Skip to main content

Establishment profile

CECIL I. WALKER MACHINERY COMPANY

1450 EAST DUPONT AVENUE, BELLE, WV, 25015
Operated by Cecil I Walker Machinery Co · 1 of 5 establishments
333120Construction Machinery Manufacturing
EIN 550352647

Download as PDF →

OSHA inspections
10
over 49 years
Violations
12
$4,855 in penalties
Penalties
$4,855
$405 avg
Violations across 3 federal agencies
Enforcement actions from multiple agencies may indicate systemic compliance issues across functions.
Accident investigations on record
1 National Emphasis Program inspections · 1 OSHA follow-up

Summary

CECIL I. WALKER MACHINERY COMPANY has accumulated 12 OSHA violations across 10 inspections over 49 years of recorded history, with $4,855 in total assessed penalties.

The establishment sits in the 68th percentile for violations within its industry-state peer group of 26 employers. Inspection frequency runs at the 100th percentile. The most recent enforcement activity was recorded 12 years ago.

Federal records were found in 3 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

CECIL I. WALKER MACHINERY COMPANY appears in OSHA workplace safety, MSHA mine safety, and NLRB labor relations records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.

OSHA workplace safety

Inspections
10
0.2 / yr · last 49 yrs
Violations
12
0.2 / yr
Penalties
$4,855
$405 avg / violation
25% serious75% other
Inspection trigger · complaint
5 of 10
Inspection trigger · planned
3 of 10

50% of inspections at this establishment produced violations, with 3 inspections producing serious-or-greater violations.

Most-cited OSHA standards

Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 12 distinct standards shown · 12 citations in this view · $4,855 in penalties.

CFR sectionCitationsInspectionsTotal penaltyFirst citedLast cited
29 CFR 1910.0212 A0111$2,338Feb 2014Feb 2014
29 CFR 1910.0133 A0111$1,403Feb 2014Feb 2014
29 CFR 1904.0029 B0111$468Feb 2014Feb 2014
29 CFR 1904.0029 B0311$468Feb 2014Feb 2014
29 CFR 1910.0178 P0111$180Feb 1977Feb 1977
29 CFR 1910.0095 K0111Jun 1983Jun 1983
29 CFR 1910.0095 L0111Jun 1983Jun 1983
29 CFR 1910.0095 D0111Jun 1983Jun 1983
29 CFR 1910.0094 D09 III11Jun 1983Jun 1983
5A000111Jan 1981Jan 1981
29 CFR 1904.0002 A11Nov 1980Nov 1980
29 CFR 1910.0215 B0911Feb 1977Feb 1977

Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.

Peer comparison

68th

Above average violations in NAICS 3331 within WV. Peer group: 26 employers. This establishment has 12 OSHA violations; peer median is 8.

Fewer violationsMore violations
Penalty percentile
40th
peer median: $7,442
Inspection frequency
100th
peer median: 1

Safety self-report (OSHA 300A)

Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.

DART rate
0.0
vs industry
−1.6
TRIR
0.0
vs industry
−2.8

Reported for 18 average annual employees at this establishment.

Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.

Industry benchmark

Industry avg TRIR
2.8
BLS SOII 2024
Industry avg DART
1.6
BLS SOII 2024
Self-reported TRIR
0.0
OSHA ITA Form 300A (employer self-reported)

BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.

Inspection breakdown

Planned
3
Complaint
5
Follow-up
2

Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for CECIL I. WALKER MACHINERY COMPANY. Verify directly with Occupational Safety and Health Administration

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
12 years ago

No federal enforcement activity has been recorded against this establishment in 12+ years. Most recent activity: 12 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

No WHD wage, overtime, or child-labor enforcement cases on file for CECIL I. WALKER MACHINERY COMPANY. Verify directly with Wage and Hour Division

Mine safety (MSHA)

Company-level in WV — for Cecil I Walker Machinery Co, not this location alone

Violations
44
Assessed penalties
$7,559

Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other Cecil I Walker Machinery Co operations in the same state.

MSHA citations

Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 44 citations · 22S&S · 44 contractor · $7,559 proposed / $7,559 paid.

CitationMineDateSectionS&SNegligenceProposedPaid
9000753
Holden #22 Surface
Logan, WV
contractor: Cecil I Walker Machinery Co
Jul 2013YesModNegligence$745$745
7216887
Little Creek Dock
Kanawha, WV
contractor: Cecil I Walker Machinery Co
Apr 2003YesHighNegligence$459$459
7216881
Little Creek Dock
Kanawha, WV
contractor: Cecil I Walker Machinery Co
Apr 2003YesHighNegligence$405$405
8142814
Beetree Surface Mine
Raleigh, WV
contractor: Cecil I Walker Machinery Co
Sep 2012YesModNegligence$308$308
8142813
Beetree Surface Mine
Raleigh, WV
contractor: Cecil I Walker Machinery Co
Sep 2012YesModNegligence$308$308
8115210
Eagle Creek #11
Logan, WV
contractor: Cecil I Walker Machinery Co
Aug 2010YesModNegligence$263$263
6041755
BURNING SPRINGS MINE
Wood, WV
contractor: Cecil I Walker Machinery Co
Aug 2006YesModNegligence$254$254
7275915
Fanco
Logan, WV
contractor: Cecil I Walker Machinery Co
Feb 2013YesModNegligence$224$224
8129012
Holden #22 Surface
Logan, WV
contractor: Cecil I Walker Machinery Co
Aug 2011YesModNegligence$224$224
8129003
Holden #22 Surface
Logan, WV
contractor: Cecil I Walker Machinery Co
Jul 2011YesModNegligence$224$224
7281104
Birch River Mine
Webster, WV
contractor: Cecil I Walker Machinery Co
Dec 2007YesModNegligence$224$224
7281103
Birch River Mine
Webster, WV
contractor: Cecil I Walker Machinery Co
Dec 2007YesModNegligence$224$224
7233877
Hobet Mine
Boone, WV
contractor: Cecil I Walker Machinery Co
Jan 2005YesModNegligence$191$191
8074017
Fanco
Logan, WV
contractor: Cecil I Walker Machinery Co
Sep 2009YesModNegligence$190$190
4805430
Coal Mac #68 Surface
Mingo, WV
contractor: Cecil I Walker Machinery Co
Sep 2002YesModNegligence$184$184
7233479
Tower Mountain
Logan, WV
contractor: Cecil I Walker Machinery Co
Apr 2005YesLowNegligence$165$165
4191922
No 1A Surface Mine
Boone, WV
contractor: Cecil I Walker Machinery Co
Jun 2003YesModNegligence$153$153
8129644
Seven Pines
Webster, WV
contractor: Cecil I Walker Machinery Co
Sep 2011NoModNegligence$150$150
7206668
Hobet Mine
Boone, WV
contractor: Cecil I Walker Machinery Co
Sep 2003YesModNegligence$144$144
7197846
Rocklick Preparation Plant
Boone, WV
contractor: Cecil I Walker Machinery Co
Jan 2001YesModNegligence$131$131
4716303
Tower Mountain
Logan, WV
contractor: Cecil I Walker Machinery Co
Mar 2003YesLowNegligence$122$122
9368933
BURNING SPRINGS MINE
Wood, WV
contractor: Cecil I Walker Machinery Co
Jan 2018NoModNegligence$118$118
9368932
BURNING SPRINGS MINE
Wood, WV
contractor: Cecil I Walker Machinery Co
Oct 2017NoModNegligence$118$118
9368931
BURNING SPRINGS MINE
Wood, WV
contractor: Cecil I Walker Machinery Co
Jul 2017NoModNegligence$118$118
9368930
BURNING SPRINGS MINE
Wood, WV
contractor: Cecil I Walker Machinery Co
Apr 2017NoModNegligence$118$118
8115291
Cub Branch Surface
Logan, WV
contractor: Cecil I Walker Machinery Co
Nov 2010NoLowNegligence$117$117
9114574
Samples Surface Mine
Kanawha, WV
contractor: Cecil I Walker Machinery Co
May 2017NoModNegligence$116$116
9311778
BURNING SPRINGS MINE
Wood, WV
contractor: Cecil I Walker Machinery Co
Mar 2017NoModNegligence$116$116
4805756
Tower Mountain
Logan, WV
contractor: Cecil I Walker Machinery Co
May 2002YesModNegligence$113$113
8137534
MT-34/Peg Fork
Mingo, WV
contractor: Cecil I Walker Machinery Co
Oct 2011YesLowNegligence$108$108
9052020
Samples Surface Mine
Kanawha, WV
contractor: Cecil I Walker Machinery Co
Jun 2015NoModNegligence$100$100
8393887
Daniel Hollow
Logan, WV
contractor: Cecil I Walker Machinery Co
Jun 2014NoModNegligence$100$100
8289262
GRAPEVINE SOUTH SURFACE MINE
Mingo, WV
contractor: Cecil I Walker Machinery Co
Apr 2013NoLowNegligence$100$100
8710585
BURNING SPRINGS MINE
Wood, WV
contractor: Cecil I Walker Machinery Co
Feb 2013NoModNegligence$100$100
8648787
BURNING SPRINGS MINE
Wood, WV
contractor: Cecil I Walker Machinery Co
Nov 2011NoModNegligence$100$100
8119032
Samples Surface Mine
Kanawha, WV
contractor: Cecil I Walker Machinery Co
Nov 2010NoModNegligence$100$100
8105073
Rocklick Preparation Plant
Boone, WV
contractor: Cecil I Walker Machinery Co
Jun 2010NoModNegligence$100$100
8094424
Samples Surface Mine
Kanawha, WV
contractor: Cecil I Walker Machinery Co
Oct 2009NoModNegligence$100$100
8083788
S11 Keystone Surface Mine
Kanawha, WV
contractor: Cecil I Walker Machinery Co
Aug 2009NoModNegligence$100$100
8069897
White Flame Surface Mine
Mingo, WV
contractor: Cecil I Walker Machinery Co
Aug 2008NoLowNegligence$100$100
7233746
Black Castle Mining Company, LLC
Boone, WV
contractor: Cecil I Walker Machinery Co
Aug 2004NoModNegligence$60$60
4627724
Ruffner
Logan, WV
contractor: Cecil I Walker Machinery Co
Sep 2002NoModNegligence$55$55
7203129
Black Castle Mining Company, LLC
Boone, WV
contractor: Cecil I Walker Machinery Co
Jun 2001NoModNegligence$55$55
7176566
Ruffner
Logan, WV
contractor: Cecil I Walker Machinery Co
Jun 2000NoLowNegligence$55$55

Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).

Labor relations (NLRB)

Company-level in WV — for Cecil I Walker Machinery Co, not this location alone

Total cases
1
Unfair labor practice
1

National Labor Relations Board — unfair labor practice charges and union representation cases. The NLRB records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other Cecil I Walker Machinery Co locations in the same state.

NLRB cases

National Labor Relations Board cases involving this employer. Includes unfair labor practice (ULP) filings and representation election proceedings. NLRB enforcement is process-driven; no per-case monetary penalty is assessed (remedies are case-by-case backpay orders, posting requirements, election re-runs, etc.). 1 case · 1 ULP

Case numberTypeFiledClosedStatusRegion
09-CA-192318Unfair labor practiceFeb 2017Mar 2017ClosedRegion 09, Cincinnati, Ohio

Source: NLRB case files. Rows shown are those the agency has published. Region numbers (1–31) correspond to NLRB's geographic offices.

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for CECIL I. WALKER MACHINERY COMPANY. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for CECIL I. WALKER MACHINERY COMPANY. Verify directly with Environmental Protection Agency

EPA-registered facilities

Every EPA ECHO facility associated with this employer, sorted most-significant first. Each row links to EPA’s Detailed Facility Report for the source-of-truth record. Permits column lists active programs (Air = Clean Air Act, Water = Clean Water Act, RCRA = hazardous waste, TRI = Toxics Release Inventory reporting). 1 facility · 1 marked inactive.

FacilityPermitsStatusInspectionsFormal actionsPenaltiesLast inspectedECHO
CECIL I WALKER MACHINERY CO
114 CARBIDE DR · BELLE, WV, 25015
RCRANo Violation Identified00Dec 2019View →

Source: EPA ECHO (Enforcement and Compliance History Online). Compliance status follows EPA’s own labels (“Sig Violation” = significant noncompliance; QNCR = quarters of noncompliance over the recent reporting window). Inactive facilities (struck through) retain historical enforcement records even after operations ceased.

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for CECIL I. WALKER MACHINERY COMPANY. Verify directly with UVA Corporate Prosecution Registry

Federal contracts

This location

Obligated (5-yr)
$0
Obligated (all-time)
$2.0M
Awards
28
Top agency
Department of Defense
$1.8M
Company-wide — BOYD COMPANY (across 8 entities)
Obligated (5-yr)
$98K
Obligated (all-time)
$3.1M
Awards (all-time)
120

Consolidated across all USAspending recipient entities under this corporate parent — not attributable to this single location.

Top agencies by obligation (this location)
Department of Defense$1.8M
Department of Justice$64K
Department of Labor$22K
Department of Veterans Affairs$17K
Department of the Interior$11K
Largest awards
  • Department of Defense
    DOZER
    contract · Last action 2012-05-16
    $1,395,820
  • Department of Defense
    200608!600198!2100!W912L8!USPFO FOR WEST VIRGINIA !W912L806P0079 !A!N! !N! ! !20060519!20060522!007944663!007944663!007944663!N!CECIL I WALKER MACHINERY COMPA!1420 DUPONT AVENUE !BELLE !WV!25015!05836!039!54!BELLE !KANAWHA !W VIRGINIA!+000000290974!N!N!000000000000!2815!DIESEL ENGINES AND COMPONENTS !S1 !SERVICES !000 !NOT DISCERNABLE !423810!E! !9! ! ! ! ! !99990909!C! ! !A! !A!U!J!2!002! ! !Z!N!Z! ! !Y!C!N! ! ! !Z!Z!A!A!000!A!B!N! ! ! ! ! ! !0001! !
    contract · Last action 2008-08-07
    $250,969
  • Department of Defense
    CAT TELESCOPIC FORK LIFT
    contract · Last action 2008-08-26
    $127,191
  • Department of Justice
    PORTABLE AIR COMPRESSOR IGF::CL::IGF
    contract · Last action 2016-02-22
    $23,900
  • Department of Justice
    IGF::OT::IGF BACKHOE REPAIR
    contract · Last action 2017-04-04
    $17,396
  • Department of Defense
    TWO TURBO CHARGERS FOR THE M/V EVANICK. ONE EMERGENCY REPLACEMENT PART, ONE IS FOR SPARE.
    contract · Last action 2012-03-08
    $15,615
  • Department of Defense
    IGF::OT::IGF DB-50 CONTROL BOX REPAIR FOR FLEET
    contract · Last action 2017-07-06
    $14,800
  • Department of Defense
    FORK LIFT AC REPAIR WALKER CAT
    contract · Last action 2013-09-04
    $11,693
  • Department of Justice
    EMERGENCY GENERATORS (4) DURING POWER OUTAGE REPAIRS
    contract · Last action 2013-05-17
    $10,550
  • Department of Justice
    EQUIPMENT RENTAL FOR STAIRWELL PROJECT AT FCI BECKLEY, WV.
    contract · Last action 2008-06-25
    $7,693
  • Department of Defense
    SERVICE ON D7R
    contract · Last action 2013-09-25
    $6,647
  • Department of Defense
    TAS::96 3135::TAS - RENTAL OF BACKHOE TO MAINTAIN RECREATIONAL FACILITIES AT SUTTON LAKE, SUTTON, WV
    contract · Last action 2010-02-25
    $6,307
  • Department of Labor
    MAINTENANCE OF THREE ONAN GENERATORS AT MINE ACADEMY
    contract · Last action 2009-12-02
    $6,251
  • Department of Labor
    PREVENTIVE MAINTENANCE AND INSPECTION OF GENERATORS
    contract · Last action 2013-04-15
    $5,994
  • Department of the Interior
    MEETS REQUIREMENT
    contract · Last action 2011-05-05
    $5,600
  • Department of Defense
    DAMAGE REPAIR RENTAL EQUIPMENT (WALKER)
    contract · Last action 2016-08-08
    $5,522
  • Department of Veterans Affairs
    MAINTENANCE, RE TAS::36 0160::TAS
    contract · Last action 2010-02-25
    $5,100
  • Department of the Interior
    DOZER RENTAL
    contract · Last action 2012-08-08
    $5,000
  • Department of Labor
    MAINTENANCE OF THREE ONAN GENERATORS AT MINE ACADEMY
    contract · Last action 2014-03-13
    $4,950
  • Department of Justice
    FILTERS AND LUBRICANT FOR OIL AND COOLANT CHANGE IN BOILERS. COMPANY IS ONLY SUPPLIER OF CATERPILLAR PARTS IN THE AREA. THIS SPECIFIC OIL MUST BE USED TO MAINTAIN WARRANTY. OIL AND FUEL FILTERS REPLACED AND COOLANT CHANGED TO KEEP BOILERS IN WORKING CONDITION.
    contract · Last action 2015-11-16
    $4,901
  • Department of Veterans Affairs
    SMALL PURCHASE DATA
    contract · Last action 2009-05-27
    $4,900
  • Department of Veterans Affairs
    PM-II AND 4 HOUR LOAD BANK TEST ON CATERPILLAR GEN
    contract · Last action 2008-05-07
    $3,880
  • Department of Veterans Affairs
    MAINTENANCE, REPAIR & REBUILDING OF EQUIPMENT
    contract · Last action 2009-09-15
    $3,500
  • Department of Labor
    MAINTENANCE OF TWO ONAN GENERATORS
    contract · Last action 2009-02-18
    $3,265
  • Department of Defense
    WALKER MACHINERY TO REPAIR HYDRAULIC UNIT
    contract · Last action 2011-05-26
    $2,274
  • Department of Labor
    PREVENTIVE MAINTENANCE AND INSPECTION OF GENERATORS
    contract · Last action 2011-05-11
    $900
  • Department of Labor
    INSPECTION/PREVENTIVE MAINTENANCE OF GENERATORS
    contract · Last action 2011-01-06
    $900
  • Department of Defense
    REPAIR /PARTS FOR FORKLIFTS, MAN LIFTS END LOADERS, TRUCKS, ETC.
    contract · Last action 2011-02-03
    $0

Federal contract dollars to this establishment. Primary NAICS: 532412 - CONSTRUCTION, MINING, AND FORESTRY MACHINERY AND EQUIPMENT RENTAL AND LEASING. Last action: 2017-07-06. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.

Inspection history

DateTriggerViolationsSeriousPenalty
2014-02-14Complaint41$4,675
2013-10-16Complaint0$0
1984-09-26Planned0$0
1983-03-21Planned4$0
1981-05-06Follow-up0$0
1980-12-04Complaint11$0
1980-10-08Complaint1$0
1977-07-18Planned0$0
1977-02-16Follow-up0$0
1977-02-02Complaint21$180

Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.

In the news

Part of a larger organization

CECIL I. WALKER MACHINERY COMPANY is one of 5 establishments rolled up under the parent organization Cecil I Walker Machinery Co.

Federal enforcement records on this page represent activity at this specific establishment only. The full enforcement footprint of Cecil I Walker Machinery Co across all 5 of its tracked locations is viewable on the parent profile.

Other employers in this industry and state

Other employers in construction machinery manufacturing within WV, ordered by federal enforcement volume:

Other locations under this parent

Other establishments operated by Cecil I Walker Machinery Co, ordered by federal enforcement volume:

Related searches

About this data

This profile aggregates federal enforcement records on CECIL I. WALKER MACHINERY COMPANY from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code. This establishment resolves to the parent rollup Cecil I Walker Machinery Co, which operates 5 establishments in our dataset.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is CECIL I. WALKER MACHINERY COMPANY's OSHA violation history?
CECIL I. WALKER MACHINERY COMPANY has 10 OSHA inspections on record with 12 violations and $4,855 in total penalties.
How does CECIL I. WALKER MACHINERY COMPANY's safety record compare to its industry?
CECIL I. WALKER MACHINERY COMPANY operates in the construction machinery manufacturing industry. The industry average Total Recordable Incident Rate (TRIR) is 2.8. CECIL I. WALKER MACHINERY COMPANY's self-reported DART rate is 0 compared to an industry average of 1.6.