Summary
BIG CEDAR STONE has no OSHA inspection history on file. Federal records covering wage, environmental, labor relations, and other agencies are noted below where present.
The most recent federal enforcement activity was recorded 0 days ago.
Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
BIG CEDAR STONE appears in MSHA mine safety record only. No matching records were found in OSHA workplace safety, WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls. Single-agency enforcement records typically indicate either a discrete incident-based inspection or a low-risk operational profile.
OSHA workplace safety
No OSHA inspections, citations, or accidents on file for BIG CEDAR STONE. Verify directly with Occupational Safety and Health Administration →
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for BIG CEDAR STONE. Verify directly with OSHA Injury Tracking Application →
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for BIG CEDAR STONE. Verify directly with Occupational Safety and Health Administration →
Activity timeline
Most recent federal enforcement activity recorded 0 days ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for BIG CEDAR STONE. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in MO — for BIG CEDAR STONE, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other BIG CEDAR STONE operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 97 citations · 22S&S · 97 contractor · $14,326 proposed / $14,326 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 8683581 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Dec 2013 | — | Yes | ModNegligence | $1,304 | $1,304 |
| 8683577 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Dec 2013 | — | Yes | ModNegligence | $1,304 | $1,304 |
| 8686517 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | May 2013 | — | Yes | HighNegligence | $585 | $585 |
| 6575468 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Dec 2010 | — | Yes | ModNegligence | $400 | $400 |
| 8674456 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jul 2012 | — | Yes | ModNegligence | $334 | $334 |
| 8674402 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jan 2012 | — | Yes | ModNegligence | $334 | $334 |
| 8775324 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Apr 2014 | — | Yes | ModNegligence | $308 | $308 |
| 6463877 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Dec 2008 | — | Yes | ModNegligence | $207 | $207 |
| 8860123 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jul 2015 | — | No | ModNegligence | $176 | $176 |
| 8860040 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jan 2015 | — | Yes | ModNegligence | $176 | $176 |
| 6265323 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Mar 2007 | — | Yes | LowNegligence | $165 | $165 |
| 6261942 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jan 2006 | — | Yes | ModNegligence | $165 | $165 |
| 8868913 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | May 2016 | — | No | ModNegligence | $162 | $162 |
| 8622265 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Sep 2011 | — | Yes | ModNegligence | $162 | $162 |
| 6575518 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jul 2011 | — | Yes | ModNegligence | $162 | $162 |
| 9260474 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Mar 2020 | — | Yes | ModNegligence | $144 | $144 |
| 9260473 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Mar 2020 | — | Yes | ModNegligence | $144 | $144 |
| 7863081 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Nov 2007 | — | Yes | ModNegligence | $138 | $138 |
| 9148521 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | May 2022 | — | No | LowNegligence | $133 | $133 |
| 9148520 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | May 2022 | — | No | LowNegligence | $133 | $133 |
| 9534532 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jan 2022 | — | No | ModNegligence | $133 | $133 |
| 9534531 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jan 2022 | — | No | LowNegligence | $133 | $133 |
| 9534530 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jan 2022 | — | No | ModNegligence | $133 | $133 |
| 9534529 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jan 2022 | — | No | ModNegligence | $133 | $133 |
| 9534528 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jan 2022 | — | No | ModNegligence | $133 | $133 |
| 9269113 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Aug 2021 | — | No | ModNegligence | $125 | $125 |
| 9269023 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Oct 2020 | — | No | ModNegligence | $123 | $123 |
| 9260522 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | May 2020 | — | No | ModNegligence | $123 | $123 |
| 9455452 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jul 2019 | — | No | ModNegligence | $121 | $121 |
| 9409476 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Feb 2019 | — | No | ModNegligence | $121 | $121 |
| 9358492 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jul 2018 | — | No | LowNegligence | $118 | $118 |
| 9358491 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jul 2018 | — | No | HighNegligence | $118 | $118 |
| 9400069 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Mar 2018 | — | No | ModNegligence | $118 | $118 |
| 9400068 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Mar 2018 | — | No | ModNegligence | $118 | $118 |
| 9400067 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Mar 2018 | — | No | ModNegligence | $118 | $118 |
| 9400066 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Mar 2018 | — | No | ModNegligence | $118 | $118 |
| 8868859 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jan 2016 | — | Yes | ModNegligence | $117 | $117 |
| 8860027 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jan 2015 | — | Yes | ModNegligence | $117 | $117 |
| 8686520 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | May 2013 | — | Yes | ModNegligence | $117 | $117 |
| 6474947 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Apr 2010 | — | Yes | ModNegligence | $117 | $117 |
| 9354036 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Aug 2017 | — | Yes | LowNegligence | $116 | $116 |
| 8867777 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jan 2017 | — | No | ModNegligence | $116 | $116 |
| 8868914 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | May 2016 | — | No | ModNegligence | $108 | $108 |
| 8868912 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | May 2016 | — | No | ModNegligence | $108 | $108 |
| 6575513 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jul 2011 | — | Yes | ModNegligence | $108 | $108 |
| 8868860 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jan 2016 | — | No | ModNegligence | $100 | $100 |
| 8868858 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jan 2016 | — | No | ModNegligence | $100 | $100 |
| 8860125 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jul 2015 | — | No | ModNegligence | $100 | $100 |
| 8860124 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jul 2015 | — | No | LowNegligence | $100 | $100 |
| 8860030 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jan 2015 | — | No | ModNegligence | $100 | $100 |
| 8860029 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jan 2015 | — | No | HighNegligence | $100 | $100 |
| 8860028 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jan 2015 | — | No | ModNegligence | $100 | $100 |
| 8860026 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jan 2015 | — | No | ModNegligence | $100 | $100 |
| 8775334 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | May 2014 | — | No | HighNegligence | $100 | $100 |
| 8775325 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Apr 2014 | — | No | ModNegligence | $100 | $100 |
| 8683594 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Feb 2014 | — | No | HighNegligence | $100 | $100 |
| 8686521 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | May 2013 | — | No | LowNegligence | $100 | $100 |
| 8686519 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | May 2013 | — | No | LowNegligence | $100 | $100 |
| 8686518 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | May 2013 | — | No | LowNegligence | $100 | $100 |
| 8686516 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | May 2013 | — | No | ModNegligence | $100 | $100 |
| 8686465 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jan 2013 | — | No | LowNegligence | $100 | $100 |
| 8686464 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jan 2013 | — | No | LowNegligence | $100 | $100 |
| 8686463 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jan 2013 | — | No | ModNegligence | $100 | $100 |
| 8674457 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jul 2012 | — | No | LowNegligence | $100 | $100 |
| 6575520 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jul 2011 | — | No | ModNegligence | $100 | $100 |
| 6575519 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jul 2011 | — | No | ModNegligence | $100 | $100 |
| 6575517 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jul 2011 | — | No | ModNegligence | $100 | $100 |
| 6575516 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jul 2011 | — | No | ModNegligence | $100 | $100 |
| 6575515 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jul 2011 | — | No | ModNegligence | $100 | $100 |
| 6575514 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jul 2011 | — | No | ModNegligence | $100 | $100 |
| 6575467 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Dec 2010 | — | No | ModNegligence | $100 | $100 |
| 6474946 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Apr 2010 | — | No | ModNegligence | $100 | $100 |
| 6474863 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Nov 2009 | — | No | ModNegligence | $100 | $100 |
| 6474862 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Nov 2009 | — | No | ModNegligence | $100 | $100 |
| 6463931 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Apr 2009 | — | No | LowNegligence | $100 | $100 |
| 6463929 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Apr 2009 | — | No | LowNegligence | $100 | $100 |
| 6463862 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Dec 2008 | — | No | ModNegligence | $100 | $100 |
| 6461411 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jul 2008 | — | No | ModNegligence | $100 | $100 |
| 7863083 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Nov 2007 | — | No | LowNegligence | $100 | $100 |
| 7863082 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Nov 2007 | — | No | ModNegligence | $100 | $100 |
| 7863080 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Nov 2007 | — | No | LowNegligence | $100 | $100 |
| 7863046 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Sep 2007 | — | No | ModNegligence | $100 | $100 |
| 7863045 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Sep 2007 | — | No | ModNegligence | $100 | $100 |
| 7863044 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Sep 2007 | — | No | ModNegligence | $100 | $100 |
| 6265324 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Mar 2007 | — | No | ModNegligence | $60 | $60 |
| 6265322 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Mar 2007 | — | No | ModNegligence | $60 | $60 |
| 6265321 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Mar 2007 | — | No | ModNegligence | $60 | $60 |
| 6265320 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Mar 2007 | — | No | ModNegligence | $60 | $60 |
| 6261924 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jan 2006 | — | No | ModNegligence | $60 | $60 |
| 6261923 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Jan 2006 | — | No | ModNegligence | $60 | $60 |
| 6242221 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Apr 2005 | — | No | ModNegligence | $60 | $60 |
| 6242220 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Apr 2005 | — | No | LowNegligence | $60 | $60 |
| 6242219 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Apr 2005 | — | No | LowNegligence | $60 | $60 |
| 6242218 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Apr 2005 | — | No | LowNegligence | $60 | $60 |
| 6242217 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Apr 2005 | — | No | LowNegligence | $60 | $60 |
| 6242216 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Apr 2005 | — | No | ModNegligence | $60 | $60 |
| 6242215 | Cedar Ridge Stone Quarry Perry, MO contractor: Big Cedar Stone | Apr 2005 | — | No | ModNegligence | $60 | $60 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for BIG CEDAR STONE. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for BIG CEDAR STONE. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for BIG CEDAR STONE. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for BIG CEDAR STONE. Verify directly with UVA Corporate Prosecution Registry →
In the news
Related searches
- Employers in MOState-wide enforcement data
About this data
This profile aggregates federal enforcement records on BIG CEDAR STONE from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is BIG CEDAR STONE's OSHA violation history?
- BIG CEDAR STONE has no OSHA inspections on record.