Establishment profile
EDSTROM CONSTRUCTION, INC.
WASTEWATER TREATMENT PLANT, ST ANTHONY, ID, 83445
237110 — Water and Sewer Line and Related Structures Construction
Summary
EDSTROM CONSTRUCTION, INC. has accumulated 4 OSHA violations across 1 inspection over 21 years of recorded history.
The establishment sits in the 79th percentile for violations within its industry-state peer group of 368 employers. The most recent enforcement activity was recorded 21 years ago.
Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
EDSTROM CONSTRUCTION, INC. appears in OSHA workplace safety and MSHA mine safety records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
100% of inspections at this establishment produced violations,
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 4 distinct standards shown · 4 citations in this view.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 1910.1200 E01 | 1 | 1 | — | Aug 2005 | Aug 2005 |
| 29 CFR 1910.1200 F05 I | 1 | 1 | — | Aug 2005 | Aug 2005 |
| 29 CFR 1910.1200 F05 II | 1 | 1 | — | Aug 2005 | Aug 2005 |
| 29 CFR 1910.1200 G01 | 1 | 1 | — | Aug 2005 | Aug 2005 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Above average violations in NAICS 2371 within ID. Peer group: 368 employers. This establishment has 4 OSHA violations; peer median is 1.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for EDSTROM CONSTRUCTION, INC.. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for EDSTROM CONSTRUCTION, INC.. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 21+ years. Most recent activity: 21 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for EDSTROM CONSTRUCTION, INC.. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in ID — for EDSTROM CONSTRUCTION, INC., not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other EDSTROM CONSTRUCTION, INC. operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 93 citations · 18S&S · $17,955 proposed / $17,955 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 9907459 | Cedar Rapids Crusher Madison, ID | Jan 2025 | — | Yes | ModNegligence | $3,184 | $3,184 |
| 5052930 | Cedar Rapids Crusher Madison, ID | Jun 2025 | — | No | ModNegligence | $642 | $642 |
| 9906989 | Cedar Rapids Crusher Madison, ID | Aug 2024 | — | No | ModNegligence | $626 | $626 |
| 9309789 | Cedar Rapids Crusher Madison, ID | Aug 2019 | — | No | ModNegligence | $474 | $474 |
| 5055318 | Cedar Rapids Crusher Madison, ID | Dec 2025 | — | Yes | ModNegligence | $432 | $432 |
| 9727928 | Cedar Rapids Crusher Madison, ID | Dec 2022 | — | Yes | ModNegligence | $407 | $407 |
| 9654851 | Cedar Rapids Crusher Madison, ID | Apr 2022 | — | Yes | ModNegligence | $378 | $378 |
| 9654850 | Cedar Rapids Crusher Madison, ID | Apr 2022 | — | Yes | ModNegligence | $378 | $378 |
| 9306778 | Cedar Rapids Crusher Madison, ID | Mar 2024 | — | No | HighNegligence | $365 | $365 |
| 9475642 | Teton Pit Fremont, ID | Aug 2023 | — | Yes | ModNegligence | $346 | $346 |
| 9370532 | Cedar Rapids Crusher Madison, ID | Mar 2018 | — | Yes | ModNegligence | $336 | $336 |
| 9431350 | Cedar Rapids Crusher Madison, ID | Jan 2019 | — | Yes | ModNegligence | $319 | $319 |
| 8836881 | Cedar Rapids Crusher Madison, ID | Jun 2017 | — | Yes | ModNegligence | $305 | $305 |
| 5052931 | Cedar Rapids Crusher Madison, ID | Jun 2025 | — | No | ModNegligence | $288 | $288 |
| 9907458 | Cedar Rapids Crusher Madison, ID | Jan 2025 | — | No | ModNegligence | $288 | $288 |
| 9906987 | Cedar Rapids Crusher Madison, ID | Aug 2024 | — | No | ModNegligence | $280 | $280 |
| 8825526 | Cedar Rapids Crusher Madison, ID | Feb 2016 | — | Yes | ModNegligence | $263 | $263 |
| 9907457 | Cedar Rapids Crusher Madison, ID | Jan 2025 | — | No | ModNegligence | $193 | $193 |
| 9906988 | Cedar Rapids Crusher Madison, ID | Aug 2024 | — | No | ModNegligence | $189 | $189 |
| 9907456 | Cedar Rapids Crusher Madison, ID | Jan 2025 | — | No | HighNegligence | $177 | $177 |
| 9478660 | Cedar Rapids Crusher Madison, ID | Jul 2021 | — | Yes | ModNegligence | $159 | $159 |
| 9475643 | Teton Pit Fremont, ID | Aug 2023 | — | Yes | ModNegligence | $155 | $155 |
| 9475641 | Teton Pit Fremont, ID | Aug 2023 | — | Yes | ModNegligence | $155 | $155 |
| 5055321 | Cedar Rapids Crusher Madison, ID | Dec 2025 | — | No | HighNegligence | $151 | $151 |
| 5055320 | Cedar Rapids Crusher Madison, ID | Dec 2025 | — | No | ModNegligence | $151 | $151 |
| 5055319 | Cedar Rapids Crusher Madison, ID | Dec 2025 | — | No | ModNegligence | $151 | $151 |
| 5053320 | Teton Pit Fremont, ID | Jun 2025 | — | No | ModNegligence | $151 | $151 |
| 9906990 | Teton Pit Fremont, ID | Aug 2024 | — | No | ModNegligence | $147 | $147 |
| 9306781 | Cedar Rapids Crusher Madison, ID | Mar 2024 | — | No | ModNegligence | $147 | $147 |
| 9306780 | Cedar Rapids Crusher Madison, ID | Mar 2024 | — | No | ModNegligence | $147 | $147 |
| 9306779 | Cedar Rapids Crusher Madison, ID | Mar 2024 | — | No | ModNegligence | $147 | $147 |
| 9306777 | Cedar Rapids Crusher Madison, ID | Mar 2024 | — | No | ModNegligence | $147 | $147 |
| 9306776 | Cedar Rapids Crusher Madison, ID | Mar 2024 | — | No | ModNegligence | $147 | $147 |
| 9306775 | Cedar Rapids Crusher Madison, ID | Mar 2024 | — | No | ModNegligence | $147 | $147 |
| 9306774 | Cedar Rapids Crusher Madison, ID | Mar 2024 | — | No | ModNegligence | $147 | $147 |
| 9475645 | Cedar Rapids Crusher Madison, ID | Aug 2023 | — | No | ModNegligence | $143 | $143 |
| 9475644 | Cedar Rapids Crusher Madison, ID | Aug 2023 | — | No | ModNegligence | $143 | $143 |
| 9475640 | Teton Pit Fremont, ID | Aug 2023 | — | No | NoNegligence | $143 | $143 |
| 9475639 | Teton Pit Fremont, ID | Aug 2023 | — | No | ModNegligence | $143 | $143 |
| 9431351 | Cedar Rapids Crusher Madison, ID | Jan 2019 | — | No | ModNegligence | $135 | $135 |
| 8825573 | Cedar Rapids Crusher Madison, ID | Sep 2016 | — | Yes | ModNegligence | $134 | $134 |
| 8825572 | Cedar Rapids Crusher Madison, ID | Sep 2016 | — | Yes | ModNegligence | $134 | $134 |
| 9654852 | Cedar Rapids Crusher Madison, ID | Apr 2022 | — | No | HighNegligence | $133 | $133 |
| 9654849 | Cedar Rapids Crusher Madison, ID | Apr 2022 | — | No | ModNegligence | $133 | $133 |
| 9654848 | Cedar Rapids Crusher Madison, ID | Apr 2022 | — | No | ModNegligence | $133 | $133 |
| 8836864 | Cedar Rapids Crusher Madison, ID | Feb 2017 | — | No | ModNegligence | $129 | $129 |
| 9478661 | Cedar Rapids Crusher Madison, ID | Jul 2021 | — | No | LowNegligence | $125 | $125 |
| 9478659 | Cedar Rapids Crusher Madison, ID | Jul 2021 | — | No | ModNegligence | $125 | $125 |
| 9478658 | Cedar Rapids Crusher Madison, ID | Jul 2021 | — | No | ModNegligence | $125 | $125 |
| 9470250 | Cedar Rapids Crusher Madison, ID | Jan 2020 | — | No | ModNegligence | $123 | $123 |
| 9431349 | Cedar Rapids Crusher Madison, ID | Jan 2019 | — | No | ModNegligence | $121 | $121 |
| 9431348 | Cedar Rapids Crusher Madison, ID | Jan 2019 | — | No | ModNegligence | $121 | $121 |
| 9431347 | Cedar Rapids Crusher Madison, ID | Jan 2019 | — | No | ModNegligence | $121 | $121 |
| 9370535 | Cedar Rapids Crusher Madison, ID | Mar 2018 | — | Yes | ModNegligence | $118 | $118 |
| 9370534 | Cedar Rapids Crusher Madison, ID | Mar 2018 | — | No | ModNegligence | $118 | $118 |
| 9370533 | Cedar Rapids Crusher Madison, ID | Mar 2018 | — | No | ModNegligence | $118 | $118 |
| 9370531 | Cedar Rapids Crusher Madison, ID | Mar 2018 | — | Yes | ModNegligence | $118 | $118 |
| 9370408 | Cedar Rapids Crusher Madison, ID | Dec 2017 | — | No | ModNegligence | $118 | $118 |
| 9370407 | Cedar Rapids Crusher Madison, ID | Dec 2017 | — | No | ModNegligence | $118 | $118 |
| 8825445 | Cedar Rapids Crusher Madison, ID | Apr 2015 | — | Yes | ModNegligence | $117 | $117 |
| 8836883 | Cedar Rapids Crusher Madison, ID | Jun 2017 | — | No | ModNegligence | $116 | $116 |
| 8836882 | Cedar Rapids Crusher Madison, ID | Jun 2017 | — | No | ModNegligence | $116 | $116 |
| 8825575 | Cedar Rapids Crusher Madison, ID | Sep 2016 | — | No | ModNegligence | $114 | $114 |
| 8825574 | Cedar Rapids Crusher Madison, ID | Sep 2016 | — | No | ModNegligence | $114 | $114 |
| 6303149 | Cedar Rapids Crusher Madison, ID | Jul 2013 | — | No | HighNegligence | $112 | $112 |
| 8825528 | Cedar Rapids Crusher Madison, ID | Feb 2016 | — | No | ModNegligence | $100 | $100 |
| 8825527 | Cedar Rapids Crusher Madison, ID | Feb 2016 | — | No | ModNegligence | $100 | $100 |
| 8825446 | Cedar Rapids Crusher Madison, ID | Apr 2015 | — | No | ModNegligence | $100 | $100 |
| 8825444 | Cedar Rapids Crusher Madison, ID | Apr 2015 | — | No | ModNegligence | $100 | $100 |
| 8751733 | Cedar Rapids Crusher Madison, ID | Jan 2014 | — | No | HighNegligence | $100 | $100 |
| 6303148 | Cedar Rapids Crusher Madison, ID | Jul 2013 | — | No | ModNegligence | $100 | $100 |
| 8586537 | Cedar Rapids Crusher Madison, ID | Feb 2013 | — | No | HighNegligence | $100 | $100 |
| 6455870 | Cedar Rapids Crusher Madison, ID | Aug 2011 | — | No | ModNegligence | $100 | $100 |
| 6455837 | Cedar Rapids Crusher Madison, ID | Nov 2010 | — | No | ModNegligence | $100 | $100 |
| 6455836 | Cedar Rapids Crusher Madison, ID | Nov 2010 | — | No | ModNegligence | $100 | $100 |
| 6475693 | Cedar Rapids Crusher Madison, ID | Nov 2008 | — | No | ModNegligence | $100 | $100 |
| 6475692 | Cedar Rapids Crusher Madison, ID | Nov 2008 | — | No | ModNegligence | $100 | $100 |
| 6475691 | Cedar Rapids Crusher Madison, ID | Nov 2008 | — | No | ModNegligence | $100 | $100 |
| 7977264 | Cedar Rapids Crusher Madison, ID | Dec 2007 | — | No | ModNegligence | $100 | $100 |
| 7977263 | Cedar Rapids Crusher Madison, ID | Dec 2007 | — | No | ModNegligence | $100 | $100 |
| 6386644 | Cedar Rapids Crusher Madison, ID | Nov 2006 | — | No | ModNegligence | $60 | $60 |
| 6386643 | Cedar Rapids Crusher Madison, ID | Nov 2006 | — | No | HighNegligence | $60 | $60 |
| 6386642 | Cedar Rapids Crusher Madison, ID | Nov 2006 | — | No | HighNegligence | $60 | $60 |
| 6386641 | Cedar Rapids Crusher Madison, ID | Nov 2006 | — | No | ModNegligence | $60 | $60 |
| 6397428 | Cedar Rapids Crusher Madison, ID | Aug 2006 | — | No | ModNegligence | $60 | $60 |
| 6347018 | Cedar Rapids Crusher Madison, ID | Oct 2002 | — | No | ModNegligence | $55 | $55 |
| 6335031 | Cedar Rapids Crusher Madison, ID | Oct 2001 | — | No | ModNegligence | $55 | $55 |
| 6335030 | Cedar Rapids Crusher Madison, ID | Oct 2001 | — | No | ModNegligence | $55 | $55 |
| 6335029 | Cedar Rapids Crusher Madison, ID | Oct 2001 | — | No | ModNegligence | $55 | $55 |
| 6335028 | Cedar Rapids Crusher Madison, ID | Oct 2001 | — | No | ModNegligence | $55 | $55 |
| 5210823 | Cedar Rapids Crusher Madison, ID | Jul 2026 | — | No | ModNegligence | — | — |
| 5210822 | Cedar Rapids Crusher Madison, ID | Jul 2026 | — | No | ModNegligence | — | — |
| 5210824 | Cedar Rapids Crusher Madison, ID | Apr 2026 | — | No | HighNegligence | — | — |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for EDSTROM CONSTRUCTION, INC.. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for EDSTROM CONSTRUCTION, INC.. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for EDSTROM CONSTRUCTION, INC.. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for EDSTROM CONSTRUCTION, INC.. Verify directly with UVA Corporate Prosecution Registry →
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2005-07-13 | Planned | 4 | — | $0 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in water and sewer line and related structures construction within ID, ordered by federal enforcement volume:
- DAHLE CONSTRUCTIONBOISE — 2 federal enforcement records
- DOUG MCCOY CONSTRUCTION, INC.TWIN FALLS — 2 federal enforcement records
- ALTA CONSTRUCTION, INC.MARSING — 2 federal enforcement records
- DAN LAFFERTY CONSTRUCTION CO., INCWENDELL — 2 federal enforcement records
- AGRICULTURAL SERVICES INCBlackfoot — 2 federal enforcement records
- EDSTROM CONSTRUCTION, INC.REXBURG — 2 federal enforcement records
- ALTA CONSTRUCTION, INC.KUNA — 2 federal enforcement records
- HARD ROCK CONSTRUCTION, INC.BOISE — 2 federal enforcement records
- THUESON CONSTRUCTION, INC.NAMPA — 2 federal enforcement records
- DOUG MCCOY CONSTRUCTION, INC.TWIN FALLS — 2 federal enforcement records
Related searches
- Water and Sewer Line and Related Structures ConstructionAll employers in this industry
- Employers in IDState-wide enforcement data
- Water and Sewer in IDIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on EDSTROM CONSTRUCTION, INC. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is EDSTROM CONSTRUCTION, INC.'s OSHA violation history?
- EDSTROM CONSTRUCTION, INC. has 1 OSHA inspection on record with 4 violations and $0 in total penalties.
- How does EDSTROM CONSTRUCTION, INC.'s safety record compare to its industry?
- EDSTROM CONSTRUCTION, INC. operates in the water and sewer line and related structures construction industry. The industry average Total Recordable Incident Rate (TRIR) is 1.9.