Skip to main content

MUNICIPAL LIGHT AND POWER PLANT #2 is a hydroelectric power generation employer in ANCHORAGE, AK. Federal records show 2 OSHA inspections with 23 violations and $6,827 in penalties. All data sourced from public federal enforcement records.

Data sourced from OSHA, DOL WHD, MSHA, EPA ECHO, NLRB, FMCSA, OFLC, BLS, SAM.gov, CMS, USAspending, CPSC, NHTSA, and the UVA Corporate Prosecution Registry. Last updated: May 2, 2026.

MUNICIPAL LIGHT AND POWER PLANT #2

8700 STARVIEW DR, ANCHORAGE, AK, 99504

221111 Top companies in Hydroelectric Power Generation

Federal Enforcement
2
OSHA inspections
23 violations
$6,827 in penalties

Industry Benchmark

Industry Avg TRIR
1.7
Industry Avg DART
1.1
Industry rates from BLS SOII 2024. Self-reported rates from OSHA ITA.
OSHA Inspections
2
OSHA Violations
23
Total Penalties
$6,827
Trend
STABLE
WHD Cases
0
Back Wages Owed
$0
Confidence
MEDIUM
SVEP Flag
No

Data Insights

History Span
11 years
Last Activity
8yr ago
Inspection Rate
0.2/yr
Violation Rate
2.1/yr
Violation Severity Mix
70% serious$297 avg per violation$3,414 avg per inspection
Active Agencies:
OSHA$6,827 total across all agencies

Inspection Breakdown

Complaint
2
Complaint and accident-triggered inspections are stronger risk signals than routine planned inspections.
Violation rate: 100% of inspections

Peer Comparison

96%
Worse than most peers
vs 52 employers in same industry & state
Fewer violationsMore violations
Penalty Percentile
82%
Inspection Frequency Percentile
49%

Need API access, CSV upload, or PDF reports? Upgrade to Paid for $79/mo.

Inspection History

No inspection records found.

Loading news...

The FastDOL Report

Weekly workplace compliance news. Free.

Data aggregated from public federal enforcement and program records (OSHA, WHD, MSHA, EPA, NLRB, FMCSA, OFLC, BLS, SAM.gov, CMS, USAspending, CPSC, NHTSA) plus the UVA Corporate Prosecution Registry. Employer profiles matched by name and location — matching errors may occur. Risk scores computed by FastDOL, not official government assessments. OSHA citations typically appear 3-8 months after the inspection, so very recent enforcement actions may not yet be reflected. Data provided as-is. Report a data error.

Other employers in Hydroelectric Power Generation within AK

Industry context

Within the hydroelectric power generation industry in AK, MUNICIPAL LIGHT AND POWER PLANT #2 ranks in the 96th percentile of OSHA violation frequency across 52 comparable establishments. That places this employer among the highest-violation establishments in its peer set.

OSHA penalty totals rank in the 82th percentile of the same peer group. Inspection frequency ranks in the 49th percentile.

The Bureau of Labor Statistics reports an industry-average Total Recordable Incident Rate (TRIR) of 1.7 for the hydroelectric power generation sector, with a Days Away, Restricted, or Transferred (DART) rate of 1.1.

Activity timeline

No federal enforcement activity has been recorded against this establishment in the past 8 years.

Frequently Asked Questions

What is MUNICIPAL LIGHT AND POWER PLANT #2's OSHA violation history?
MUNICIPAL LIGHT AND POWER PLANT #2 has 2 OSHA inspections on record with 23 violations and $6,827 in total penalties.
How does MUNICIPAL LIGHT AND POWER PLANT #2's safety record compare to its industry?
MUNICIPAL LIGHT AND POWER PLANT #2 operates in the hydroelectric power generation industry. The industry average Total Recordable Incident Rate (TRIR) is 1.7.

About this data

This profile aggregates federal enforcement records on MUNICIPAL LIGHT AND POWER PLANT #2 of ANCHORAGE, AK from 17 federal data sources. Records were found in 2 sources: OSHA workplace safety inspections, and BLS industry safety benchmarks. The remaining 15 sources were checked and found no matching records: WHD, MSHA, EPA, NLRB, OFLC, OFCCP, FMCSA, USAspending, SAM.gov, CMS, CPSC, NHTSA, UVA, SEC enforcement, SEC facts.

Establishments are matched across agencies using normalized employer name, state, and ZIP code. The dataset was last refreshed on May 2, 2026.

This profile may be incomplete if MUNICIPAL LIGHT AND POWER PLANT #2operates under multiple legal names, files under variations our entity-matching rules don't yet cover, or maintains records below current matching thresholds. To report a missing record or correction, email corrections@fastdol.com.