OSHA inspections
7
over 40 years
Violations
18
$600 in penalties
Penalties
$600
$33 avg
Accident investigations on record
1 National Emphasis Program inspections

Summary

CHARLES BLALOCK & SONS INC has accumulated 18 OSHA violations across 7 inspections over 40 years of recorded history, with $600 in total assessed penalties.

The establishment sits in the 97th percentile for violations within its industry-state peer group of 23,338 employers. Inspection frequency runs at the 98th percentile. The most recent enforcement activity was recorded 35 years ago.

Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

CHARLES BLALOCK & SONS INC appears in OSHA workplace safety and FMCSA motor carrier registration records only. No matching records were found in WHD wage enforcement, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.

OSHA workplace safety

Inspections
7
0.2 / yr · last 40 yrs
Violations
18
0.5 / yr
Penalties
$600
$33 avg / violation
22% serious78% other
Inspection trigger · planned
6 of 7
Inspection trigger · complaint
1 of 7

57% of inspections at this establishment produced violations,

Most-cited OSHA standards

Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 17 distinct standards shown · 18 citations in this view · $600 in penalties.

CFR sectionCitationsInspectionsTotal penaltyFirst citedLast cited
29 CFR 1926.0550 B0221Nov 1986Nov 1986
29 CFR 1926.0106 A11$600Dec 1986Dec 1986
29 CFR 1926.0651 F11Oct 1990Oct 1990
29 CFR 1926.0021 B0211Feb 1990Feb 1990
29 CFR 1926.0652 B11Feb 1990Feb 1990
29 CFR 1926.0651 I0111Feb 1990Feb 1990
29 CFR 1910.0094 D09 II11Feb 1989Feb 1989
29 CFR 1910.0094 D09 VII11Feb 1989Feb 1989
29 CFR 1910.0141 C02 I11Feb 1989Feb 1989
29 CFR 1910.0215 A0411Feb 1989Feb 1989
29 CFR 1910.0215 B0911Feb 1989Feb 1989
29 CFR 1910.0305 B0211Feb 1989Feb 1989
29 CFR 9000.60911Feb 1989Feb 1989
29 CFR 1926.0106 D11Dec 1986Dec 1986
29 CFR 1926.0106 C11Dec 1986Dec 1986
29 CFR 1926.0500 D0111Dec 1986Dec 1986
29 CFR 1926.0152 E0311Nov 1986Nov 1986

Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.

Peer comparison

97th

Worse on violations than nearly every other employer. Peer group: 23,338 employers. This establishment has 18 OSHA violations; peer median is 2.

Fewer violationsMore violations
Penalty percentile
83rd
peer median: $0
Inspection frequency
98th
peer median: 1

Safety self-report (OSHA 300A)

No self-reported injury rates filed with OSHA's Injury Tracking Application for CHARLES BLALOCK & SONS INC. Verify directly with OSHA Injury Tracking Application

Inspection breakdown

Planned
6
Complaint
1

Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for CHARLES BLALOCK & SONS INC. Verify directly with Occupational Safety and Health Administration

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
35 years ago

No federal enforcement activity has been recorded against this establishment in 35+ years. Most recent activity: 35 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

No WHD wage, overtime, or child-labor enforcement cases on file for CHARLES BLALOCK & SONS INC. Verify directly with Wage and Hour Division

Mine safety (MSHA)

No MSHA mine safety violations on file for CHARLES BLALOCK & SONS INC. Verify directly with Mine Safety and Health Administration

Labor relations (NLRB)

No NLRB unfair labor practice charges or union representation cases on file for CHARLES BLALOCK & SONS INC. Verify directly with National Labor Relations Board

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for CHARLES BLALOCK & SONS INC. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for CHARLES BLALOCK & SONS INC. Verify directly with Environmental Protection Agency

Motor carrier safety (FMCSA)

DOT number
181063
Operation
A

Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for CHARLES BLALOCK & SONS INC. Verify directly with UVA Corporate Prosecution Registry

Federal contracts

This location

Obligated (5-yr)
$50K
Obligated (all-time)
$18.1M
Awards
22
Top agency
Department of the Interior
$14.6M
Top agencies by obligation (this location)
Department of the Interior$14.6M
Department of Transportation$3.5M
Largest awards
  • Department of the Interior
    TAS14::1401 - RECOVERY GRSM 054757 RESURFACE CLINGMANS DOME ROAD AND PARKINF AREAS AT THE GREAT SMOKY MOUNTAIN NATIONAL PARK. WORK INCLUDES RESURFACING 7.2 MILES OF CLINGMANS DOME ROAD
    contract · Last action 2010-09-23
    $7,886,323
  • Department of the Interior
    RECOVERY GRSM 054782 RESURFACE FOOTHILLS PARKWAY (EAST). WORK INCLUDES A TWO-LANE, TWO-WAY 5.6 MILE PAVED ROAD. THE PAVEMENT WIDTH IS APPROXIMATELY 20 FEET WIDE. THE WORK ON THIS ROAD WILL INCLUDE RECONSTRUCTING (FULL DEPTH RECLAMATION) THE ROAD ALONG WITH EXISTING PARKING AREAS AND PULLOUTS AND REPAIRING ONE SLIDE AREA. MISCELLANEOUS ITEMS WOULD INCLUDE REMOVAL OF ASPHALT WALKWAYS AND REPLACEMENT WITH COLORED CONCRETE WALKS; DRAINAGE WORK; SHOULDER WORK; SIGN REPLACEMENT, INSTALLATION OF APPROPRIATE NEW SIGNAGE (INCLUDING MUTCD AND UNIGUIDE), NEW TRAFFIC MARKINGS, AND TURF ESTABLISHMENT ALONG THE ROADWAY SHOULDERS.
    contract · Last action 2010-09-23
    $4,449,692
  • Department of Transportation
    IGF::OT::IGF GREAT SMOKY MOUNTAINS NATIONAL PARK PROJECT PRA-GRSM 10(2),12(2), SOLICITATION NUMBER DTFH71-13-B-00038, LOCATED IN SEVIER COUNTY, TENNESSEE. THE PROJECT CONSISTS OF RESURFACING OF APPROXIMATELY 4.3 MILES OF THE GATLINBURG BYPASS AND PORTIONS OF NEWFOUND GAP ROAD. THE WORK INCLUDES MILLING, ASPHALT PAVEMENT, GUARDRAIL, REPAIR OF BRIDGE JOINTS, PAVEMENT STRIPING, SIGNAGE, TRAFFIC CONTROL, AND OTHER MISCELLANEOUS WORK.
    contract · Last action 2021-01-06
    $2,505,919
  • Department of the Interior
    TAS::14 1041::TAS RECOVERY GRSM PMIS # 90480 REHABILITATION OF COSBY CAMPGROUND AREAS ROADS, GREAT SMOKY MOUNTAINS NATIONAL PARK.
    contract · Last action 2010-08-27
    $2,003,231
  • Department of Transportation
    THE PROJECT CONSISTS OF THE REPLACEMENT OF THE WASHED OUT POTTER FORD ROAD BRIDGE OVER THE OBED RIVER AND THE OTTER CREEK ROAD BRIDGE OVER DADDY S CREEK WITHIN THE CATOOSA WILDLIFE MANAGEMENT AREA. THE BRIDGE WORK INCLUDES REMOVAL OF THE EXISTING TIMBER BRIDGE (OTTER CREEK ROAD) AND REPLACING BOTH BRIDGES WITH PRECAST, PRESTRESSED CONCRETE SLAB BRIDGES. THE PROJECT INCLUDES REHABILITATION, REALIGNMENT, AND RESURFACING OF THE AGGREGATE APPROACHES AND OTHER MISCELLANEOUS WORK.
    contract · Last action 2011-01-10
    $897,966
  • Department of Transportation
    ROADWAY REHABILITATION, DRAINAGE CHASE WORK, TUNNEL LIGHTING, SLIDE AREA SCALING AND DEBRIS REMOVAL, PIPE REHABILITATION, REPOINTING STONE MASONRY, OVERLAY OF EXISTING PAVED WATERWAYS, GUARDRAIL REPAIR, REPAIR DAMAGED BRIDGE GIRDERS, REPLACEMENT OF TRAFFIC SIGNALS, PAVEMENT MARKINGS. TRAFFIC CONTROL, PAVEMENT OVERLAY AND OTHER WORK.
    contract · Last action 2010-11-22
    $613,569
  • Department of the Interior
    STORM CLEAN UP
    contract · Last action 2012-07-08
    $94,880
  • Department of the Interior
    LANDSLIDE DEBRIS REMOVAL.
    contract · Last action 2009-08-14
    $38,025
  • Department of the Interior
    IGF::OT::IGF,BIOBA, SEVICE, SEEDING AND STABILIZATION
    contract · Last action 2016-12-22
    $36,800
  • Department of the Interior
    GRSM SLIDE REMOVAL
    contract · Last action 2023-07-20
    $31,168
  • Department of the Interior
    ROCKSLIDE ON SPUR
    contract · Last action 2012-03-12
    $16,740
  • Department of the Interior
    GRSM SLIDE CLEAN UP NB SPUR
    contract · Last action 2024-09-05
    $10,691
  • Department of the Interior
    1,500 GALLON SEPTIC TANKS WITH FITTINGS AND INCIDENTALS WITH DELIVERY TO METCALF BOTTOMS PICNIC AREA, GREAT SMOKY MOUNTAINS NATIONAL PARK.
    contract · Last action 2008-04-04
    $9,375
  • Department of the Interior
    GRSM EMERGENCY HWY ROCK/SLIDE
    contract · Last action 2022-02-07
    $8,999
  • Department of the Interior
    GRSM NEWFOUND GAP ROCK SLIDE
    contract · Last action 2024-02-06
    $8,417
  • Department of the Interior
    CONCRETE
    contract · Last action 2008-09-26
    $7,529
  • Department of the Interior
    CONCRETE
    contract · Last action 2008-09-08
    $6,216
  • Department of the Interior
    EMERGENCY WORK TO CLEAR UP LANDSLIDE MATERIAL.
    contract · Last action 2009-12-24
    $5,950
  • Department of the Interior
    HOT MIX
    contract · Last action 2008-09-05
    $5,600
  • Department of the Interior
    LITTLE RIVER LANDSLIDE
    contract · Last action 2009-11-04
    $5,031
  • Department of the Interior
    GRSM 054757 GATE ADJUSTMENTS TO CLINGMANS DOME ROAD AT GREAT SMOKY MOUNTAINS NATIONAL PARK
    contract · Last action 2010-12-20
    $1,440
  • Department of Transportation
    CONSTRUCTION OF FOOTHILLS PKWY FROM STA. 25+477 TO 25+600 INCLUDING, ONE AASHTO GIRDER BRIDGE, DRAINAGE, GRADING, SUB-BASE, ASPHALT SURFACE TREATMENT, RETAINING WALLS & OTHER WORK. CONSTRUCT TO FINISH GRADE EXISTING PARKWAY SECTION FROM STA. 25+600 TO 26+120 INCLUDING GRADING, SUB-BASE, PAVING, BRIDGE DECK OVERLAYS AND OTHER WORK.
    contract · Last action 2008-07-31
    $-536,822

Federal contract dollars to this establishment. Primary NAICS: 237310 - HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Last action: 2024-09-05. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.

Inspection history

DateTriggerViolationsSeriousPenalty
1990-12-10Planned0$0
1990-09-28Planned1$0
1990-02-12Planned3$0
1989-01-24Complaint7$0
1986-10-24Planned74$600
1986-09-25Planned0$0
1986-06-18Planned0$0

Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.

In the news

Related searches

About this data

This profile aggregates federal enforcement records on CHARLES BLALOCK & SONS INC from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is CHARLES BLALOCK & SONS INC's OSHA violation history?
CHARLES BLALOCK & SONS INC has 7 OSHA inspections on record with 18 violations and $600 in total penalties.