Establishment profile
C.C.C. Group
5797 Dietrich, San Antonio, TX, 78220
237990 — Other Heavy and Civil Engineering Construction
EIN 742391991
Summary
C.C.C. Group has no OSHA inspection history on file. Federal records covering wage, environmental, labor relations, and other agencies are noted below where present.
The most recent federal enforcement activity was recorded 15 years ago.
Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
C.C.C. Group appears in WHD wage enforcement and MSHA mine safety records only. No matching records were found in OSHA workplace safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
No OSHA inspections, citations, or accidents on file for C.C.C. Group. Verify directly with Occupational Safety and Health Administration →
Safety self-report (OSHA 300A)
Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.
Reported for 716 average annual employees at this establishment.
Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for C.C.C. Group. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 15+ years. Most recent activity: 15 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
Department of Labor Wage & Hour Division — minimum-wage, overtime, child-labor, FMLA, and prevailing-wage enforcement.
Wage and hour cases
Closed DOL Wage & Hour Division cases (FLSA, FMLA, H-2B, MSPA, and related statutes). Backwages reflect amounts the agency assessed; civil penalty (CMP) is a separate fine levied on top, where the statute provides for one (FLSA / H-1B / H-2A / MSPA / FMLA / EPPA / FLSA Child Labor; other acts have no CMP column in DOL’s data). The Statutes column lists which laws each case cited. 1 case · $0 in backwages · 1 worker affected
| Case period | Industry | Statutes | Violations | Workers | Backwages | Civil penalty |
|---|---|---|---|---|---|---|
| Jul 2010 – Nov 2010 | Other Heavy and Civil Engineering Construction | — | — | 1 | — | — |
Source: DOL WHD enforcement database. Cases shown reflect those the agency has closed and made public. A violation count is the agency’s tally of cited violations (one violation can affect many workers); the workers column counts distinct employees the agency found to be affected.
Mine safety (MSHA)
Company-level in TX — for C.C.C. Group, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other C.C.C. Group operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 33S&S · 100 contractor · $709,142 proposed / $366,698 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 8473297 | Marshall Mine Harrison, TX contractor: CCC Group Inc | Dec 2013 | — | Yes | Reckless | $63,000 | $63,000 |
| 8625170 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Dec 2012 | — | Yes | HighNegligence | $44,645 | $12,248 |
| 4542270 | South Hallsville No 1 Mine Harrison, TX contractor: CCC Group Inc | Oct 2007 | — | Yes | HighNegligence | $44,600 | $10,437 |
| 8775843 | Sherwin Alumina, L.P. San Patricio, TX contractor: CCC Group Inc | Jul 2014 | — | Yes | LowNegligence | $42,944 | $5,961 |
| 6568400 | Sherwin Alumina, L.P. San Patricio, TX contractor: CCC Group Inc | May 2010 | — | No | HighNegligence | $42,944 | $20,000 |
| 6566173 | Sherwin Alumina, L.P. San Patricio, TX contractor: CCC Group Inc | Apr 2010 | — | Yes | ModNegligence | $42,944 | $13,269 |
| 8677213 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Mar 2012 | — | No | HighNegligence | $37,416 | $7,579 |
| 6261181 | Bayer Alumina Plant Calhoun, TX contractor: CCC Group Inc | May 2006 | — | Yes | HighNegligence | $26,500 | $13,500 |
| 8961415 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Jan 2016 | — | No | HighNegligence | $17,301 | $3,493 |
| 9402956 | Lonestar Prospects, Ltd. Winkler, TX contractor: CCC Group Inc | Aug 2018 | — | Yes | LowNegligence | $13,691 | $1,667 |
| 8473299 | Marshall Mine Harrison, TX contractor: CCC Group Inc | Dec 2013 | — | Yes | ModNegligence | $13,268 | $11,000 |
| 8473298 | Marshall Mine Harrison, TX contractor: CCC Group Inc | Dec 2013 | — | Yes | ModNegligence | $13,268 | $11,000 |
| 8769102 | Bayer Alumina Plant Calhoun, TX contractor: CCC Group Inc | Aug 2013 | — | Yes | ModNegligence | $13,268 | $13,268 |
| 8769101 | Bayer Alumina Plant Calhoun, TX contractor: CCC Group Inc | Aug 2013 | — | No | ModNegligence | $13,268 | $2,678 |
| 8679188 | Sherwin Alumina, L.P. San Patricio, TX contractor: CCC Group Inc | Aug 2013 | — | Yes | ModNegligence | $13,268 | $13,268 |
| 8683947 | Sherwin Alumina, L.P. San Patricio, TX contractor: CCC Group Inc | May 2013 | — | Yes | HighNegligence | $13,268 | $13,268 |
| 8860935 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Aug 2015 | — | No | HighNegligence | $12,248 | $7,711 |
| 8677366 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Dec 2012 | — | No | ModNegligence | $12,248 | $2,473 |
| 8677365 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Dec 2012 | — | Yes | ModNegligence | $12,248 | $12,248 |
| 8681680 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Nov 2012 | — | No | ModNegligence | $12,248 | $745 |
| 8624217 | Bayer Alumina Plant Calhoun, TX contractor: CCC Group Inc | Aug 2011 | — | No | ModNegligence | $12,248 | $745 |
| 9510720 | Bayer Alumina Plant Calhoun, TX contractor: CCC Group Inc | Dec 2019 | — | Yes | ModNegligence | $12,171 | $10,345 |
| 9402944 | Lonestar Prospects, Ltd. Winkler, TX contractor: CCC Group Inc | Jul 2018 | — | No | HighNegligence | $10,499 | $2,120 |
| 9452859 | Crane County Plant Crane, TX contractor: CCC Group Inc | Feb 2019 | — | Yes | ModNegligence | $7,817 | $2,615 |
| 8965243 | Midlothian Quarry and Plant Ellis, TX contractor: CCC Group Inc | May 2016 | — | Yes | ModNegligence | $5,961 | $5,961 |
| 6576488 | Bayer Alumina Plant Calhoun, TX contractor: CCC Group Inc | Aug 2010 | — | No | ModNegligence | $5,961 | $808 |
| 8860961 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Oct 2015 | — | Yes | LowNegligence | $5,503 | $2,577 |
| 9407787 | Lonestar Prospects, Ltd. Winkler, TX contractor: CCC Group Inc | Jan 2019 | — | No | ModNegligence | $4,836 | $977 |
| 8766143 | SERVTEX PLANT Comal, TX contractor: CCC Group Inc | Aug 2013 | — | No | HighNegligence | $4,440 | $4,440 |
| 9351016 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Mar 2017 | — | Yes | ModNegligence | $4,267 | $3,414 |
| 9354735 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Nov 2017 | — | No | HighNegligence | $4,041 | $3,233 |
| 8687709 | Bayer Alumina Plant Calhoun, TX contractor: CCC Group Inc | Oct 2013 | — | No | LowNegligence | $3,996 | $892 |
| 8687708 | Bayer Alumina Plant Calhoun, TX contractor: CCC Group Inc | Oct 2013 | — | No | LowNegligence | $3,996 | $892 |
| 8683724 | Bayer Alumina Plant Calhoun, TX contractor: CCC Group Inc | Apr 2013 | — | Yes | ModNegligence | $3,996 | $3,996 |
| 8623326 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Nov 2011 | — | No | ModNegligence | $3,996 | $1,203 |
| 8961401 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Jan 2016 | — | No | HighNegligence | $3,784 | $3,784 |
| 8858182 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Jun 2015 | — | Yes | ModNegligence | $3,689 | $3,689 |
| 8858180 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Jun 2015 | — | No | ModNegligence | $3,689 | $1,689 |
| 8858227 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Jan 2015 | — | Yes | ModNegligence | $3,689 | $3,689 |
| 8677370 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Dec 2012 | — | Yes | ModNegligence | $3,689 | $3,689 |
| 8677368 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Dec 2012 | — | No | ModNegligence | $3,689 | $745 |
| 8681676 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Nov 2012 | — | Yes | ModNegligence | $3,689 | $3,689 |
| 8619614 | Bayer Alumina Plant Calhoun, TX contractor: CCC Group Inc | Mar 2011 | — | No | ModNegligence | $3,689 | $1,112 |
| 7868649 | Bayer Alumina Plant Calhoun, TX contractor: CCC Group Inc | Mar 2008 | — | Yes | ModNegligence | $3,689 | $745 |
| 6259824 | Bayer Alumina Plant Calhoun, TX contractor: CCC Group Inc | Jul 2007 | — | Yes | LowNegligence | $3,689 | $324 |
| 8864983 | Midlothian Quarry and Plant Ellis, TX contractor: CCC Group Inc | Mar 2016 | — | No | HighNegligence | $2,678 | $1,636 |
| 8961403 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Jan 2016 | — | No | ModNegligence | $2,678 | $2,678 |
| 6576490 | Bayer Alumina Plant Calhoun, TX contractor: CCC Group Inc | Aug 2010 | — | No | ModNegligence | $2,678 | $808 |
| 6473597 | Capitol Cement Plant & Quarry Bexar, TX contractor: CCC Group Inc | Mar 2010 | — | No | HighNegligence | $2,678 | $2,678 |
| 9404671 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Sep 2018 | — | No | ModNegligence | $2,487 | $2,487 |
| 9404670 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Sep 2018 | — | No | ModNegligence | $2,487 | $833 |
| 8861298 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Oct 2015 | — | No | ModNegligence | $2,473 | $2,000 |
| 8860959 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Oct 2015 | — | No | ModNegligence | $2,473 | $2,473 |
| 8860955 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Oct 2015 | — | No | ModNegligence | $2,473 | $2,000 |
| 8860936 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Aug 2015 | — | No | ModNegligence | $2,473 | $1,473 |
| 8625162 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Dec 2012 | — | Yes | LowNegligence | $2,473 | $2,473 |
| 8623330 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Dec 2011 | — | No | ModNegligence | $2,473 | $745 |
| 8618046 | Bayer Alumina Plant Calhoun, TX contractor: CCC Group Inc | Mar 2011 | — | No | ModNegligence | $2,473 | $745 |
| 6236338 | Bayer Alumina Plant Calhoun, TX contractor: CCC Group Inc | Jan 2004 | — | Yes | ModNegligence | $2,200 | $286 |
| 9402942 | Lonestar Prospects, Ltd. Winkler, TX contractor: CCC Group Inc | Jul 2018 | — | No | HighNegligence | $2,119 | $2,119 |
| 6260614 | Sherwin Alumina, L.P. San Patricio, TX contractor: CCC Group Inc | Sep 2005 | — | Yes | HighNegligence | $1,700 | $1,000 |
| 4542273 | South Hallsville No 1 Mine Harrison, TX contractor: CCC Group Inc | Oct 2007 | — | Yes | ModNegligence | $1,412 | $946 |
| 8961556 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Sep 2016 | — | No | ModNegligence | $1,265 | $1,265 |
| 8961555 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Sep 2016 | — | No | ModNegligence | $1,265 | $1,265 |
| 8965244 | Midlothian Quarry and Plant Ellis, TX contractor: CCC Group Inc | May 2016 | — | No | ModNegligence | $1,203 | $1,203 |
| 7285163 | Oak Hill Strip Rusk, TX contractor: CCC Group Inc | Dec 2007 | — | Yes | LowNegligence | $1,203 | $1,203 |
| 8973661 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Mar 2017 | — | No | ModNegligence | $1,187 | $1,187 |
| 8861258 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Jul 2015 | — | No | ModNegligence | $1,111 | $1,000 |
| 6255673 | Bayer Alumina Plant Calhoun, TX contractor: CCC Group Inc | Mar 2005 | — | Yes | HighNegligence | $1,100 | $1,100 |
| 9455130 | Alpine Silica-Monahans Ector, TX contractor: CCC Group Inc | Aug 2019 | — | No | ModNegligence | $977 | $977 |
| 9407783 | Lonestar Prospects, Ltd. Winkler, TX contractor: CCC Group Inc | Jan 2019 | — | No | ModNegligence | $977 | $977 |
| 8766144 | SERVTEX PLANT Comal, TX contractor: CCC Group Inc | Aug 2013 | — | No | HighNegligence | $897 | $897 |
| 8855749 | Bayer Alumina Plant Calhoun, TX contractor: CCC Group Inc | Apr 2015 | — | Yes | LowNegligence | $873 | $700 |
| 9351013 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Mar 2017 | — | No | ModNegligence | $862 | $862 |
| 9641854 | Marble Falls Plant Burnet, TX contractor: CCC Group Inc | Dec 2020 | — | Yes | ModNegligence | $856 | $856 |
| 8864986 | Midlothian Quarry and Plant Ellis, TX contractor: CCC Group Inc | Mar 2016 | — | No | ModNegligence | $807 | $807 |
| 8864985 | Midlothian Quarry and Plant Ellis, TX contractor: CCC Group Inc | Mar 2016 | — | No | ModNegligence | $807 | $807 |
| 8864973 | Amrize Midlothian Plant Ellis, TX contractor: CCC Group Inc | Mar 2016 | — | No | HighNegligence | $807 | $807 |
| 8775846 | Sherwin Alumina, L.P. San Patricio, TX contractor: CCC Group Inc | Jul 2014 | — | No | ModNegligence | $807 | $807 |
| 8775824 | Sherwin Alumina, L.P. San Patricio, TX contractor: CCC Group Inc | Jul 2014 | — | No | ModNegligence | $807 | $807 |
| 8775823 | Sherwin Alumina, L.P. San Patricio, TX contractor: CCC Group Inc | Jul 2014 | — | No | ModNegligence | $807 | $807 |
| 8686385 | Bayer Alumina Plant Calhoun, TX contractor: CCC Group Inc | Sep 2013 | — | No | ModNegligence | $807 | $807 |
| 8686395 | Bayer Alumina Plant Calhoun, TX contractor: CCC Group Inc | Sep 2013 | — | No | ModNegligence | $807 | $807 |
| 8683948 | Sherwin Alumina, L.P. San Patricio, TX contractor: CCC Group Inc | May 2013 | — | No | ModNegligence | $807 | $807 |
| 8764771 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Apr 2013 | — | No | ModNegligence | $807 | $807 |
| 8764768 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Apr 2013 | — | No | ModNegligence | $807 | $807 |
| 8764767 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Apr 2013 | — | No | ModNegligence | $807 | $807 |
| 8764766 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Apr 2013 | — | No | ModNegligence | $807 | $807 |
| 6576485 | Bayer Alumina Plant Calhoun, TX contractor: CCC Group Inc | Aug 2010 | — | No | ModNegligence | $807 | $807 |
| 6473598 | Capitol Cement Plant & Quarry Bexar, TX contractor: CCC Group Inc | Mar 2010 | — | No | ModNegligence | $807 | $807 |
| 9354736 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Nov 2017 | — | No | HighNegligence | $795 | $795 |
| 8625059 | MARYNEAL QUARRY AND MILL Nolan, TX contractor: CCC Group Inc | Apr 2012 | — | No | HighNegligence | $764 | $764 |
| 9450812 | Lamesa Plant Dawson, TX contractor: CCC Group Inc | Dec 2018 | — | No | ModNegligence | $749 | $749 |
| 9402952 | Lonestar Prospects, Ltd. Winkler, TX contractor: CCC Group Inc | Jul 2018 | — | No | ModNegligence | $749 | $749 |
| 9402949 | Lonestar Prospects, Ltd. Winkler, TX contractor: CCC Group Inc | Jul 2018 | — | No | ModNegligence | $749 | $749 |
| 9402948 | Lonestar Prospects, Ltd. Winkler, TX contractor: CCC Group Inc | Jul 2018 | — | No | ModNegligence | $749 | $749 |
| 8965246 | Midlothian Quarry and Plant Ellis, TX contractor: CCC Group Inc | May 2016 | — | No | HighNegligence | $745 | $745 |
| 8959601 | Bayer Alumina Plant Calhoun, TX contractor: CCC Group Inc | Oct 2015 | — | No | ModNegligence | $745 | $745 |
| 8859600 | Bayer Alumina Plant Calhoun, TX contractor: CCC Group Inc | Oct 2015 | — | No | ModNegligence | $745 | $745 |
| 8859599 | Bayer Alumina Plant Calhoun, TX contractor: CCC Group Inc | Oct 2015 | — | No | ModNegligence | $745 | $745 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for C.C.C. Group. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for C.C.C. Group. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for C.C.C. Group. Verify directly with Environmental Protection Agency →
In the news
Other employers in this industry and state
Other employers in other heavy and civil engineering construction within TX, ordered by federal enforcement volume:
- TURNER INDUSTRIES GROUP, LLCDEER PARK — 3 federal enforcement records
- TURNER INDUSTRIES GROUP, LLCNEDERLAND — 3 federal enforcement records
- PERFORMANCE CONTRACTORS, INC.DEER PARK — 3 federal enforcement records
- SER CONSTRUCTION PARTNERS, LLCPASADENA — 2 federal enforcement records
- PARKER ELECTRICAUSTIN — 2 federal enforcement records
- JAMES CONSTRUCTION GROUP LLCWILLIS — 2 federal enforcement records
- PERFORMANCE CONTRACTORS, INCPORT ARTHUR — 2 federal enforcement records
- TRAC-WORK INC.MCCAMEY — 2 federal enforcement records
- KING FISHER MARINE SERVICE LPPORT LAVACA — 2 federal enforcement records
- Allen Butler Construction Inc.Lubbock — 2 federal enforcement records
Related searches
- Other Heavy and Civil Engineering ConstructionAll employers in this industry
- Employers in TXState-wide enforcement data
- Other Heavy and in TXIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on C.C.C. Group from every major federal compliance and enforcement source. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is C.C.C. Group's OSHA violation history?
- C.C.C. Group has no OSHA inspections on record.
- How does C.C.C. Group's safety record compare to its industry?
- C.C.C. Group operates in the other heavy and civil engineering construction industry. The industry average Total Recordable Incident Rate (TRIR) is 1.8. C.C.C. Group's self-reported DART rate is 0.13 compared to an industry average of 1.