Establishment profile
APPLIED TECHNICAL SYSTEMS INC
9551 RIDGETOP BLVD, SILVERDALE, WA, 98383
Summary
APPLIED TECHNICAL SYSTEMS INC has accumulated 4 OSHA violations across 1 inspection over 29 years of recorded history, with $250 in total assessed penalties.
The establishment sits in the 69th percentile for violations within its industry-state peer group of 67,396 employers. The most recent enforcement activity was recorded 29 years ago.
Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
APPLIED TECHNICAL SYSTEMS INC appears in OSHA workplace safety record only. No matching records were found in WHD wage enforcement, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification, FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls. Single-agency enforcement records typically indicate either a discrete incident-based inspection or a low-risk operational profile.
OSHA workplace safety
100% of inspections at this establishment produced violations,
Peer comparison
Above average violations. Peer group: 67,396 employers. This establishment has 4 OSHA violations; peer median is 2.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for APPLIED TECHNICAL SYSTEMS INC. Verify directly with OSHA Injury Tracking Application →
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for APPLIED TECHNICAL SYSTEMS INC. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 29+ years. Most recent activity: 29 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for APPLIED TECHNICAL SYSTEMS INC. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
No MSHA mine safety violations on file for APPLIED TECHNICAL SYSTEMS INC. Verify directly with Mine Safety and Health Administration →
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for APPLIED TECHNICAL SYSTEMS INC. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC)
No H-1B, H-2A, or H-2B labor condition applications on file for APPLIED TECHNICAL SYSTEMS INC. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for APPLIED TECHNICAL SYSTEMS INC. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for APPLIED TECHNICAL SYSTEMS INC. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
- Department of DefenseCOMMOM DIGITAL SENSOR ARCHITECTURE (CDSA) CORE SYSTEM DEVELOPMENTcontract · Last action 2019-02-11$10,392,540
- Department of DefenseCCM SOFTWAREcontract · Last action 2010-03-11$7,432,079
- Department of DefenseLOGISTICS AND TECHNICAL SUPPORT FOR NSWCPCD SUPPORTED SYSTEMS.contract · Last action 2025-08-05$6,925,655
- Department of CommerceUSER INTERFACE DESIGNScontract · Last action 2014-10-08$6,789,602
- Department of DefenseCORPORATE INFORMATION SUPPORT SERVICEScontract · Last action 2014-02-07$6,781,503
- Department of CommerceUSER CENTERED DESIGN (UCD) AND USER INTERFACE/USER EXPERIENCE (UI/UX) SUPPORT SERVICES POP: 02/01/2015-01/31/2016 IGF::OT::IGFcontract · Last action 2022-07-26$5,558,919
- Department of DefenseENGINEERING AND TECHNICAL SUPPORT FOR IN-SERVICE MINES, MINE COUNTERMEASURES (MCM) TARGETS, MINE IMPROVEMENTS, AND NEW CONCEPT MINEScontract · Last action 2025-09-24$4,901,913
- Department of CommerceUI TASK ORDER: 0007 - TMNG-USER INTERFACE PHASE 1.contract · Last action 2016-08-25$4,608,893
- Department of DefenseNAVAL SURFACE WARFARE CENTER PANAMA CITY DIVISION (NSWC PCD) SCIENCE & TECHNOLOGY DEPARTMENT LABORATORY SUPPORTcontract · Last action 2025-09-23$3,220,024
- Department of CommerceFEE PROCESSING NEXT GENERATION TRANSACTIONAL SERVICES-INTERNAL USER; IGF::OT::IGFcontract · Last action 2018-06-13$2,270,672
- Department of DefenseLITTORAL COMBAT SHIP (LCS) MULTI-VEHICLE COMMUNICATIONS SYSTEM (MVCS) SUPPORTcontract · Last action 2025-04-30$2,189,665
- Department of DefenseMINE WARFARE (MIW) TACTICS AND ANALYSIS PROGRAM SUPPORTcontract · Last action 2025-08-26$1,886,071
- Department of CommerceFUNDING FOR PATENT END TO END (PE2E) ARCHITECTURE AND INFRASTRUCTURE 1.0 FOR A PERIOD OF PERFORMANCE FROM THE DATE OF AWARD THROUGH 11/21/11.contract · Last action 2013-02-07$1,788,616
- Department of CommercePAY WITH PROFILE; IGF::OT::IGFcontract · Last action 2015-02-06$1,521,563
- Department of CommerceATS FMPD PHASE 1. POP THROUGH 04/30/2019contract · Last action 2025-04-17$1,390,925
- Department of CommerceFEE PROCESSING NEXT GENERATION UII REFUNDS AND CONTENT MANAGEMENT SERVICES.; IGF::OT::IGFcontract · Last action 2021-07-29$1,357,295
- Department of CommerceFPNG ENTERPRISE SHOPPING CART PROJECT DEVELOPMENT SUPPORT; IGF::OT::IGFcontract · Last action 2015-09-17$1,339,202
- Department of CommerceOTHER FUNCTION - IGF::OT::IGF USER INTERFACE SUPPORT FOR PROJECTS: PE2E ET&I PHASE 2 (100589)&PE2E OFFICE ACTION PHASE 2 (100593)- THE TOS IS COMPETED UNDER THE UCD CONTRACT. POP: 02/22/2013 -12/31/13; FPOP: 02/22/2013 -12/31/13contract · Last action 2014-03-26$1,274,217
- Department of CommerceFEE PROCESSING NEXT GENERATION (FPNG) TRANSACTION SERVICES PROCESSING PROJECT PHASE 2; IGF::OT::IGFcontract · Last action 2018-06-07$1,248,082
- Department of CommerceIGF::OT::IGF MAINTENANCE FEE AND DEPOSIT ACCOUNT INTERNALcontract · Last action 2016-07-30$1,171,211
- Department of CommerceFEE PROCESSING NEXT GENERATION PROJECT DEVELOPMENT SUPPORT (FPNG) ENTERPRISE SHOPPING CART; IGF::OT::IGFcontract · Last action 2015-04-25$1,087,630
- Department of DefenseIGF::OT::IGF NEW AWARD. SBIR PHASE II.contract · Last action 2018-07-16$999,855
- Department of DefenseBASE IGF::OT::IGFcontract · Last action 2018-03-29$967,953
- Department of DefenseINTELLIGENT SENSING OPERATIONAL SYSTEM (ISOS)contract · Last action 2025-09-11$940,500
- Department of CommerceUSPTO USER INTERFACE DESIGNS: TASK ORDER T0008: FPNG SSPAMS PHASE 1contract · Last action 2014-06-24$818,551
- Department of CommerceFEE PROCESSING NEXT GENERATION (FPNG) USER INTERFACE OPERATIONS AND MAINTENANCE (O&M) AND OVERALL FPNG O&M TRANSITION SUPPORT.; IGF::OT::IGFcontract · Last action 2018-12-28$763,944
- Department of CommerceFEE PROCESSING NEXT GENERATION PROJECT DEVELOPMENT SUPPORT (FPNS) MAINTENANCE FEE STOREFRONT (MFS);L IGF::OT::IGFcontract · Last action 2015-04-25$719,919
- Department of CommerceFEE PROCESSING NEXT GENERATION PROJECT DEVELOPMENT SUPPORT (FPNG) STAKEHOLDER AND STORED PAYMENT ACCOUNT MANAGEMENT SERVICES (SSPAMS) AND STAKEHOLDER AND STORED PAYMENT ACCOUNT MANAGEMENT SERVICES (SSPAMI); IGF::OT::IGFcontract · Last action 2014-04-28$698,828
- Department of CommerceOBTAIN SUPPORT SERVICES NECESSARY FOR THE CONTINUAL, ITERATIVE DESIGN, DEVELOPMENT, TESTING, AND DEPLOYMENT STAGES OF THE FEE PROCESS NEXT GENERATION (FPNG) INVESTMENT FOR FPNG UII TRANSACTION SERVICES PROCESSING PROJECT.; IGF::OT::IGFcontract · Last action 2015-10-09$678,570
- Department of CommerceFPNG UII TRANSACTION SERVICES CONTENT MANAGEMENT TOOL; IGF::OT::IGFcontract · Last action 2016-11-04$660,839
- Department of DefenseCCM SOFTWAREcontract · Last action 2008-06-23$641,965
- Department of CommerceSUPPORT FOR THE FEE PROCESSING NEXT GENERATION PAY.GOV PROTOTYPE AND TRANSACTIONAL SERVICES-OTC-NET PROJECTS; IGF::OT::IGFcontract · Last action 2014-08-23$584,060
- Department of CommerceFEE PROCESSING NEXT GENERATION TASK ORDER 0003 - USER CENTER DESIGN (UCD) PROTOTYPE - CONTRACTOR SUPPORTcontract · Last action 2016-10-28$535,582
- Department of CommerceFEE PROCESSING NEXT GENERATION (FPNG) USER INTERFACE AND INTEGRATION (UI&I) INTERNATIONAL FILE TRANSFERS; IGF::OT::IGFcontract · Last action 2018-06-13$466,183
- Department of CommerceSUPPORT FOR THE FEE PROCESSING NEXT GENERATION PAY.GOV PROTOTYPE AND TRANSACTIONAL SERVICES-OTC-NET PROJECTS; IGF::OT::IGFcontract · Last action 2015-05-20$446,994
- Department of CommercePAY WITH PROFILE; IGF::OT::IGFcontract · Last action 2016-02-05$445,331
- Department of CommerceUI TASK ORDER T0009: PRPS USER EXPERIENCEcontract · Last action 2013-11-08$435,173
- Department of CommerceTRADEMARK NEXT GENERATION (TMNG) - USER CENTER DESIGN (UCD) PROTOTYPE - CONTRACTOR SUPPORTcontract · Last action 2012-04-23$431,030
- Department of CommerceFEE PROCESSING NEXT GENERATION PROJECT DEVELOPMENT SUPPORT (FPNG) CONSUMER TRANSACTIONAL SERVICES AND CONSUMER INQUIRY SERVICES.; IGF::OT::IGFcontract · Last action 2016-06-11$406,802
- Department of DefenseND ENTERPRISE AGREEMENT MAINTENANCEcontract · Last action 2009-07-01$396,000
- Department of CommerceFPNG MAINTENANCE FEE STOREFRONT PROJECT DEVELOPMENT SUPPORT; IGF::OT::IGFcontract · Last action 2015-05-31$280,028
- Department of AgricultureSENIOR ORACLE DEV 4 NEEDED TO WORK UNDER THE SUPERVISION OF THE PROJECT SUPERVISOR. DUTIES TO INCLUDE DEVELOPING A DATABASE USING ORACLE APPLICATION DEVELOPMENT SOFTWARE, CREATING THE DATA DEFINITION LANGUAGE AND ORACLE DATABASE OBJECTS RELEVANT TO THE APPLICATION REQUIREMENTS, AND DEVELOPING MICROSOFT ACCESS DATABASES WITH ORCLE LINKED TABLES. NEEDED FOR 120 DAYS OR 960 HRS AT $110/HR = $105,600. NO OT OR TRAVEL AUTHORIZED. POSITION IS FULLTIME, 40 HRS/WK. WORK TO BE PERFORMED VIRTUAL. PERIOD OF PERFORMANCE 1 SEPT 2011 THRU 30 SEPT 2012.contract · Last action 2013-05-21$216,189
- Department of AgricultureSR. JAVA DEVELOPER 4: TERM 2/26/2012 - 12/31/2012; 120 DAYS, 960 HRS X $108.75/HR = $104,400.contract · Last action 2012-08-29$213,800
- Department of AgricultureSENIOR ORACLE DEVELOPER 2: 120 DAYS, 960 HOURS AT 40 HOURS PER WEEK FOR A TOTAL OF $105600; PERIOD OF PERFORMANCE 8/9/2010 TO 3/31/2011.contract · Last action 2011-03-18$211,200
- Department of AgricultureSR. JAVA DEVELOPER 3: FOLLOW WRITTEN SPECS TO DEVELOP COMPLEX APPLICATIONS, DEVELOP APPLICATION SOLUTIONS, INTEGRATE OPEN SOURCE SOLUTIONS AND WEB TECHNOLOGIES, PACKAGE SOFTWARE FOR INSTALLATION IN FOREST SERVICE CENTRALIZED DATA CENTERS, AND MANAGE /MENTOR JAVA AND WEB DEVELOPERS. 120 DAYS, 960 HRS X 108.75/HR = $104,400. FULL TIME. TRAVEL NOT AUTHORIZED. PERIOD OF PERFORMANCE 1 MARCH 2011 - 30 SEPTEMBER 2011. LOCATION IS VIRTUAL.contract · Last action 2011-07-19$208,800
- Department of AgricultureSR. SHAREPOINT DEV 3. DUTIES INCLUDE DEVELOPING THE INFORMATION ARCHITECTURE FOR THE SHAREPT SITE. THIS WILL ENTAIL INSTALLING, CONFIGURING, AND MAINTAINING THE SHAREPT SITE SOTFTWARE; CREATING THE DATA DEFINITION LANGUAGE AND ORACLE DATABASE OJECTS RELEVANT TO THE APPLICATION REQUIRMTS; CREATE APPLICATIONS WITHIN THE SHAREPT ENVIRONMENT...ALL BASE UPON BUSINESS REQUIREMENTS. NEEDED FOR 120 BUSINESS DAYS, 960 HRS X $105/HR = $100,800. NO TRAVEL OR OT AUTHORIZED. PERIOD OF PERFORMANCE OCT 1, 2011 - SEP 30, 2012.contract · Last action 2012-02-09$206,600
- Department of AgricultureSR SHAREPOINT DEVELOPER 2: 960 HRS/120 DAYS AT $105/HR = $100,800. PERIOD OF PERFORMANCE 11/15/10 - 5/31/11. TRAVEL NOT AUTHORIZED. WORK TO BE COMPLETED VIRTUALLY.contract · Last action 2011-04-15$201,600
- Department of CommerceEACQUISITIONS PHASE 1 - EERP DESIGN; IGF::OT::IGFcontract · Last action 2015-02-21$199,995
- Department of AgricultureORACLE DEVELOPER 3: 960 HRS/120 DAYS X $85/HOUR = $81,600. PERIOD OF PERFORMANCE 11/15/10 - 5/31/11. TRAVEL NOT AUTHORIZED. WORK TO BE COMPLETED VIRTUALLY.contract · Last action 2011-05-06$163,200
- Department of DefenseIGF::OT::IGF STATUS REPORTcontract · Last action 2015-11-23$149,886
Federal contract dollars to this establishment. Primary NAICS: 541330 - ENGINEERING SERVICES. Last action: 2025-09-24. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 1996-07-19 | Referral | 4 | 4 | $250 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Related searches
- Employers in WAState-wide enforcement data
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →About this data
This profile aggregates federal enforcement records on APPLIED TECHNICAL SYSTEMS INC from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Frequently asked
- What is APPLIED TECHNICAL SYSTEMS INC's OSHA violation history?
- APPLIED TECHNICAL SYSTEMS INC has 1 OSHA inspection on record with 4 violations and $250 in total penalties.