Establishment profile
GIBCO MOTOR EXPRESS LLC
12600 WARRICK COUNTY LINE, EVANSVILLE, IN, 47725
484220 — Specialized Freight (except Used Goods) Trucking, Local
Summary
GIBCO MOTOR EXPRESS LLC has accumulated 5 OSHA violations across 1 inspection over 19 years of recorded history, with $1,073 in total assessed penalties.
The establishment sits in the 87th percentile for violations within its industry-state peer group of 32 employers. The most recent enforcement activity was recorded 19 years ago.
Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
GIBCO MOTOR EXPRESS LLC appears in OSHA workplace safety and MSHA mine safety records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
100% of inspections at this establishment produced violations,
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 5 distinct standards shown · 5 citations in this view · $1,073 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 1910.0215 A04 | 1 | 1 | $537 | Aug 2007 | Aug 2007 |
| 29 CFR 1910.0304 F04 | 1 | 1 | $536 | Aug 2007 | Aug 2007 |
| 29 CFR 1910.0147 D04 I | 1 | 1 | — | Aug 2007 | Aug 2007 |
| 29 CFR 1910.0215 B09 | 1 | 1 | — | Aug 2007 | Aug 2007 |
| 29 CFR 1910.0242 B | 1 | 1 | — | Aug 2007 | Aug 2007 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Worse on violations than most other employers in NAICS 4842 within IN. Peer group: 32 employers. This establishment has 5 OSHA violations; peer median is 1.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for GIBCO MOTOR EXPRESS LLC. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for GIBCO MOTOR EXPRESS LLC. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 19+ years. Most recent activity: 19 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for GIBCO MOTOR EXPRESS LLC. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in IN — for GIBCO MOTOR EXPRESS LLC, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other GIBCO MOTOR EXPRESS LLC operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 57S&S · 100 contractor · $96,826 proposed / $76,703 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 8416757 | Prosperity Mine Pike, IN contractor: Gibco Motor Express LLC | Sep 2009 | — | Yes | ModNegligence | $14,373 | $4,329 |
| 6681421 | Freelandville Mine Knox, IN contractor: Gibco Motor Express LLC | Oct 2008 | — | Yes | HighNegligence | $13,268 | $13,268 |
| 8416759 | Prosperity Mine Pike, IN contractor: Gibco Motor Express LLC | Sep 2009 | — | Yes | HighNegligence | $7,176 | $7,176 |
| 6679887 | Hurricane Creek Gibson, IN contractor: Gibco Motor Express LLC | Mar 2009 | — | Yes | ModNegligence | $6,458 | $6,458 |
| 6669283 | Air Quality #1 Mine Knox, IN contractor: Gibco Motor Express LLC | Jun 2007 | — | No | ModNegligence | $3,143 | $112 |
| 6669282 | Air Quality #1 Mine Knox, IN contractor: Gibco Motor Express LLC | Jun 2007 | — | No | ModNegligence | $3,143 | $112 |
| 7566881 | Discovery Gibson, IN contractor: Gibco Motor Express LLC | Nov 2002 | — | Yes | HighNegligence | $2,800 | $2,800 |
| 8421509 | Switz City Greene, IN contractor: Gibco Motor Express LLC | Sep 2009 | — | Yes | ModNegligence | $2,341 | $2,341 |
| 8416767 | Prosperity Mine Pike, IN contractor: Gibco Motor Express LLC | Sep 2009 | — | No | HighNegligence | $2,106 | $2,106 |
| 8416762 | Prosperity Mine Pike, IN contractor: Gibco Motor Express LLC | Sep 2009 | — | Yes | ModNegligence | $1,944 | $1,944 |
| 8416755 | Prosperity Mine Pike, IN contractor: Gibco Motor Express LLC | Sep 2009 | — | No | ModNegligence | $1,944 | $392 |
| 6677439 | Freelandville Mine Knox, IN contractor: Gibco Motor Express LLC | Jul 2008 | — | Yes | ModNegligence | $1,944 | $1,944 |
| 8416758 | Prosperity Mine Pike, IN contractor: Gibco Motor Express LLC | Sep 2009 | — | No | ModNegligence | $1,530 | $1,530 |
| 6695890 | Augusta Mine Pike, IN contractor: Gibco Motor Express LLC | Feb 2008 | — | Yes | ModNegligence | $1,449 | $1,449 |
| 6669281 | Air Quality #1 Mine Knox, IN contractor: Gibco Motor Express LLC | Jun 2007 | — | No | ModNegligence | $1,412 | $112 |
| 8416760 | Prosperity Mine Pike, IN contractor: Gibco Motor Express LLC | Sep 2009 | — | No | ModNegligence | $1,304 | $392 |
| 6695889 | Augusta Mine Pike, IN contractor: Gibco Motor Express LLC | Feb 2008 | — | Yes | ModNegligence | $1,304 | $1,304 |
| 7557879 | Discovery Gibson, IN contractor: Gibco Motor Express LLC | Jan 2008 | — | Yes | ModNegligence | $1,203 | $950 |
| 6670304 | Augusta Mine Pike, IN contractor: Gibco Motor Express LLC | Jun 2007 | — | Yes | ModNegligence | $1,203 | $1,203 |
| 9033689 | Bear Run Mine Sullivan, IN contractor: Gibco Motor Express LLC | Mar 2015 | — | Yes | ModNegligence | $1,140 | $1,140 |
| 8416766 | Prosperity Mine Pike, IN contractor: Gibco Motor Express LLC | Sep 2009 | — | No | ModNegligence | $1,026 | $1,026 |
| 8416761 | Prosperity Mine Pike, IN contractor: Gibco Motor Express LLC | Sep 2009 | — | No | ModNegligence | $1,026 | $1,026 |
| 6677441 | Freelandville Mine Knox, IN contractor: Gibco Motor Express LLC | Jul 2008 | — | No | ModNegligence | $897 | $897 |
| 7597148 | Viking Mine - Corning Pit Daviess, IN contractor: Gibco Motor Express LLC | Mar 2005 | — | Yes | HighNegligence | $750 | $750 |
| 8492552 | Augusta Mine Pike, IN contractor: Gibco Motor Express LLC | Apr 2009 | — | No | ModNegligence | $745 | $745 |
| 6667197 | Gibson Mine Gibson, IN contractor: Gibco Motor Express LLC | Mar 2008 | — | Yes | ModNegligence | $705 | $705 |
| 7597147 | Viking Mine - Corning Pit Daviess, IN contractor: Gibco Motor Express LLC | Mar 2005 | — | Yes | HighNegligence | $525 | $525 |
| 7596597 | Craney Mine Daviess, IN contractor: Gibco Motor Express LLC | Dec 2004 | — | Yes | ModNegligence | $500 | $500 |
| 7596158 | Air Quality #1 Mine Knox, IN contractor: Gibco Motor Express LLC | Aug 2004 | — | Yes | HighNegligence | $463 | $463 |
| 8415483 | Prosperity Mine Pike, IN contractor: Gibco Motor Express LLC | Jun 2009 | — | No | ModNegligence | $460 | $460 |
| 8492551 | Augusta Mine Pike, IN contractor: Gibco Motor Express LLC | Apr 2009 | — | No | ModNegligence | $460 | $460 |
| 8492550 | Augusta Mine Pike, IN contractor: Gibco Motor Express LLC | Apr 2009 | — | No | ModNegligence | $460 | $460 |
| 8492548 | Augusta Mine Pike, IN contractor: Gibco Motor Express LLC | Apr 2009 | — | No | ModNegligence | $460 | $460 |
| 8448190 | Viking Mine - Corning Pit Daviess, IN contractor: Gibco Motor Express LLC | Nov 2012 | — | Yes | ModNegligence | $425 | $425 |
| 8448189 | Viking Mine - Corning Pit Daviess, IN contractor: Gibco Motor Express LLC | Nov 2012 | — | Yes | ModNegligence | $425 | $425 |
| 8448179 | Bear Run Mine Sullivan, IN contractor: Gibco Motor Express LLC | Nov 2012 | — | Yes | ModNegligence | $425 | $425 |
| 8492549 | Augusta Mine Pike, IN contractor: Gibco Motor Express LLC | Apr 2009 | — | No | ModNegligence | $425 | $425 |
| 8492547 | Augusta Mine Pike, IN contractor: Gibco Motor Express LLC | Apr 2009 | — | No | ModNegligence | $425 | $425 |
| 6681730 | Discovery Gibson, IN contractor: Gibco Motor Express LLC | Mar 2009 | — | No | ModNegligence | $425 | $425 |
| 6667198 | Gibson Mine Gibson, IN contractor: Gibco Motor Express LLC | Mar 2008 | — | No | HighNegligence | $425 | $425 |
| 8433406 | BRC Chinook LLC Clay, IN contractor: Gibco Motor Express LLC | Feb 2011 | — | Yes | ModNegligence | $392 | $392 |
| 8416002 | Freelandville Mine Knox, IN contractor: Gibco Motor Express LLC | Apr 2009 | — | No | ModNegligence | $392 | $392 |
| 8492546 | Augusta Mine Pike, IN contractor: Gibco Motor Express LLC | Apr 2009 | — | No | ModNegligence | $392 | $392 |
| 6681148 | Farmersburg Mine Vigo, IN contractor: Gibco Motor Express LLC | Dec 2008 | — | No | ModNegligence | $392 | $392 |
| 7595845 | Craney Mine Daviess, IN contractor: Gibco Motor Express LLC | May 2004 | — | Yes | ModNegligence | $383 | $383 |
| 7595878 | Discovery Gibson, IN contractor: Gibco Motor Express LLC | Sep 2004 | — | Yes | ModNegligence | $354 | $354 |
| 7566954 | Somerville Gibson, IN contractor: Gibco Motor Express LLC | Sep 2002 | — | Yes | ModNegligence | $347 | $347 |
| 8422043 | Freelandville Mine Knox, IN contractor: Gibco Motor Express LLC | Mar 2010 | — | No | ModNegligence | $334 | $334 |
| 6682513 | Augusta Mine Pike, IN contractor: Gibco Motor Express LLC | Dec 2008 | — | No | ModNegligence | $334 | $334 |
| 6682512 | Augusta Mine Pike, IN contractor: Gibco Motor Express LLC | Dec 2008 | — | No | ModNegligence | $334 | $334 |
| 6682511 | Augusta Mine Pike, IN contractor: Gibco Motor Express LLC | Dec 2008 | — | No | ModNegligence | $334 | $334 |
| 6682510 | Augusta Mine Pike, IN contractor: Gibco Motor Express LLC | Dec 2008 | — | No | ModNegligence | $334 | $334 |
| 6682509 | Augusta Mine Pike, IN contractor: Gibco Motor Express LLC | Dec 2008 | — | No | ModNegligence | $334 | $334 |
| 6682506 | Augusta Mine Pike, IN contractor: Gibco Motor Express LLC | Dec 2008 | — | No | ModNegligence | $334 | $334 |
| 8356016 | Chili Pepper Mine Warrick, IN contractor: Gibco Motor Express LLC | Apr 2009 | — | No | ModNegligence | $308 | $308 |
| 6666253 | Air Quality #1 Mine Knox, IN contractor: Gibco Motor Express LLC | Jan 2007 | — | Yes | ModNegligence | $305 | $305 |
| 6672392 | Freelandville Mine Knox, IN contractor: Gibco Motor Express LLC | Feb 2008 | — | No | ModNegligence | $293 | $293 |
| 7595597 | Augusta Mine Pike, IN contractor: Gibco Motor Express LLC | Jun 2004 | — | Yes | ModNegligence | $291 | $291 |
| 6666389 | Air Quality #1 Mine Knox, IN contractor: Gibco Motor Express LLC | Feb 2007 | — | Yes | HighNegligence | $268 | $268 |
| 6672394 | Freelandville Mine Knox, IN contractor: Gibco Motor Express LLC | Feb 2008 | — | No | ModNegligence | $263 | $263 |
| 6669285 | Air Quality #1 Mine Knox, IN contractor: Gibco Motor Express LLC | Jun 2007 | — | No | ModNegligence | $243 | $243 |
| 6669284 | Air Quality #1 Mine Knox, IN contractor: Gibco Motor Express LLC | Jun 2007 | — | No | ModNegligence | $243 | $243 |
| 7566935 | Discovery Gibson, IN contractor: Gibco Motor Express LLC | Aug 2002 | — | Yes | ModNegligence | $242 | $242 |
| 7566934 | Discovery Gibson, IN contractor: Gibco Motor Express LLC | Aug 2002 | — | Yes | ModNegligence | $242 | $242 |
| 7566812 | Discovery Gibson, IN contractor: Gibco Motor Express LLC | Aug 2002 | — | Yes | ModNegligence | $242 | $242 |
| 7486986 | Francisco Mine Gibson, IN contractor: Gibco Motor Express LLC | Feb 2006 | — | Yes | ModNegligence | $237 | $237 |
| 7485920 | Somerville East Pike, IN contractor: Gibco Motor Express LLC | Sep 2005 | — | No | ModNegligence | $237 | $237 |
| 7591713 | Francisco Mine Gibson, IN contractor: Gibco Motor Express LLC | Jan 2003 | — | Yes | ModNegligence | $231 | $231 |
| 7598372 | Somerville Gibson, IN contractor: Gibco Motor Express LLC | Sep 2005 | — | Yes | ModNegligence | $228 | $228 |
| 7597261 | Miller Creek Mine-Jenlin Pit Clay, IN contractor: Gibco Motor Express LLC | Feb 2005 | — | Yes | ModNegligence | $228 | $228 |
| 7595252 | Gibson Mine Gibson, IN contractor: Gibco Motor Express LLC | Sep 2004 | — | Yes | ModNegligence | $228 | $228 |
| 7592624 | Discovery Gibson, IN contractor: Gibco Motor Express LLC | Sep 2003 | — | Yes | ModNegligence | $214 | $214 |
| 8422044 | Freelandville Mine Knox, IN contractor: Gibco Motor Express LLC | Mar 2010 | — | No | ModNegligence | $207 | $207 |
| 8422042 | Freelandville Mine Knox, IN contractor: Gibco Motor Express LLC | Mar 2010 | — | No | ModNegligence | $207 | $207 |
| 7597580 | Francisco Mine Gibson, IN contractor: Gibco Motor Express LLC | Mar 2005 | — | Yes | ModNegligence | $207 | $207 |
| 6666255 | Air Quality #1 Mine Knox, IN contractor: Gibco Motor Express LLC | Jan 2007 | — | Yes | ModNegligence | $191 | $191 |
| 7494082 | Discovery Gibson, IN contractor: Gibco Motor Express LLC | Oct 2006 | — | Yes | ModNegligence | $191 | $191 |
| 7494028 | Air Quality #1 Mine Knox, IN contractor: Gibco Motor Express LLC | Sep 2006 | — | Yes | ModNegligence | $191 | $191 |
| 7494027 | Air Quality #1 Mine Knox, IN contractor: Gibco Motor Express LLC | Sep 2006 | — | Yes | ModNegligence | $191 | $191 |
| 7489183 | Air Quality #1 Mine Knox, IN contractor: Gibco Motor Express LLC | Sep 2006 | — | Yes | ModNegligence | $191 | $191 |
| 7597334 | Francisco Mine Gibson, IN contractor: Gibco Motor Express LLC | Mar 2005 | — | Yes | ModNegligence | $191 | $191 |
| 7563797 | Somerville Central Mine Gibson, IN contractor: Gibco Motor Express LLC | Mar 2000 | — | No | ModNegligence | $188 | $188 |
| 8498589 | Prosperity Mine Pike, IN contractor: Gibco Motor Express LLC | Aug 2010 | — | No | ModNegligence | $176 | $176 |
| 7486983 | Francisco Mine Gibson, IN contractor: Gibco Motor Express LLC | Feb 2006 | — | Yes | ModNegligence | $165 | $165 |
| 7595590 | Patoka River Pike, IN contractor: Gibco Motor Express LLC | May 2004 | — | Yes | ModNegligence | $165 | $165 |
| 7598170 | Farmersburg Mine Vigo, IN contractor: Gibco Motor Express LLC | Jun 2005 | — | No | ModNegligence | $164 | $164 |
| 7592811 | Farmersburg Mine Vigo, IN contractor: Gibco Motor Express LLC | Oct 2003 | — | Yes | ModNegligence | $164 | $164 |
| 7566967 | Craney Mine Daviess, IN contractor: Gibco Motor Express LLC | Oct 2002 | — | Yes | ModNegligence | $150 | $150 |
| 7566914 | Somerville Gibson, IN contractor: Gibco Motor Express LLC | Aug 2002 | — | Yes | ModNegligence | $150 | $150 |
| 7562382 | Viking Mine - Corning Pit Daviess, IN contractor: Gibco Motor Express LLC | Jan 2002 | — | Yes | ModNegligence | $150 | $150 |
| 7562367 | Miller Creek Mine-Jenlin Pit Clay, IN contractor: Gibco Motor Express LLC | Oct 2001 | — | Yes | ModNegligence | $150 | $150 |
| 7597336 | Viking Mine - Corning Pit Daviess, IN contractor: Gibco Motor Express LLC | Mar 2005 | — | Yes | ModNegligence | $144 | $144 |
| 7597583 | Francisco Mine Gibson, IN contractor: Gibco Motor Express LLC | Mar 2005 | — | Yes | ModNegligence | $144 | $144 |
| 7597332 | Francisco Mine Gibson, IN contractor: Gibco Motor Express LLC | Mar 2005 | — | Yes | ModNegligence | $144 | $144 |
| 7597717 | Francisco Mine Gibson, IN contractor: Gibco Motor Express LLC | Mar 2005 | — | Yes | ModNegligence | $144 | $144 |
| 7596199 | Little Sandy Daviess, IN contractor: Gibco Motor Express LLC | Sep 2004 | — | Yes | ModNegligence | $144 | $144 |
| 6672794 | Air Quality #1 Mine Knox, IN contractor: Gibco Motor Express LLC | Apr 2008 | — | No | ModNegligence | $142 | $142 |
| 6672187 | Flat Creek Pike, IN contractor: Gibco Motor Express LLC | Mar 2008 | — | No | ModNegligence | $142 | $142 |
| 9191166 | Craney Mine Daviess, IN contractor: Gibco Motor Express LLC | Sep 2019 | — | Yes | ModNegligence | $132 | $132 |
| 6672393 | Freelandville Mine Knox, IN contractor: Gibco Motor Express LLC | Feb 2008 | — | No | LowNegligence | $131 | $131 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for GIBCO MOTOR EXPRESS LLC. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for GIBCO MOTOR EXPRESS LLC. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for GIBCO MOTOR EXPRESS LLC. Verify directly with Environmental Protection Agency →
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2007-07-18 | Planned | 5 | 3 | $1,073 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in specialized freight (except used goods) trucking, local within IN, ordered by federal enforcement volume:
- ELMER BUCHTA TRUCKING LLCOTWELL — 2 federal enforcement records
- Austgen Equipment Inc.Griffith — 2 federal enforcement records
- D TransportIndianapolis — 1 federal enforcement record
- YOUNG BROTHERS TRUCKING INC.VALPARAISO — 1 federal enforcement record
- MELHORN SALES, SERVICE, & TRUCKING CO.WARSAW — 1 federal enforcement record
- KLINK TRUCKINGASHLEY — 1 federal enforcement record
- DAYS CORPORATION/DISTRIBUTION DIVISIONELKHART — 1 federal enforcement record
- DANIIL EGOVRUSHVILLE — 1 federal enforcement record
Related searches
- Specialized Freight (except Used Goods) Trucking, LocalAll employers in this industry
- Employers in INState-wide enforcement data
- Specialized Freight (except in INIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on GIBCO MOTOR EXPRESS LLC from every major federal compliance and enforcement source. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is GIBCO MOTOR EXPRESS LLC's OSHA violation history?
- GIBCO MOTOR EXPRESS LLC has 1 OSHA inspection on record with 5 violations and $1,072.5 in total penalties.
- How does GIBCO MOTOR EXPRESS LLC's safety record compare to its industry?
- GIBCO MOTOR EXPRESS LLC operates in the specialized freight (except used goods) trucking, local industry. The industry average Total Recordable Incident Rate (TRIR) is 2.1.