Skip to main content

Establishment profile

Cemex Construction Materials South

1 McKelligon Canyon, El Paso, TX, 79930
Operated by Cemex Construction Materials South LLC · 1 of 4 establishments
327310Cement Manufacturing
EIN 263067986

Download as PDF →

OSHA inspections
0
over 10 years
Violations
0
Penalties
$0
Violations across 3 federal agencies
Enforcement actions from multiple agencies may indicate systemic compliance issues across functions.
Context
No OSHA inspections on record. This does not mean the employer is violation-free — OSHA inspects a small fraction of workplaces annually.

Summary

Cemex Construction Materials South has no OSHA inspection history on file. Federal records covering wage, environmental, labor relations, and other agencies are noted below where present.

The most recent federal enforcement activity was recorded 10 years ago.

Federal records were found in 3 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

Cemex Construction Materials South appears in WHD wage enforcement, MSHA mine safety, and NLRB labor relations records only. No matching records were found in OSHA workplace safety, EPA environmental compliance, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.

OSHA workplace safety

No OSHA inspections, citations, or accidents on file for Cemex Construction Materials South. Verify directly with Occupational Safety and Health Administration

Safety self-report (OSHA 300A)

Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.

DART rate
6.2
vs industry
+4.2
TRIR
6.2
vs industry
+2.9

Reported for 30 average annual employees at this establishment.

Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.

Industry benchmark

Industry avg TRIR
3.3
BLS SOII 2024
Industry avg DART
2.0
BLS SOII 2024
Self-reported TRIR
6.2
OSHA ITA Form 300A (employer self-reported)

BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for Cemex Construction Materials South. Verify directly with Occupational Safety and Health Administration

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
10 years ago

No federal enforcement activity has been recorded against this establishment in 10+ years. Most recent activity: 10 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

Cases
1
Back wages owed
$0

Department of Labor Wage & Hour Division — minimum-wage, overtime, child-labor, FMLA, and prevailing-wage enforcement.

Wage and hour breakdown by law

Per-statute totals across all closed DOL Wage & Hour cases against this employer. Backwages reflect amounts the agency assessed; civil penalty is the separate fine where applicable. Some acts (Davis-Bacon, SCA, CWHSSA, H-2B, CCPA) don't carry a civil penalty field in DOL's data. 1 statute · 1 violation · $0 in backwages

StatutePeriodCasesViolationsWorkersBackwagesCivil penalty
FLSA — minimum wage & overtimeAug 201511

Source: DOL WHD enforcement database, aggregated per statute. Lifetime totals. A case can cite multiple statutes — so the total here may exceed the case count in the table above.

Wage and hour cases

Closed DOL Wage & Hour Division cases (FLSA, FMLA, H-2B, MSPA, and related statutes). Backwages reflect amounts the agency assessed; civil penalty (CMP) is a separate fine levied on top, where the statute provides for one (FLSA / H-1B / H-2A / MSPA / FMLA / EPPA / FLSA Child Labor; other acts have no CMP column in DOL’s data). The Statutes column lists which laws each case cited. 1 case · $0 in backwages

Case periodIndustryStatutesViolationsWorkersBackwagesCivil penalty
Feb 2014 – Aug 2015Cement Manufacturing0

Source: DOL WHD enforcement database. Cases shown reflect those the agency has closed and made public. A violation count is the agency’s tally of cited violations (one violation can affect many workers); the workers column counts distinct employees the agency found to be affected.

Mine safety (MSHA)

Company-level in TX — for Cemex Construction Materials South LLC, not this location alone

Violations
1,574
Assessed penalties
$2,018,165

Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other Cemex Construction Materials South LLC operations in the same state.

MSHA citations

Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 71S&S · 13 contractor · $1,109,462 proposed / $799,718 paid.

CitationMineDateSectionS&SNegligenceProposedPaid
8965050
Balcones Quarry
Comal, TX
Mar 2019YesHighNegligence$72,620$72,620
8864412
Odessa Cement Plant
Ector, TX
contractor: CEMEX Construction Materials South LLC
Jul 2015YesReckless$63,071$33,775
8972198
Balcones Plant
Comal, TX
Jul 2017YesModNegligence$37,009$9,908
9643323
Balcones Plant
Comal, TX
Jul 2021YesHighNegligence$36,801$25,761
9643322
Balcones Plant
Comal, TX
Jul 2021YesHighNegligence$36,801$25,761
9790982
Balcones Plant
Comal, TX
Mar 2024YesModNegligence$31,575$31,575
8854954
Balcones Plant
Comal, TX
Jan 2015YesLowNegligence$29,529$15,000
8972093
Balcones Plant
Comal, TX
Feb 2017YesHighNegligence$27,500$8,769
9644401
Chico 2 Quarry
Wise, TX
contractor: Cemex Construction Materials South, LLC
May 2021YesModNegligence$24,668$3,820
8774473
Balcones Plant
Comal, TX
Jan 2015YesModNegligence$23,229$16,340
9517667
Balcones Quarry
Comal, TX
Jan 2021NoHighNegligence$22,770$5,109
8864413
Odessa Cement Plant
Ector, TX
contractor: CEMEX Construction Materials South LLC
Jul 2015YesHighNegligence$21,993$11,867
8623927
Balcones Plant
Comal, TX
Jan 2012NoModNegligence$21,442$1,304
8862868
Balcones Plant
Comal, TX
Sep 2015YesHighNegligence$19,793$19,793
9640201
Balcones Quarry
Comal, TX
Aug 2020YesLowNegligence$19,670$7,955
9790979
Balcones Plant
Comal, TX
Mar 2024YesModNegligence$19,539$19,539
9799327
Balcones Plant
Comal, TX
Mar 2026YesHighNegligence$14,557
9793110
Balcones Plant
Comal, TX
Aug 2024YesModNegligence$14,188$14,188
9790970
Balcones Plant
Comal, TX
Mar 2024YesModNegligence$14,188$14,188
5005369
Balcones Plant
Comal, TX
Mar 2026YesModNegligence$13,436
8674057
Odessa Cement Plant
Ector, TX
contractor: CEMEX Construction Materials South LLC
Mar 2012YesHighNegligence$13,268$13,268
9793106
Balcones Plant
Comal, TX
Aug 2024YesModNegligence$13,095$13,095
9793105
Balcones Plant
Comal, TX
Aug 2024YesModNegligence$13,095$13,095
9793642
Balcones Plant
Comal, TX
Aug 2024YesModNegligence$13,095$13,095
9793096
Balcones Plant
Comal, TX
Aug 2024YesModNegligence$13,095$13,095
9747486
Balcones Plant
Comal, TX
Aug 2024YesModNegligence$13,095$13,095
8970658
Balcones Plant
Comal, TX
Feb 2017NoModNegligence$12,075$2,434
9285269
Balcones Plant
Comal, TX
Sep 2022YesModNegligence$11,772$11,772
5003238
Balcones Plant
Comal, TX
Jun 2025NoHighNegligence$11,450$11,450
9640806
Balcones Plant
Comal, TX
Sep 2020YesModNegligence$10,953$10,953
9285272
Balcones Plant
Comal, TX
Sep 2022YesModNegligence$10,868$10,868
9285271
Balcones Plant
Comal, TX
Sep 2022YesModNegligence$10,868$10,868
8854957
Balcones Plant
Comal, TX
Jan 2015NoHighNegligence$9,634$4,744
9790981
Balcones Plant
Comal, TX
Mar 2024YesModNegligence$9,510$9,510
9643299
Balcones Plant
Comal, TX
Jul 2021YesModNegligence$9,446$8,029
8859568
Balcones Plant
Comal, TX
Sep 2015NoModNegligence$8,893$541
8767913
Balcones Plant
Comal, TX
Jul 2013NoHighNegligence$8,893$1,799
8767805
Balcones Plant
Comal, TX
Mar 2014NoModNegligence$8,209$1,658
8970666
Balcones Plant
Comal, TX
Feb 2017NoHighNegligence$8,094$8,094
9643317
Balcones Plant
Comal, TX
Jul 2021YesModNegligence$8,048$5,634
9519375
Balcones Plant
Comal, TX
Mar 2021YesModNegligence$8,048$8,048
9640202
Balcones Quarry
Comal, TX
Aug 2020YesLowNegligence$7,955$7,955
9640593
Balcones Plant
Comal, TX
Mar 2022YesModNegligence$7,890$7,890
8766038
Balcones Plant
Comal, TX
Oct 2013YesHighNegligence$7,578$7,578
8766033
Balcones Plant
Comal, TX
Oct 2013YesHighNegligence$7,578$7,578
9793643
Balcones Plant
Comal, TX
Aug 2024NoModNegligence$7,481$7,481
9747485
Balcones Plant
Comal, TX
Aug 2024NoModNegligence$7,481$7,481
8972193
Balcones Plant
Comal, TX
Jul 2017NoHighNegligence$7,472$7,472
8965051
Balcones Quarry
Comal, TX
Mar 2019YesHighNegligence$7,214$5,847
9748979
Balcones Plant
Comal, TX
Aug 2024NoModNegligence$6,905$6,905
9748973
Balcones Plant
Comal, TX
Aug 2024NoModNegligence$6,905$6,905
9747489
Balcones Plant
Comal, TX
Aug 2024NoModNegligence$6,905$6,905
9646056
Balcones Quarry
Comal, TX
Aug 2021NoModNegligence$6,858$1,385
9517672
Balcones Quarry
Comal, TX
Jan 2021YesLowNegligence$6,858$3,425
8862275
Odessa Cement Plant
Ector, TX
contractor: CEMEX Construction Materials South LLC
Aug 2015YesModNegligence$6,458$6,458
8854952
Balcones Plant
Comal, TX
Jan 2015YesLowNegligence$6,458$4,600
8623929
Balcones Plant
Comal, TX
Jan 2012NoModNegligence$6,458$392
9745549
Balcones Plant
Comal, TX
Aug 2024NoHighNegligence$6,374$6,374
8959560
McKelligon Canyon
El Paso, TX
contractor: CEMEX Construction Materials South LLC
Jul 2016YesModNegligence$6,264$6,264
8866287
Balcones Plant
Comal, TX
Sep 2015YesModNegligence$5,961$5,961
8854960
Balcones Plant
Comal, TX
Jan 2015NoHighNegligence$5,961$5,961
8774471
Balcones Plant
Comal, TX
Jan 2015NoHighNegligence$5,961$5,961
9514120
Balcones Plant
Comal, TX
Mar 2021YesModNegligence$5,844$5,844
9514119
Balcones Plant
Comal, TX
Mar 2021YesModNegligence$5,844$5,844
8960962
Balcones Plant
Comal, TX
Jun 2016YesHighNegligence$5,783$5,783
8960969
Balcones Plant
Comal, TX
Jun 2016YesModNegligence$5,783$5,783
8775195
McKelligon Canyon
El Paso, TX
contractor: CEMEX Construction Materials South LLC
Jul 2014YesModNegligence$5,503$5,503
8771819
Balcones Plant
Comal, TX
Mar 2014YesModNegligence$5,503$5,503
6571410
McKelligon Canyon
El Paso, TX
contractor: CEMEX Construction Materials South LLC
Jan 2010YesModNegligence$5,503$5,503
9643326
Balcones Plant
Comal, TX
Jul 2021NoHighNegligence$5,395$3,777
8854964
Balcones Plant
Comal, TX
Jan 2015YesModNegligence$5,080$2,766
8774478
Balcones Plant
Comal, TX
Jan 2015YesHighNegligence$5,080$5,080
8774477
Balcones Plant
Comal, TX
Jan 2015YesModNegligence$5,080$4,056
8766414
EAST LOOP 375 SAND PLT
El Paso, TX
contractor: Cemex Construction Materials South LLC
Oct 2013YesHighNegligence$5,000$5,000
9519376
Balcones Plant
Comal, TX
Mar 2021YesModNegligence$4,980$4,980
9515013
Balcones Plant
Comal, TX
Mar 2020YesModNegligence$4,922$4,922
9405761
Balcones Quarry
Comal, TX
Jul 2019YesHighNegligence$4,840$527
5000586
Balcones Quarry
Comal, TX
Jul 2025YesModNegligence$4,749
8854963
Balcones Plant
Comal, TX
Jan 2015NoHighNegligence$4,689$4,689
8774476
Balcones Plant
Comal, TX
Jan 2015NoHighNegligence$4,689$4,689
6567109
EAST LOOP 375 SAND PLT
El Paso, TX
contractor: Cemex Construction Materials South LLC
May 2010YesHighNegligence$4,689$4,689
9359636
Balcones Quarry
Comal, TX
Nov 2017YesModNegligence$4,623$4,623
5003236
Balcones Plant
Comal, TX
Jun 2025NoHighNegligence$4,383$4,383
8959898
Odessa Cement Plant
Ector, TX
contractor: CEMEX Construction Materials South LLC
Apr 2016YesHighNegligence$4,329$4,329
8685494
Odessa Cement Plant
Ector, TX
contractor: CEMEX Construction Materials South LLC
May 2013YesModNegligence$4,329$4,329
9793101
Balcones Plant
Comal, TX
Aug 2024YesModNegligence$4,273$4,273
9745919
Balcones Plant
Comal, TX
Sep 2023YesHighNegligence$4,139$4,139
9673560
Balcones Plant
Comal, TX
Mar 2023YesModNegligence$4,139$4,139
8771818
Balcones Plant
Comal, TX
Mar 2014YesModNegligence$3,996$3,996
8686350
Balcones Plant
Comal, TX
Jul 2013YesModNegligence$3,996$3,996
9640213
Balcones Quarry
Comal, TX
Sep 2020NoModNegligence$3,871$769
9515012
Balcones Plant
Comal, TX
Mar 2020YesModNegligence$3,871$3,871
9672239
Balcones Quarry
Comal, TX
Mar 2022YesLowNegligence$3,841$1,725
5005371
Balcones Plant
Comal, TX
Mar 2026NoModNegligence$3,736
5003235
Balcones Plant
Comal, TX
Jun 2025NoHighNegligence$3,736$3,736
9798764
Balcones Plant
Comal, TX
Feb 2025NoModNegligence$3,736$3,736
8967018
Odessa Cement Plant
Ector, TX
contractor: CEMEX Construction Materials South LLC
Apr 2016YesModNegligence$3,689$3,689
8854967
Balcones Plant
Comal, TX
Feb 2015NoModNegligence$3,689$2,580
9356008
Balcones Plant
Comal, TX
Jul 2017YesModNegligence$3,636$3,636
8972092
Balcones Plant
Comal, TX
Feb 2017YesModNegligence$3,636$3,636

Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).

Labor relations (NLRB)

Company-level in TX — for Cemex Construction Materials South LLC, not this location alone

Total cases
1
Representation (union)
1

National Labor Relations Board — unfair labor practice charges and union representation cases. The NLRB records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other Cemex Construction Materials South LLC locations in the same state.

NLRB cases

National Labor Relations Board cases involving this employer. Includes unfair labor practice (ULP) filings and representation election proceedings. NLRB enforcement is process-driven; no per-case monetary penalty is assessed (remedies are case-by-case backpay orders, posting requirements, election re-runs, etc.). 1 case · 1 representation

Case numberTypeFiledClosedStatusRegion
16-RM-331258Representation electionDec 2023Jan 2024ClosedRegion 16, Fort Worth, Texas

Source: NLRB case files. Rows shown are those the agency has published. Region numbers (1–31) correspond to NLRB's geographic offices.

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for Cemex Construction Materials South. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for Cemex Construction Materials South. Verify directly with Environmental Protection Agency

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for Cemex Construction Materials South. Verify directly with UVA Corporate Prosecution Registry

In the news

Part of a larger organization

Cemex Construction Materials South is one of 4 establishments rolled up under the parent organization Cemex Construction Materials South LLC.

Federal enforcement records on this page represent activity at this specific establishment only. The full enforcement footprint of Cemex Construction Materials South LLC across all 4 of its tracked locations is viewable on the parent profile.

Other employers in this industry and state

Other employers in cement manufacturing within TX, ordered by federal enforcement volume:

Other locations under this parent

Other establishments operated by Cemex Construction Materials South LLC, ordered by federal enforcement volume:

Related searches

About this data

This profile aggregates federal enforcement records on Cemex Construction Materials South from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code. This establishment resolves to the parent rollup Cemex Construction Materials South LLC, which operates 4 establishments in our dataset.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is Cemex Construction Materials South's OSHA violation history?
Cemex Construction Materials South has no OSHA inspections on record.
How does Cemex Construction Materials South's safety record compare to its industry?
Cemex Construction Materials South operates in the cement manufacturing industry. The industry average Total Recordable Incident Rate (TRIR) is 3.3. Cemex Construction Materials South's self-reported DART rate is 6.21 compared to an industry average of 2.