Establishment profile
DUCKELS CONSTRUCTION
WATER TANK, CORDILLERA RANCH, EDWARDS, CO, 81632
Summary
DUCKELS CONSTRUCTION has accumulated 9 OSHA violations across 1 inspection over 27 years of recorded history, with $3,985 in total assessed penalties.
The establishment sits in the 91st percentile for violations within its industry-state peer group of 25,050 employers. The most recent enforcement activity was recorded 27 years ago.
Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
DUCKELS CONSTRUCTION appears in OSHA workplace safety and MSHA mine safety records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
100% of inspections at this establishment produced violations,
Peer comparison
Worse on violations than most other employers. Peer group: 25,050 employers. This establishment has 9 OSHA violations; peer median is 1.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for DUCKELS CONSTRUCTION. Verify directly with OSHA Injury Tracking Application →
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for DUCKELS CONSTRUCTION. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 27+ years. Most recent activity: 27 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for DUCKELS CONSTRUCTION. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in CO — for DUCKELS CONSTRUCTION, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other DUCKELS CONSTRUCTION operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 47S&S · $109,747 proposed / $83,598 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 6424315 | 1995 Cedarapids Crusher Routt, CO | May 2008 | — | Yes | HighNegligence | $18,742 | $11,245 |
| 6424316 | 1995 Cedarapids Crusher Routt, CO | May 2008 | — | Yes | HighNegligence | $8,421 | $5,053 |
| 6583051 | 1995 Cedarapids Crusher Routt, CO | Aug 2010 | — | Yes | HighNegligence | $6,458 | $6,458 |
| 9728714 | 1995 Cedarapids Crusher Routt, CO | Jun 2023 | — | Yes | HighNegligence | $3,340 | $3,340 |
| 5052673 | 1995 Cedarapids Crusher Routt, CO | Jun 2025 | — | Yes | ModNegligence | $2,936 | $2,936 |
| 5052672 | 1995 Cedarapids Crusher Routt, CO | Jun 2025 | — | Yes | ModNegligence | $2,936 | $2,936 |
| 9728715 | 1995 Cedarapids Crusher Routt, CO | Jun 2023 | — | Yes | HighNegligence | $2,853 | $2,853 |
| 6424314 | 1995 Cedarapids Crusher Routt, CO | May 2008 | — | Yes | ModNegligence | $2,536 | $1,522 |
| 6313627 | 1995 Cedarapids Crusher Routt, CO | Aug 2005 | — | No | HighNegligence | $2,500 | $2,500 |
| 9655443 | 1995 Cedarapids Crusher Routt, CO | Oct 2021 | — | Yes | HighNegligence | $2,493 | $2,493 |
| 6424323 | 1995 Cedarapids Crusher Routt, CO | Jun 2008 | — | Yes | ModNegligence | $2,282 | $1,369 |
| 6424322 | 1995 Cedarapids Crusher Routt, CO | Jun 2008 | — | Yes | ModNegligence | $2,282 | $1,369 |
| 5052681 | 1995 Cedarapids Crusher Routt, CO | Jun 2025 | — | No | HighNegligence | $1,968 | $1,968 |
| 5052677 | 1995 Cedarapids Crusher Routt, CO | Jun 2025 | — | No | HighNegligence | $1,968 | $1,968 |
| 6590126 | 1995 Cedarapids Crusher Routt, CO | Aug 2011 | — | Yes | ModNegligence | $1,795 | $1,795 |
| 6424340 | 1995 Cedarapids Crusher Routt, CO | Jun 2008 | — | Yes | ModNegligence | $1,795 | $1,077 |
| 6424337 | 1995 Cedarapids Crusher Routt, CO | Jun 2008 | — | Yes | ModNegligence | $1,795 | $1,077 |
| 6424336 | 1995 Cedarapids Crusher Routt, CO | Jun 2008 | — | Yes | ModNegligence | $1,795 | $1,077 |
| 6424335 | 1995 Cedarapids Crusher Routt, CO | Jun 2008 | — | Yes | ModNegligence | $1,795 | $1,077 |
| 9728720 | 1995 Cedarapids Crusher Routt, CO | Jun 2023 | — | Yes | LowNegligence | $1,350 | $189 |
| 9728707 | 1995 Cedarapids Crusher Routt, CO | Jun 2023 | — | Yes | LowNegligence | $1,350 | $189 |
| 9728704 | 1995 Cedarapids Crusher Routt, CO | Jun 2023 | — | Yes | LowNegligence | $1,350 | $189 |
| 9728703 | 1995 Cedarapids Crusher Routt, CO | Jun 2023 | — | Yes | HighNegligence | $1,350 | $1,350 |
| 9728701 | 1995 Cedarapids Crusher Routt, CO | Jun 2023 | — | Yes | LowNegligence | $1,350 | $189 |
| 5052680 | 1995 Cedarapids Crusher Routt, CO | Jun 2025 | — | Yes | ModNegligence | $1,320 | $1,320 |
| 5052679 | 1995 Cedarapids Crusher Routt, CO | Jun 2025 | — | Yes | ModNegligence | $1,320 | $1,320 |
| 5052678 | 1995 Cedarapids Crusher Routt, CO | Jun 2025 | — | Yes | ModNegligence | $1,320 | $1,320 |
| 5052674 | 1995 Cedarapids Crusher Routt, CO | Jun 2025 | — | No | ModNegligence | $1,320 | $267 |
| 6313629 | 1995 Cedarapids Crusher Routt, CO | Aug 2005 | — | Yes | ModNegligence | $963 | $963 |
| 6313628 | 1995 Cedarapids Crusher Routt, CO | Aug 2005 | — | Yes | ModNegligence | $963 | $963 |
| 6303677 | 1995 Cedarapids Crusher Routt, CO | Oct 2006 | — | Yes | ModNegligence | $838 | $838 |
| 6300221 | 1995 Cedarapids Crusher Routt, CO | Aug 2004 | — | No | HighNegligence | $800 | $800 |
| 6415245 | 1995 Cedarapids Crusher Routt, CO | May 2007 | — | Yes | ModNegligence | $687 | $687 |
| 6300206 | 1995 Cedarapids Crusher Routt, CO | Aug 2004 | — | Yes | ModNegligence | $629 | $629 |
| 6313630 | 1995 Cedarapids Crusher Routt, CO | Aug 2005 | — | No | ModNegligence | $614 | $614 |
| 6300222 | 1995 Cedarapids Crusher Routt, CO | Aug 2004 | — | No | ModNegligence | $600 | $600 |
| 5052675 | 1995 Cedarapids Crusher Routt, CO | Jun 2025 | — | No | ModNegligence | $592 | $177 |
| 9908534 | 1995 Cedarapids Crusher Routt, CO | Sep 2024 | — | No | ModNegligence | $576 | $576 |
| 9908533 | 1995 Cedarapids Crusher Routt, CO | Sep 2024 | — | No | ModNegligence | $576 | $576 |
| 9908532 | 1995 Cedarapids Crusher Routt, CO | Sep 2024 | — | No | ModNegligence | $576 | $576 |
| 6303679 | 1995 Cedarapids Crusher Routt, CO | Oct 2006 | — | No | ModNegligence | $524 | $524 |
| 6303678 | 1995 Cedarapids Crusher Routt, CO | Oct 2006 | — | No | ModNegligence | $524 | $524 |
| 6303676 | 1995 Cedarapids Crusher Routt, CO | Oct 2006 | — | No | ModNegligence | $524 | $524 |
| 6318060 | 1995 Cedarapids Crusher Routt, CO | Sep 2006 | — | No | ModNegligence | $524 | $524 |
| 9655445 | 1995 Cedarapids Crusher Routt, CO | Oct 2021 | — | Yes | HighNegligence | $487 | $487 |
| 6424329 | 1995 Cedarapids Crusher Routt, CO | Jun 2008 | — | No | ModNegligence | $460 | $276 |
| 6424327 | 1995 Cedarapids Crusher Routt, CO | Jun 2008 | — | No | ModNegligence | $460 | $276 |
| 6424326 | 1995 Cedarapids Crusher Routt, CO | Jun 2008 | — | No | ModNegligence | $460 | $276 |
| 6424324 | 1995 Cedarapids Crusher Routt, CO | Jun 2008 | — | No | ModNegligence | $460 | $276 |
| 6424321 | 1995 Cedarapids Crusher Routt, CO | Jun 2008 | — | No | ModNegligence | $460 | $276 |
| 6424320 | 1995 Cedarapids Crusher Routt, CO | Jun 2008 | — | No | ModNegligence | $460 | $276 |
| 6415248 | 1995 Cedarapids Crusher Routt, CO | May 2007 | — | No | ModNegligence | $460 | $460 |
| 6415239 | 1995 Cedarapids Crusher Routt, CO | May 2007 | — | Yes | LowNegligence | $460 | $460 |
| 5057288 | 1995 Cedarapids Crusher Routt, CO | Mar 2026 | — | Yes | HighNegligence | $432 | $432 |
| 9728721 | 1995 Cedarapids Crusher Routt, CO | Jun 2023 | — | Yes | LowNegligence | $407 | $189 |
| 9728717 | 1995 Cedarapids Crusher Routt, CO | Jun 2023 | — | Yes | LowNegligence | $407 | $148 |
| 9728712 | 1995 Cedarapids Crusher Routt, CO | Jun 2023 | — | Yes | LowNegligence | $407 | $189 |
| 9728708 | 1995 Cedarapids Crusher Routt, CO | Jun 2023 | — | Yes | HighNegligence | $407 | $407 |
| 9728600 | 1995 Cedarapids Crusher Routt, CO | Jun 2023 | — | Yes | LowNegligence | $407 | $148 |
| 6424339 | 1995 Cedarapids Crusher Routt, CO | Jun 2008 | — | No | ModNegligence | $362 | $217 |
| 6424338 | 1995 Cedarapids Crusher Routt, CO | Jun 2008 | — | No | ModNegligence | $362 | $217 |
| 6424334 | 1995 Cedarapids Crusher Routt, CO | Jun 2008 | — | No | ModNegligence | $362 | $217 |
| 6424333 | 1995 Cedarapids Crusher Routt, CO | Jun 2008 | — | No | ModNegligence | $362 | $217 |
| 6424332 | 1995 Cedarapids Crusher Routt, CO | Jun 2008 | — | No | ModNegligence | $362 | $217 |
| 6424331 | 1995 Cedarapids Crusher Routt, CO | Jun 2008 | — | No | ModNegligence | $362 | $217 |
| 6318062 | 1995 Cedarapids Crusher Routt, CO | Sep 2006 | — | No | ModNegligence | $350 | $350 |
| 6318061 | 1995 Cedarapids Crusher Routt, CO | Sep 2006 | — | No | ModNegligence | $350 | $350 |
| 6300207 | 1995 Cedarapids Crusher Routt, CO | Aug 2004 | — | Yes | ModNegligence | $350 | $350 |
| 9303304 | 1995 Cedarapids Crusher Routt, CO | Jul 2016 | — | Yes | ModNegligence | $300 | $300 |
| 6300210 | 1995 Cedarapids Crusher Routt, CO | Aug 2004 | — | Yes | ModNegligence | $286 | $286 |
| 6300208 | 1995 Cedarapids Crusher Routt, CO | Aug 2004 | — | Yes | ModNegligence | $286 | $286 |
| 7939341 | 1995 Cedarapids Crusher Routt, CO | Feb 2009 | — | Yes | ModNegligence | $285 | $285 |
| 6300220 | 1995 Cedarapids Crusher Routt, CO | Aug 2004 | — | No | HighNegligence | $275 | $275 |
| 9728706 | 1995 Cedarapids Crusher Routt, CO | Jun 2023 | — | No | LowNegligence | $271 | $148 |
| 9728705 | 1995 Cedarapids Crusher Routt, CO | Jun 2023 | — | No | HighNegligence | $271 | $271 |
| 5052676 | 1995 Cedarapids Crusher Routt, CO | Jun 2025 | — | No | ModNegligence | $267 | $267 |
| 8932221 | 1995 Cedarapids Crusher Routt, CO | Aug 2015 | — | Yes | ModNegligence | $243 | $243 |
| 6424343 | 1995 Cedarapids Crusher Routt, CO | Jun 2008 | — | No | ModNegligence | $224 | $134 |
| 6424342 | 1995 Cedarapids Crusher Routt, CO | Jun 2008 | — | No | ModNegligence | $224 | $134 |
| 6297013 | 1995 Cedarapids Crusher Routt, CO | Jun 2002 | — | Yes | ModNegligence | $224 | $224 |
| 6297010 | 1995 Cedarapids Crusher Routt, CO | Jun 2002 | — | Yes | ModNegligence | $224 | $224 |
| 6424328 | 1995 Cedarapids Crusher Routt, CO | Jun 2008 | — | No | ModNegligence | $207 | $124 |
| 6424325 | 1995 Cedarapids Crusher Routt, CO | Jun 2008 | — | No | ModNegligence | $207 | $124 |
| 8838950 | 1995 Cedarapids Crusher Routt, CO | Apr 2017 | — | No | HighNegligence | $204 | $204 |
| 8838949 | 1995 Cedarapids Crusher Routt, CO | Apr 2017 | — | No | HighNegligence | $204 | $204 |
| 5057285 | 1995 Cedarapids Crusher Routt, CO | Mar 2026 | — | Yes | ModNegligence | $193 | $193 |
| 6313631 | 1995 Cedarapids Crusher Routt, CO | Aug 2005 | — | No | ModNegligence | $191 | $191 |
| 7939342 | 1995 Cedarapids Crusher Routt, CO | Feb 2009 | — | No | HighNegligence | $190 | $190 |
| 6318063 | 1995 Cedarapids Crusher Routt, CO | Sep 2006 | — | No | ModNegligence | $177 | $177 |
| 5052604 | 1995 Cedarapids Crusher Routt, CO | Mar 2025 | — | No | HighNegligence | $165 | $165 |
| 6590128 | 1995 Cedarapids Crusher Routt, CO | Aug 2011 | — | No | ModNegligence | $162 | $162 |
| 6590127 | 1995 Cedarapids Crusher Routt, CO | Aug 2011 | — | No | ModNegligence | $162 | $162 |
| 6424330 | 1995 Cedarapids Crusher Routt, CO | Jun 2008 | — | No | ModNegligence | $162 | $97 |
| 9728727 | 1995 Cedarapids Crusher Routt, CO | Jul 2023 | 104(g)(1) | No | HighNegligence | $159 | $159 |
| 5057287 | 1995 Cedarapids Crusher Routt, CO | Mar 2026 | — | No | ModNegligence | $151 | $151 |
| 5057286 | 1995 Cedarapids Crusher Routt, CO | Mar 2026 | — | No | ModNegligence | $151 | $151 |
| 5057284 | 1995 Cedarapids Crusher Routt, CO | Mar 2026 | — | No | ModNegligence | $151 | $151 |
| 5052682 | 1995 Cedarapids Crusher Routt, CO | Jun 2025 | — | No | ModNegligence | $151 | $151 |
| 5052603 | 1995 Cedarapids Crusher Routt, CO | Mar 2025 | — | No | ModNegligence | $151 | $151 |
| 9728729 | 1995 Cedarapids Crusher Routt, CO | Jul 2023 | — | Yes | ModNegligence | $143 | $143 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for DUCKELS CONSTRUCTION. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for DUCKELS CONSTRUCTION. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for DUCKELS CONSTRUCTION. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for DUCKELS CONSTRUCTION. Verify directly with UVA Corporate Prosecution Registry →
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 1999-06-10 | Referral | 9 | 9 | $3,985 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Related searches
- Employers in COState-wide enforcement data
About this data
This profile aggregates federal enforcement records on DUCKELS CONSTRUCTION from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is DUCKELS CONSTRUCTION's OSHA violation history?
- DUCKELS CONSTRUCTION has 1 OSHA inspection on record with 9 violations and $3,985 in total penalties.