Establishment profile
B & F Contracting, Inc.
198 State Route 716, Ashland, KY, 41102
238990 — All Other Specialty Trade Contractors
Summary
B & F Contracting, Inc. has no OSHA inspection history on file. Federal records covering wage, environmental, labor relations, and other agencies are noted below where present.
The most recent federal enforcement activity was recorded 9 years ago.
Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
B & F Contracting, Inc. appears in WHD wage enforcement record only. No matching records were found in OSHA workplace safety, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls. Single-agency enforcement records typically indicate either a discrete incident-based inspection or a low-risk operational profile.
OSHA workplace safety
No OSHA inspections, citations, or accidents on file for B & F Contracting, Inc.. Verify directly with Occupational Safety and Health Administration →
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for B & F Contracting, Inc.. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for B & F Contracting, Inc.. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 9+ years. Most recent activity: 9 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
Department of Labor Wage & Hour Division — minimum-wage, overtime, child-labor, FMLA, and prevailing-wage enforcement.
Wage and hour breakdown by law
Per-statute totals across all closed DOL Wage & Hour cases against this employer. Backwages reflect amounts the agency assessed; civil penalty is the separate fine where applicable. Some acts (Davis-Bacon, SCA, CWHSSA, H-2B, CCPA) don't carry a civil penalty field in DOL's data. 2 statutes · 15 violations · $213,283 in backwages
| Statute | Period | Cases | Violations | Workers | Backwages | Civil penalty |
|---|---|---|---|---|---|---|
| Davis-Bacon (federal construction) | Sep 2016 | 1 | 14 | 7 | $211,119 | — |
| CWHSSA (federal-contract overtime) | Sep 2016 | 1 | 1 | 1 | $2,164 | — |
Source: DOL WHD enforcement database, aggregated per statute. Lifetime totals. A case can cite multiple statutes — so the total here may exceed the case count in the table above.
Wage and hour cases
Closed DOL Wage & Hour Division cases (FLSA, FMLA, H-2B, MSPA, and related statutes). Backwages reflect amounts the agency assessed; civil penalty (CMP) is a separate fine levied on top, where the statute provides for one (FLSA / H-1B / H-2A / MSPA / FMLA / EPPA / FLSA Child Labor; other acts have no CMP column in DOL’s data). The Statutes column lists which laws each case cited. 1 case · 15 violations · $213,283 in backwages · 7 workers affected
| Case period | Industry | Statutes | Violations | Workers | Backwages | Civil penalty |
|---|---|---|---|---|---|---|
| Oct 2014 – Sep 2016 | All Other Specialty Trade Contractors | CWHSSADavis-Bacon | 15 | 7 | $213,283 | — |
Source: DOL WHD enforcement database. Cases shown reflect those the agency has closed and made public. A violation count is the agency’s tally of cited violations (one violation can affect many workers); the workers column counts distinct employees the agency found to be affected.
Mine safety (MSHA)
No MSHA mine safety violations on file for B & F Contracting, Inc.. Verify directly with Mine Safety and Health Administration →
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for B & F Contracting, Inc.. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for B & F Contracting, Inc.. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for B & F Contracting, Inc.. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for B & F Contracting, Inc.. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
- General Services AdministrationREMOVE AND INSTALL CARPETcontract · Last action 2011-07-18$230,717
- General Services AdministrationMAGISTRATE JUDGE'S CHAMBER RENOVATIONcontract · Last action 2010-12-13$165,174
- General Services AdministrationREMOVE AND INSTALL CARPETcontract · Last action 2013-05-07$156,621
- General Services AdministrationRENOVATION 1ST FLOOR USDCcontract · Last action 2010-04-01$154,964
- General Services AdministrationLL2 PARKING GARAGE COATINGcontract · Last action 2012-06-27$150,000
- General Services AdministrationIGF::OT::IGF CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, SUPERVISION AND EQUIPMENT TO: 1. DEMO OLD WIRING, WIREMOLD AND OTHER ELECTRICAL ITEMS AS NECESSARY. 2. DEMO OLD LIGHT FIXTURES, SWITCHES, CONDUIT AS NECESSARY. 3. FURNISH AND INSTALL NEW LED LIGHT FIXTURES, CONDUIT AND WIRING AS NEEDED FOR NEW LIGHTING LAYOUT. WALK-THROUGH PERFORMED WITH CONTRACTOR ON APRIL 1ST TO REVIEW PROJECT. SEE SCOPE OF WORK FOR MORE DETAILS. CONTRACTOR WILL ALSO PROVIDE ALL MATERIAL, LABOR, EQUIPMENT AND SUPERVISION TO PAINT THE FLOORS, WALLS AND CEILINGS OF THE MECHANICAL ROOM IN THE HUNTINGTON FEDERAL BUILDING. SEE SCOPE OF WORK FOR MORE DETAILS. WORK WILL TAKE PLACE AT THE HUNTINGTON FEDERAL BUILDING LOCATED AT 502 8TH STREET, HUNTINGTON, WEST VIRGINIA.contract · Last action 2015-10-26$142,452
- General Services AdministrationIP TELEPHONY PROJECTcontract · Last action 2012-04-18$130,280
- General Services AdministrationIGF::OT::IGF RENOVATION OF EXISTING FORMER FBI SPACE FOR NEW OCCUPANCY OF USAO. DEMO INCLUDES WALLS, CARPET, COVE BASE, CEILING TILE, ETC. NEW WORK INCLUDES NEW FLOORING, BATHROOM AND KITCHEN AREAS INCLUDING ALL ACCESSORIES, ETC.contract · Last action 2015-02-27$129,468
- General Services AdministrationIGF::OT::IGF RENOVATIONS TO JUDGE THACKER'S CHAMBERS ON THE 7TH FLOOR OF WV0163ZZ. THE PROJECT WAS REQUESTED BY THE 4TH CIRCUIT COURT OF APPEALS.contract · Last action 2014-10-08$115,953
- General Services AdministrationIGF::OT::IGF RENOVATION TO CONVERT ONE LARGE STORAGE ROOM INTO TWO ROOMS AT THE ROBERT C. BYRD UNITED STATES COURTHOUSE LOCATED AT 300 VIRGINIA STREET, EAST, CHARLESTON, WEST VIRGINIA. ROOM 1 - LIBRARY/CONFERENCE ROOM - F&I WALLS (3 5/8 METAL STUD WITH 5/8 TYPE- X EACH SIDE WITH SAB) TO SEPARATE SPACE INTO TWO ROOMS. - FINISH ALL EXISTING WALLS (TAPE AND FINISH TO LEVEL 5). - F&I CEILING. CEILING TO BE A COMBINATION OF HARD CEILING OVER CONFERENCE TABLE AREA AND DROPPED CEILING OVER OTHER AND LIBRARY AREA. STYLE TO BE SIMILAR TO BECKLEY COURTROOM CEILING. - INSTALL COURT-FURNISHED WALL-MOUNT TV INCLUDE, BLOCKING, A ELECTRICAL WALL OUTLET AND DATA CASES. - INSTALL CONVENIENCE KEY CARD READER ON DOOR. - F&I NEW DOOR, FRAME, AND LOCKSET. ROOM #2 FOR ACCESS - PAINT HARD CEILING 3 COATS CEILING, ALL WALLS 3 COATS, DOOR, AND FRAME PRIMER WITH 2 FINISH COATS. - F&I CARPET GLUE DOWN (KINGS ROAD-ARIES BLUE) INCLUDING COVE BASE. - ASSEMBLE EXISTING BOOKCASES FROM 4TH CIRCUIT LIBRARY AREA. (NOTE CUT 6' OFF THE UPRIGHTS OF CENTER OF ROOM SHELVES TO ACHIEVE NO MORE THAN A 7-0 HEIGHT) WALL SHELVES CAN BE 7-6 . (SHELVING THE LAW BOOKS BY OTHER). - F&I 16 EA SPRINKLER HEADS INSTALL AT NEW CEILING HEIGHT OF 8'-6" - HVAC AND DUCTWORK AS REQUIRED. PROVIDE MAIN DUCT OF 1,000 CFM WITH 6 SUPPLIES WITH CEILING PLENUM RETURNS INCLUDING ELECTRICAL CONTROL WIRING FOR EXISTING VAV BOX. - F&I CANNED LIGHTS IN CONFERENCE AREA AND STANDARD 2 X 2 LIGHTING IN LIBRARY AREA. - INSTALL COURT-FURNISHED CHANDELIERS (2). F&I COVE LED LIGHT STRIPS ON UPPER LEDGE OF HARD CEILING. - F&I ELECTRIC, CONVENIENCE OUTLET PER CODE, ONE FLOOR BOX WITH QUAD OUTLET AND DATA, 2 LIGHT SWITCHES FOR 2X2 ONE FOR LED, 1 FOR CANS , AND ONE DIMMER FOR COURT-FURNISHED CHANDELIERS, AND 1 ADDITIONAL DATA END OF SCOPE ROOM 2 (OPTION) - FINISH OUT EXISTING WALLS (TAPE AND FINISH TO LEVEL 5) - F&I 2 X 2 ACOUSTICAL DROPPED CEILING. - F&I STANDARD 2 X 2 LIGHTING T-8 THREE TUBE SWITCHED TO LIGHT TWO TUBES OR ONE TUBE. - F&I 10 EA SPRINKLER HEADS INSTALL AT NEW CEILING HEIGHT OF 7'-8" - F&I ELECTRIC CONVENIENCE OUTLET PER CODE, LIGHT SWITCHES DBL AT NEW DOOR, AND ONE (1) DATA. - HVAC AND DUCT WORK AS REQUIRED. PROVIDE MAIN DUCT OF 1,000 CFM WITH 6 SUPPLIES AND CEILING PLENUM RETURNS - PAINT CEILING, ALL WALLS, DOOR, FRAME AND OTHER FOR A COMPLETE JOB. - F&I VCT AND COVE BASE. END OF SCOPE THE FOLLOWING ITEMS ARE HEREBY INCORPORATED BY REFERENCE IN CONTRACT NO. GS-03P-11-CD-D-0024 / GS-P-03-14-QN-5033. - B&F CONTRACTING, INC.'S PROPOSAL DATED: 08/07/2014, IN THE TOTAL AMOUNT OF $103,009.93 - SCOPE OF WORK AND TECHNICAL DRAWINGS ATTACHEDcontract · Last action 2015-01-30$108,622
- General Services AdministrationIGF::OT::IGF CHARLESTON, WV-CONFERENCE/TRAINING ROOM RENOVATION, EXPAND SPACE CONTRACT SHALL PROVIDE ALL LABOR, TOOLS, MATERIALS, EQUIPMENT, AND SUPERVISION FOR RENOVATING THE USP CONFERENCE ROOM LOCATED AT THE ROBERT C. BYRD UNITED STATES COURTHOUSE, 300 VIRGINIA STREET, EAST, CHARLESTON, WEST VIRGINIA. THIS WORK INCLUDE, BUT NOT BE LIMITED TO, EXPAND SPACE USING ADJACENT CORRIDOR; FURNISH AND INSTALL EIGHT (8) SPEAKERS, MOUNT FOR TVS, ONE (1) FLOOR BOX, PAINT/PATCH/CARPET; FURNISH AND INSTALL HDMI, CAT6 (PURPLE), ALL NECESSARY ELECTRICAL WORK TO COMPLETE THE PROJECT. SEE DETAILED STATEMENT OF WORK FOR SPECIFICATIONS. CONTRACTOR, B&F CONTRACTING, INC.'S PROPOSAL DATED 01/27/2016 FOR THE TOTAL AMOUNT OF $86,060.04 IS HEREBY INCORPORATED INTO THIS TASK ORDER.contract · Last action 2016-06-28$105,439
- General Services AdministrationIGF::CT::IGF CONTRACTOR TO PROVIDE ALL LABOR, TOOLS, EQUIPMENT AND SUPERVISION FOR THE OFFICE RENOVATIONS IN THE SSA BUILDING LOCATED AT 50 MCDOWELL STREET, WELCH, WEST VIRGINIA.contract · Last action 2013-08-20$95,103
- General Services AdministrationIGF::CT::IGF CONTRACTOR TO PROVIDE ALL LABOR, TOOLS, EQUIPMENT AND SUPERVISION FOR THE RENOVATION OF ROOMS 2311 AND 2323 AT THE FEDERAL BUILDING LOCATED AT 425 JULIANA STREET, PARKERSBURG, WV.contract · Last action 2013-12-11$90,624
- General Services AdministrationIGF::OT::IGF CONTRACTOR IS TO PROVIDE ALL LABOR, TOOLS, EQUIPMENT, AND SUPERVISION FOR THE DESCRIBED WORK LISTED BELOW AT THE ROBERT C. BYRD UNITED STATES COURTHOUSE LOCATED AT 300 VIRGINIA STREET, EAST, CHARLESTON, WEST VIRGINIA. F&I TWO 5-TON LIEBERT AIR CONDITIONING UNITS WITH SCROLL COMPRESSOR, CONDENSATE PAN AND WATER SENSOR. ONE UNIT IS TO BE USED AS PRIMARY; THE SECOND UNIT IS TO BE USED AS A BACKUP. REPLACE CRIMPED CONNECTIONS IN SPRINKLER PIPING WITH THREADED CONNECTIONS. REPLACE SPRINKLER HEADS. RELOCATE AIR RETURN TO THE NORTH WALL AND WEST WALL ABOVE SERVERS. RELOCATE ELECTRIC AND DATA FOR SERVER EQUIPMENT. INSTALL AMP/VOLT METER FOR CALCULATION OF ACTUAL POWER USED BY AIR CONDITIONING UNITS. F&I SERVER ROOM FENCE WITH SLIDING DOOR AND LOCK. REPLACE CEILING TILES AND PROVIDE LABOR TO REMOVE AND INSTALL 24"X24" ACCESS FLOORING AND FURNISHED BY USDC UP TO 225 EACH PATCH AND PAINT ALL WALLS AND COLUMN INSTALL NEW BLOCKING FOR HAND RAIL. F&I TWO CEILING SPEAKERS AND WIRE AND CONNECT TO EXISTING INTERCOM SYSTEM. ONE SPEAKER TO BE LOCATED IN CLERK'S CONFERENCE ROOM VESTIBULE. ONE SPEAKER TO BE LOCATED IN CORRIDOR NEAR JURY ROOM. FURNISH APPROPRIATE CEILING TILE FOR SPEAKER.contract · Last action 2015-07-30$85,990
- General Services AdministrationRELOCATION TO 2ND FLOORcontract · Last action 2011-01-11$82,368
- General Services AdministrationREMOVE AND INSTALL CARPET FOR US DISTRICT COURT CLERK'S 2ND FLOOR PRIVATE OFFICEScontract · Last action 2012-09-26$80,565
- General Services AdministrationIGF::OT::IGF CONTRACTOR, B&F CONTRACTING, INC., SHALL PROVIDE ALL SUPERVISION, LABOR, MATERIALS, SUPPLIES AND EQUIPMENT NEEDED TO COORDINATE AND COMPLETE ASPECTS OF ALTERATIONS TO THE EXISTING OFFICE SPACE, LOCATED IN THE IRS-BECKLEY FINANCE CENTER BUILDING ON 110 NORTH HEBER STREET IN BECKLEY, WEST VIRGINIA, IN ACCORDANCE WITH THE SCOPE OF WORK AS PREPARED BY IRS DATED 5/27/2016 INCLUDING DRAWINGS A, B, C, D, E, F, G, H, I, J, AND K. CONTRACTOR'S QUOTE DATED 06/17/2016 IN THE AMOUNT OF 70,757.09 IS HEREBY INCORPORATED IN THIS TASK DELIVERY AWARD.contract · Last action 2017-02-23$76,982
- General Services AdministrationCONSTRUCTION/ALTERATIONS TO MOVE TAX PAYER ADVOCATE OFFICEcontract · Last action 2010-01-04$74,474
- General Services AdministrationIGF::OT::IGF CONTRACTOR TO PROVIDE WOODWORK IN US DISTRICT COURTROOM ATHE THE SIDNYE L. CHRISTIE FEDERAL BUILDING LOCATED AT 845 FIFTH AVENUE, HUNTINGTON, WVcontract · Last action 2014-08-07$67,706
- General Services AdministrationIGF::OT::IGF PROVIDE ALL MATERIAL, LABOR, EQUIPMENT AND SUPERVISION TO INSTALL A SECURE VAULT, DEMO AND INSTALL NEW CEILING/GRID, DEMO AND INSTALL NEW LIGHTING, INSTALL NEW STOREFRONT GLASS WALL AT DEPUTY IN CHARGE'S OFFICE, PROVIDE DATA/ELECTRICAL AS REQUIRED BY SCOPE AND PAINT ENTIRE CLERK'S OFFICE SUITE. SEE SCOPE OF WORK AND RWA FOR FULL DETAILS. WORK TO BE COMPLETED AT THE SIDNEY L. CHRISTIE FEDERAL BUILDING LOCATED AT 845 FIFTH AVENUE, HUNTINGTON, WEST VIRGINIA.contract · Last action 2014-09-09$67,457
- General Services AdministrationBUILD OUT OF 2 HEARING ROOMScontract · Last action 2008-10-15$65,370
- General Services AdministrationCYCLICAL PAINTINGcontract · Last action 2009-05-12$56,530
- General Services AdministrationIGF::OT::IGF CONTRACT TO PROVIDE ALL LABOR, TOOLS, EQUIPMENT, AND SUPERVISION TO REMOVE THREE (3) WALLS ; FURNISH AND INSTALL NEW WALLS TO DIVIDE PORTION OF LIBRARY INTO TWO (2) OFFICES (AS SHOWN ON THE ATTACHED DRAWINGS). THIS WORK INCLUDES INSTALLING NEW CARPET AND PAINT; DEMOLITION AND RELOCATION OF BOOKCASES; A/C REWORK; LIGHTING REWORK; NEW WALL TO BE SOUND PROOF (EITHER SOUNDROCK OR TWO-LAYER); INCLUDES ALL ELECTRIC, FURNITURE, MOVING, ETC. ALSO INCLUDED IS THE INSTALLATION OF TWO (2) XLR CABLES AND DUPLEXES; INSTALLATION OF NEW LIGHTING AND INVESTIGATOIN OF THE A/C AS NEEDED; AND CURTAIN TRACK. THIS WORK WILL BE PERFORMED AT THE ROBERT C. BYRD UNITED STATES COURTHOUSE LOCATED AT 300 VIRGINIA STREET, EAST, CHARLESTON, WEST VIRGINIA. CONTRACTOR, B&F'S PROPOSAL DATED 03/11/2016 FOR THE TOTAL AMOUNT OF $46,685.28 IS HEREBY INCORPORATED INTO THIS TASK DELIVERY ORDER.contract · Last action 2016-06-29$55,664
- General Services AdministrationIGF::OT::IGF CONTRACTOR TO PROVIDE ALL LABOR, TOOLS, EQUIPMENT AND SUPERVISION FOR WORK DESCRIBED AS BELOW. THIS WORK WILL TAKE PLACE FOR THE UNITED STATES DISTRICT COURT JUDGES IN THE ROBERT C. BYRD UNITED STATES COURTHOUSE LOCATED AT 300 VIRGINIA STREET, EAST, CHARLESTON, WEST VIRGINIA. CONTRACTOR WILL PUT IN FLOOR BOXES AND OTHER UPGRADES IN FIVE ELECTRONIC COURTROOMS.contract · Last action 2017-02-23$54,601
- General Services AdministrationIGF::OT::IGF PROVIDE ALL LABOR, MATERIAL, EQUIPMENT AND SUPERVISION TO PAINT AND REFINISH WOOD WORK AS SPECIFIED IN PROBATION SUITE. ALL WORK TO BE COMPLETED AT THE SIDNEY L. CHRISTIE FB&USCH LOCATED AT 845 5TH AVENUE, HUNTINGTON, WV. PROJECT ALSO INCLUDES F&I NEW STANDARD SIZE WOOD DOOR, NEW HANDLES AND LOCK-SET LOCATED AT PUBLIC ENTRANCE (ROOM 324). WALL MODICATION FOR NEW DOOR ALSO INCLUDED. SEE SOW AND RWA FOR FULL DETAILS.contract · Last action 2014-09-09$52,709
- General Services AdministrationIP TELEPHONY PROJECT FFOR US DISTRICT, US BANKRUPTCY, AND US PROBATIONcontract · Last action 2012-03-28$51,667
- General Services AdministrationIGF::OT::IGF BUILD OUT SERVER ROOM. UPGRADE TO CAT-6E CABLING. PROVIDE ADEQUATE COOLING FOR SERVER ROOM EQUIPMENT. ALL WALLS NEED TO GO FLOOR TO DECK FOR SECURITY PURPOSES. THE SERVER ROOM NEEDS LIMITED ACCESS TO PROVIDE NECESSARY SECURITY.contract · Last action 2014-10-14$50,638
- General Services AdministrationINSTALL CAPRET, PAINT WALLS, DOORS AND WINDOWScontract · Last action 2012-04-26$48,224
- General Services AdministrationPAINT AND CARPET KICHEN IN PROBATION SPACEcontract · Last action 2011-02-02$46,004
- General Services AdministrationIGF::OT::IGF CONTRACTOR TO PROVIDE ALL MATERIAL, LABOR AND SUPERVISION TO INSTALL A FULL SERVICE GALLEY WITH CABINETS, COUNTERTOPS, SINK (PLUMBING), AND HOOK UP TO ACCOMODATE REFRIGERATOR. WORK ALSO INCLUDES CONSTRUCTING COPY ROOM ALCOVE. CONTRACTOR TO PROVIDE DATA AND ELECTRIC AS REQUIRED. SEE SOW FOR FULL DETAILS. WORK TO BE COMPLETED AT THE SIDNEY L. CHRISTIE FEDERAL BUILDING LOCATED AT 845 5TH AVENUE, HUNTINGTON, WEST VIRGINIA.contract · Last action 2015-02-02$45,086
- General Services AdministrationRENOVATE ATF ON THE 2ND FLOORcontract · Last action 2013-09-27$44,629
- General Services AdministrationIGF::OT::IGF CONTRACTOR TO PROVIDE ALL LABOR, TOOLS, EQUIPMENT, AND SUPERVISION TO RECONFIGURE EXISTING CSO'S ABILITY TO SEE VISITORS ENTERING THE COURTHOUSE. THIS WORK WILL TAKE PLACE AT THE SIDNEY L. CHRISTIE FEDERAL BUILDING LOCATED AT 845 5TH AVENUE, HUNTINGTON, WEST VIRGINIA.contract · Last action 2016-04-25$43,793
- General Services AdministrationTHE PURPOSE OF THIS CONTRACT IS FOR THE CONTRACTOR TO FURNISH AND INSTALL MATERIAL AND EQUIPMENT TO RENOVATE THE U. S. PROBATION OFFICEScontract · Last action 2011-04-25$43,331
- General Services AdministrationCONVERT ROOM 1038 FROM A FILE ROOM TO THE ELECTRIC/DATA ROOMcontract · Last action 2010-04-08$42,165
- General Services AdministrationREMOVE/INSTALL CARPETcontract · Last action 2009-04-27$41,803
- General Services AdministrationIGF::OT::IGF INSTALL BALLISTIC GLASS AND KEVLAR FRONT ENTRY FURNISH AND INSTALL NEW BALLISTIC WALL SYSTEM TO PROTECT GUARDS UPON ENTRY.contract · Last action 2016-02-17$41,451
- General Services AdministrationIGF::OT::IGF CONTRACTOR TO PROVIDE ALL LABOR, TOOLS, EQUIPMENT, AND SUPERVISION TO PERFORM RENOVATIONS TO THE BASEMENT STORAGE AREA FOR THE ARMY CORP OF ENGINEERS LOCATED AT THE HUNTINGTON FEDERAL BUILDING LOCATED AT 502 8TH STREET, HUNTINGTON, WEST VIRGINIA.contract · Last action 2016-11-21$41,366
- General Services AdministrationRENOVATE THE JUDGES CONFERENCE ROOMcontract · Last action 2010-03-22$41,004
- Department of LaborREPAIR AND ALTERATIONScontract · Last action 2010-09-29$39,803
- General Services AdministrationRENOVATIONS TO THE 7TH FLOOR STORAGE ROOMcontract · Last action 2013-02-22$39,504
- General Services AdministrationIGF::CT::IGF CONTRACTOR TO PROVIDE LABOR, NECESSARY MATERTIALS AND SUPERVISION FOR THE INSTALLATION OF GOVERNMENT PURCHASED TREADS AT THE HUNTINGTON FEDERAL BUILDING LOCATED AT 502 8TH STREET, HUNTINGTON, WVcontract · Last action 2014-03-20$37,269
- General Services AdministrationCARPET, PAINT, ELECTRICcontract · Last action 2010-07-12$35,399
- General Services AdministrationIGF::OT::IGF CONTRACTOR TO PERFORM WORK ON THIS PROJECT AT THE ROBERT C. BYRD UNITED STATES COURTHOUSE LOCATED AT 110 NORTH HEBER STREET, BECKLEY, WEST VIRGINIA PER THE TERMS AND CONDITIONS OF THE ABOVE STATED CONTRACT. THE PURPOSE OF THIS CONTRACT IS TO REMOVE AND F&I NEW PAD, BASE AND CARPET ON THE 2ND FLOOR US MAGISTRATE JUDGE CHAMBERS. THE INSPECTOR FOR THIS PROJECT WILL BE GSA CONSTRUCTION REPRESENTATIVE MIKE ROBINSON. PLEASE SEE ATTACHED SHEET FOR BREAKDOWN OF LINE ITEM EXPENDITURES.contract · Last action 2013-04-24$35,211
- General Services AdministrationRENOVATION TO FIRST FLOOR HALLWAYcontract · Last action 2008-09-08$33,685
- General Services AdministrationREMOVE 2 WALLS AND DOOR AND INSTALL TWO GLASS WALLScontract · Last action 2011-05-26$33,207
- General Services AdministrationREPAINT EXISTING JUDGES CHAMBERS AND PRIVATE OFFICEScontract · Last action 2010-11-30$33,022
- General Services AdministrationIGF::OT::IGF CONTRACTOR TO PROVIDE ALL LABOR, SUPERVISION, MATERIAL, AND EQUIPMENT TO COMPLETE THE FOLLOWING WORK ON THE SECOND FLOOR - U.S. TRUSTEE'S OFFICE SPACE: - REMOVE EXISTING CARPET AND COVE BASE THROUGHOUT THE OFFICE SPACE. - PATCH AND PAINT WALLS AND DOOR FRAMES. - INSTALL NEW CARPET AND COVE BASE THROUGHOUT THE OFFICE SPACE. - REMOVE WALL COVERING AND PAINT WALLS.contract · Last action 2015-05-05$31,920
- General Services AdministrationELECTRONIC COURTROOMcontract · Last action 2009-07-07$31,810
- General Services AdministrationF&I RENOVATIONS TO ROOMScontract · Last action 2009-01-12$31,462
- General Services AdministrationREMOVE AND INSTALL CARPETcontract · Last action 2013-09-26$28,704
Federal contract dollars to this establishment. Primary NAICS: 236220 - COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION. Last action: 2017-07-07. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
In the news
Other employers in this industry and state
Other employers in all other specialty trade contractors within KY, ordered by federal enforcement volume:
- MURPHY ELEVATOR CO., INCFORT KNOX — 3 federal enforcement records
- ROGERS GROUP, INC.FORT CAMPBELL — 3 federal enforcement records
- WHAYNE SUPPLY COMPANYFOUNTAIN RUN — 2 federal enforcement records
- J&J/BMARFORT CAMPBELL — 2 federal enforcement records
- SMYRNA READY MIX CONCRETE LLCBROOKS — 2 federal enforcement records
- WESTERN CRANE SERVICE, INC.BOWLING GREEN — 2 federal enforcement records
- KCK WeldingMadisonville — 2 federal enforcement records
- AMERICAN COMPLETE ACCESS HOIST AND PLATFORM LLCOWENSBORO — 1 federal enforcement record
- UNISIGN CORPORATIONIVEL — 1 federal enforcement record
- EPIC OUTDOOR LIVING - LANDSCAPING LLCGLENDALE — 1 federal enforcement record
Related searches
- All Other Specialty Trade ContractorsAll employers in this industry
- Employers in KYState-wide enforcement data
- All Other Specialty in KYIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on B & F Contracting, Inc. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is B & F Contracting, Inc.'s OSHA violation history?
- B & F Contracting, Inc. has no OSHA inspections on record.
- How does B & F Contracting, Inc.'s safety record compare to its industry?
- B & F Contracting, Inc. operates in the all other specialty trade contractors industry. The industry average Total Recordable Incident Rate (TRIR) is 1.6.