Establishment profile
AVENAL AGGREGATE & ASPHALT
45315 LOST HILLS ROAD, COALINGA, CA, 93210
212321 — Construction Sand and Gravel Mining
Summary
AVENAL AGGREGATE & ASPHALT has accumulated 8 OSHA violations across 4 inspections over 18 years of recorded history, with $635 in total assessed penalties.
The establishment sits in the 82nd percentile for violations within its industry-state peer group of 1,680 employers. Inspection frequency runs at the 63rd percentile. The most recent enforcement activity was recorded 14 years ago.
Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
AVENAL AGGREGATE & ASPHALT appears in OSHA workplace safety and MSHA mine safety records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
100% of inspections at this establishment produced violations,
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 8 distinct standards shown · 8 citations in this view · $635 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 7046 D | 1 | 1 | $200 | Jan 2012 | Jan 2012 |
| 29 CFR 2500.0010 A | 1 | 1 | $185 | Jul 2008 | Jul 2008 |
| 7046 B | 1 | 1 | $150 | Sep 2009 | Sep 2009 |
| 7183 A09 | 1 | 1 | $100 | Oct 2010 | Oct 2010 |
| 29 CFR 2340.0026 | 1 | 1 | — | Jan 2012 | Jan 2012 |
| 3942 B | 1 | 1 | — | Oct 2010 | Oct 2010 |
| 3942 A | 1 | 1 | — | Sep 2009 | Sep 2009 |
| 7040 | 1 | 1 | — | Jul 2008 | Jul 2008 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Worse on violations than most other employers in NAICS 2123 within CA. Peer group: 1,680 employers. This establishment has 8 OSHA violations; peer median is 2.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for AVENAL AGGREGATE & ASPHALT. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for AVENAL AGGREGATE & ASPHALT. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 14+ years. Most recent activity: 14 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for AVENAL AGGREGATE & ASPHALT. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in CA — for AVENAL AGGREGATE & ASPHALT, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other AVENAL AGGREGATE & ASPHALT operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 55S&S · 100 contractor · $81,554 proposed / $77,895 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 6440853 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Dec 2008 | — | Yes | HighNegligence | $8,209 | $8,209 |
| 6440844 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Dec 2008 | — | Yes | HighNegligence | $3,689 | $3,689 |
| 6431927 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Jun 2008 | — | Yes | HighNegligence | $3,689 | $3,689 |
| 8555383 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Dec 2010 | — | Yes | HighNegligence | $3,143 | $3,143 |
| 6440854 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Dec 2008 | — | Yes | ModNegligence | $2,473 | $1,973 |
| 6440852 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Dec 2008 | — | Yes | ModNegligence | $2,473 | $2,473 |
| 6440851 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Dec 2008 | — | Yes | ModNegligence | $2,473 | $2,473 |
| 6440849 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Dec 2008 | — | Yes | ModNegligence | $2,473 | $828 |
| 6440842 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Dec 2008 | — | Yes | ModNegligence | $2,473 | $2,473 |
| 6481367 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Oct 2013 | — | Yes | ModNegligence | $2,282 | $2,282 |
| 8613798 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Apr 2012 | — | Yes | ModNegligence | $2,282 | $2,282 |
| 8613797 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Apr 2012 | — | Yes | ModNegligence | $2,282 | $2,282 |
| 6486542 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Aug 2009 | — | Yes | ModNegligence | $2,282 | $2,282 |
| 6486539 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Aug 2009 | — | Yes | ModNegligence | $2,282 | $2,282 |
| 6370514 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Mar 2005 | — | Yes | HighNegligence | $1,760 | $1,760 |
| 6370504 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Mar 2005 | — | Yes | ModNegligence | $1,376 | $1,376 |
| 8611466 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Apr 2014 | — | Yes | ModNegligence | $1,111 | $1,111 |
| 6431928 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Jun 2008 | — | Yes | ModNegligence | $1,111 | $1,111 |
| 6431923 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Jun 2008 | — | Yes | ModNegligence | $1,111 | $1,111 |
| 6431922 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Jun 2008 | — | Yes | ModNegligence | $1,111 | $1,111 |
| 6481371 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Oct 2013 | — | Yes | ModNegligence | $1,026 | $1,026 |
| 6486545 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Aug 2009 | — | Yes | LowNegligence | $1,026 | $1,026 |
| 6486541 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Aug 2009 | — | Yes | ModNegligence | $1,026 | $1,026 |
| 6486540 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Aug 2009 | — | Yes | ModNegligence | $1,026 | $1,026 |
| 6379468 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Nov 2005 | — | Yes | ModNegligence | $963 | $963 |
| 6379467 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Nov 2005 | — | Yes | ModNegligence | $963 | $963 |
| 6379464 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Nov 2005 | — | Yes | ModNegligence | $963 | $963 |
| 6370513 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Mar 2005 | — | Yes | ModNegligence | $963 | $963 |
| 6370511 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Mar 2005 | — | Yes | ModNegligence | $963 | $963 |
| 6370510 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Mar 2005 | — | Yes | ModNegligence | $963 | $963 |
| 6370500 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Mar 2005 | — | Yes | ModNegligence | $963 | $963 |
| 6370499 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Mar 2005 | — | Yes | ModNegligence | $963 | $963 |
| 6370495 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Mar 2005 | — | No | ModNegligence | $963 | $60 |
| 6370493 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Mar 2005 | — | Yes | ModNegligence | $963 | $963 |
| 8557129 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Feb 2010 | — | Yes | HighNegligence | $946 | $946 |
| 6440843 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Dec 2008 | — | No | HighNegligence | $745 | $745 |
| 6440841 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Dec 2008 | — | No | HighNegligence | $745 | $745 |
| 6440840 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Dec 2008 | — | No | HighNegligence | $745 | $745 |
| 6431925 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Jun 2008 | — | Yes | ModNegligence | $745 | $745 |
| 6481368 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Oct 2013 | — | No | HighNegligence | $687 | $687 |
| 6481366 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Oct 2013 | — | Yes | ModNegligence | $687 | $687 |
| 6370502 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Mar 2005 | — | Yes | ModNegligence | $614 | $614 |
| 6370492 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Mar 2005 | — | Yes | ModNegligence | $614 | $614 |
| 6370484 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Mar 2005 | — | No | ModNegligence | $614 | $60 |
| 6440850 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Dec 2008 | — | No | ModNegligence | $499 | $499 |
| 6440847 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Dec 2008 | — | No | ModNegligence | $499 | $499 |
| 6486543 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Aug 2009 | — | No | ModNegligence | $460 | $460 |
| 8555384 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Dec 2010 | — | No | ModNegligence | $425 | $425 |
| 6390713 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Dec 2006 | — | Yes | ModNegligence | $375 | $375 |
| 6370512 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Mar 2005 | — | Yes | ModNegligence | $350 | $350 |
| 6370483 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Mar 2005 | — | Yes | ModNegligence | $350 | $350 |
| 8696959 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Jul 2013 | — | Yes | ModNegligence | $308 | $308 |
| 8613796 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Apr 2012 | — | Yes | ModNegligence | $308 | $308 |
| 8613795 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Apr 2012 | — | Yes | HighNegligence | $308 | $308 |
| 8611471 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Apr 2014 | — | No | ModNegligence | $224 | $224 |
| 8611470 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Apr 2014 | — | No | ModNegligence | $224 | $224 |
| 8611468 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Apr 2014 | — | No | ModNegligence | $224 | $224 |
| 6440845 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Dec 2008 | — | No | ModNegligence | $224 | $167 |
| 6431926 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Jun 2008 | — | No | LowNegligence | $224 | $224 |
| 6431924 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Jun 2008 | — | No | ModNegligence | $224 | $224 |
| 6358776 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Sep 2004 | — | Yes | ModNegligence | $217 | $217 |
| 6481369 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Oct 2013 | — | No | ModNegligence | $207 | $207 |
| 6481365 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Oct 2013 | — | No | ModNegligence | $207 | $207 |
| 8697602 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | May 2013 | — | No | HighNegligence | $207 | $207 |
| 6486544 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Aug 2009 | — | No | LowNegligence | $207 | $207 |
| 6486538 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Aug 2009 | — | No | ModNegligence | $207 | $207 |
| 8555382 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Dec 2010 | — | No | ModNegligence | $190 | $190 |
| 6358747 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Sep 2004 | — | Yes | ModNegligence | $165 | $165 |
| 8611469 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Apr 2014 | — | No | ModNegligence | $150 | $150 |
| 8611467 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Apr 2014 | — | No | ModNegligence | $150 | $150 |
| 6440848 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Dec 2008 | — | No | ModNegligence | $150 | $150 |
| 6431817 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Jan 2008 | — | Yes | ModNegligence | $150 | $150 |
| 6390758 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | May 2007 | — | No | ModNegligence | $150 | $150 |
| 6390757 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | May 2007 | — | No | ModNegligence | $150 | $150 |
| 6481370 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Oct 2013 | — | No | ModNegligence | $138 | $138 |
| 8697600 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | May 2013 | — | Yes | ModNegligence | $138 | $138 |
| 6358775 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Sep 2004 | — | Yes | ModNegligence | $135 | $135 |
| 6358774 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Sep 2004 | — | Yes | ModNegligence | $135 | $135 |
| 6358773 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Sep 2004 | — | Yes | ModNegligence | $135 | $135 |
| 6358760 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Sep 2004 | — | Yes | ModNegligence | $135 | $135 |
| 8555385 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Dec 2010 | — | No | ModNegligence | $127 | $127 |
| 8555386 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Dec 2010 | — | No | HighNegligence | $117 | $117 |
| 8611472 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Apr 2014 | — | No | ModNegligence | $100 | $100 |
| 6481372 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Oct 2013 | — | No | ModNegligence | $100 | $100 |
| 8696985 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Jul 2013 | — | No | ModNegligence | $100 | $100 |
| 8696961 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Jul 2013 | — | No | ModNegligence | $100 | $100 |
| 8696960 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Jul 2013 | — | No | ModNegligence | $100 | $100 |
| 8696958 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Jul 2013 | — | No | ModNegligence | $100 | $100 |
| 8697601 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | May 2013 | — | No | ModNegligence | $100 | $100 |
| 8697599 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | May 2013 | — | No | ModNegligence | $100 | $100 |
| 8697598 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | May 2013 | — | No | ModNegligence | $100 | $100 |
| 8697597 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | May 2013 | — | No | ModNegligence | $100 | $100 |
| 8613794 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Apr 2012 | — | Yes | ModNegligence | $100 | $100 |
| 8613793 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Apr 2012 | — | No | ModNegligence | $100 | $100 |
| 8613792 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Apr 2012 | — | Yes | ModNegligence | $100 | $100 |
| 8613791 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Apr 2012 | — | Yes | ModNegligence | $100 | $100 |
| 8557130 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Feb 2010 | — | No | ModNegligence | $100 | $100 |
| 8557128 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Feb 2010 | — | No | ModNegligence | $100 | $100 |
| 6440846 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Dec 2008 | — | No | LowNegligence | $100 | $100 |
| 6431819 | Seirra Pacific Materials Fresno, CA contractor: Avenal Aggregate & Asphalt | Jan 2008 | — | No | ModNegligence | $100 | $100 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for AVENAL AGGREGATE & ASPHALT. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for AVENAL AGGREGATE & ASPHALT. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for AVENAL AGGREGATE & ASPHALT. Verify directly with Environmental Protection Agency →
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2011-12-20 | Planned | 2 | — | $200 | |
| 2010-10-01 | Planned | 2 | — | $100 | |
| 2009-08-26 | Planned | 2 | — | $150 | |
| 2008-07-02 | Planned | 2 | — | $185 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in construction sand and gravel mining within CA, ordered by federal enforcement volume:
- CALAVERAS MATERIALS, INC.MERCED — 4 federal enforcement records
- HUMBOLDT REDWOOD COMPANY LLCSCOTIA — 4 federal enforcement records
- ROBERTSON'S READY MIX INC.CORONA — 4 federal enforcement records
- BCJ SAND & ROCK, INC.OROVILLE — 4 federal enforcement records
- CEMEX, INC.FRIANT — 3 federal enforcement records
- BCJ SAND AND ROCK, INCSACRAMENTO — 3 federal enforcement records
- GRANITE ROCK COMPANYHOLLISTER — 3 federal enforcement records
- 7/11 MATERIALS INCVALLEY SPRINGS — 3 federal enforcement records
- CALPORTLAND COMPANYMOORPARK — 3 federal enforcement records
- PYRAMID CONSTRUCTION AND AGGREGATES, INC.HEBER — 3 federal enforcement records
Related searches
- Construction Sand and Gravel MiningAll employers in this industry
- Employers in CAState-wide enforcement data
- Construction Sand and in CAIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on AVENAL AGGREGATE & ASPHALT from every major federal compliance and enforcement source. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is AVENAL AGGREGATE & ASPHALT's OSHA violation history?
- AVENAL AGGREGATE & ASPHALT has 4 OSHA inspections on record with 8 violations and $635 in total penalties.
- How does AVENAL AGGREGATE & ASPHALT's safety record compare to its industry?
- AVENAL AGGREGATE & ASPHALT operates in the construction sand and gravel mining industry. The industry average Total Recordable Incident Rate (TRIR) is 1.5.