Establishment profile
BWXT NUCLEAR OPERATIONS GROUP. INC.
1570 MT ATHOS ROAD, LYNCHBURG, VA, 24504
Operated by BWX Technologies, Inc · 1 of 6 establishments
332410 — Power Boiler and Heat Exchanger Manufacturing
EIN 261523776
Summary
BWXT NUCLEAR OPERATIONS GROUP. INC. has accumulated 1 OSHA violation across 3 inspections over 4 years of recorded history, with $10,151 in total assessed penalties.
The establishment sits in the 29th percentile for violations within its industry-state peer group of 50 employers. Inspection frequency runs at the 65th percentile. The most recent enforcement activity was recorded 2 years ago.
Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
BWXT NUCLEAR OPERATIONS GROUP. INC. appears in OSHA workplace safety, EPA environmental compliance, and NLRB labor relations records only. No matching records were found in WHD wage enforcement, MSHA mine safety, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
33% of inspections at this establishment produced violations,
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 1 distinct standard shown · 1 citation in this view · $10,151 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 5A0001 | 1 | 1 | $10,151 | Nov 2022 | Nov 2022 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Below average violations in NAICS 3324 within VA. Peer group: 50 employers. This establishment has 1 OSHA violation; peer median is 3.
Safety self-report (OSHA 300A)
Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.
Reported for 2,200 average annual employees at this establishment.
Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for BWXT NUCLEAR OPERATIONS GROUP. INC.. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 2+ years. Most recent activity: 2 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for BWXT NUCLEAR OPERATIONS GROUP. INC.. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
No MSHA mine safety violations on file for BWXT NUCLEAR OPERATIONS GROUP. INC.. Verify directly with Mine Safety and Health Administration →
Labor relations (NLRB)
Company-level in VA — for BWX Technologies, Inc, not this location alone
National Labor Relations Board — unfair labor practice charges and union representation cases. The NLRB records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other BWX Technologies, Inc locations in the same state.
NLRB cases
National Labor Relations Board cases involving this employer. Includes unfair labor practice (ULP) filings and representation election proceedings. NLRB enforcement is process-driven; no per-case monetary penalty is assessed (remedies are case-by-case backpay orders, posting requirements, election re-runs, etc.). 2 cases · 1 ULP · 1 representation
| Case number | Type | Filed | Closed | Status | Region |
|---|---|---|---|---|---|
| 10-CA-363253 | Unfair labor practice | Apr 2025 | — | Open | Region 10, Atlanta, Georgia |
| 10-RM-360221 | Representation election | Feb 2025 | Mar 2025 | Closed | Region 10, Atlanta, Georgia |
Source: NLRB case files. Rows shown are those the agency has published. Region numbers (1–31) correspond to NLRB's geographic offices.
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for BWXT NUCLEAR OPERATIONS GROUP. INC.. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
EPA Enforcement and Compliance History — Clean Air Act, Clean Water Act, RCRA, Safe Drinking Water Act. Status: No Violation Identified.
EPA-registered facilities
Every EPA ECHO facility associated with this employer, sorted most-significant first. Each row links to EPA’s Detailed Facility Report for the source-of-truth record. Permits column lists active programs (Air = Clean Air Act, Water = Clean Water Act, RCRA = hazardous waste, TRI = Toxics Release Inventory reporting). 1 facility.
| Facility | Permits | Status | Inspections | Formal actions | Penalties | Last inspected | ECHO |
|---|---|---|---|---|---|---|---|
BWXT NUCLEAR OPERATIONS GROUP INC 1570 MT ATHOS RD - RT 726 · LYNCHBURG, VA, 24504 | Water | No Violation Identified | 1 | 0 | — | Jun 2024 | View → |
Source: EPA ECHO (Enforcement and Compliance History Online). Compliance status follows EPA’s own labels (“Sig Violation” = significant noncompliance; QNCR = quarters of noncompliance over the recent reporting window). Inactive facilities (struck through) retain historical enforcement records even after operations ceased.
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for BWXT NUCLEAR OPERATIONS GROUP. INC.. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
Consolidated across all USAspending recipient entities under this corporate parent — not attributable to this single location.
- Department of EnergyMANUFACTURE OF NAVAL REACTOR COREScontract · Last action 2014-07-10$1,390,785,922
- Department of EnergyMANUFACTURE REACTOR CORES AND STEAM GENERATORS FOR THE NAVY NUCLEAR PROPULSION PROGRAMcontract · Last action 2014-06-18$569,686,684
- Department of EnergyMANUFACTURE OF REACTOR COREScontract · Last action 2014-05-29$407,304,801
- Department of EnergyHORIZONTAL STEAM GENERATOR WORKcontract · Last action 2014-06-30$161,964,630
- Department of EnergyMANUFATURE OF NAVAL REACTOR COREScontract · Last action 2014-05-29$132,947,383
- Department of EnergyTHE CONTRACTOR SHALL PROCESS 3.6 MT OF HALEUcontract · Last action 2025-12-11$79,811,931
- Department of EnergyDISASSEMBLY AND RECOVERY OF NAVAL REACTOR COREScontract · Last action 2014-04-30$35,659,316
- Department of EnergyENRICHED URANIUM RECOVERY SERVICES FOR Y-12 SITE OFFICE - YSO.contract · Last action 2019-03-12$28,000,846
- Department of EnergyNAVAL REACTOR COREScontract · Last action 2014-05-29$26,200,980
- Department of EnergyNAVAL REACTOR COREScontract · Last action 2014-06-18$13,521,474
- Department of EnergyNUCLEAR REACTOR STEAM GENERATORScontract · Last action 2014-05-29$11,295,302
- Department of EnergyREACTOR COREScontract · Last action 2014-05-29$9,877,491
- Department of EnergyREACTOR COREScontract · Last action 2014-05-29$9,583,390
- Department of EnergyNAVAL NUCLEAR REACTOR COREcontract · Last action 2014-05-29$4,037,014
- Department of EnergyREACTOR COREScontract · Last action 2014-05-29$2,888,262
- Department of EnergyPROCESSING OF ENRICHED URANIUM SCRAP - STAINLESS STEEL INITIAL TASK ORDERcontract · Last action 2025-03-20$311,607
- Department of EnergyPROCESSING OF ENRICHED URANIUM SCRAP - U-MOLYBDENUM TEST TASKcontract · Last action 2023-06-30$300,000
- Department of EnergyPROCESSING OF ENRICHED URANIUM SCRAP - SILICIDE TEST TASKcontract · Last action 2021-07-08$263,536
- Department of DefenseIGF::OT::IGF CRANE LIFT SERVICES TO TRANSFER CAPT. ANTHONY MELDAHL MITER GATE LEAF FROM CONTRACTOR-SUPPLIED BARGES TO GOVERNMENT-OWNED BARGES AT MOUNT VERNON, IN, FACILITY.contract · Last action 2014-08-27$173,293
- Nuclear Regulatory CommissionREQUESTING 15K TO CREATE A FIBER OPTIC PATHWAY FROM THE TELCO DEMARC TO THE BWXT NRC RESIDENT OFFICE IN SUPPORT OF NRC'S BANDWIDTH EXPANSION EFFORTS. PRICING BASED ON PREVIOUS ESTIMATE PROVIDED BY BWXT FOR THIS WORK. DUE TO THE NATURE OF Tcontract · Last action 2025-07-23$20,000
- Department of EnergyPROCESSING OF ENRICHED URANIUM SCRAPcontract · Last action 2026-03-27$0
- Department of EnergyNUCLEAR REACTOR COREcontract · Last action 2014-05-29$-150,107
- Department of EnergyREACTOR COREScontract · Last action 2014-05-29$-1,082,953
- Department of EnergyNAVAL REACTOR COREScontract · Last action 2014-05-29$-1,112,939
Federal contract dollars to this establishment. Primary NAICS: 332313 - PLATE WORK MANUFACTURING. Last action: 2026-03-27. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2023-09-25 | Follow-up | 0 | — | $0 | |
| 2022-08-09 | Complaint | 1 | 1 | $10,151 | |
| 2022-05-11 | Complaint | 0 | — | $0 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Part of a larger organization
BWXT NUCLEAR OPERATIONS GROUP. INC. is one of 6 establishments rolled up under the parent organization BWX Technologies, Inc.
Federal enforcement records on this page represent activity at this specific establishment only. The full enforcement footprint of BWX Technologies, Inc across all 6 of its tracked locations is viewable on the parent profile.
Other employers in this industry and state
Other employers in power boiler and heat exchanger manufacturing within VA, ordered by federal enforcement volume:
- ALFA LAVAL INC.RICHMOND — 1 federal enforcement record
- CARBONE AMERICASALEM — 1 federal enforcement record
- ENGLISH BOILER LLCRICHMOND — 1 federal enforcement record
- NATIONAL BOILER SERVICE INC.COVINGTON — 1 federal enforcement record
- ENGLISH BOILER & TUBE INCRICHMOND — 1 federal enforcement record
Other locations under this parent
Other establishments operated by BWX Technologies, Inc, ordered by federal enforcement volume:
- BWX TECHNOLOGIES INC.LYNCHBURG, VA — 2 federal enforcement records
- NUCLEAR FUEL SERVICES INCERWIN, TN — 2 federal enforcement records
- BWXT NUCLEAR OPERATIONS GROUP, INC.EUCLID, OH — 1 federal enforcement record
Related searches
- All BWX Technologies, Inc locationsParent rollup
- Power Boiler and Heat Exchanger ManufacturingAll employers in this industry
- Employers in VAState-wide enforcement data
- Power Boiler and in VAIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on BWXT NUCLEAR OPERATIONS GROUP. INC. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code. This establishment resolves to the parent rollup BWX Technologies, Inc, which operates 6 establishments in our dataset.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is BWXT NUCLEAR OPERATIONS GROUP. INC.'s OSHA violation history?
- BWXT NUCLEAR OPERATIONS GROUP. INC. has 3 OSHA inspections on record with 1 violation and $10,151.4 in total penalties.
- How does BWXT NUCLEAR OPERATIONS GROUP. INC.'s safety record compare to its industry?
- BWXT NUCLEAR OPERATIONS GROUP. INC. operates in the power boiler and heat exchanger manufacturing industry. The industry average Total Recordable Incident Rate (TRIR) is 3.2. BWXT NUCLEAR OPERATIONS GROUP. INC.'s self-reported DART rate is 0.44 compared to an industry average of 1.5.