Establishment profile
CENTRAL PREMIX CONCRETE CO
20609 77TH AVE S, KENT, WA, 98035
423320 — Brick, Stone, and Related Construction Material Merchant Wholesalers
Summary
CENTRAL PREMIX CONCRETE CO has accumulated 5 OSHA violations across 4 inspections over 32 years of recorded history, with $1,090 in total assessed penalties.
The establishment sits in the 79th percentile for violations within its industry-state peer group of 463 employers. Inspection frequency runs at the 93rd percentile. The most recent enforcement activity was recorded 22 years ago.
Federal records were found in 3 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
CENTRAL PREMIX CONCRETE CO appears in OSHA workplace safety, MSHA mine safety, and NLRB labor relations records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
75% of inspections at this establishment produced violations, with 3 inspections producing serious-or-greater violations.
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 5 distinct standards shown · 5 citations in this view · $1,090 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 0242.1515 | 1 | 1 | $450 | Sep 1995 | Sep 1995 |
| 29 CFR 0249.560507 B 01 | 1 | 1 | $450 | Sep 1995 | Sep 1995 |
| 29 CFR 8412.0010 | 1 | 1 | $100 | Apr 2004 | Apr 2004 |
| 29 CFR 0247.651101 | 1 | 1 | $90 | May 1994 | May 1994 |
| 29 CFR 8002.2010 | 1 | 1 | — | Apr 2004 | Apr 2004 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Above average violations in NAICS 4233 within WA. Peer group: 463 employers. This establishment has 5 OSHA violations; peer median is 2.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for CENTRAL PREMIX CONCRETE CO. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for CENTRAL PREMIX CONCRETE CO. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 22+ years. Most recent activity: 22 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for CENTRAL PREMIX CONCRETE CO. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in WA — for CENTRAL PREMIX CONCRETE CO, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other CENTRAL PREMIX CONCRETE CO operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 35S&S · 22 contractor · $34,296 proposed / $34,082 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 8556460 | Toppenish Facility Yakima, WA | Mar 2011 | — | Yes | ModNegligence | $4,329 | $4,329 |
| 8565285 | Sullivan Road Facility Spokane, WA | Dec 2010 | — | Yes | HighNegligence | $2,282 | $2,282 |
| 6483610 | Pasco Facility Franklin, WA contractor: Central Pre-Mix Concrete Co. | Oct 2009 | — | Yes | HighNegligence | $2,282 | $2,068 |
| 8556157 | Toppenish Facility Yakima, WA | Jun 2010 | — | Yes | HighNegligence | $1,944 | $1,944 |
| 6433419 | Toppenish Facility Yakima, WA | Apr 2008 | — | Yes | ModNegligence | $1,530 | $1,530 |
| 7963720 | Sullivan Road Facility Spokane, WA | Sep 2007 | — | No | ModNegligence | $1,026 | $1,026 |
| 7963719 | Sullivan Road Facility Spokane, WA | Sep 2007 | — | No | ModNegligence | $1,026 | $1,026 |
| 6483605 | Pasco Facility Franklin, WA contractor: Central Pre-Mix Concrete Co. | Oct 2009 | — | Yes | ModNegligence | $687 | $687 |
| 8605327 | Pasco Facility Franklin, WA contractor: Central Pre-Mix Concrete Co. | Nov 2011 | — | Yes | ModNegligence | $634 | $634 |
| 8780496 | Toppenish Facility Yakima, WA | Sep 2014 | — | Yes | ModNegligence | $585 | $585 |
| 8696559 | Pasco Facility Franklin, WA contractor: Central Pre-Mix Concrete Co. | Apr 2013 | — | Yes | ModNegligence | $585 | $585 |
| 8696524 | Pasco Facility Franklin, WA contractor: Central Pre-Mix Concrete Co. | Feb 2013 | — | Yes | ModNegligence | $585 | $585 |
| 8556149 | Toppenish Facility Yakima, WA | Jun 2010 | — | Yes | ModNegligence | $585 | $585 |
| 8556147 | Toppenish Facility Yakima, WA | Jun 2010 | — | Yes | ModNegligence | $585 | $585 |
| 8556145 | Toppenish Facility Yakima, WA | Jun 2010 | — | Yes | ModNegligence | $585 | $585 |
| 6433421 | Toppenish Facility Yakima, WA | Apr 2008 | — | No | ModNegligence | $460 | $460 |
| 6433418 | Toppenish Facility Yakima, WA | Apr 2008 | — | No | ModNegligence | $460 | $460 |
| 7963779 | Sullivan Road Facility Spokane, WA | Jan 2008 | — | No | ModNegligence | $460 | $460 |
| 8556148 | Toppenish Facility Yakima, WA | Jun 2010 | — | No | HighNegligence | $392 | $392 |
| 6399428 | Sullivan Road Facility Spokane, WA | Apr 2010 | — | Yes | ModNegligence | $392 | $392 |
| 7979312 | Toppenish Facility Yakima, WA | Oct 2007 | — | Yes | LowNegligence | $392 | $392 |
| 6396379 | Toppenish Facility Yakima, WA | Apr 2007 | — | Yes | ModNegligence | $375 | $375 |
| 6350394 | Pasco Facility Franklin, WA contractor: Central Pre-Mix Concrete Co. | Dec 2003 | — | Yes | ModNegligence | $350 | $350 |
| 8611593 | Sullivan Road Facility Spokane, WA | Oct 2013 | — | Yes | LowNegligence | $308 | $308 |
| 8605799 | Pasco Facility Franklin, WA contractor: Central Pre-Mix Concrete Co. | Apr 2012 | — | No | ModNegligence | $308 | $308 |
| 6399438 | Sullivan Road Facility Spokane, WA | Apr 2010 | — | Yes | ModNegligence | $308 | $308 |
| 7967311 | Pasco Facility Franklin, WA contractor: Central Pre-Mix Concrete Co. | Jul 2009 | — | Yes | ModNegligence | $308 | $308 |
| 6443768 | Toppenish Facility Yakima, WA | Feb 2009 | — | No | ModNegligence | $285 | $285 |
| 6443767 | Toppenish Facility Yakima, WA | Feb 2009 | — | No | ModNegligence | $285 | $285 |
| 6396378 | Toppenish Facility Yakima, WA | Apr 2007 | — | Yes | LowNegligence | $268 | $268 |
| 8786100 | Toppenish Facility Yakima, WA | Sep 2014 | — | Yes | ModNegligence | $263 | $263 |
| 8565733 | Toppenish Facility Yakima, WA | Aug 2011 | — | No | ModNegligence | $263 | $263 |
| 8565732 | Toppenish Facility Yakima, WA | Aug 2011 | — | No | ModNegligence | $263 | $263 |
| 6363704 | Matheson Pit Benton, WA | May 2005 | — | Yes | ModNegligence | $217 | $217 |
| 8563624 | Sullivan Road Facility Spokane, WA | May 2012 | — | Yes | ModNegligence | $207 | $207 |
| 6433420 | Toppenish Facility Yakima, WA | Apr 2008 | — | No | LowNegligence | $207 | $207 |
| 7990344 | Yakima Crusher Yakima, WA | Oct 2000 | — | Yes | ModNegligence | $196 | $196 |
| 8562915 | Pasco Facility Franklin, WA contractor: Central Pre-Mix Concrete Co. | May 2011 | — | Yes | ModNegligence | $190 | $190 |
| 6336362 | Pasco Facility Franklin, WA contractor: Central Pre-Mix Concrete Co. | Jan 2003 | — | Yes | ModNegligence | $184 | $184 |
| 9431060 | Sullivan Road Facility Spokane, WA | Jan 2019 | — | No | ModNegligence | $181 | $181 |
| 6384145 | Sullivan Road Facility Spokane, WA | Sep 2006 | — | Yes | LowNegligence | $177 | $177 |
| 6384144 | Sullivan Road Facility Spokane, WA | Sep 2006 | — | Yes | LowNegligence | $177 | $177 |
| 6350340 | Matheson Pit Benton, WA | Apr 2004 | — | Yes | ModNegligence | $177 | $177 |
| 8556146 | Toppenish Facility Yakima, WA | Jun 2010 | — | Yes | ModNegligence | $176 | $176 |
| 7959465 | Matheson Pit Benton, WA | May 2007 | — | Yes | ModNegligence | $162 | $162 |
| 8880977 | Sullivan Road Facility Spokane, WA | Feb 2017 | — | No | ModNegligence | $160 | $160 |
| 6396296 | Sullivan Road Facility Spokane, WA | Jan 2007 | — | Yes | ModNegligence | $154 | $154 |
| 9990956 | Sullivan Road Facility Spokane, WA | Apr 2025 | — | No | LowNegligence | $151 | $151 |
| 9501667 | Sullivan Road Facility Spokane, WA | Nov 2024 | — | No | LowNegligence | $147 | $147 |
| 9501666 | Sullivan Road Facility Spokane, WA | Nov 2024 | — | No | LowNegligence | $147 | $147 |
| 6384139 | Sullivan Road Facility Spokane, WA | Sep 2006 | — | Yes | LowNegligence | $144 | $144 |
| 9707554 | Crestline Facility Spokane, WA | Jun 2023 | — | No | ModNegligence | $143 | $143 |
| 8870948 | Sullivan Road Facility Spokane, WA | Dec 2015 | — | No | ModNegligence | $138 | $138 |
| 8784576 | Sullivan Road Facility Spokane, WA | Mar 2015 | — | No | ModNegligence | $138 | $138 |
| 8565283 | Sullivan Road Facility Spokane, WA | Dec 2010 | — | Yes | LowNegligence | $138 | $138 |
| 6483609 | Pasco Facility Franklin, WA contractor: Central Pre-Mix Concrete Co. | Oct 2009 | — | No | ModNegligence | $138 | $138 |
| 6483608 | Pasco Facility Franklin, WA contractor: Central Pre-Mix Concrete Co. | Oct 2009 | — | No | ModNegligence | $138 | $138 |
| 6483606 | Pasco Facility Franklin, WA contractor: Central Pre-Mix Concrete Co. | Oct 2009 | — | No | ModNegligence | $138 | $138 |
| 7981719 | Toppenish Facility Yakima, WA | Nov 2007 | — | No | ModNegligence | $138 | $138 |
| 7979311 | Toppenish Facility Yakima, WA | Oct 2007 | — | No | ModNegligence | $138 | $138 |
| 7979307 | Toppenish Facility Yakima, WA | Oct 2007 | — | No | ModNegligence | $138 | $138 |
| 8696560 | Pasco Facility Franklin, WA contractor: Central Pre-Mix Concrete Co. | Apr 2013 | — | No | ModNegligence | $131 | $131 |
| 8562462 | Pasco Facility Franklin, WA contractor: Central Pre-Mix Concrete Co. | Dec 2010 | — | No | ModNegligence | $127 | $127 |
| 8558609 | Pasco Facility Franklin, WA contractor: Central Pre-Mix Concrete Co. | Jan 2010 | — | No | ModNegligence | $127 | $127 |
| 9431999 | Sullivan Road Facility Spokane, WA | Jan 2020 | — | No | ModNegligence | $123 | $123 |
| 9431061 | Sullivan Road Facility Spokane, WA | Jan 2019 | — | No | LowNegligence | $121 | $121 |
| 9370736 | Crestline Facility Spokane, WA | Jun 2018 | — | No | ModNegligence | $118 | $118 |
| 9370718 | Sullivan Road Facility Spokane, WA | Mar 2018 | — | No | ModNegligence | $118 | $118 |
| 9370717 | Sullivan Road Facility Spokane, WA | Mar 2018 | — | No | ModNegligence | $118 | $118 |
| 9370716 | Sullivan Road Facility Spokane, WA | Mar 2018 | — | No | ModNegligence | $118 | $118 |
| 9370715 | Sullivan Road Facility Spokane, WA | Mar 2018 | — | No | ModNegligence | $118 | $118 |
| 9370714 | Sullivan Road Facility Spokane, WA | Mar 2018 | — | No | ModNegligence | $118 | $118 |
| 9370713 | Sullivan Road Facility Spokane, WA | Mar 2018 | — | No | ModNegligence | $118 | $118 |
| 9370712 | Sullivan Road Facility Spokane, WA | Mar 2018 | — | No | ModNegligence | $118 | $118 |
| 8780499 | Toppenish Facility Yakima, WA | Sep 2014 | — | No | ModNegligence | $117 | $117 |
| 6389980 | Pasco Facility Franklin, WA contractor: Central Pre-Mix Concrete Co. | Apr 2014 | — | No | ModNegligence | $117 | $117 |
| 8563650 | Toppenish Facility Yakima, WA | Jul 2012 | — | No | ModNegligence | $117 | $117 |
| 8556459 | Toppenish Facility Yakima, WA | Mar 2011 | — | No | LowNegligence | $117 | $117 |
| 8556158 | Toppenish Facility Yakima, WA | Jun 2010 | — | No | ModNegligence | $117 | $117 |
| 8556156 | Toppenish Facility Yakima, WA | Jun 2010 | — | No | ModNegligence | $117 | $117 |
| 8556152 | Toppenish Facility Yakima, WA | Jun 2010 | — | No | ModNegligence | $117 | $117 |
| 8556150 | Toppenish Facility Yakima, WA | Jun 2010 | — | No | ModNegligence | $117 | $117 |
| 8556144 | Toppenish Facility Yakima, WA | Jun 2010 | — | No | ModNegligence | $117 | $117 |
| 8556141 | Toppenish Facility Yakima, WA | Jun 2010 | — | No | ModNegligence | $117 | $117 |
| 8880978 | Sullivan Road Facility Spokane, WA | Feb 2017 | — | No | ModNegligence | $116 | $116 |
| 6399315 | Crestline Facility Spokane, WA | Jun 2008 | — | No | ModNegligence | $108 | $108 |
| 8784755 | Sullivan Road Facility Spokane, WA | Nov 2014 | — | No | LowNegligence | $100 | $100 |
| 8784754 | Sullivan Road Facility Spokane, WA | Nov 2014 | — | No | ModNegligence | $100 | $100 |
| 8784819 | Pasco Facility Franklin, WA contractor: Central Pre-Mix Concrete Co. | Oct 2014 | — | No | ModNegligence | $100 | $100 |
| 8784818 | Pasco Facility Franklin, WA contractor: Central Pre-Mix Concrete Co. | Oct 2014 | — | No | ModNegligence | $100 | $100 |
| 8784817 | Pasco Facility Franklin, WA contractor: Central Pre-Mix Concrete Co. | Oct 2014 | — | No | ModNegligence | $100 | $100 |
| 8780498 | Toppenish Facility Yakima, WA | Sep 2014 | — | No | ModNegligence | $100 | $100 |
| 8780497 | Toppenish Facility Yakima, WA | Sep 2014 | — | No | ModNegligence | $100 | $100 |
| 8780495 | Toppenish Facility Yakima, WA | Sep 2014 | — | No | ModNegligence | $100 | $100 |
| 8780494 | Toppenish Facility Yakima, WA | Sep 2014 | — | No | ModNegligence | $100 | $100 |
| 8780493 | Toppenish Facility Yakima, WA | Sep 2014 | — | No | ModNegligence | $100 | $100 |
| 6389979 | Pasco Facility Franklin, WA contractor: Central Pre-Mix Concrete Co. | Apr 2014 | — | No | LowNegligence | $100 | $100 |
| 6389924 | Pasco Facility Franklin, WA contractor: Central Pre-Mix Concrete Co. | Dec 2013 | — | No | ModNegligence | $100 | $100 |
| 8780018 | Toppenish Facility Yakima, WA | Oct 2013 | — | No | LowNegligence | $100 | $100 |
| 8780115 | Crestline Facility Spokane, WA | Sep 2013 | — | No | ModNegligence | $100 | $100 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
Company-level in WA — for CENTRAL PREMIX CONCRETE CO, not this location alone
National Labor Relations Board — unfair labor practice charges and union representation cases. The NLRB records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other CENTRAL PREMIX CONCRETE CO locations in the same state.
NLRB cases
National Labor Relations Board cases involving this employer. Includes unfair labor practice (ULP) filings and representation election proceedings. NLRB enforcement is process-driven; no per-case monetary penalty is assessed (remedies are case-by-case backpay orders, posting requirements, election re-runs, etc.). 2 cases · 2 ULP
| Case number | Type | Filed | Closed | Status | Region |
|---|---|---|---|---|---|
| 19-CA-179850 | Unfair labor practice | Jul 2016 | Aug 2016 | Closed | Region 19, Seattle, Washington |
| 19-CA-179820 | Unfair labor practice | Jul 2016 | Aug 2016 | Closed | Region 19, Seattle, Washington |
Source: NLRB case files. Rows shown are those the agency has published. Region numbers (1–31) correspond to NLRB's geographic offices.
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for CENTRAL PREMIX CONCRETE CO. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for CENTRAL PREMIX CONCRETE CO. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for CENTRAL PREMIX CONCRETE CO. Verify directly with UVA Corporate Prosecution Registry →
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2004-02-02 | Planned | 2 | 1 | $100 | |
| 2000-06-26 | Follow-up | 0 | — | $0 | |
| 1995-08-15 | Complaint | 2 | 2 | $900 | |
| 1994-04-18 | Planned | 1 | 1 | $90 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in brick, stone, and related construction material merchant wholesalers within WA, ordered by federal enforcement volume:
- MUTUAL MATERIALS COMPANYTUMWATER — 3 federal enforcement records
- LAKESIDE INDUSTRIESABERDEEN — 3 federal enforcement records
- STONE NW INCVANCOUVER — 2 federal enforcement records
- QUALITY ROCK PRODUCTS INCTENINO — 2 federal enforcement records
- FIFE SAND & GRAVELFIFE — 2 federal enforcement records
- STONE NW INCCAMAS — 2 federal enforcement records
- QUALITY ROCK PRODUCTS INCOLYMPIA — 2 federal enforcement records
- CENTRAL PRE-MIX CONCRETE PRODUCTSSPOKANE — 2 federal enforcement records
- PENINSULA TOPSOIL LLCBELFAIR — 2 federal enforcement records
- ATLAS SAND & ROCK INCPULLMAN — 2 federal enforcement records
Related searches
- Brick, Stone, and Related Construction Material Merchant WholesalersAll employers in this industry
- Employers in WAState-wide enforcement data
- Brick, Stone, and in WAIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on CENTRAL PREMIX CONCRETE CO from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is CENTRAL PREMIX CONCRETE CO's OSHA violation history?
- CENTRAL PREMIX CONCRETE CO has 4 OSHA inspections on record with 5 violations and $1,090 in total penalties.
- How does CENTRAL PREMIX CONCRETE CO's safety record compare to its industry?
- CENTRAL PREMIX CONCRETE CO operates in the brick, stone, and related construction material merchant wholesalers industry. The industry average Total Recordable Incident Rate (TRIR) is 3.