Skip to main content

Establishment profile

CRITICAL PATH RECONSTRUCTION INC.

3905 DALE RD., MODESTO, CA, 95356
238160Roofing Contractors

Download as PDF →

OSHA inspections
1
Violations
1
$2,475 in penalties
Penalties
$2,475
$2,475 avg

Summary

CRITICAL PATH RECONSTRUCTION INC. has accumulated 1 OSHA violation across 1 inspection, with $2,475 in total assessed penalties.

The establishment sits in the 29th percentile for violations within its industry-state peer group of 11,676 employers. The most recent enforcement activity was recorded 6 months ago.

Federal records were found in 1 of 16 sources. Sources without matching records returned empty for this establishment.

Agency coverage

CRITICAL PATH RECONSTRUCTION INC. appears in OSHA workplace safety record only. No matching records were found in WHD wage enforcement, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification, FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls. Single-agency enforcement records typically indicate either a discrete incident-based inspection or a low-risk operational profile.

OSHA workplace safety

Inspections
1
Violations
1
Penalties
$2,475
$2,475 avg / violation
100% serious0% other
Inspection trigger · complaint
1 of 1

100% of inspections at this establishment produced violations,

Peer comparison

29th

Below average violations in NAICS 2381 within CA. Peer group: 11,676 employers. This establishment has 1 OSHA violation; peer median is 1.

Fewer violationsMore violations
Penalty percentile
72nd
peer median: $600
Inspection frequency
0th
peer median: 1

Safety self-report (OSHA 300A)

No self-reported injury rates filed with OSHA's Injury Tracking Application for CRITICAL PATH RECONSTRUCTION INC.. Verify directly with OSHA Injury Tracking Application

Industry benchmark

Industry avg TRIR
2.4
BLS SOII 2024
Industry avg DART
1.7
BLS SOII 2024
Self-reported TRIR
Not in OSHA ITA

BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.

Inspection breakdown

Complaint
1

Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for CRITICAL PATH RECONSTRUCTION INC.. Verify directly with Occupational Safety and Health Administration

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
6 months ago

Most recent federal enforcement activity recorded 6 months ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

No WHD wage, overtime, or child-labor enforcement cases on file for CRITICAL PATH RECONSTRUCTION INC.. Verify directly with Wage and Hour Division

Mine safety (MSHA)

No MSHA mine safety violations on file for CRITICAL PATH RECONSTRUCTION INC.. Verify directly with Mine Safety and Health Administration

Labor relations (NLRB)

No NLRB unfair labor practice charges or union representation cases on file for CRITICAL PATH RECONSTRUCTION INC.. Verify directly with National Labor Relations Board

Visa & labor certification (OFLC)

No H-1B, H-2A, or H-2B labor condition applications on file for CRITICAL PATH RECONSTRUCTION INC.. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for CRITICAL PATH RECONSTRUCTION INC.. Verify directly with Environmental Protection Agency

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for CRITICAL PATH RECONSTRUCTION INC.. Verify directly with UVA Corporate Prosecution Registry

Inspection history

DateTriggerViolationsSeriousPenalty
2025-11-26Complaint11$2,475

Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.

In the news

Other employers in this industry and state

Other employers in roofing contractors within CA, ordered by federal enforcement volume:

Related searches

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

About this data

This profile aggregates federal enforcement records on CRITICAL PATH RECONSTRUCTION INC. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Frequently asked

What is CRITICAL PATH RECONSTRUCTION INC.'s OSHA violation history?
CRITICAL PATH RECONSTRUCTION INC. has 1 OSHA inspection on record with 1 violation and $2,475 in total penalties.
How does CRITICAL PATH RECONSTRUCTION INC.'s safety record compare to its industry?
CRITICAL PATH RECONSTRUCTION INC. operates in the roofing contractors industry. The industry average Total Recordable Incident Rate (TRIR) is 2.4.