND INSTALLATION OF PHOTOVOLTAIC SYSTEM PER STATEMENT OF WORK AT LOS LUNAS, NM INSTALL A GOVERNMENT-FURNISHED RADIO COMMUNICATIONS LINK REPEATER (RCLR) SOLAR BACK-UP POWER SYSTEM AS PER THE STANDARD RCL DRAWINGS (SWSD-D-RCL-E001 TO E006 AND SWSD-GROUNDING DRAWINGS). SYSTEMS ARE GOV-FURNISHED MATERIALS WITH THE EXCEPTION OF GROUND RODS. THE ESTIMATED PERIOD OF PERFORMANCE FOR THIS PROJECT IS 1 WEEK FROM THE START DATE OF INSTALLATION.contract · Last action 2009-06-23$60,000
- Department of TransportationINSTALL A GOVERNMENT-FURNISHED RADIO COMMUNICATIONS LINK REPEATER (RCLR) SOLAR BACK-UP POWER SYSTEM AS PER THE STANDARD RCL DRAWINGS (SWSD-D-RCL-E001 TO E006 AND SWSD-GROUNDING DRAWINGS). SYSTEMS ARE GOV-FURNISHED MATERIALS WITH THE EXCEPTION OF GROUND RODS. THE ESTIMATED PERIOD OF PERFORMANCE FOR THIS PROJECT IS 1 WEEK FROM THE START DATE OF INSTALLATION. MILESTONE SCHEDULE AND INSTALLATION OF PHOTOVOLTAIC SYSTEM PER STATEMENT OF WORK AT BELEN, NMcontract · Last action 2009-06-23$60,000
- Department of TransportationSITE SURVEY FOR ADEQUACY OF EXISTING POWER SYSTEM EQUIPMENT AND PHYSICAL FACILITY TO ACCOMMODATE THE NEW PHOTOVOLTAIC SYSTEM REQUIREMENTS AT STONG, NM. SURVEY WILL INCLUDE ARCHITECTURAL FLOOR PLAN AND LAYOUT OF FACILITY, DISPOSAL OF BATTERIES AND RACKS, AND COMMMENTS ON ACCESSIBILITY OF SITE FOR MATERIAL DELIVERIES. TAS::69 8107::TAScontract · Last action 2010-01-22$50,722
- Department of TransportationSITE SURVEY FOR ADEQUACY OF EXISTING POWER SYSTEM EQUIPMENT AND PHYSICAL FACILITY TO ACCOMMODATE THE NEW PHOTOVOLTAIC SYSTEM REQUIREMENTS AT QUESTA, NM. SURVEY WILL INCLUDE ARCHITECTURAL FLOOR PLAN AND LAYOUT OF FACILITY, DISPOSAL OF BATTERIES AND RACKS, AND COMMMENTS ON ACCESSIBILITY OF SITE FOR MATERIAL DELIVERIES. TAS::69 8107::TAScontract · Last action 2010-01-22$50,722
Federal contract dollars to this establishment. Primary NAICS: 238210 - ELECTRICAL CONTRACTORS AND OTHER WIRING INSTALLATION CONTRACTORS. Last action: 2011-01-13. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 1999-06-24 | Planned | 1 | — | $105 | |
| 1991-09-09 | Planned | 4 | — | $0 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Related searches
- Employers in MNState-wide enforcement data
About this data
This profile aggregates federal enforcement records on HANSON ELECTRIC OF BEMIDJI, INC. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is HANSON ELECTRIC OF BEMIDJI, INC.'s OSHA violation history?
- HANSON ELECTRIC OF BEMIDJI, INC. has 2 OSHA inspections on record with 5 violations and $105 in total penalties.