Establishment profile
H-K CONTRACTORS INC.
CITY WIDE, IDAHO FALLS, ID, 83401
237310 — Highway, Street, and Bridge Construction
Summary
H-K CONTRACTORS INC. has accumulated 3 OSHA violations across 6 inspections over 50 years of recorded history, with $230 in total assessed penalties.
The establishment sits in the 88th percentile for violations within its industry-state peer group of 278 employers. Inspection frequency runs at the 98th percentile. The most recent enforcement activity was recorded 16 years ago.
Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
H-K CONTRACTORS INC. appears in OSHA workplace safety and MSHA mine safety records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
33% of inspections at this establishment produced violations,
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 3 distinct standards shown · 3 citations in this view · $230 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 1926.0652 H | 1 | 1 | $160 | Sep 1975 | Sep 1975 |
| 29 CFR 1926.0652 B | 1 | 1 | $70 | Sep 1975 | Sep 1975 |
| 29 CFR 1926.0651 I01 | 1 | 1 | — | Aug 1978 | Aug 1978 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Worse on violations than most other employers in NAICS 2373 within ID. Peer group: 278 employers. This establishment has 3 OSHA violations; peer median is 0.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for H-K CONTRACTORS INC.. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for H-K CONTRACTORS INC.. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 16+ years. Most recent activity: 16 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for H-K CONTRACTORS INC.. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in ID — for H-K CONTRACTORS INC., not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other H-K CONTRACTORS INC. operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 28S&S · $23,741 proposed / $22,325 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 7977585 | 134 Crusher H-K Portable Plant Bear Lake, ID | May 2000 | — | Yes | HighNegligence | $3,000 | $2,400 |
| 7977586 | 134 Crusher H-K Portable Plant Bear Lake, ID | May 2000 | — | Yes | HighNegligence | $2,000 | $1,600 |
| 9654255 | 134 Crusher H-K Portable Plant Bear Lake, ID | Mar 2022 | — | Yes | ModNegligence | $840 | $840 |
| 9470265 | 133 Portable Crusher Bonneville, ID | Apr 2020 | — | Yes | ModNegligence | $782 | $782 |
| 9470248 | 133 Portable Crusher Bonneville, ID | Jan 2020 | — | Yes | ModNegligence | $782 | $782 |
| 6483927 | 133 Portable Crusher Bonneville, ID | Jan 2010 | — | Yes | LowNegligence | $634 | $285 |
| 6374251 | 133 Portable Crusher Bonneville, ID | Nov 2005 | — | Yes | ModNegligence | $614 | $614 |
| 6374250 | 133 Portable Crusher Bonneville, ID | Nov 2005 | — | Yes | ModNegligence | $614 | $614 |
| 6581380 | 132 Portable Crusher Bonneville, ID | Jul 2012 | — | Yes | ModNegligence | $540 | $540 |
| 5052938 | 134 Crusher H-K Portable Plant Bear Lake, ID | Jun 2025 | — | Yes | ModNegligence | $432 | $432 |
| 5052937 | 134 Crusher H-K Portable Plant Bear Lake, ID | Jun 2025 | — | Yes | ModNegligence | $432 | $432 |
| 6360496 | 133 Portable Crusher Bonneville, ID | Mar 2005 | — | Yes | ModNegligence | $324 | $324 |
| 8825241 | 133 Portable Crusher Bonneville, ID | Sep 2014 | — | Yes | ModNegligence | $263 | $263 |
| 8593917 | 133 Portable Crusher Bonneville, ID | Feb 2014 | — | Yes | ModNegligence | $263 | $263 |
| 6581379 | 132 Portable Crusher Bonneville, ID | Jul 2012 | — | Yes | ModNegligence | $243 | $243 |
| 5055452 | 134 Crusher H-K Portable Plant Bear Lake, ID | Feb 2026 | — | No | ModNegligence | $209 | $209 |
| 5058308 | 133 Portable Crusher Bonneville, ID | Dec 2025 | — | No | ModNegligence | $193 | $193 |
| 5052924 | 134 Crusher H-K Portable Plant Bear Lake, ID | Jun 2025 | — | No | ModNegligence | $193 | $193 |
| 5052923 | 134 Crusher H-K Portable Plant Bear Lake, ID | Jun 2025 | — | No | ModNegligence | $193 | $193 |
| 9907476 | 134 Crusher H-K Portable Plant Bear Lake, ID | Mar 2025 | — | No | ModNegligence | $193 | $193 |
| 9907455 | 133 Portable Crusher Bonneville, ID | Jan 2025 | — | No | ModNegligence | $193 | $193 |
| 9901750 | 133 Portable Crusher Bonneville, ID | Sep 2023 | — | No | ModNegligence | $182 | $182 |
| 8757077 | 1700 Trac Screening Plant Bonneville, ID | Apr 2014 | — | No | HighNegligence | $181 | $181 |
| 9370811 | 132 Portable Crusher Bonneville, ID | Apr 2018 | — | Yes | ModNegligence | $177 | $177 |
| 6347584 | 133 Portable Crusher Bonneville, ID | Apr 2004 | — | No | LowNegligence | $177 | $140 |
| 6347094 | 133 Portable Crusher Bonneville, ID | Mar 2003 | — | Yes | ModNegligence | $173 | $173 |
| 6347090 | 133 Portable Crusher Bonneville, ID | Mar 2003 | — | Yes | ModNegligence | $173 | $173 |
| 6347089 | 133 Portable Crusher Bonneville, ID | Mar 2003 | — | Yes | ModNegligence | $173 | $173 |
| 9654254 | 134 Crusher H-K Portable Plant Bear Lake, ID | Mar 2022 | — | No | ModNegligence | $169 | $169 |
| 9654253 | 134 Crusher H-K Portable Plant Bear Lake, ID | Mar 2022 | — | No | ModNegligence | $169 | $169 |
| 5051535 | 132 Portable Crusher Bonneville, ID | Jul 2025 | — | No | ModNegligence | $165 | $165 |
| 6302428 | 134 Crusher H-K Portable Plant Bear Lake, ID | Aug 2005 | — | Yes | ModNegligence | $165 | $165 |
| 9826226 | 132 Portable Crusher Bonneville, ID | Sep 2024 | — | No | ModNegligence | $161 | $161 |
| 9478611 | 133 Portable Crusher Bonneville, ID | Jan 2021 | — | No | ModNegligence | $159 | $159 |
| 9470249 | 133 Portable Crusher Bonneville, ID | Jan 2020 | — | No | ModNegligence | $157 | $157 |
| 9901734 | Portable Wash Plant #1 Bonneville, ID | Aug 2023 | — | No | ModNegligence | $155 | $155 |
| 9901732 | Portable Wash Plant #1 Bonneville, ID | Aug 2023 | — | No | ModNegligence | $155 | $155 |
| 6347587 | 133 Portable Crusher Bonneville, ID | Apr 2004 | — | Yes | ModNegligence | $154 | $154 |
| 5055453 | 134 Crusher H-K Portable Plant Bear Lake, ID | Feb 2026 | — | No | ModNegligence | $151 | $151 |
| 5058307 | 133 Portable Crusher Bonneville, ID | Dec 2025 | — | No | ModNegligence | $151 | $151 |
| 5052968 | 133 Portable Crusher Bonneville, ID | Aug 2025 | — | No | ModNegligence | $151 | $151 |
| 5052967 | 133 Portable Crusher Bonneville, ID | Aug 2025 | — | No | ModNegligence | $151 | $151 |
| 5052966 | 133 Portable Crusher Bonneville, ID | Aug 2025 | — | No | ModNegligence | $151 | $151 |
| 5052926 | 134 Crusher H-K Portable Plant Bear Lake, ID | Jun 2025 | — | No | ModNegligence | $151 | $151 |
| 5052925 | 134 Crusher H-K Portable Plant Bear Lake, ID | Jun 2025 | — | No | ModNegligence | $151 | $151 |
| 5052922 | 134 Crusher H-K Portable Plant Bear Lake, ID | Jun 2025 | — | No | ModNegligence | $151 | $151 |
| 9907454 | 133 Portable Crusher Bonneville, ID | Jan 2025 | — | No | ModNegligence | $151 | $151 |
| 9907453 | 133 Portable Crusher Bonneville, ID | Jan 2025 | — | No | ModNegligence | $151 | $151 |
| 7993153 | 133 Portable Crusher Bonneville, ID | Jan 2002 | — | Yes | ModNegligence | $150 | $120 |
| 9826225 | 132 Portable Crusher Bonneville, ID | Sep 2024 | — | No | ModNegligence | $147 | $147 |
| 9907682 | 133 Portable Crusher Bonneville, ID | Aug 2024 | — | No | ModNegligence | $147 | $147 |
| 9306786 | 134 Crusher H-K Portable Plant Bear Lake, ID | Mar 2024 | — | No | ModNegligence | $147 | $147 |
| 9306783 | 133 Portable Crusher Bonneville, ID | Mar 2024 | — | No | ModNegligence | $147 | $147 |
| 9306782 | 133 Portable Crusher Bonneville, ID | Mar 2024 | — | No | ModNegligence | $147 | $147 |
| 9901749 | 133 Portable Crusher Bonneville, ID | Sep 2023 | — | No | ModNegligence | $143 | $143 |
| 9901742 | 134 Crusher H-K Portable Plant Bear Lake, ID | Sep 2023 | — | No | ModNegligence | $143 | $143 |
| 9901741 | 134 Crusher H-K Portable Plant Bear Lake, ID | Sep 2023 | — | No | ModNegligence | $143 | $143 |
| 9901740 | 134 Crusher H-K Portable Plant Bear Lake, ID | Sep 2023 | — | No | LowNegligence | $143 | $143 |
| 9901733 | Portable Wash Plant #1 Bonneville, ID | Aug 2023 | — | No | ModNegligence | $143 | $143 |
| 7977563 | 134 Crusher H-K Portable Plant Bear Lake, ID | Jan 2000 | — | Yes | ModNegligence | $140 | $140 |
| 7977562 | 134 Crusher H-K Portable Plant Bear Lake, ID | Jan 2000 | — | Yes | ModNegligence | $140 | $140 |
| 7977550 | 134 Crusher H-K Portable Plant Bear Lake, ID | Jan 2000 | — | Yes | ModNegligence | $140 | $140 |
| 7977549 | 134 Crusher H-K Portable Plant Bear Lake, ID | Jan 2000 | — | Yes | ModNegligence | $140 | $140 |
| 8825570 | 133 Portable Crusher Bonneville, ID | Sep 2016 | — | No | ModNegligence | $134 | $134 |
| 9727864 | 133 Portable Crusher Bonneville, ID | Sep 2022 | — | No | ModNegligence | $133 | $133 |
| 9727863 | 133 Portable Crusher Bonneville, ID | Sep 2022 | — | No | ModNegligence | $133 | $133 |
| 9727802 | 134 Crusher H-K Portable Plant Bear Lake, ID | Jul 2022 | — | No | ModNegligence | $133 | $133 |
| 9654256 | 134 Crusher H-K Portable Plant Bear Lake, ID | Mar 2022 | — | No | ModNegligence | $133 | $133 |
| 9654457 | 133 Portable Crusher Bonneville, ID | Mar 2022 | — | No | ModNegligence | $133 | $133 |
| 8593667 | 133 Portable Crusher Bonneville, ID | Nov 2012 | — | No | ModNegligence | $127 | $127 |
| 8558987 | 133 Portable Crusher Bonneville, ID | Aug 2010 | — | No | ModNegligence | $127 | $127 |
| 6303805 | 133 Portable Crusher Bonneville, ID | Aug 2008 | — | No | ModNegligence | $127 | $127 |
| 9478668 | 134 Crusher H-K Portable Plant Bear Lake, ID | Aug 2021 | — | No | ModNegligence | $125 | $125 |
| 9474872 | 133 Portable Crusher Bonneville, ID | May 2021 | — | No | LowNegligence | $125 | $125 |
| 9478612 | 133 Portable Crusher Bonneville, ID | Jan 2021 | — | No | ModNegligence | $125 | $125 |
| 9478610 | 134 Crusher H-K Portable Plant Bear Lake, ID | Jan 2021 | — | No | ModNegligence | $125 | $125 |
| 7993887 | 134 Crusher H-K Portable Plant Bear Lake, ID | Nov 2001 | — | Yes | ModNegligence | $122 | $122 |
| 9431139 | 133 Portable Crusher Bonneville, ID | Oct 2018 | — | No | ModNegligence | $118 | $118 |
| 9431131 | 134 Crusher H-K Portable Plant Bear Lake, ID | Oct 2018 | — | No | ModNegligence | $118 | $118 |
| 9370810 | 132 Portable Crusher Bonneville, ID | Apr 2018 | — | No | ModNegligence | $118 | $118 |
| 8825339 | 134 Crusher H-K Portable Plant Bear Lake, ID | Mar 2015 | — | No | ModNegligence | $117 | $117 |
| 8825338 | 134 Crusher H-K Portable Plant Bear Lake, ID | Mar 2015 | — | No | ModNegligence | $117 | $117 |
| 8825240 | 133 Portable Crusher Bonneville, ID | Sep 2014 | — | No | ModNegligence | $117 | $117 |
| 8757196 | 134 Crusher H-K Portable Plant Bear Lake, ID | Sep 2014 | — | No | ModNegligence | $117 | $117 |
| 8593916 | 133 Portable Crusher Bonneville, ID | Feb 2014 | — | No | ModNegligence | $117 | $117 |
| 9370225 | 133 Portable Crusher Bonneville, ID | Nov 2017 | — | No | ModNegligence | $116 | $116 |
| 9370224 | 133 Portable Crusher Bonneville, ID | Nov 2017 | — | No | ModNegligence | $116 | $116 |
| 8836910 | 133 Portable Crusher Bonneville, ID | Sep 2017 | — | No | LowNegligence | $116 | $116 |
| 8757382 | Portable Wash Plant #1 Bonneville, ID | Sep 2015 | — | No | ModNegligence | $100 | $100 |
| 8757373 | 133 Portable Crusher Bonneville, ID | Aug 2015 | — | No | ModNegligence | $100 | $100 |
| 8757198 | 134 Crusher H-K Portable Plant Bear Lake, ID | Sep 2014 | — | No | ModNegligence | $100 | $100 |
| 8757197 | 134 Crusher H-K Portable Plant Bear Lake, ID | Sep 2014 | — | No | ModNegligence | $100 | $100 |
| 8757081 | 1700 Trac Screening Plant Bonneville, ID | Apr 2014 | — | No | ModNegligence | $100 | $100 |
| 8757080 | 1700 Trac Screening Plant Bonneville, ID | Apr 2014 | — | No | ModNegligence | $100 | $100 |
| 8756364 | Portable Wash Plant #1 Bonneville, ID | Nov 2013 | — | No | HighNegligence | $100 | $100 |
| 8756363 | Portable Plant 130 Bonneville, ID | Nov 2013 | — | No | HighNegligence | $100 | $100 |
| 8756362 | 1700 Trac Screening Plant Bonneville, ID | Nov 2013 | — | No | HighNegligence | $100 | $100 |
| 8593248 | Portable Wash Plant #1 Bonneville, ID | Jul 2012 | — | No | LowNegligence | $100 | $100 |
| 8593247 | Portable Wash Plant #1 Bonneville, ID | Jul 2012 | — | No | LowNegligence | $100 | $100 |
| 8593246 | Portable Wash Plant #1 Bonneville, ID | Jul 2012 | — | Yes | LowNegligence | $100 | $100 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for H-K CONTRACTORS INC.. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for H-K CONTRACTORS INC.. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for H-K CONTRACTORS INC.. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for H-K CONTRACTORS INC.. Verify directly with UVA Corporate Prosecution Registry →
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2010-06-09 | Planned | 0 | — | $0 | |
| 2005-07-12 | Referral | 0 | — | $0 | |
| 2002-06-19 | Referral | 0 | — | $0 | |
| 2002-03-28 | Planned | 0 | — | $0 | |
| 1978-07-31 | Planned | 1 | — | $0 | |
| 1975-09-17 | Planned | 2 | — | $230 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in highway, street, and bridge construction within ID, ordered by federal enforcement volume:
- HK CONTRACTORS, INCIDAHO FALLS — 3 federal enforcement records
- H-K CONTRACTORS, INC.TWIN FALLS — 2 federal enforcement records
- KLOEPFER, INC.SHOSHONE — 2 federal enforcement records
- BECO CONSTRUCTION COMPANY, INC.IDAHO FALLS — 2 federal enforcement records
- H-K CONTRACTORS, INC.2 federal enforcement records
- CANNON BUILDERS, INC.BLACKFOOT — 2 federal enforcement records
- COOK & SONS CONSTRUCTION LLCPLUMMER — 2 federal enforcement records
- WESTERN CONSTRUCTION, INCBLISS — 2 federal enforcement records
- H-K CONTRACTORS, INCARCO — 2 federal enforcement records
- GRANITE EXCAVATION, INC.RUPERT — 2 federal enforcement records
Related searches
- Highway, Street, and Bridge ConstructionAll employers in this industry
- Employers in IDState-wide enforcement data
- Highway, Street, and in IDIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on H-K CONTRACTORS INC. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is H-K CONTRACTORS INC.'s OSHA violation history?
- H-K CONTRACTORS INC. has 6 OSHA inspections on record with 3 violations and $230 in total penalties.
- How does H-K CONTRACTORS INC.'s safety record compare to its industry?
- H-K CONTRACTORS INC. operates in the highway, street, and bridge construction industry. The industry average Total Recordable Incident Rate (TRIR) is 2.5.