Establishment profile
BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION
NH, 03054
Summary
BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION has no OSHA inspection history on file. Federal records covering wage, environmental, labor relations, and other agencies are noted below where present.
The most recent federal enforcement activity was recorded 0 days ago.
Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION appears in UVA Corporate Prosecution Registry record only. No matching records were found in OSHA workplace safety, WHD wage enforcement, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, CPSC product recalls, or NHTSA vehicle recalls. Single-agency enforcement records typically indicate either a discrete incident-based inspection or a low-risk operational profile.
OSHA workplace safety
No OSHA inspections, citations, or accidents on file for BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION. Verify directly with Occupational Safety and Health Administration →
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION. Verify directly with OSHA Injury Tracking Application →
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION. Verify directly with Occupational Safety and Health Administration →
Activity timeline
Most recent federal enforcement activity recorded 0 days ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
No MSHA mine safety violations on file for BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION. Verify directly with Mine Safety and Health Administration →
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
First case: 2010-03-02. Most recent: 2010-03-02. Source: UVA Corporate Prosecution Registry — federal pleas, DPAs, and NPAs.
Federal contracts
This location
Consolidated across all USAspending recipient entities under this corporate parent — not attributable to this single location.
- Department of DefenseDARPA JANUS PROGRAMcontract · Last action 2026-01-05$82,620,020
- Department of DefenseDARPA RESEARCH PROGRAMcontract · Last action 2025-12-04$71,023,545
- Department of DefenseIGF::OT::IGF CAMBRIDGE PHASE 4 BAEcontract · Last action 2025-11-25$50,056,403
- Department of DefenseDARPA ELECTRA "ARGOS" BASE + IT PHASE 1contract · Last action 2025-06-30$44,904,844
- Department of DefenseCAMBRIDGEcontract · Last action 2024-01-29$41,152,370
- Department of DefenseTHE GOAL OF THE ADAPTIVE RADAR COUNTERMEASURES (ARC) PROGRAM IS TO DEVELOP THE CAPABILITY TO COUNTER ADAPTIVE RADAR THREATS IN TACTICALLY RELEVANT TIME FRAMES BASED ON OVER-THE-AIR OBSERVABLE SIGNALS. AN ADAPTIVE THREAT IS DEFINED AS AN ADVERSARY S RADAR WHOSE WAVEFORMS AND BEHAVIORS ARE NEW, UNKNOWN, OR AMBIGUOUS. THREATS OF PARTICULAR INTEREST INCLUDE GROUND-TO-AIR AND AIR-TO-AIR PHASED ARRAY RADARS CAPABLE OF PERFORMING MULTIPLE FUNCTIONS (E.G., SURVEILLANCE, CUED TARGET ACQUISITION, TRACKING, NON-COOPERATIVE TARGET IDENTIFICATION, MISSILE TRACK, ETC.) AND EXHIBITING A HIGH DEGREE OF AGILITY IN BEAM STEERING, WAVEFORM, AND COHERENT PROCESSING INTERVAL (CPI) CHARACTERISTICS (E.G., CODING, PULSE REPETITION INTERVAL [PRI], ETC.). THE KEY CHALLENGES TO COUNTERING RADAR THREATS ARE: (1) UNAMBIGUOUSLY ISOLATING THE SIGNAL IN THE PRESENCE OF OTHER HOSTILE, FRIENDLY AND NEUTRAL SIGNALS; (2)DEDUCING THE THREAT POSED BY THAT SIGNAL; AND (3) SYNTHESIZING AND TRANSMITTING A COUNTERMEASURE THAT ACHIEVES A DESIRED EFFECT WITHIN THE RADAR S SIGNAL PROCESSOR. TODAY S AIRBORNE ELECTRONIC WARFARE (EW) SYSTEMS RELY ON A PRIORI KNOWLEDGE OF THE THREAT ENVIRONMENT IN ORDER TO SIMPLIFY THESE TASKS. WHEN A SIGNAL IS DETECTED, ITS CHARACTERISTICS ARE COMPARED TO A LIST OF RADAR SIGNALS THAT WERE DEEMED TO BE POTENTIAL THREATS IN THE GEOGRAPHICAL AREA OF OPERATION (I.E., A LOAD SET). IF A MATCH IS FOUND, THEN THE EW SYSTEM IS ABLE TO IDENTIFY THE THREAT AND APPLY AN APPROPRIATE PRE-PROGRAMMED COUNTERMEASURE (CM) THAT WAS DEVELOPED OFFLINE BY SKILLED ANALYSTS AND ENGINEERS, AND TESTED VIA SIMULATION AND RANGE TESTING (WHEN POSSIBLE). WHEN THE SIGNALS DETECTED IN THEATER ARE AMBIGUOUS OR DO NOT MATCH THE WAVEFORMS IN THE CURRENT LOAD SET, LIMITED REAL-TIME, ADAPTIVE RESPONSES ARE AVAILABLE TODAY. AS RADARS EVOLVE FROM FIXED ANALOG SYSTEMS TO DIGITALLY PROGRAMMABLE VARIANTS WITH UNKNOWN BEHAVIORS AND AGILE WAVEFORM CHARACTERISTICS, IDENTIFYING RADAR SYSTEMS IS BECOMING INCREASINGLY CHALLENGING. FUTURE RADARS PRESENT AN EVEN GREATER CHALLENGE AS THEY ARE EXPECTED TO HAVE THE ABILITY TO SENSE THEIR ENVIRONMENT AND ADAPT THEIR TRANSMISSION CHARACTERISTICS AND PULSE PROCESSING ALGORITHMS TO MAXIMIZE PERFORMANCE AND MITIGATE INTERFERENCE EFFECTS. THE RESULT IS THAT OUR EW SYSTEMS WILL INCREASINGLY ENCOUNTER ADAPTIVE RADAR THREATS. THE OBJECTIVE OF THE ARC PROGRAM IS TO ENABLE OUR EW SYSTEMS TO AUTOMATICALLY GENERATE EFFECTIVE COUNTERMEASURES AGAINST NEW, UNKNOWN, OR AMBIGUOUS RADAR SIGNALS IN NEAR REAL-TIME (I.E., AS THEY ARE ENCOUNTERED DURING A MISSION).contract · Last action 2024-01-29$36,539,401
- Department of DefenseSEEKER COST TRANSFORMATIONcontract · Last action 2025-07-21$35,319,083
- Department of DefenseMERCURYcontract · Last action 2025-12-16$26,682,883
- Department of DefenseBAA OVERRSIGHT PROGRAMcontract · Last action 2025-12-11$22,027,341
- Department of DefenseCOMMUNICATIONS UNDER EXTREME RF SPECTRUM CONDITIONS (COMMEX)contract · Last action 2024-01-29$21,235,166
- Department of DefenseTHE CONTRACTOR SHALL PERFORM RESEARCH AND DEVELOPMENT OF THE RADIO SYSTEM OF THE TACTICAL BOOST GLIDE (TBG) PROGRAM.contract · Last action 2025-03-31$16,793,497
- Department of DefenseIGF::OT::IGF ARRAY BUILDING BLOCK ENABLED BY MATRICS (ABEAM)contract · Last action 2024-01-29$15,092,904
- Department of DefenseLEAD INTEGRATOR.contract · Last action 2025-12-16$14,301,300
- Department of DefensePHASE II SEEKER TRANSFORMATION COSTcontract · Last action 2025-01-29$14,242,739
- Department of DefenseDARPA RESEARCH PROJECT.contract · Last action 2024-01-29$13,733,687
- Department of DefenseIGF::OT::IGF MULTI OPTICAL SENSING (MOS) PHASE 2 AND 3contract · Last action 2024-08-01$13,672,188
- Department of DefenseIGF::OT::IGF-- NEXT-GENERATION ESTIMATION OF POSITION USING TOMOGRAPHY, UNDERSEA-DATA, NONLINEAR MODELING, AND EXFILTRATION (NEPTUNE)contract · Last action 2024-01-29$13,572,072
- Department of DefenseIGF::OT::IGF THE NAVIGATION WARFARE (NAVWAR) TRINITY (TNT) PROGRAMcontract · Last action 2023-04-11$13,391,529
- Department of DefenseIGF::OT::IGF DARPA RESEARCH PROJECT.contract · Last action 2024-01-29$13,267,005
- Department of DefenseDARPA RESEARCH PROJECTcontract · Last action 2025-02-19$12,381,075
- Department of DefenseMOVING EMITTER LOCALIZATION AND TRACKINGcontract · Last action 2021-07-22$12,158,033
- Department of DefenseARMS (ADAPTIVE RESOURCE MANAGEMENT SYS)contract · Last action 2024-10-01$10,742,185
- Department of DefenseFAST EVENT-BASED NEUROMORPHIC CAMERA AND ELECTRONICS (FENCE) AIMS TO DEVELOP AND DEMONSTRATE A LOW LATENCY, LOW POWER,EVENT-BASED CAMERA AND A NEW CLASS OF SIGNAL PROCESSING AND LEARNING ALGORITHMS THAT ENABLE INTELLIGENT SENSORS.contract · Last action 2024-05-31$9,672,975
- Department of DefenseDARPA EDINBURGH PROGRAM TRAP TA1contract · Last action 2024-03-20$9,350,532
- Department of DefenseIGF::OT::IGF DAHI ELECTRONICS FOR NEXT GENERATION EW SUPPORT (YELLOWFIN) PHASE 0.contract · Last action 2024-01-29$8,973,353
- Department of DefenseIGF::OT::IGF 56-9633-15 PRODUCT 2 LASER SOURCES: DESIGN, BUILD OR PROCURE, AND TEST LASER SOURCES FOR MEIRCAT HARDWARE, SOFTWARE, INTEGRATION, AND TESTING SPECIFICATIONcontract · Last action 2024-01-29$8,858,663
- Department of DefenseRADIO FREQUENCY-FIELD PROGRAMMABLE GATE ARRAYS (RF-FPGA), THIS PROGRAM SEEKS TO DEVELOP FIELD-PROGRAMMABLE, FULLY ADAPTABLE, AND WAVEFORM AGNOSTIC INTEGRATED RF FRONT-ENDS AND ASSOCIATED DESIGN TOOLS FOR NEXT-GENERATION MILITARY COGNITIVE COMMUNICATIONS, RADAR AND ELECTRONIC WARFARE PLATFORMS.contract · Last action 2024-01-29$8,352,052
- Department of DefenseSTRATEGIC CHAOS ENGINE FOR PLANNING, TACTICS, EXPERIMENTATION, AND RESILIENCY (SCEPTER)contract · Last action 2024-01-29$8,349,794
- Department of DefenseTECHNOLOGIES FOR MIXED-MODE ULTRA SCALED INTEGRATED CIRCUITS (T-MUSIC DISCO)contract · Last action 2024-01-29$8,077,550
- Department of DefensePOWER RECYCLING ANALOG CORRELATOR VIA TILED IMPLEMENTATION OF A CROSSBAR AND ADIABATIC SUPPLY (PRACTICAL)contract · Last action 2025-01-24$7,474,996
- Department of DefenseEO14042 THE GOAL OF THE GENERATING RF WITH PHOTONIC OSCILLATORS FOR LOW NOISE (GRYPHON) PROGRAM IS TO DEVELOP COMPACT, LOWNOISE MICROWAVE FREQUENCY SYNTHESIZERS TO ENABLE ADVANCED SENSING AND COMMUNICATION APPLICATIONS.contract · Last action 2024-01-29$7,157,541
- Department of DefenseIGF::OT::IGF DIVERSE ACCESSIBLE HETEROGENEOUS INTEGRATIONcontract · Last action 2024-08-21$7,132,800
- Department of DefensePBL FOR AN/ALQ-126Bcontract · Last action 2010-02-11$7,079,928
- Department of DefenseDARPA RESEARCH EFFORTcontract · Last action 2024-01-29$6,826,242
- Department of DefenseBASE EFFORT - RESEARCH&DEVELOPMENTcontract · Last action 2024-01-29$6,826,135
- Department of DefenseNITRIDE ELECTRONICS WITH ENHANCED DEVICE LEVEL HEAT EXTRACTION (NEEDLE)contract · Last action 2025-09-19$6,671,089
- Department of DefensePBL FOR AN/ALQ-126Bcontract · Last action 2011-01-20$6,498,552
- Department of DefensePBL FOR THE AN/ALQ-126B ELECTRICAL COUNTERMEASURES SYSTEMcontract · Last action 2012-01-23$6,421,044
- Department of DefenseTHE HIGH OPERATIONAL TEMPERATURE SENSORS (HOTS) PROGRAM AIMS TO DEVELOP A TECHNOLOGY FOR HIGH-BANDWIDTH, HIGH-DYNAMIC-RANGE SENSING AT HIGH TEMPERATURE.contract · Last action 2025-09-16$6,194,105
- Department of DefenseRESEARCH AND DEVELOPMENTcontract · Last action 2024-06-14$5,893,494
- Department of DefenseDARPA RESEARCH PROJECTcontract · Last action 2025-01-15$5,789,332
- Department of DefenseAN/ALQ-126B ELECTRONIC COUNTERMEASURES SYSTEMcontract · Last action 2014-01-31$5,534,616
- Department of DefenseIGF::CT::IGF HIGH ALTITUDE ASW (HAASW) FOR THE P-8A FNC UNMANNED TARGETING AIR SYSTEM (UTAS) PHASES 1B AND 2contract · Last action 2024-01-29$5,372,071
- Department of DefenseDARPA RESEARCH PROJECTcontract · Last action 2024-01-29$5,339,574
- Department of DefenseIGF::OT::IGF THE RECONFIGURABLE IMAGING (REIMAGINE) PROGRAM AIMS TO DEMONSTRATE MULTI-FUNCTIONAL IMAGING SENSORS THAT ARE RECONFIGURABLE THROUGH SOFTWARE.contract · Last action 2025-07-21$5,285,335
- Department of DefenseWIDEBAND ADAPTIVE RF PROTECTION (WARP) SELF-INTEFERENCE PROTECTION WITH INTEGRATED CANCELLATION ALGOcontract · Last action 2024-05-21$5,267,895
- Department of DefenseTHE GOAL OF THE WAVEFORM AGILE RADIO-FREQUENCY DIRECTED ENERGY (WARDEN) PROGRAM IS TO EXTEND THE RANGE OF HIGH POWER MICROWAVE (HPM) BACK-DOOR ATTACK BY A FACTOR OF 10 BEYOND THE CURRENT STATE OF THE ART.contract · Last action 2024-01-29$5,220,208
- Department of DefenseDARPA RESEARCH PROJECTcontract · Last action 2025-03-07$5,049,910
- Department of DefenseTHE COMPACT FRONT-END FILTERS AT THE ELEMENT-LEVEL (COFFEE) AIMS TO PRODUCE FRONT-END RF FILTERS THAT PROTECT THE ELEMENTS OF DIGITAL ACTIVE ELECTRONICALLY SCANNED ARRAYS (AESAS) AGAINST INTERFERENCE IN INCREASINGLY CROWDED RF SPECTRUM ENVIRONMENTS.contract · Last action 2025-04-02$4,713,122
- Department of DefenseCONTRACT AWARD FOR PHASE 1 OF THE ADVANCED ROTARY WING MULTIFUNCTION SENSOR (ARMS) PROGRAM.contract · Last action 2012-08-07$4,690,633
Federal contract dollars to this establishment. Primary NAICS: 541715 - RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT NANOTECHNOLOGY AND BIOTECHNOLOGY). Last action: 2026-01-05. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
In the news
Related searches
- Employers in NHState-wide enforcement data
About this data
This profile aggregates federal enforcement records on BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION's OSHA violation history?
- BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION has no OSHA inspections on record.