Establishment profile
CHARLES BLALOCK & SONS INC
BRIDGE #3, HWY. 129, ALCOA, TN, 37862
Summary
CHARLES BLALOCK & SONS INC has accumulated 18 OSHA violations across 7 inspections over 40 years of recorded history, with $600 in total assessed penalties.
The establishment sits in the 97th percentile for violations within its industry-state peer group of 23,338 employers. Inspection frequency runs at the 98th percentile. The most recent enforcement activity was recorded 35 years ago.
Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
CHARLES BLALOCK & SONS INC appears in OSHA workplace safety and FMCSA motor carrier registration records only. No matching records were found in WHD wage enforcement, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
57% of inspections at this establishment produced violations,
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 17 distinct standards shown · 18 citations in this view · $600 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 1926.0550 B02 | 2 | 1 | — | Nov 1986 | Nov 1986 |
| 29 CFR 1926.0106 A | 1 | 1 | $600 | Dec 1986 | Dec 1986 |
| 29 CFR 1926.0651 F | 1 | 1 | — | Oct 1990 | Oct 1990 |
| 29 CFR 1926.0021 B02 | 1 | 1 | — | Feb 1990 | Feb 1990 |
| 29 CFR 1926.0652 B | 1 | 1 | — | Feb 1990 | Feb 1990 |
| 29 CFR 1926.0651 I01 | 1 | 1 | — | Feb 1990 | Feb 1990 |
| 29 CFR 1910.0094 D09 II | 1 | 1 | — | Feb 1989 | Feb 1989 |
| 29 CFR 1910.0094 D09 VII | 1 | 1 | — | Feb 1989 | Feb 1989 |
| 29 CFR 1910.0141 C02 I | 1 | 1 | — | Feb 1989 | Feb 1989 |
| 29 CFR 1910.0215 A04 | 1 | 1 | — | Feb 1989 | Feb 1989 |
| 29 CFR 1910.0215 B09 | 1 | 1 | — | Feb 1989 | Feb 1989 |
| 29 CFR 1910.0305 B02 | 1 | 1 | — | Feb 1989 | Feb 1989 |
| 29 CFR 9000.609 | 1 | 1 | — | Feb 1989 | Feb 1989 |
| 29 CFR 1926.0106 D | 1 | 1 | — | Dec 1986 | Dec 1986 |
| 29 CFR 1926.0106 C | 1 | 1 | — | Dec 1986 | Dec 1986 |
| 29 CFR 1926.0500 D01 | 1 | 1 | — | Dec 1986 | Dec 1986 |
| 29 CFR 1926.0152 E03 | 1 | 1 | — | Nov 1986 | Nov 1986 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Worse on violations than nearly every other employer. Peer group: 23,338 employers. This establishment has 18 OSHA violations; peer median is 2.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for CHARLES BLALOCK & SONS INC. Verify directly with OSHA Injury Tracking Application →
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for CHARLES BLALOCK & SONS INC. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 35+ years. Most recent activity: 35 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for CHARLES BLALOCK & SONS INC. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
No MSHA mine safety violations on file for CHARLES BLALOCK & SONS INC. Verify directly with Mine Safety and Health Administration →
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for CHARLES BLALOCK & SONS INC. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for CHARLES BLALOCK & SONS INC. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for CHARLES BLALOCK & SONS INC. Verify directly with Environmental Protection Agency →
Motor carrier safety (FMCSA)
Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for CHARLES BLALOCK & SONS INC. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
- Department of the InteriorTAS14::1401 - RECOVERY GRSM 054757 RESURFACE CLINGMANS DOME ROAD AND PARKINF AREAS AT THE GREAT SMOKY MOUNTAIN NATIONAL PARK. WORK INCLUDES RESURFACING 7.2 MILES OF CLINGMANS DOME ROADcontract · Last action 2010-09-23$7,886,323
- Department of the InteriorRECOVERY GRSM 054782 RESURFACE FOOTHILLS PARKWAY (EAST). WORK INCLUDES A TWO-LANE, TWO-WAY 5.6 MILE PAVED ROAD. THE PAVEMENT WIDTH IS APPROXIMATELY 20 FEET WIDE. THE WORK ON THIS ROAD WILL INCLUDE RECONSTRUCTING (FULL DEPTH RECLAMATION) THE ROAD ALONG WITH EXISTING PARKING AREAS AND PULLOUTS AND REPAIRING ONE SLIDE AREA. MISCELLANEOUS ITEMS WOULD INCLUDE REMOVAL OF ASPHALT WALKWAYS AND REPLACEMENT WITH COLORED CONCRETE WALKS; DRAINAGE WORK; SHOULDER WORK; SIGN REPLACEMENT, INSTALLATION OF APPROPRIATE NEW SIGNAGE (INCLUDING MUTCD AND UNIGUIDE), NEW TRAFFIC MARKINGS, AND TURF ESTABLISHMENT ALONG THE ROADWAY SHOULDERS.contract · Last action 2010-09-23$4,449,692
- Department of TransportationIGF::OT::IGF GREAT SMOKY MOUNTAINS NATIONAL PARK PROJECT PRA-GRSM 10(2),12(2), SOLICITATION NUMBER DTFH71-13-B-00038, LOCATED IN SEVIER COUNTY, TENNESSEE. THE PROJECT CONSISTS OF RESURFACING OF APPROXIMATELY 4.3 MILES OF THE GATLINBURG BYPASS AND PORTIONS OF NEWFOUND GAP ROAD. THE WORK INCLUDES MILLING, ASPHALT PAVEMENT, GUARDRAIL, REPAIR OF BRIDGE JOINTS, PAVEMENT STRIPING, SIGNAGE, TRAFFIC CONTROL, AND OTHER MISCELLANEOUS WORK.contract · Last action 2021-01-06$2,505,919
- Department of the InteriorTAS::14 1041::TAS RECOVERY GRSM PMIS # 90480 REHABILITATION OF COSBY CAMPGROUND AREAS ROADS, GREAT SMOKY MOUNTAINS NATIONAL PARK.contract · Last action 2010-08-27$2,003,231
- Department of TransportationTHE PROJECT CONSISTS OF THE REPLACEMENT OF THE WASHED OUT POTTER FORD ROAD BRIDGE OVER THE OBED RIVER AND THE OTTER CREEK ROAD BRIDGE OVER DADDY S CREEK WITHIN THE CATOOSA WILDLIFE MANAGEMENT AREA. THE BRIDGE WORK INCLUDES REMOVAL OF THE EXISTING TIMBER BRIDGE (OTTER CREEK ROAD) AND REPLACING BOTH BRIDGES WITH PRECAST, PRESTRESSED CONCRETE SLAB BRIDGES. THE PROJECT INCLUDES REHABILITATION, REALIGNMENT, AND RESURFACING OF THE AGGREGATE APPROACHES AND OTHER MISCELLANEOUS WORK.contract · Last action 2011-01-10$897,966
- Department of TransportationROADWAY REHABILITATION, DRAINAGE CHASE WORK, TUNNEL LIGHTING, SLIDE AREA SCALING AND DEBRIS REMOVAL, PIPE REHABILITATION, REPOINTING STONE MASONRY, OVERLAY OF EXISTING PAVED WATERWAYS, GUARDRAIL REPAIR, REPAIR DAMAGED BRIDGE GIRDERS, REPLACEMENT OF TRAFFIC SIGNALS, PAVEMENT MARKINGS. TRAFFIC CONTROL, PAVEMENT OVERLAY AND OTHER WORK.contract · Last action 2010-11-22$613,569
- Department of the InteriorSTORM CLEAN UPcontract · Last action 2012-07-08$94,880
- Department of the InteriorLANDSLIDE DEBRIS REMOVAL.contract · Last action 2009-08-14$38,025
- Department of the InteriorIGF::OT::IGF,BIOBA, SEVICE, SEEDING AND STABILIZATIONcontract · Last action 2016-12-22$36,800
- Department of the InteriorGRSM SLIDE REMOVALcontract · Last action 2023-07-20$31,168
- Department of the InteriorROCKSLIDE ON SPURcontract · Last action 2012-03-12$16,740
- Department of the InteriorGRSM SLIDE CLEAN UP NB SPURcontract · Last action 2024-09-05$10,691
- Department of the Interior1,500 GALLON SEPTIC TANKS WITH FITTINGS AND INCIDENTALS WITH DELIVERY TO METCALF BOTTOMS PICNIC AREA, GREAT SMOKY MOUNTAINS NATIONAL PARK.contract · Last action 2008-04-04$9,375
- Department of the InteriorGRSM EMERGENCY HWY ROCK/SLIDEcontract · Last action 2022-02-07$8,999
- Department of the InteriorGRSM NEWFOUND GAP ROCK SLIDEcontract · Last action 2024-02-06$8,417
- Department of the InteriorCONCRETEcontract · Last action 2008-09-26$7,529
- Department of the InteriorCONCRETEcontract · Last action 2008-09-08$6,216
- Department of the InteriorEMERGENCY WORK TO CLEAR UP LANDSLIDE MATERIAL.contract · Last action 2009-12-24$5,950
- Department of the InteriorHOT MIXcontract · Last action 2008-09-05$5,600
- Department of the InteriorLITTLE RIVER LANDSLIDEcontract · Last action 2009-11-04$5,031
- Department of the InteriorGRSM 054757 GATE ADJUSTMENTS TO CLINGMANS DOME ROAD AT GREAT SMOKY MOUNTAINS NATIONAL PARKcontract · Last action 2010-12-20$1,440
- Department of TransportationCONSTRUCTION OF FOOTHILLS PKWY FROM STA. 25+477 TO 25+600 INCLUDING, ONE AASHTO GIRDER BRIDGE, DRAINAGE, GRADING, SUB-BASE, ASPHALT SURFACE TREATMENT, RETAINING WALLS & OTHER WORK. CONSTRUCT TO FINISH GRADE EXISTING PARKWAY SECTION FROM STA. 25+600 TO 26+120 INCLUDING GRADING, SUB-BASE, PAVING, BRIDGE DECK OVERLAYS AND OTHER WORK.contract · Last action 2008-07-31$-536,822
Federal contract dollars to this establishment. Primary NAICS: 237310 - HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Last action: 2024-09-05. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 1990-12-10 | Planned | 0 | — | $0 | |
| 1990-09-28 | Planned | 1 | — | $0 | |
| 1990-02-12 | Planned | 3 | — | $0 | |
| 1989-01-24 | Complaint | 7 | — | $0 | |
| 1986-10-24 | Planned | 7 | 4 | $600 | |
| 1986-09-25 | Planned | 0 | — | $0 | |
| 1986-06-18 | Planned | 0 | — | $0 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Related searches
- Employers in TNState-wide enforcement data
About this data
This profile aggregates federal enforcement records on CHARLES BLALOCK & SONS INC from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is CHARLES BLALOCK & SONS INC's OSHA violation history?
- CHARLES BLALOCK & SONS INC has 7 OSHA inspections on record with 18 violations and $600 in total penalties.