Establishment profile
FIBER MATERIALS, INC.
5 MORIN STREET, BIDDEFORD, ME, 04005
Operated by CIANBRO CORPORATION · 1 of 132 establishments
336419 — Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing
EIN 010206260
Summary
FIBER MATERIALS, INC. has accumulated 107 OSHA violations across 30 inspections over 51 years of recorded history, with $40,420 in total assessed penalties.
The most recent federal enforcement activity was recorded 6 years ago.
Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
FIBER MATERIALS, INC. appears in OSHA workplace safety, EPA environmental compliance, and FMCSA motor carrier registration records only. No matching records were found in WHD wage enforcement, MSHA mine safety, NLRB labor relations, OFLC visa and labor certification (historical), SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
50% of inspections at this establishment produced violations, with 10 inspections producing serious-or-greater violations.
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 20 distinct standards shown · 46 citations in this view · $31,650 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 1910.1000 E | 5 | 4 | — | Aug 1985 | Feb 2000 |
| 29 CFR 1910.0212 A01 | 4 | 4 | $3,035 | Dec 1974 | Dec 2008 |
| 29 CFR 1910.1000 A02 | 4 | 3 | $2,500 | Aug 1985 | Feb 2000 |
| 29 CFR 1910.0134 B08 | 4 | 3 | $800 | Jun 1986 | May 1989 |
| 5A0001 | 3 | 3 | $4,900 | Jul 1989 | Jan 2011 |
| 29 CFR 1910.1200 H | 3 | 3 | $2,125 | Sep 1987 | Oct 1992 |
| 29 CFR 1910.1200 G08 | 2 | 2 | $2,125 | Sep 1987 | Oct 1992 |
| 29 CFR 1910.0157 C01 | 2 | 1 | $1,100 | Dec 2008 | Dec 2008 |
| 29 CFR 1910.0134 A01 | 2 | 2 | $990 | Aug 1985 | Jun 1986 |
| 29 CFR 1910.0151 C | 2 | 2 | $400 | Oct 1985 | Jun 1986 |
| 29 CFR 1910.1200 E01 | 2 | 2 | $300 | Sep 1987 | May 1989 |
| 29 CFR 1910.0023 D01 IV | 2 | 2 | — | Dec 1974 | May 1989 |
| 29 CFR 1910.0134 B03 | 2 | 2 | — | May 1977 | May 1989 |
| 29 CFR 1910.0023 C01 | 2 | 2 | — | Aug 1985 | May 1989 |
| 29 CFR 1910.0134 B11 | 2 | 2 | — | May 1977 | Nov 1977 |
| 29 CFR 1910.0120 Q02 I | 1 | 1 | $3,500 | Oct 1992 | Oct 1992 |
| 29 CFR 1910.0120 Q03 II | 1 | 1 | $3,500 | Oct 1992 | Oct 1992 |
| 29 CFR 1910.0120 Q08 I | 1 | 1 | $2,125 | Oct 1992 | Oct 1992 |
| 29 CFR 1910.0120 Q06 | 1 | 1 | $2,125 | Oct 1992 | Oct 1992 |
| 29 CFR 1910.0120 Q09 I | 1 | 1 | $2,125 | Oct 1992 | Oct 1992 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for FIBER MATERIALS, INC.. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
Self-reported events under 29 CFR 1904.39 (24-hour notification of hospitalization, amputation, or loss of an eye) · Jan 2020
Most frequent event: Part of occupant s body caught between vehicle and other object in nonroadway transport incident
Source: OSHA Severe Injury Reports (federal OSHA only; state-plan states like California, Oregon, and Washington maintain their own programs and do not consistently report into this feed).
Severe injury reports — events
Each row is a hospitalization, amputation, or eye-loss event the employer self-reported to OSHA under 29 CFR 1904.39. Narratives are written by the reporting employer.
| Date | Event | Body part | Outcome | |
|---|---|---|---|---|
| Jan 6, 2020 | Part of occupant s body caught between vehicle and other object in nonroadway transport incident | Forearm(s) | Hospitalized |
Source: OSHA Severe Injury Reports. Federal-OSHA jurisdiction only by default; some state-plan programs report voluntarily.
OSHA accident events
Accidents, fatalities, and catastrophes documented during OSHA inspections at this employer. Each entry links to the inspection that recorded it.
| Date | Event | Injuries | Hospitalized | Fatalities | |
|---|---|---|---|---|---|
| Jan 6, 2020 | Arm,Backing Up,Caught Between,Contusion,Ind Trk Operator,Metal Bar,Numbness,Pallet Jack,Stair | 1 | 1 | — | |
| Jan 10, 1989 | BURN,FURNACE,ACCIDENTAL DISCHARGE,HIGH TEMPERATURE | 2 | 1 | — |
Source: OSHA accident investigations. Narratives are recorded by the inspecting officer and may be truncated.
Activity timeline
No federal enforcement activity has been recorded against this establishment in 6+ years. Most recent activity: 6 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for FIBER MATERIALS, INC.. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
No MSHA mine safety violations on file for FIBER MATERIALS, INC.. Verify directly with Mine Safety and Health Administration →
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for FIBER MATERIALS, INC.. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for FIBER MATERIALS, INC.. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
EPA Enforcement and Compliance History — Clean Air Act, Clean Water Act, RCRA, Safe Drinking Water Act. Status: No Violation Identified.
EPA-registered facilities
Every EPA ECHO facility associated with this employer, sorted most-significant first. Each row links to EPA’s Detailed Facility Report for the source-of-truth record. Permits column lists active programs (Air = Clean Air Act, Water = Clean Water Act, RCRA = hazardous waste, TRI = Toxics Release Inventory reporting). 1 facility · $18,571 in assessed penalties.
| Facility | Permits | Status | Inspections | Formal actions | Penalties | Last inspected | ECHO |
|---|---|---|---|---|---|---|---|
FIBER MATERIALS 5 MORIN ST · BIDDEFORD, ME, 04005 | AirWaterRCRATRI | No Violation Identified QNCR 2 | 1 | 1 | $18,571 | Mar 2023 | View → |
Source: EPA ECHO (Enforcement and Compliance History Online). Compliance status follows EPA’s own labels (“Sig Violation” = significant noncompliance; QNCR = quarters of noncompliance over the recent reporting window). Inactive facilities (struck through) retain historical enforcement records even after operations ceased.
Motor carrier safety (FMCSA)
Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for FIBER MATERIALS, INC.. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
Consolidated across all USAspending recipient entities under this corporate parent — not attributable to this single location.
- Department of DefenseCOMPOSITES FOR HYPERSONICS BY INTEGRATED COMPUTATIONAL MATERIALS ENGINEERINGcontract · Last action 2025-09-29$8,863,615
- Department of DefenseCHARACTERIZATION AND PERFORMANCE TESTING (CHAPT) OF HYPERSONIC THERMAL PROTECTION COMPOSITE MATERIAL SYSTEMScontract · Last action 2025-08-25$5,028,966
- National Aeronautics and Space AdministrationTHERMAL PROTECTIONS SYSTEMS (TPS) FOR SCIENCE MISSION DIRECTORATE (SMD) 3MDCP FLIGHT PRODUCTION UNITS (FPU1, FPU2, AND FPU3) (SOW19)contract · Last action 2025-12-22$4,072,941
- Department of DefenseSHAPE STABLE NOSE TIP PRODUCTION EXPANSION FEASIBILITY STUDYcontract · Last action 2025-07-29$3,742,866
- Department of DefenseADVANCED DEVELOPMENT OF 3D CARBON-CARBON MATERIALcontract · Last action 2014-08-12$3,387,155
- Department of DefenseADVANCED NOSETIP DEVELOPMENT FOR HYPERSONIC VECHICLEScontract · Last action 2011-11-30$2,806,472
- National Aeronautics and Space AdministrationTPS FOR SMD - DRAGONFLY 6-INCH PICA D BLANKScontract · Last action 2022-01-31$2,473,116
- National Aeronautics and Space AdministrationTHERMAL PROTECTION SYSTEMS (TPS) FOR SCIENCE MISSION DIRECTORATE (SMD) MISSIONS (CONTRACT NO. 80ARC021D0002) FABRICATION OF THE FLIGHT MANUFACTURING DEMONSTRATION UNIT #1 (F-MDU-1) (MSREEVTPS-GP0027)contract · Last action 2023-09-20$2,323,362
- National Aeronautics and Space AdministrationTHERMAL PROTECTION SYSTEMS (TPS) FOR SCIENCE MISSION DIRECTORATE (SMD) MISSIONS - FABRICATION OF 8" PICA-D BILLETS FOR DRAGONFLYcontract · Last action 2022-08-03$2,301,789
- National Aeronautics and Space AdministrationTHERMAL PROTECTION SYSTEMS (TPS) FOR SCIENCE MISSION DIRECTORATE (SMD): FABRICATION OF FIBERFORM AND PICA-D BILLETS FOR DRAGONFLYcontract · Last action 2023-09-21$1,661,514
- National Aeronautics and Space AdministrationMACHINING AND TESTING OF SINGLE PIECE 3MDCP SUB-SCALE DEVELOPMENT UNIT (S-DEV)contract · Last action 2022-05-06$1,503,641
- National Aeronautics and Space AdministrationTHERMAL PROTECTION SYSTEMS (TPS) FOR SCIENCE MISSION DIRECTORATE (SMD) MISSIONS SOW 14 PICA-D BILLETS FOR THE MARS SAMPLE RETURN LANDER (SRL)contract · Last action 2023-12-22$1,490,052
- National Aeronautics and Space AdministrationTHERMAL PROTECTION SYSTEMS (TPS) FOR SCIENCE MISSION DIRECTORATE (SMD) - 3-D MEDIUM DENSITY CARBON PHELONIC (3MDCP) DEVELOPMENT UNIT PHASE 1 TESTINGcontract · Last action 2022-05-31$1,057,500
- Department of DefenseSBIR PHASE II RESEARCH AND DEVELOPMENT.contract · Last action 2010-10-06$985,432
- National Aeronautics and Space AdministrationTPS FOR SMD 80ARC021D0002 FLIGHT TOOLING PROCUREMENT AND MANUFACTURING THROUGH INFUSION (SOW-11) DO 80ARC022F0089contract · Last action 2022-11-22$865,670
- National Aeronautics and Space AdministrationTHERMAL PROTECTION SYSTEMS (TPS) FOR SCIENCE MISSION DIRECTORATE (SMD) MISSIONS: MSREEVTPS-GP0025 (SOW-12) FLIGHT TOOLING PROCUREMENT AND MANUFACTURING FROM INFUSION THROUGH COMPLETIONcontract · Last action 2022-11-15$764,858
- National Aeronautics and Space AdministrationTHERMAL PROTECTION SYSTEMS (TPS) FOR SCIENCE MISSION DIRECTORATE (SMD) - 3MDCP FLIGHT MATERIAL PROPERTY (SOW-18)contract · Last action 2024-11-18$761,309
- National Aeronautics and Space AdministrationIGF::OT::IGF SBIR PHASE III CONTRACT FOR POST-WEAVING MANUFACTURING SUPPORT FOR HEATSHIELD FOR EXTREME ENTRY ENVIRONMENT TECHNOLOGY (HEEET) PROJECT, IDIQ PER INDIVIDUAL TASK ORDERScontract · Last action 2017-07-13$668,471
- National Aeronautics and Space AdministrationFABRICATION OF SINGLE PIECE 3MDCP DEVELOPMENT UNIT, FLAT PANELS AND MANUFACTURING DEVELOPMENT UNIT (MDU) FROM GFE SURROGATE WEAVEcontract · Last action 2021-07-21$602,499
- National Aeronautics and Space AdministrationTHIS PROPOSED PHASE II PROGRAM BUILDS ON THE PHASE I EFFORT ADDRESSING FUTURE MISSION REQUIREMENTS BY: 1) DEVELOPING HIGHER PERFORMING TPS MATERIALS CAPABLE OF MEETING THE DEMANDS OF MULTIPLE SEVERE MISSION TRAJECTORIES; AND 2) INTEGRATING TPS MATERIALS WITH THE SUB-STRUCTURE TO IMPROVE OVERALL ROBUSTNESS AND DECREASE MASS. THE PROGRAM'S GOAL IS TO EXTEND PHENOLIC IMPREGNATED CARBON ABLATOR (PICA) AND INTEGRATED COMPOSITE STRUCTURE (ICS) TPS MATERIALS TO A BROADER RANGE OF FLIGHT HEAT FLUXES AND MISSION PERFORMANCE REQUIREMENTS TO ADDRESS FUTURE HEATSHIELD DESIGN NEEDS. SPECIFIC MISSION ENABLING IMPROVEMENTS SOUGHT THAT WILL BE DEVELOPED AND/OR DEMONSTRATED UNDER THIS PHASE II PROGRAM INCLUDE: PREFORM/COMPONENT SIZE, ABLATION PERFORMANCE, THERMAL INSULATION PERFORMANCE, EFFICIENT AND EXTENDABLE ASSEMBLY PROCESS, AND NET-SHAPE PREFORM CASTING.contract · Last action 2013-11-05$599,904
- National Aeronautics and Space AdministrationDURING THIS PROGRAM, WE WILL DEVELOP PRACTICAL METHODS FOR PREPARING PHENOLIC IMPREGNATED CARBON ABLATOR (PICA) MATERIALS FOR JOINING THERMAL PROTECTION SYSTEM SEGMENTS AND PENETRATIONS OF THE HEAT SHIELD ASSEMBLY. CURRENT AND FUTURE MISSION FLIGHT ENVIRONMENTS AND DESIGNS, SUCH AS THOSE FOR MARS SCIENCE LABORATORY AEROSHELL (MSLA) AND ANTICIPATED FOR NEW FRONTIERS AND MARS EDL MISSIONS, WILL BE ASSESSED. CAPABILITY OF THE DEVELOPED SOLUTION(S) WILL ADDRESS MECHANICAL AND THERMAL ROBUSTNESS, AND PERFORMANCE UNDER REPRESENTATIVE MISSION HEATING ENVIRONMENT. THE PHASE 1 PROGRAM EVALUATED CANDIDATE JOINING AND GAP-FILL MATERIALS, AND ASSESSED JOINING DESIGN APPROACHES FOR COST EFFECTIVE MANUFACTURABILITY AND ASSEMBLY. MATERIAL JOINING DESIGN, ASSEMBLY METHODOLOGY AND MATERIAL TEST PERFORMANCE WAS DOCUMENTED. THE PHASE 2 PROGRAM WILL UTILIZE MATERIALS DEVELOPED DURING THE PHASE 1 PROGRAM TO TEST PERFORMANCE UNDER REPRESENTATIVE ENVIRONMENT(S). A DOWN-SELECTED MATERIAL-JOINING APPROACH WILL RESULT IN THE DESIGN AND FABRICATION OF A MISSION-SPECIFIC PICA SUB-ASSEMBLY. THE PROTOTYPE SUB-ASSEMBLY WILL DEMONSTRATE ASSEMBLY METHODS AND THE PROTOTYPE MATERIALS WILL BE UTILIZED FOR CHARACTERIZATION AND PERFORMANCE TESTING. THE PROPOSED MATERIALS, DESIGNS AND METHODS ARE TRL<=3. IT IS ANTICIPATED THAT TRL=>6 WILL BE ACHIEVED AT THE CONCLUSION OF A SUCCESSFUL PHASE 2 PROGRAM.contract · Last action 2013-07-24$576,527
- National Aeronautics and Space AdministrationSINGLE PIECE 3D MEDIUM DENSITY CARBON PHENOLIC (3MDCP) FLIGHT SCALE EARTH ENTRY SYSTEM (EES) FOREBODY HEATSHIELD: TOOLING DESIGN, PROCESS/PROCEDURE DOCUMENTATION DEVELOPMENT AND LONG LEAD PROCUREMENT ITEMScontract · Last action 2022-05-10$525,606
- National Aeronautics and Space AdministrationFLIGHT THERMAL PROTECTION SYSTEMS (TPS) FOR SMD MISSIONScontract · Last action 2022-07-21$442,414
- Department of DefenseADVANCED DEVLELOPMENT OF 3D CARBON-CARBON NOSE TIP MATERIALcontract · Last action 2012-12-05$432,290
- National Aeronautics and Space AdministrationTHERMAL PROTECTION SYSTEMS (TPS) FOR SCIENCE MISSION DIRECTORATE (SMD)contract · Last action 2023-06-27$404,959
- Department of DefenseS2 FIBERGLASS ROVING 463-AA-250 FOR THE MARINE ABV PROGRAM.contract · Last action 2012-07-02$365,725
- National Aeronautics and Space AdministrationMARS SAMPLE RETURN EARTH ENTRY VEHICLE (MSR EEV) - FABRICATION OF FORMING AND RESIN INFUSION TOOLING TO SUPPORT MANUFACTURING OF THE SINGLE PIECE 3MDCP DEVELOPMENT UNITcontract · Last action 2021-04-26$298,781
- Department of DefenseSBIR PHASE II RESEARCH AND DEVELOPMENTcontract · Last action 2010-06-24$285,000
- National Aeronautics and Space AdministrationPICA MATERIAL PROPERTY TESTINGcontract · Last action 2009-04-07$279,873
- National Aeronautics and Space AdministrationTHERMAL PROTECTION SYSTEMS (TPS) FOR SCIENCE MISSION DIRECTORATE (SMD) - SOW23 - FMDU1 SPECIMEN BLANKINGcontract · Last action 2025-12-22$252,331
- National Aeronautics and Space AdministrationPICA SUSTAINABILITY - TASK 20B - DUST COLLECTOR AND VARCUM VACUUM SYSTEM.contract · Last action 2020-04-30$230,356
- National Aeronautics and Space AdministrationPICA TASK 20A - NASH PUMP AND CASTING CONTROLScontract · Last action 2020-04-30$224,902
- National Aeronautics and Space AdministrationPICA TASK 19A - DOUGLAS VESSEL MOVEcontract · Last action 2020-04-30$220,496
- National Aeronautics and Space AdministrationTHERMAL PROTECTION SYSTEM (TPS) FOR SCIENCE MISSION DIRECTORATE (SMD)- SOW 27 CPICA-D MANUFACTURING.contract · Last action 2026-01-26$219,044
- National Aeronautics and Space AdministrationPICA - TASK 16B - PREPARE AND SHUT DOWN FIBERFORM AND PICA PRODUCTION EQUIPMENTcontract · Last action 2019-11-14$211,934
- National Aeronautics and Space AdministrationPICA - TASK 17A - PERFORM ELECTRICAL UPGRADEScontract · Last action 2019-11-14$211,600
- National Aeronautics and Space AdministrationTPS FOR SMD - FLIGHT WEAVE TRIAL FORMING DEMONSTRATION AND PROPERTY TESTING (SOW-13)contract · Last action 2022-08-17$200,064
- National Aeronautics and Space AdministrationDESIGN AND FABRICATION OF INFUSION VESSEL RACK TO SUPPORT ADDITIONAL TRAY, DESIGN AND FABRICATION OF FLAT WEAVE INFUSION TOOLING, AND X-RAY SYSTEM FOR INSPECTION OF 3MDCP WEAVE AND FINAL COMPONENTScontract · Last action 2022-01-14$199,276
- National Aeronautics and Space AdministrationFABRICATION OF AT LEAST 22 FIBERFORM BILLETS AND PICA INFUSION OF FF BILLETS. REPORT SUMMARIZING RESULTS OF LAT. CALL ORDER 21F.contract · Last action 2021-02-19$193,942
- National Aeronautics and Space AdministrationPICA TASK 22 - DRAGONFLY TPS FABRICATION PROGRAM MANAGEMENT SUPPORT, PURCHASE OF LYOCELL, AND STORAGE LYOCELL.contract · Last action 2020-10-23$186,505
- Department of Defense6,500 YARDS OF S2 FIBERGLASS ROVING 463-AA-250 FOR THE ARMY ABV PROGRAM.contract · Last action 2012-07-16$177,832
- National Aeronautics and Space AdministrationPICA TASK 17B COMPLETION OF ELECTRICAL UPGRADES PART 1contract · Last action 2020-01-14$176,716
- National Aeronautics and Space AdministrationFABRICATION OF AT LEAST 22 FIBERFORM BILLETS AND PICA INFUSION OF FF BILLETS. REPORT SUMMARIZING RESULTS OF LAT. CALL ORDER 21G.contract · Last action 2021-02-19$174,375
- National Aeronautics and Space AdministrationIGF::OT::IGF SBIR PHASE III CONTRACT FOR POST-WEAVING MANUFACTURING SUPPORT FOR HEATSHIELD FOR EXTREME ENTRY ENVIRONMNET TECHNOLOGY (HEEEET) PROJECT.contract · Last action 2015-10-26$170,216
- National Aeronautics and Space AdministrationPICA TASK 19B - DRYING OVENS AND MACHINING EQUIPMENTcontract · Last action 2020-04-30$169,015
- National Aeronautics and Space AdministrationIGF::OT::IGF SBIR PHASE III CONTRACT FOR POST-WEAVING MANUFACTURING SUPPORT FOR HEATSHIELD FOR EXTREME ENTRY ENVIRONMENT TECHNOLOGY (HEEET) PROJECT, IDIQ PER INDIVIDUAL TASK ORDERcontract · Last action 2017-04-20$166,975
- National Aeronautics and Space AdministrationPICA - TASK 18B - SUMMARY OF PICA INFUSION UPGRADES AND MODIFICATIONS TO EQUIPMENT.contract · Last action 2019-11-14$163,423
- Department of DefenseDO 0008 FOR S2 FIBERGLASS ROVING 463-AA-250 FOR ARMY AND MARINE ABV.contract · Last action 2011-10-04$162,719
- National Aeronautics and Space AdministrationPICA - TASK 18D - SUMMARY OF PICA INFUSION UPGRADES AND MODIFICATIONS TO EQUIPMENT.contract · Last action 2019-11-14$157,232
- National Aeronautics and Space AdministrationIGF::OT::IGF CALL UNDER BPA NNA16BE83Z, FOR CASTING EQUIPMENT AND TOOLING DESIGN AND FABRICATION, FIBER PROCESSINGcontract · Last action 2018-09-21$155,972
Federal contract dollars to this establishment. Primary NAICS: 541715 - RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT NANOTECHNOLOGY AND BIOTECHNOLOGY). Last action: 2026-01-26. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2020-01-09 | Referral | 0 | — | $0 | |
| 2011-12-19 | Planned | 0 | — | $0 | |
| 2010-09-14 | Complaint | 1 | 1 | $1,600 | |
| 2008-12-10 | Planned | 8 | 6 | $5,775 | |
| 1999-12-28 | Planned | 6 | 5 | $7,250 | |
| 1997-10-20 | Planned | 0 | — | $0 | |
| 1997-06-26 | Planned | 0 | — | $0 | |
| 1997-04-09 | Planned | 0 | — | $0 | |
| 1997-02-07 | Complaint | 0 | — | $0 | |
| 1995-02-09 | Planned | 0 | — | $0 | |
| 1992-07-28 | Referral | 13 | 13 | $20,125 | |
| 1990-05-09 | Complaint | 0 | — | $0 | |
| 1990-01-05 | Complaint | 0 | — | $0 | |
| 1989-01-10 | Referral | 1 | 1 | $800 | |
| 1988-11-16 | Complaint | 13 | 8 | $1,200 | |
| 1988-04-28 | Complaint | 1 | 1 | $200 | |
| 1987-09-30 | Referral | 0 | — | $0 | |
| 1987-04-16 | Follow-up | 18 | 5 | $1,060 | |
| 1986-05-13 | Complaint | 0 | — | $0 | |
| 1986-03-20 | Complaint | 11 | 1 | $1,250 | |
| 1985-09-03 | Complaint | 0 | — | $0 | |
| 1985-08-27 | Complaint | 1 | — | $0 | |
| 1985-02-28 | Complaint | 12 | 9 | $1,100 | |
| 1981-06-02 | Complaint | 0 | — | $0 | |
| 1978-07-06 | Accident | 0 | — | $0 | |
| 1978-05-18 | Complaint | 0 | — | $0 | |
| 1977-10-21 | Complaint | 9 | — | $0 | |
| 1977-10-21 | Complaint | 1 | — | $0 | |
| 1977-04-26 | Complaint | 5 | — | $0 | |
| 1974-12-03 | Planned | 7 | — | $60 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Part of a larger organization
FIBER MATERIALS, INC. is one of 132 establishments rolled up under the parent organization CIANBRO CORPORATION.
Federal enforcement records on this page represent activity at this specific establishment only. The full enforcement footprint of CIANBRO CORPORATION across all 132 of its tracked locations is viewable on the parent profile.
Other locations under this parent
Other establishments operated by CIANBRO CORPORATION, ordered by federal enforcement volume:
- CIANBRO CORPPittsfield, ME — 4 federal enforcement records
- CIANBRO CORP.YORK, ME — 3 federal enforcement records
- CIANBRO CORPORATIONBREWER, ME — 3 federal enforcement records
- CIANBRO CORP.BATH, ME — 3 federal enforcement records
- CIANBRO CORPORATIONCALAIS, ME — 3 federal enforcement records
- CIANBRO CORPORATIONHOWLAND, ME — 3 federal enforcement records
- CIANBRO CORP.PORTLAND, ME — 3 federal enforcement records
- CIANBRO CORPORATIONHERMON, ME — 3 federal enforcement records
- CIANBRO CORP.BRIDGTON, ME — 3 federal enforcement records
- CIANBRO CORPORATIONKITTERY, ME — 3 federal enforcement records
Related searches
- All CIANBRO CORPORATION locationsParent rollup
- Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment ManufacturingAll employers in this industry
- Employers in MEState-wide enforcement data
- Other Guided Missile in MEIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on FIBER MATERIALS, INC. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code. This establishment resolves to the parent rollup CIANBRO CORPORATION, which operates 132 establishments in our dataset.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is FIBER MATERIALS, INC.'s OSHA violation history?
- FIBER MATERIALS, INC. has 30 OSHA inspections on record with 107 violations and $40,420 in total penalties.
- How does FIBER MATERIALS, INC.'s safety record compare to its industry?
- FIBER MATERIALS, INC. operates in the other guided missile and space vehicle parts and auxiliary equipment manufacturing industry. The industry average Total Recordable Incident Rate (TRIR) is 1.3.