Establishment profile
Barnard Construction
701 Gold Ave, Bozeman, MT, 59715
237990 — Other Heavy and Civil Engineering Construction
EIN 810384712
Summary
Barnard Construction has no OSHA inspection history on file. Federal records covering wage, environmental, labor relations, and other agencies are noted below where present.
The most recent federal enforcement activity was recorded 4 years ago.
Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
Barnard Construction appears in WHD wage enforcement and OFLC visa and labor certification records only. No matching records were found in OSHA workplace safety, MSHA mine safety, EPA environmental compliance, NLRB labor relations, FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
No OSHA inspections, citations, or accidents on file for Barnard Construction. Verify directly with Occupational Safety and Health Administration →
Safety self-report (OSHA 300A)
Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.
Reported for 133 average annual employees at this establishment.
Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for Barnard Construction. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 4+ years. Most recent activity: 4 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
Department of Labor Wage & Hour Division — minimum-wage, overtime, child-labor, FMLA, and prevailing-wage enforcement.
Wage and hour cases
Closed DOL Wage & Hour Division cases (FLSA, FMLA, H-2B, MSPA, and related statutes). Backwages reflect amounts the agency assessed; final payment may differ. 2 cases · $0 in backwages · 0 workers affected
| Case period | Industry | Backwages | Workers |
|---|---|---|---|
| May 2019 – Aug 2021 | Other Heavy and Civil Engineering Construction | — | 0 |
| Nov 2017 – Nov 2019 | Water and Sewer Line and Related Structures Construction | — | 0 |
Source: DOL WHD enforcement database. Cases shown reflect those the agency has closed and made public.
Mine safety (MSHA)
No MSHA mine safety violations on file for Barnard Construction. Verify directly with Mine Safety and Health Administration →
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for Barnard Construction. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC)
Office of Foreign Labor Certification — labor condition applications for H-1B, H-2A, H-2B visa programs. Wage ratio = offered / prevailing wage.
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for Barnard Construction. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for Barnard Construction. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
- Department of Homeland SecurityBORDER BARRIER CONSTRUCTION IN HUDSPETH COUNTY, TXcontract · Last action 2026-03-05$1,025,996,158
- Department of Homeland SecurityBBT-3 BORDER BARRIER CONSTRUCTION PROJECTcontract · Last action 2026-03-11$960,423,540
- Department of Homeland SecurityBORDER WALL CONSTRUCTION - VERTICAL BARRIER, DEL RIO TEXAS SECTOR (DRT-4)contract · Last action 2026-03-05$601,914,474
- Department of Homeland SecurityBORDER WALL CONSTRUCTION IN RIO GRANDE VALLEY SECTOR, TEXAS - RGV-1 120 MILES OF VERTICAL BARRIERcontract · Last action 2026-02-03$369,492,406
- Department of DefenseDESIGN/BUILD FOR ARIZONA FY18 PRIME PEDESTRIAN FENCE REPLACEMENT PROJECT (33 MILES).contract · Last action 2020-11-03$261,032,494
- Department of DefenseC-44 RESERVOIR/STA PROJECT, CONTRACT NO. 2, MARTIN COUNTY, FLORIDA IGF::CT::IGFcontract · Last action 2024-01-24$227,984,961
- Department of DefensePIPESTEM SPILLWAY MODIFICATION PROJECTcontract · Last action 2025-10-28$199,837,731
- Department of DefenseDESIGN-BID-BUILD OF THREE RIVERS PHASE 2 HYDRAULIC CONTAINMENT STRUCTURE AND MODIFICATIONS TO OWENS LAKE AND LA GRUES LAKE CULVERTS. WORK WILL INCLUDE, BUT NOT LIMITED TO, ACTIVITIES SUCH AS CLEARING, GRUBBING, EXCAVATION AND HAUL ROADS.contract · Last action 2025-10-29$108,639,709
- Department of DefenseSANTA TERESA FENCE REPLACEMENT 20 MILEScontract · Last action 2018-12-14$75,875,350
- Department of DefensePRADO DAM SPILLWAY MODIFICATION PROJECT IN RIVERSIDE COUNTY, CALIFORNIA / CALIFORNIA MEGA PROJECTS OFFICE (CAMPO) FPIS CONTRACT TYPE, UTILIZING THE IDAC APPROACH.contract · Last action 2025-12-17$67,361,290
- Department of the InteriorOLYMPIC NATIONAL PARK, REMOVAL OF ELWHA AND GLINES CANYON DAMS, ELWHA RESTORATION, OLYM 005375 5.0 AND 155929contract · Last action 2014-11-07$29,724,221
- Department of DefenseWHITTIER NARROWS DAM IS OWNED BY THE FEDERAL GOVERNMENT AND OPERATED AND MAINTAINED BY THE USACE LOS ANGELES DISTRICT (SPL) AND IS 11 MILES EAST OF DOWNTOWN LOS ANGELES.contract · Last action 2025-12-19$24,165,478
- Department of EnergyASHERVILLE TO IDALIA 161 KV LINE REBUILDcontract · Last action 2012-06-11$4,954,483
- Department of EnergyESTES-FLATIRON 115-KV DOUBLE CIRCUIT REBUILDcontract · Last action 2024-09-05$1,975,337
- Department of the InteriorEC- POLE HILL AFTERBAY REPAIRcontract · Last action 2024-04-16$1,939,182
- Department of AgricultureMORATORIUM EXCEPTION" BLI DDVAK725 HURRICANE HELENE VCT DISASTER RECON DESIGN-BUILD ATTACHMENT 007, SECTION L, ITEM K (2)(B) PROPOSAL EXPENSE AND PRE-AWARD COSTScontract · Last action 2025-11-06$500,000
- Department of EnergyMOTION MONITORING SYSTEM INSTALLATION SERVICEScontract · Last action 2025-09-25$299,494
- Department of DefenseUNDEFINITIZED CONTRACT ACTION FOR YUMA SECTOR 1 AND YUMA SECTOR 2, FENCE REPLACEMENT, YUMA ARIZONAcontract · Last action 2019-08-07$244,106
- Department of DefenseMINIMUM GUARANTEE/ HH MACCcontract · Last action 2023-02-27$5,000
- Department of DefenseTHIS TASK ORDER (T.O.) FOR THIS INDEFINITE DELIVERY CONTRACT (IDC) AWARDED UNDER SOLICITATION W912HY21R0012. THE MINIMUM GUARANTEE AMOUNT IS $2,500.00 FOR EACH IDC AWARDED UNDER THE MATOC IAW FAR CLAUSE 52.216-19.contract · Last action 2025-04-08$2,500
- Department of Homeland SecurityMULTIPLE AWARD IDIQ CONSTRUCTION SOUTHWEST BORDER WAIVER 90 FED REG 48281-48290contract · Last action 2026-03-15$0
- Department of DefenseINDEFINITE DELIVERY CONTRACT FOR DESIGN-BUILD AND DESIGN-BID-BUILD HORIZONTAL CONSTRUCTION IN SUPPORT OF THE GALVESTON DISTRICT AND SOUTHWESTERN DIVISION. UNRESTRICTED WITH SMALL BUSINESS RESERVE.contract · Last action 2025-09-26$0
- Department of DefenseHEAVY HORIZONTAL IV MACC/NAICS 237990contract · Last action 2025-03-27$0
Federal contract dollars to this establishment. Primary NAICS: 236220 - COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION. Last action: 2026-03-15. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
In the news
Other employers in this industry and state
Other employers in other heavy and civil engineering construction within MT, ordered by federal enforcement volume:
- AMES CONSTRUCTION, INC.CHESTER — 2 federal enforcement records
- SLETTEN CONSTRUCTION COMPANYFORT PECK — 2 federal enforcement records
- JORDAN CONTRACTINGANACONDA — 2 federal enforcement records
- NW CONSTRUCTION, INC.Bozeman — 2 federal enforcement records
- JOHNSON-WILSON CONSTRUCTORS, INC.FORT PECK — 1 federal enforcement record
- LITTLE BEAR CONSTRUCTION, INC.ALDER — 1 federal enforcement record
- RALPH L. WADSWORTH CONSTRUCTION CO., LLCEAST GLACIER PARK — 1 federal enforcement record
- AMES CONSTRUCTION, INC.ROUNDUP — 1 federal enforcement record
- INTERSTATE IMPROVEMENT, INC.GREAT FALLS — 1 federal enforcement record
- UTILIBORE, INC.GLENDIVE — 1 federal enforcement record
Related searches
- Other Heavy and Civil Engineering ConstructionAll employers in this industry
- Employers in MTState-wide enforcement data
- Other Heavy and in MTIndustry × state cross-filter
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →About this data
This profile aggregates federal enforcement records on Barnard Construction from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Frequently asked
- What is Barnard Construction's OSHA violation history?
- Barnard Construction has no OSHA inspections on record.
- How does Barnard Construction's safety record compare to its industry?
- Barnard Construction operates in the other heavy and civil engineering construction industry. The industry average Total Recordable Incident Rate (TRIR) is 1.8. Barnard Construction's self-reported DART rate is 0 compared to an industry average of 1.