Establishment profile
EVANS CONSTRUCTION COMPANY
1250 EAST AIRPORT ROAD, JACKSON, WY, 83001
238910 — Site Preparation Contractors
Summary
EVANS CONSTRUCTION COMPANY has accumulated 9 OSHA violations across 9 inspections over 40 years of recorded history, with $1,280 in total assessed penalties.
The establishment sits in the 92nd percentile for violations within its industry-state peer group of 306 employers. Inspection frequency runs at the 100th percentile. The most recent enforcement activity was recorded 3 years ago.
Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
EVANS CONSTRUCTION COMPANY appears in OSHA workplace safety, MSHA mine safety, EPA environmental compliance, and FMCSA motor carrier registration records only. No matching records were found in WHD wage enforcement, NLRB labor relations, OFLC visa and labor certification (historical), SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
44% of inspections at this establishment produced violations, with 2 inspections producing serious-or-greater violations.
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 9 distinct standards shown · 9 citations in this view · $1,280 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 1926.0652 G01 III | 1 | 1 | $601 | May 2004 | May 2004 |
| GN190003 B01 | 1 | 1 | $288 | Jul 1993 | Jul 1993 |
| GN160002 A01 | 1 | 1 | $287 | Jul 1993 | Jul 1993 |
| 29 CFR 1926.0651 E | 1 | 1 | $104 | May 2004 | May 2004 |
| 29 CFR 1904.0040 A | 1 | 1 | — | Aug 2023 | Aug 2023 |
| GN120002 C04 | 1 | 1 | — | Jul 1993 | Jul 1993 |
| GN090003 A02 | 1 | 1 | — | Jul 1993 | Jul 1993 |
| GN210006 E | 1 | 1 | — | Jul 1993 | Jul 1993 |
| PP060003 C | 1 | 1 | — | Sep 1985 | Sep 1985 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Worse on violations than most other employers in NAICS 2389 within WY. Peer group: 306 employers. This establishment has 9 OSHA violations; peer median is 2.
Safety self-report (OSHA 300A)
Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.
Reported for 57 average annual employees at this establishment.
Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for EVANS CONSTRUCTION COMPANY. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 3+ years. Most recent activity: 3 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for EVANS CONSTRUCTION COMPANY. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in WY — for EVANS CONSTRUCTION COMPANY, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other EVANS CONSTRUCTION COMPANY operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 85 citations · 17S&S · $26,253 proposed / $18,845 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 9655777 | Evans No 1 Pit Teton, WY | Dec 2021 | — | No | ModNegligence | $3,022 | $378 |
| 9655775 | Evans No 1 Pit Teton, WY | Dec 2021 | — | No | ModNegligence | $3,022 | $378 |
| 9475209 | Evans No 1 Pit Teton, WY | Feb 2020 | — | No | HighNegligence | $2,595 | $1,200 |
| 6302181 | Evans No 1 Pit Teton, WY | Jul 2004 | — | Yes | ModNegligence | $1,096 | $1,096 |
| 5100244 | Evans No 1 Pit Teton, WY | Jul 2025 | — | Yes | ModNegligence | $1,037 | $1,037 |
| 5100241 | Evans No 1 Pit Teton, WY | Jul 2025 | — | Yes | ModNegligence | $1,037 | $1,037 |
| 9657072 | Evans No 1 Pit Teton, WY | May 2022 | — | Yes | ModNegligence | $840 | $840 |
| 9475211 | Evans No 1 Pit Teton, WY | Feb 2020 | — | Yes | ModNegligence | $782 | $782 |
| 9722434 | Evans Wash Plant Teton, WY | Aug 2022 | — | Yes | ModNegligence | $774 | $774 |
| 9650658 | Evans Wash Plant Teton, WY | Jul 2021 | — | Yes | ModNegligence | $729 | $729 |
| 9650656 | Evans Wash Plant Teton, WY | Jul 2021 | — | Yes | ModNegligence | $729 | $729 |
| 9655774 | Evans No 1 Pit Teton, WY | Dec 2021 | — | No | ModNegligence | $716 | $133 |
| 9303272 | Evans No 1 Pit Teton, WY | Mar 2017 | — | Yes | ModNegligence | $677 | $677 |
| 9657070 | Evans No 1 Pit Teton, WY | May 2022 | — | Yes | ModNegligence | $378 | $378 |
| 9772332 | Evans Wash Plant Teton, WY | Sep 2024 | — | No | ModNegligence | $289 | $147 |
| 6305732 | Evans No 1 Pit Teton, WY | Aug 2007 | — | Yes | ModNegligence | $285 | $285 |
| 7913780 | Evans No 1 Pit Teton, WY | Apr 2002 | — | Yes | ModNegligence | $242 | $242 |
| 7913777 | Evans No 1 Pit Teton, WY | Apr 2002 | — | Yes | ModNegligence | $242 | $242 |
| 7913774 | Evans No 1 Pit Teton, WY | Apr 2002 | — | Yes | ModNegligence | $242 | $242 |
| 9269938 | Evans No 1 Pit Teton, WY | Sep 2021 | — | Yes | ModNegligence | $237 | $237 |
| 5100243 | Evans No 1 Pit Teton, WY | Jul 2025 | — | No | ModNegligence | $209 | $209 |
| 6302427 | Evans No 1 Pit Teton, WY | Jun 2005 | — | Yes | ModNegligence | $203 | $203 |
| 9722006 | Evans No 1 Pit Teton, WY | Mar 2024 | — | No | ModNegligence | $189 | $189 |
| 9722005 | Evans No 1 Pit Teton, WY | Mar 2024 | — | No | ModNegligence | $189 | $189 |
| 9657073 | Evans No 1 Pit Teton, WY | May 2022 | — | No | ModNegligence | $169 | $169 |
| 9722621 | Evans Wash Plant Teton, WY | Jun 2023 | — | No | ModNegligence | $167 | $167 |
| 6302358 | Evans No 1 Pit Teton, WY | Nov 2004 | — | Yes | ModNegligence | $165 | $165 |
| 9475210 | Evans No 1 Pit Teton, WY | Feb 2020 | — | No | ModNegligence | $157 | $157 |
| 9722435 | Evans Wash Plant Teton, WY | Aug 2022 | — | No | ModNegligence | $155 | $155 |
| 9657074 | Evans Wash Plant Teton, WY | May 2022 | — | No | ModNegligence | $155 | $155 |
| 9397014 | Evans No 1 Pit Teton, WY | Jul 2019 | — | No | ModNegligence | $154 | $154 |
| 9348471 | Evans No 1 Pit Teton, WY | Feb 2019 | — | No | ModNegligence | $154 | $154 |
| 5051646 | Evans Wash Plant Teton, WY | Apr 2026 | — | No | ModNegligence | $151 | $151 |
| 9905263 | Evans No 1 Pit Teton, WY | Mar 2026 | — | No | ModNegligence | $151 | $151 |
| 5051560 | Evans Wash Plant Teton, WY | Sep 2025 | — | No | ModNegligence | $151 | $151 |
| 5051559 | Evans Wash Plant Teton, WY | Sep 2025 | — | No | ModNegligence | $151 | $151 |
| 5100245 | Evans No 1 Pit Teton, WY | Jul 2025 | — | No | ModNegligence | $151 | $151 |
| 5100242 | Evans No 1 Pit Teton, WY | Jul 2025 | — | No | ModNegligence | $151 | $151 |
| 9722620 | Evans Wash Plant Teton, WY | Jun 2023 | — | No | ModNegligence | $143 | $143 |
| 9722619 | Evans Wash Plant Teton, WY | Jun 2023 | — | No | ModNegligence | $143 | $143 |
| 9725609 | Evans Wash Plant Teton, WY | Nov 2022 | — | No | ModNegligence | $143 | $143 |
| 9269939 | Evans No 1 Pit Teton, WY | Sep 2021 | — | No | ModNegligence | $139 | $139 |
| 9650776 | Small Crusher #1330 Teton, WY | Sep 2021 | — | No | ModNegligence | $136 | $136 |
| 9269927 | Small Crusher #1330 Teton, WY | Aug 2021 | — | No | HighNegligence | $136 | $136 |
| 9657071 | Evans No 1 Pit Teton, WY | May 2022 | — | No | ModNegligence | $133 | $133 |
| 9655776 | Evans No 1 Pit Teton, WY | Dec 2021 | — | No | LowNegligence | $133 | $133 |
| 9650775 | Evans Wash Plant Teton, WY | Sep 2021 | — | No | ModNegligence | $125 | $125 |
| 9269926 | Small Crusher #1330 Teton, WY | Aug 2021 | — | No | LowNegligence | $125 | $125 |
| 9650659 | Evans Wash Plant Teton, WY | Jul 2021 | — | No | HighNegligence | $125 | $125 |
| 9650657 | Evans Wash Plant Teton, WY | Jul 2021 | — | No | ModNegligence | $125 | $125 |
| 9349468 | Evans Wash Plant Teton, WY | Apr 2020 | — | No | LowNegligence | $123 | $123 |
| 9475213 | Evans No 1 Pit Teton, WY | Feb 2020 | — | No | ModNegligence | $123 | $123 |
| 9475212 | Evans No 1 Pit Teton, WY | Feb 2020 | — | No | LowNegligence | $123 | $123 |
| 9397016 | Evans Wash Plant Teton, WY | Aug 2019 | — | No | ModNegligence | $121 | $121 |
| 9307527 | Evans Wash Plant Teton, WY | Sep 2018 | — | No | ModNegligence | $118 | $118 |
| 9307526 | Evans Wash Plant Teton, WY | Sep 2018 | — | No | ModNegligence | $118 | $118 |
| 9307525 | Evans No 1 Pit Teton, WY | Sep 2018 | — | No | LowNegligence | $118 | $118 |
| 8826144 | Evans Wash Plant Teton, WY | Oct 2015 | — | No | ModNegligence | $100 | $100 |
| 8586101 | Evans No 1 Pit Teton, WY | Mar 2013 | — | No | ModNegligence | $100 | $100 |
| 6456477 | Evans No 1 Pit Teton, WY | Jan 2012 | — | No | LowNegligence | $100 | $100 |
| 6455860 | Evans Wash Plant Teton, WY | Jun 2011 | — | No | ModNegligence | $100 | $100 |
| 6455489 | Evans Wash Plant Teton, WY | Jul 2010 | — | No | ModNegligence | $100 | $100 |
| 6419925 | Evans No 1 Pit Teton, WY | Jun 2009 | — | No | LowNegligence | $100 | $100 |
| 6303767 | Evans Wash Plant Teton, WY | May 2008 | — | No | LowNegligence | $100 | $100 |
| 6304217 | Evans No 1 Pit Teton, WY | Feb 2007 | — | No | ModNegligence | $60 | $60 |
| 6305168 | Evans Wash Plant Teton, WY | Oct 2006 | — | No | LowNegligence | $60 | $60 |
| 6305167 | Evans Wash Plant Teton, WY | Oct 2006 | — | No | ModNegligence | $60 | $60 |
| 6305166 | Evans Wash Plant Teton, WY | Oct 2006 | — | No | ModNegligence | $60 | $60 |
| 6305165 | Evans Wash Plant Teton, WY | Oct 2006 | — | No | ModNegligence | $60 | $60 |
| 6304171 | Evans No 1 Pit Teton, WY | Jan 2006 | — | No | ModNegligence | $60 | $60 |
| 6304170 | Evans No 1 Pit Teton, WY | Jan 2006 | — | No | ModNegligence | $60 | $60 |
| 6304152 | Evans No 1 Pit Teton, WY | Jan 2006 | — | No | ModNegligence | $60 | $60 |
| 6304151 | Evans No 1 Pit Teton, WY | Jan 2006 | — | No | ModNegligence | $60 | $60 |
| 6302425 | Evans No 1 Pit Teton, WY | Jun 2005 | — | No | ModNegligence | $60 | $60 |
| 6302359 | Evans No 1 Pit Teton, WY | Nov 2004 | — | No | LowNegligence | $60 | $60 |
| 6302180 | Evans No 1 Pit Teton, WY | Jul 2004 | — | No | ModNegligence | $60 | $60 |
| 7913782 | Evans No 1 Pit Teton, WY | Apr 2002 | — | No | LowNegligence | $55 | $55 |
| 7913781 | Evans No 1 Pit Teton, WY | Apr 2002 | — | No | ModNegligence | $55 | $55 |
| 7913779 | Evans No 1 Pit Teton, WY | Apr 2002 | — | No | ModNegligence | $55 | $55 |
| 7913778 | Evans No 1 Pit Teton, WY | Apr 2002 | — | No | ModNegligence | $55 | $55 |
| 7913776 | Evans No 1 Pit Teton, WY | Apr 2002 | — | No | ModNegligence | $55 | $55 |
| 7913775 | Evans No 1 Pit Teton, WY | Apr 2002 | — | No | ModNegligence | $55 | $55 |
| 7913626 | Evans Wash Plant Teton, WY | Jul 2001 | — | No | ModNegligence | $55 | $55 |
| 4338481 | Evans No 1 Pit Teton, WY | Jul 2000 | — | No | ModNegligence | $55 | $55 |
| 5051678 | Evans No 1 Pit Teton, WY | Jun 2026 | — | No | ModNegligence | — | — |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for EVANS CONSTRUCTION COMPANY. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for EVANS CONSTRUCTION COMPANY. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
EPA Enforcement and Compliance History — Clean Air Act, Clean Water Act, RCRA, Safe Drinking Water Act. Status: No Violation Identified.
EPA-registered facilities
Every EPA ECHO facility associated with this employer, sorted most-significant first. Each row links to EPA’s Detailed Facility Report for the source-of-truth record. Permits column lists active programs (Air = Clean Air Act, Water = Clean Water Act, RCRA = hazardous waste, TRI = Toxics Release Inventory reporting). 2 facilities.
| Facility | Permits | Status | Inspections | Formal actions | Penalties | Last inspected | ECHO |
|---|---|---|---|---|---|---|---|
EVANS CONSTRUCTION 7255 S. U.S. HIGHWAY 89126 · JACKSON, WY, 83001 | RCRA | No Violation Identified | 1 | 0 | — | May 2022 | View → |
EVANS CONSTRUCTION 7255 SOUTH HIGHWAY 89 · JACKSON, WY, 83001 | Air | No Violation Identified | 0 | 0 | — | — | View → |
Source: EPA ECHO (Enforcement and Compliance History Online). Compliance status follows EPA’s own labels (“Sig Violation” = significant noncompliance; QNCR = quarters of noncompliance over the recent reporting window). Inactive facilities (struck through) retain historical enforcement records even after operations ceased.
Motor carrier safety (FMCSA)
Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for EVANS CONSTRUCTION COMPANY. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
Consolidated across all USAspending recipient entities under this corporate parent — not attributable to this single location.
- Department of TransportationIGF::CT::IGF WY FTFW/FLAP NAEL 11(1) DTFH68-14-B-00015 ROAD REHABILITATION AND BRIDGE CONSTRUCTION AT NATIONAL ELK WILDLIFE REFUGE IN JACKSON WYOMINGcontract · Last action 2017-02-16$2,568,973
- Department of DefenseSITE 11 & 12, RIPRAP PLACEMENTcontract · Last action 2009-12-23$763,285
- Department of the InteriorX:NOGRN - GRTE ASPHALT SUPPLYcontract · Last action 2018-01-05$613,596
- Department of the InteriorG:BIOBA, OPERATIONS AND MAINTENANCE PRODUCTS; 52.223-2, AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION (SEP 2013) HOT MIX ASPHALT SUPPLY (1/2-INCH 58-28 30% RAP 5.10 AC OR SIMILAR AIMMS-2) GRAND TETON NATIONAL PARK; TETON COUNTY, WYcontract · Last action 2017-09-22$526,632
- Department of the InteriorX:NOGRN HOT MIX ASPHALT FOR GRAND TETON NATIONAL PARKcontract · Last action 2020-01-02$386,429
- Department of the InteriorGRTE GRAVEL SUPPLY 2021 - GRAND TETON NATIONAL PARK NEEDS TO PURCHASE APPROXIMATELY 17,610 TONS OF 3/4 INCH GRADE W ROAD BASE GRAVEL FOR THE 2021 CONSTRUCTION SEASON.contract · Last action 2021-09-15$325,785
- Department of the InteriorTHIS SOLICITATION IS FOR 2900 TONS OF HOT MIX ASPHALT FOR GRAND TETON NATIONAL PARK TO BE PICKED UP BETWEEN JUNE 6, 2021 AND SEPTEMBER 30, 2021.contract · Last action 2022-05-18$312,800
- Department of the InteriorHOT MIX FOR ROAD REPAIRScontract · Last action 2012-07-05$289,031
- Department of the InteriorGRTE FY15 HOT ASPHALTcontract · Last action 2015-12-22$274,966
- Department of the InteriorPROVISION OF ROAD MATERIALS FOR RESURFACING ASPHALT ROAD SURFACES.contract · Last action 2011-08-24$262,127
- Department of the InteriorPROVISION OF ROAD MATERIALS FOR REPAIRScontract · Last action 2012-03-07$261,130
- Department of the Interior1400 - 2000 TONS OF HOT MIX ASPHALT FOR GRAND TETON NATIONAL PARKcontract · Last action 2023-04-20$220,860
- Department of the InteriorPROVISION OF 2000T OF HOT MIX ASPHALT AND SAND TO BE USED TO REPAIR SD ROADScontract · Last action 2015-02-05$217,102
- Department of the Interior1/4" CRUSHER SAND & 1/2" HOTMIX ASPHALTcontract · Last action 2008-03-18$192,500
- Department of the InteriorAC-20 HOT-MIX FOR PACIFIC CREEK ROADcontract · Last action 2008-05-29$189,600
- Department of the InteriorPROVISION OF CRUSHED GRAVEL TO USE IN UPGRADE OF ROADWAYS.contract · Last action 2011-03-28$181,374
- Department of the InteriorIGF::OT::IGF PROCUREMENT AND HAULING OF CHIPS FOR GRAND TETON NP ROADWAY REPAIRScontract · Last action 2013-08-30$166,509
- Department of DefenseCY09 JH LEVEE REPAIR - CONTRACT --- PROJcontract · Last action 2009-12-22$159,436
- Department of the InteriorHOT MIX 58/28 ASPHALT TO BE USED AT COLTER BAYcontract · Last action 2016-01-15$149,832
- Department of the InteriorG:BIOBA IGF::OT::IGF HOT ASPHALT AND SAND FOR ROAD REPAIRScontract · Last action 2015-01-27$146,650
- Department of the InteriorSUPPLY OF HOT MIX ASPHALTcontract · Last action 2009-04-03$145,400
- Department of the InteriorAC-20 HOT-MIX FOR PACIFIC CREEK ROADcontract · Last action 2009-03-11$142,014
- Department of the InteriorHOT MIX ASPHALT FOR ROAD CONSTRUCTIONcontract · Last action 2009-04-22$136,150
- Department of the InteriorPROVISION OF MATERIALS TO BE USED IN HIWAY REPAIRcontract · Last action 2010-09-17$128,531
- Department of the InteriorGRTE PLOWING, KELLY SNOW REMOVAL IN GRAND TETON NATIONAL PARK IN KELLY, WY. SNOW REMOVAL ON APPROXIMATELY 1.3 MILES OF ROADS IN THE TOWN OF KELLY, WY, LOCATED WITHIN GRAND TETON NATIONAL PARK.contract · Last action 2024-08-27$107,751
- Department of the InteriorIGF::OT::IGF GRAVEL PROCUREMENT AND HAULING FOR GRAND TETON NP ROAD REPAIRScontract · Last action 2013-07-02$103,092
- Department of the InteriorX:NOGRN PURCHASE OF 900 TONS OF HOT ASPHALT FOR GRAND TETON NATIONAL PARK.contract · Last action 2018-06-13$97,200
- Department of the InteriorG:BIOBA SUPPLY OF HOT MIX ASPHALT FOR ROAD REPAIRScontract · Last action 2014-06-25$83,125
- Department of the InteriorG:BIOBA, OPERATIONS AND MAINTENANCE PRODUCTS; 52.223-2, AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION (SEP 2013) HOT MIX ASPHALT SUPPLY (1/2-INCH 58-28 30% RAP 5.10 AC OR SIMILAR AIMMS-2) GRAND TETON NATIONAL PARK; TETON COUNTY, WY THIS AWARD DOCUMENT CONSUMMATES PURCHASE ORDER P17PX02652 WHICH CONSISTS OF (A) COMBINED SYNOPSIS/SOLICITATION P17PS02457, AND (B) THIS PURCHASE ORDER AWARD. COMBINED SYNOPSIS/SOLICITATION P17PS02457 (SECTIONS I-III AND V) IS ATTACHED AND INCLUDED IN PURCHASE ORDER P17PX02652. CONTRACTING OFFICER: ALANE FITZPATRICK, PHONE (307) 739-3669 DELIVERY POC: STEVE BALDOCK, PHONE (307) 739-3365 THE HOT MIX ASPHALT MUST BE READILY AVAILABLE FOR PICK-UP DURING THE PERIOD OF PERFORMANCE, BETWEEN 08/21/2017 AND 09/28/2017; APPROXIMATE QUANTITIES WILL RANGE BETWEEN 6 YARDS&300 YARDS PER SCHEDULED PICK-UP. NOTE: THE PICK-UP QUANTITY VARIATION IS DUE IN PART TO UNCERTAINTY IN WEATHER CONDITIONS AND AVAILABILITY OF EQUIPMENT (E.G., A CHANGE IN WEATHER CONDITIONS MAY ONLY ALLOW WORK FOR 1/2 DAY AND/OR EQUIPMENT FAILURES/AVAILABILITY MAY RESULT IN FEWER YARDS OF ASPHALT BEING TRANSPORTED IN A DAY). THE GOVERNMENT WILL PROVIDE A MINIMUM OF 24 HOURS' NOTICE PRIOR TO PICK-UP. SHOULD THE GOVERNMENT GIVE LESS THAN 24 HOURS' NOTICE, THE VENDOR MAY ELECT TO EITHER LOAD THE TRUCKS AS REQUESTED OR TO SCHEDULE AN ALTERNATE DAY. PICK-UP DAYS WILL BE SCHEDULED WHEN CONDITIONS ARE FAVORABLE, AND ARE WEATHER DEPENDENT. DELIVERY ADDRESS: GRAND TETON NATIONAL PARK, 103 HEADQUARTERS LOOP ROAD, MOOSE, WY 83012 INVOICES MUST BE SUBMITTED ELECTRONICALLY AT HTTPS://WWW.IPP.GOV/.contract · Last action 2018-08-30$60,447
- Department of the InteriorHOT-MIX ASPHALT FOR ROAD REPAIRScontract · Last action 2013-03-01$46,229
- Department of the Interior3/4" CRUSHED GRAVEL DELIVERED FOR GRAND TETON NATIONAL PARKcontract · Last action 2025-07-08$44,010
- Department of the InteriorSUPPLY OF CRUSHED GRAVELcontract · Last action 2009-09-24$40,558
- Department of the InteriorPROVISION OF HOT MIX TO BE USED FOR ROADWAY REPAIRcontract · Last action 2012-08-08$40,374
- Department of the InteriorPROVISION OF ROAD MATERIALS FOR REPAIRS.contract · Last action 2011-05-11$35,316
- Department of the InteriorPURCHASE OF SAND TO BE USED FOR WINTER OPERATIONS IN ICE CONTROLcontract · Last action 2009-08-26$22,625
- Department of the InteriorSUPPLY OF HOT MIX ASPHALTcontract · Last action 2009-09-24$22,325
- Department of the InteriorHOT-MIX TO BE USED FOR ROADWAYS REPAIRScontract · Last action 2011-08-24$20,956
- Department of the InteriorCRUSHER SANDcontract · Last action 2008-07-02$20,217
- Department of the InteriorSUPPLY OF CRUSHED ROCK FOR ROAD MATERIALScontract · Last action 2009-03-26$19,980
- Department of the InteriorIGF::OT::IGF GRTE CHIP PROJECT EQUIPMENT RENTALcontract · Last action 2013-08-28$17,997
- Department of the InteriorHOT MIX AXPHALT TO BE USED FOR HIGHWAY MAINTENANCEcontract · Last action 2015-07-10$15,035
- Department of AgricultureIGF::OT::IGF US FOREST SERVICE SUPPLIES - MATERIALS FOR JACKSON RANGER DISTRICT PARKING PROJECTcontract · Last action 2014-09-09$13,913
- Department of the InteriorHOT MIX FOR HIWAY REPAIRScontract · Last action 2016-01-15$12,643
- Department of the InteriorCONCRETE FOR CURBScontract · Last action 2009-04-08$11,732
- Department of the InteriorROAD MATERIALS TO BE USED FOR REPAIR OF PARKING LOT.contract · Last action 2011-08-24$11,721
- Department of the InteriorMATERIALS PROVIDED FOR SNOW REMOVAL.contract · Last action 2010-10-20$11,459
- Department of the InteriorPROVISION OF MATERIALS FOR WINTER SNOW REMOVALcontract · Last action 2010-10-21$11,417
- Department of the InteriorPURCHASE OF HOT-MIX TO RESURFACT PARKING LOT...contract · Last action 2010-08-19$11,037
- Department of the InteriorSAND USED DURING WINTER SNOWPLOW OPERATIONScontract · Last action 2009-08-26$9,125
- Department of AgricultureIGF::OT::IGF US FOREST SERVICE SUPPLIES - ROAD BASE / CONCRETE/ ASPHALTcontract · Last action 2013-11-13$5,591
Federal contract dollars to this establishment. Primary NAICS: 212321 - CONSTRUCTION SAND AND GRAVEL MINING. Last action: 2025-07-08. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2023-04-20 | Programmed Related | 1 | — | $0 | |
| 2016-07-12 | Programmed Related | 0 | — | $0 | |
| 2015-02-24 | Planned | 0 | — | $0 | |
| 2004-03-31 | Planned | 2 | — | $705 | |
| 1999-10-19 | Planned | 0 | — | $0 | |
| 1995-09-14 | Planned | 0 | — | $0 | |
| 1993-07-14 | Planned | 5 | 3 | $575 | |
| 1991-10-01 | Planned | 0 | — | $0 | |
| 1985-09-11 | Planned | 1 | — | $0 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in site preparation contractors within WY, ordered by federal enforcement volume:
- JACKMAN CONSTRUCTION INCGREEN RIVER — 2 federal enforcement records
- INTERMOUNTAIN CONSTRUCTION & MATERIALSGILLETTE — 2 federal enforcement records
- YENTER COMPANIES, INCCHEYENNE — 2 federal enforcement records
- D.& A. Construction and ConcreteThermopolis — 2 federal enforcement records
- DRM INC.GILLETTE — 2 federal enforcement records
- ALL B EXCAVATINGSHERIDAN — 2 federal enforcement records
- TOWN OF SARATOGASATATOGA — 2 federal enforcement records
- LINDLEY CONSTRUCTIONEVANSTON — 2 federal enforcement records
- ELDRIDGE EXCAVATING INCGILLETTE — 2 federal enforcement records
- EARTH WORK SOLUTIONSBILL — 2 federal enforcement records
Related searches
- Site Preparation ContractorsAll employers in this industry
- Employers in WYState-wide enforcement data
- Site Preparation Contractors in WYIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on EVANS CONSTRUCTION COMPANY from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is EVANS CONSTRUCTION COMPANY's OSHA violation history?
- EVANS CONSTRUCTION COMPANY has 9 OSHA inspections on record with 9 violations and $1,280 in total penalties.
- How does EVANS CONSTRUCTION COMPANY's safety record compare to its industry?
- EVANS CONSTRUCTION COMPANY operates in the site preparation contractors industry. The industry average Total Recordable Incident Rate (TRIR) is 1.5. EVANS CONSTRUCTION COMPANY's self-reported DART rate is 1.7 compared to an industry average of 1.