Establishment profile
DON KEHN CONSTRUCTION
6322 SOUTH COLLEGE STREET, FORT COLLINS, CO, 80525
Summary
DON KEHN CONSTRUCTION has accumulated 8 OSHA violations across 1 inspection over 34 years of recorded history, with $700 in total assessed penalties.
The establishment sits in the 89th percentile for violations within its industry-state peer group of 25,052 employers. The most recent enforcement activity was recorded 34 years ago.
Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
DON KEHN CONSTRUCTION appears in OSHA workplace safety and MSHA mine safety records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
100% of inspections at this establishment produced violations,
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 8 distinct standards shown · 8 citations in this view · $700 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 1910.0023 C01 | 1 | 1 | $350 | Jan 1992 | Jan 1992 |
| 29 CFR 1910.0101 B | 1 | 1 | $350 | Jan 1992 | Jan 1992 |
| 29 CFR 1910.0215 A02 | 1 | 1 | — | Jan 1992 | Jan 1992 |
| 29 CFR 1910.0215 A04 | 1 | 1 | — | Jan 1992 | Jan 1992 |
| 29 CFR 1910.0215 B09 | 1 | 1 | — | Jan 1992 | Jan 1992 |
| 29 CFR 1910.1200 E01 | 1 | 1 | — | Jan 1992 | Jan 1992 |
| 29 CFR 1910.1200 G01 | 1 | 1 | — | Jan 1992 | Jan 1992 |
| 29 CFR 1910.1200 H | 1 | 1 | — | Jan 1992 | Jan 1992 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Worse on violations than most other employers. Peer group: 25,052 employers. This establishment has 8 OSHA violations; peer median is 1.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for DON KEHN CONSTRUCTION. Verify directly with OSHA Injury Tracking Application →
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for DON KEHN CONSTRUCTION. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 34+ years. Most recent activity: 34 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for DON KEHN CONSTRUCTION. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in CO — for DON KEHN CONSTRUCTION, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other DON KEHN CONSTRUCTION operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 75S&S · 62 contractor · $80,862 proposed / $63,348 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 6311887 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | May 2004 | — | Yes | HighNegligence | $6,000 | $6,000 |
| 6447156 | Wyoming Hereford Ranch Pit Larimer, CO | May 2010 | — | Yes | HighNegligence | $5,961 | — |
| 7941478 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Aug 2000 | — | Yes | HighNegligence | $5,000 | $5,000 |
| 6445454 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | May 2008 | — | Yes | ModNegligence | $4,810 | $4,810 |
| 6315161 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | May 2006 | — | Yes | HighNegligence | $3,600 | $3,600 |
| 7941487 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Aug 2000 | — | Yes | HighNegligence | $3,000 | $3,000 |
| 7941486 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Aug 2000 | — | Yes | HighNegligence | $3,000 | $3,000 |
| 6318235 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Jan 2008 | — | Yes | ModNegligence | $1,944 | $1,360 |
| 6447158 | Wyoming Hereford Ranch Pit Larimer, CO | May 2010 | — | Yes | HighNegligence | $1,795 | — |
| 7938448 | Wyoming Hereford Ranch Pit Larimer, CO | Dec 2004 | — | Yes | ModNegligence | $1,566 | $1,566 |
| 7943663 | Wyoming Hereford Ranch Pit Larimer, CO | Aug 2001 | — | Yes | ModNegligence | $1,419 | $990 |
| 6311886 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | May 2004 | — | Yes | HighNegligence | $1,400 | $1,400 |
| 9655186 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Oct 2021 | — | Yes | HighNegligence | $1,179 | $1,179 |
| 7941480 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Aug 2000 | — | No | ModNegligence | $1,086 | — |
| 7941489 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Aug 2000 | — | No | HighNegligence | $1,000 | $1,000 |
| 7917673 | Wyoming Hereford Ranch Pit Larimer, CO | Feb 2000 | — | No | HighNegligence | $993 | — |
| 8831570 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Feb 2015 | — | Yes | HighNegligence | $946 | $946 |
| 8838058 | Wyoming Hereford Ranch Pit Larimer, CO | Nov 2016 | — | Yes | HighNegligence | $918 | $918 |
| 7938444 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Dec 2004 | — | Yes | HighNegligence | $900 | $900 |
| 6447155 | Wyoming Hereford Ranch Pit Larimer, CO | May 2010 | — | Yes | ModNegligence | $807 | $623 |
| 6423110 | Wyoming Hereford Ranch Pit Larimer, CO | Nov 2007 | — | Yes | ModNegligence | $807 | $403 |
| 6423109 | Wyoming Hereford Ranch Pit Larimer, CO | Nov 2007 | — | No | ModNegligence | $807 | $162 |
| 6423107 | Wyoming Hereford Ranch Pit Larimer, CO | Nov 2007 | — | Yes | ModNegligence | $807 | $403 |
| 6423106 | Wyoming Hereford Ranch Pit Larimer, CO | Nov 2007 | — | Yes | ModNegligence | $807 | $807 |
| 7917674 | Wyoming Hereford Ranch Pit Larimer, CO | Feb 2000 | — | Yes | ModNegligence | $760 | $760 |
| 6311929 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Jul 2004 | — | Yes | HighNegligence | $750 | $750 |
| 6311926 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Jul 2004 | — | Yes | HighNegligence | $750 | $750 |
| 6299772 | Wyoming Hereford Ranch Pit Larimer, CO | Apr 2004 | — | Yes | HighNegligence | $700 | $700 |
| 7917668 | Wyoming Hereford Ranch Pit Larimer, CO | Feb 2000 | — | No | HighNegligence | $655 | $655 |
| 6315189 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Jun 2006 | — | No | Reckless | $625 | — |
| 6315160 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | May 2006 | — | No | HighNegligence | $625 | $625 |
| 6298724 | Wyoming Hereford Ranch Pit Larimer, CO | May 2003 | — | Yes | HighNegligence | $622 | $622 |
| 6582069 | Wyoming Hereford Ranch Pit Larimer, CO | Feb 2011 | — | Yes | ModNegligence | $600 | $600 |
| 6590517 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Apr 2012 | — | Yes | ModNegligence | $585 | $585 |
| 6590514 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Apr 2012 | — | Yes | ModNegligence | $585 | $585 |
| 6590513 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Apr 2012 | — | No | ModNegligence | $585 | $300 |
| 6590512 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Apr 2012 | — | No | ModNegligence | $585 | $300 |
| 7917670 | Wyoming Hereford Ranch Pit Larimer, CO | Feb 2000 | — | No | HighNegligence | $557 | $557 |
| 6447159 | Wyoming Hereford Ranch Pit Larimer, CO | May 2010 | — | Yes | ModNegligence | $540 | — |
| 6447157 | Wyoming Hereford Ranch Pit Larimer, CO | May 2010 | — | Yes | ModNegligence | $540 | — |
| 6311923 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Jul 2004 | — | Yes | HighNegligence | $525 | $525 |
| 6311931 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Jul 2004 | — | Yes | HighNegligence | $500 | $109 |
| 6311930 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Jul 2004 | — | Yes | HighNegligence | $500 | $500 |
| 6311924 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Jul 2004 | — | Yes | HighNegligence | $500 | $500 |
| 7938441 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Dec 2004 | — | No | HighNegligence | $475 | $475 |
| 7938440 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Dec 2004 | — | No | HighNegligence | $475 | $475 |
| 8938720 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Feb 2016 | — | Yes | HighNegligence | $425 | $425 |
| 8938717 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Feb 2016 | — | Yes | HighNegligence | $425 | $425 |
| 8831568 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Feb 2015 | — | Yes | HighNegligence | $425 | $425 |
| 7917672 | Wyoming Hereford Ranch Pit Larimer, CO | Feb 2000 | — | No | ModNegligence | $399 | $399 |
| 7917669 | Wyoming Hereford Ranch Pit Larimer, CO | Feb 2000 | — | No | ModNegligence | $399 | $399 |
| 7917665 | Wyoming Hereford Ranch Pit Larimer, CO | Feb 2000 | — | No | ModNegligence | $399 | $399 |
| 6318236 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Jan 2008 | — | No | ModNegligence | $392 | $274 |
| 6314040 | Wyoming Hereford Ranch Pit Larimer, CO | Aug 2006 | — | Yes | ModNegligence | $375 | $375 |
| 6314037 | Wyoming Hereford Ranch Pit Larimer, CO | Aug 2006 | — | Yes | ModNegligence | $375 | $375 |
| 6314035 | Wyoming Hereford Ranch Pit Larimer, CO | Aug 2006 | — | Yes | ModNegligence | $375 | $375 |
| 6315162 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | May 2006 | — | No | HighNegligence | $375 | $375 |
| 6299774 | Wyoming Hereford Ranch Pit Larimer, CO | Apr 2004 | — | No | HighNegligence | $375 | $375 |
| 6423112 | Wyoming Hereford Ranch Pit Larimer, CO | Nov 2007 | — | No | ModNegligence | $362 | $117 |
| 6423108 | Wyoming Hereford Ranch Pit Larimer, CO | Nov 2007 | — | Yes | LowNegligence | $362 | $362 |
| 9655184 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Oct 2021 | — | Yes | HighNegligence | $355 | $355 |
| 6315175 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | May 2006 | — | Yes | ModNegligence | $350 | $280 |
| 6315174 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | May 2006 | — | Yes | ModNegligence | $350 | $280 |
| 6315172 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | May 2006 | — | Yes | ModNegligence | $350 | $280 |
| 6315166 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | May 2006 | — | Yes | ModNegligence | $350 | $280 |
| 6315165 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | May 2006 | — | Yes | ModNegligence | $350 | $280 |
| 6315164 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | May 2006 | — | Yes | ModNegligence | $350 | $280 |
| 6315163 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | May 2006 | — | Yes | ModNegligence | $350 | $280 |
| 7943657 | Wyoming Hereford Ranch Pit Larimer, CO | Aug 2001 | — | Yes | ModNegligence | $340 | $340 |
| 7943656 | Wyoming Hereford Ranch Pit Larimer, CO | Aug 2001 | — | Yes | ModNegligence | $340 | $340 |
| 7924747 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Jan 2000 | — | Yes | ModNegligence | $340 | $340 |
| 9347826 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Jun 2018 | — | Yes | ModNegligence | $336 | $336 |
| 8838061 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Nov 2016 | — | No | HighNegligence | $330 | $330 |
| 6314039 | Wyoming Hereford Ranch Pit Larimer, CO | Aug 2006 | — | Yes | ModNegligence | $305 | $305 |
| 6315199 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Jul 2006 | — | Yes | ModNegligence | $305 | $305 |
| 6311925 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Jul 2004 | — | No | HighNegligence | $300 | — |
| 7917671 | Wyoming Hereford Ranch Pit Larimer, CO | Feb 2000 | — | No | ModNegligence | $294 | $294 |
| 6315197 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Jun 2006 | — | Yes | ModNegligence | $286 | $229 |
| 6315186 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Jun 2006 | — | Yes | ModNegligence | $286 | $229 |
| 6315176 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | May 2006 | — | Yes | ModNegligence | $286 | $229 |
| 6315173 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | May 2006 | — | Yes | ModNegligence | $286 | $229 |
| 6311885 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | May 2004 | — | Yes | ModNegligence | $286 | $286 |
| 6299769 | Wyoming Hereford Ranch Pit Larimer, CO | Apr 2004 | — | Yes | ModNegligence | $286 | $286 |
| 6299767 | Wyoming Hereford Ranch Pit Larimer, CO | Apr 2004 | — | Yes | ModNegligence | $286 | $286 |
| 8938718 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Feb 2016 | — | Yes | ModNegligence | $285 | $285 |
| 8831572 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Feb 2015 | — | Yes | HighNegligence | $285 | $285 |
| 7941488 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Aug 2000 | — | Yes | ModNegligence | $277 | — |
| 7941481 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Aug 2000 | — | Yes | ModNegligence | $277 | — |
| 7941479 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Aug 2000 | — | Yes | ModNegligence | $277 | — |
| 6311883 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | May 2004 | — | No | HighNegligence | $275 | $275 |
| 6447040 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Nov 2009 | — | Yes | ModNegligence | $263 | $263 |
| 6447039 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Nov 2009 | — | No | ModNegligence | $263 | $112 |
| 7938439 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Dec 2004 | — | No | HighNegligence | $250 | $250 |
| 6297720 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | Sep 2002 | — | Yes | ModNegligence | $248 | $248 |
| 8763565 | Wyoming Hereford Ranch Pit Larimer, CO | Feb 2016 | — | Yes | ModNegligence | $243 | $243 |
| 8763564 | Wyoming Hereford Ranch Pit Larimer, CO | Feb 2016 | — | Yes | ModNegligence | $243 | $243 |
| 8763562 | Wyoming Hereford Ranch Pit Larimer, CO | Feb 2016 | — | Yes | ModNegligence | $243 | $243 |
| 6311891 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | May 2004 | — | Yes | ModNegligence | $228 | $228 |
| 6311890 | PORTABLE #1 Fort Collins Larimer, CO contractor: Don Kehn Construction Inc | May 2004 | — | Yes | ModNegligence | $228 | $228 |
| 6298727 | Wyoming Hereford Ranch Pit Larimer, CO | May 2003 | — | Yes | ModNegligence | $226 | $226 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for DON KEHN CONSTRUCTION. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for DON KEHN CONSTRUCTION. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for DON KEHN CONSTRUCTION. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for DON KEHN CONSTRUCTION. Verify directly with UVA Corporate Prosecution Registry →
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 1991-07-15 | Complaint | 8 | 2 | $700 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Related searches
- Employers in COState-wide enforcement data
About this data
This profile aggregates federal enforcement records on DON KEHN CONSTRUCTION from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is DON KEHN CONSTRUCTION's OSHA violation history?
- DON KEHN CONSTRUCTION has 1 OSHA inspection on record with 8 violations and $700 in total penalties.