Establishment profile

ALLIED BUILDING SERVICE COMPANY OF DETROIT, INC.

2000 HOWARD STREET, DETROIT, MI, 48216
237110Water and Sewer Line and Related Structures Construction

Download as PDF →

OSHA inspections
2
over 9 years
Violations
4
$4,900 in penalties
Penalties
$4,900
$1,225 avg
Violations across 2 federal agencies
Enforcement actions from multiple agencies may indicate systemic compliance issues across functions.
Accident investigations on record
1 National Emphasis Program inspections

Summary

ALLIED BUILDING SERVICE COMPANY OF DETROIT, INC. has accumulated 4 OSHA violations across 2 inspections over 9 years of recorded history, with $4,900 in total assessed penalties.

The establishment sits in the 73rd percentile for violations within its industry-state peer group of 3,577 employers. Inspection frequency runs at the 82nd percentile. The most recent enforcement activity was recorded 2 years ago.

Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

ALLIED BUILDING SERVICE COMPANY OF DETROIT, INC. appears in OSHA workplace safety, NLRB labor relations, and FMCSA motor carrier registration records only. No matching records were found in WHD wage enforcement, MSHA mine safety, EPA environmental compliance, OFLC visa and labor certification (historical), SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.

OSHA workplace safety

Inspections
2
0.2 / yr · last 9 yrs
Violations
4
0.4 / yr
Penalties
$4,900
$1,225 avg / violation
75% serious25% other
Inspection trigger · complaint
1 of 2
Inspection trigger · referral
1 of 2

50% of inspections at this establishment produced violations,

Most-cited OSHA standards

Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 4 distinct standards shown · 4 citations in this view · $4,900 in penalties.

CFR sectionCitationsInspectionsTotal penaltyFirst citedLast cited
408.10529(3)11$2,450Nov 2016Nov 2016
408.10566(3)11$2,450Nov 2016Nov 2016
29 CFR 1910.1200 E0111Nov 2016Nov 2016
408.1339011Nov 2016Nov 2016

Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.

Peer comparison

73rd

Above average violations in NAICS 2371 within MI. Peer group: 3,577 employers. This establishment has 4 OSHA violations; peer median is 1.

Fewer violationsMore violations
Penalty percentile
96th
peer median: $0
Inspection frequency
82nd
peer median: 1

Safety self-report (OSHA 300A)

No self-reported injury rates filed with OSHA's Injury Tracking Application for ALLIED BUILDING SERVICE COMPANY OF DETROIT, INC.. Verify directly with OSHA Injury Tracking Application

Industry benchmark

Industry avg TRIR
1.9
BLS SOII 2024
Industry avg DART
1.1
BLS SOII 2024
Self-reported TRIR
Not in OSHA ITA

BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.

Inspection breakdown

Complaint
1
Referral
1

Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for ALLIED BUILDING SERVICE COMPANY OF DETROIT, INC.. Verify directly with Occupational Safety and Health Administration

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
2 years ago

No federal enforcement activity has been recorded against this establishment in 2+ years. Most recent activity: 2 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

No WHD wage, overtime, or child-labor enforcement cases on file for ALLIED BUILDING SERVICE COMPANY OF DETROIT, INC.. Verify directly with Wage and Hour Division

Mine safety (MSHA)

No MSHA mine safety violations on file for ALLIED BUILDING SERVICE COMPANY OF DETROIT, INC.. Verify directly with Mine Safety and Health Administration

Labor relations (NLRB)

Company-level in MI — for ALLIED BUILDING SERVICE COMPANY OF DETROIT, INC., not this location alone

Total cases
2
Representation (union)
2

National Labor Relations Board — unfair labor practice charges and union representation cases. The NLRB records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other ALLIED BUILDING SERVICE COMPANY OF DETROIT, INC. locations in the same state.

NLRB cases

National Labor Relations Board cases involving this employer. Includes unfair labor practice (ULP) filings and representation election proceedings. NLRB enforcement is process-driven; no per-case monetary penalty is assessed (remedies are case-by-case backpay orders, posting requirements, election re-runs, etc.). 2 cases · 2 representation

Case numberTypeFiledClosedStatusRegion
07-RM-328688Representation electionOct 2023Dec 2023ClosedRegion 07, Detroit, Michigan
07-RC-328459Representation electionOct 2023Dec 2023ClosedRegion 07, Detroit, Michigan

Source: NLRB case files. Rows shown are those the agency has published. Region numbers (1–31) correspond to NLRB's geographic offices.

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for ALLIED BUILDING SERVICE COMPANY OF DETROIT, INC.. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for ALLIED BUILDING SERVICE COMPANY OF DETROIT, INC.. Verify directly with Environmental Protection Agency

Motor carrier safety (FMCSA)

DOT number
3881130
Operation
C

Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for ALLIED BUILDING SERVICE COMPANY OF DETROIT, INC.. Verify directly with UVA Corporate Prosecution Registry

Federal contracts

This location

Obligated (5-yr)
$-2800
Obligated (all-time)
$22.8M
Awards
282
Top agency
General Services Administration
$21.5M
Top agencies by obligation (this location)
General Services Administration$21.5M
Department of Defense$1.0M
Department of Veterans Affairs$179K
Department of Justice$26K
Department of Homeland Security$23K
Largest awards (top 50 of 282)
  • General Services Administration
    GENERAL CONTRACTING SERVICES FOR THE CBP OFFICE RENOVATION - BROKER BUILDING, CARGO INSPECTION FACILITY AT THE AMBASSADOR BRIDGE, DETROIT, MICHIGAN
    contract · Last action 2012-10-22
    $2,057,443
  • General Services Administration
    DHS ICE 4TH FLOOR BUILD OUT, PV MCNAMARA FEDERAL BLDG., DETROIT, MI.
    contract · Last action 2013-08-21
    $1,106,583
  • General Services Administration
    IGF::OT::IGF THE SCOPE OF WORK OF THIS TASK ORDER IS TO RENOVATE TENANT OFFICES AND ASSOCIATED ROOMS ON THE 3RD FLOOR OF THE FEDERAL BUILDING IN ANN ARBOR, MI. PRINCIPAL PLACE OF PERFORMANCE: 200 E LIBERTY STREET, ANN ARBOR, MI 48104.
    contract · Last action 2017-03-27
    $808,581
  • General Services Administration
    IGF::OT::IGF, FIRE PROTECTION WATER SUPPLY PROJECT - CUSTOMS CARGO INSPECTION FACILITY, DETROIT MI THE PROJECT WILL INCLUDE BUT NOT BE LIMITED TO: REPLACEMENT OF THE EXISTING 6 WATER MAIN FROM THE INTERSECTION OF ST. ANNE AND FORT ST. (M-85) APPROXIMATELY 380 FEET EAST WITH 8 WATER MAIN, EXCAVATION, A NEW CONCRETE METER PIT, WATER METER&PIPING, PAVING, ELECTRICAL CONNECTIONS AND ALL ASSOCIATED COMPONENTS TO REPLACE THE EXISTING EAST METER PIT.
    contract · Last action 2015-09-01
    $760,361
  • General Services Administration
    IGF::OT::IGF FEDERAL BUREAU OF INVESTIGATION ANTENNA INSTALLATION, PATRICK V. MCNAMARA FEDERAL BUILDING LOCATED AT 477 MICHIGAN AVE, DETROIT, MICHIGAN
    contract · Last action 2018-10-29
    $700,816
  • General Services Administration
    IGF::CL::IGF CONSTRUCTION AWARD USDC CHAMBERS 867, LOCATION: THEODOR LEVIN U.S. COURTHOUSE, 231 WEST LAFAYETTE BLVD., DETROIT, MICHIGAN 48226 (MI002ZZ).
    contract · Last action 2017-10-30
    $685,887
  • General Services Administration
    AHU #5 REPLACEMENT&LOBBY A/C, THEODORE LEVIN U.S. COURTHOUSE, DETROIT, MI
    contract · Last action 2013-03-19
    $685,875
  • Department of Defense
    OPTION YEAR TWO
    contract · Last action 2009-09-30
    $669,196
  • General Services Administration
    IGF::CL::IGF CONSTRUCTION AWARD FOR THE US SENATE OFFICE SUITE 18TH, LOCATION: PATRICK V. FEDERAL BUILDING, 477 MICHIGAN AVENUE, DETROIT MI 48226 (MI0131MC), PDN#EN-GS-P-05-16-FB-7168.
    contract · Last action 2017-01-12
    $613,732
  • General Services Administration
    CARPET, PAINT AND MINOR RENOVATIONS TO DHS SPACE.
    contract · Last action 2010-06-25
    $612,605
  • General Services Administration
    GS05P06SVD3037/GSP0508FB0123, "HUD 16TH & 17TH FLOOR OFFICE SPACE RENOVATION" AT THE PATRICK V. MCNAMARA FEDERAL BUILDING IN DETROIT, MI
    contract · Last action 2009-06-09
    $560,058
  • General Services Administration
    AWARD - MANCHESTER STREET GATE PROJECT, HART-DOLE-INOUYE FEDERAL CENTER, BATTLE CREEK, MI
    contract · Last action 2014-07-15
    $500,030
  • General Services Administration
    IGF::OT::IGF RENOVATION OF U.S. ATTORNEY'S OFFICE, 2ND FLOOR, CHARLES CHAMBERLAIN FEDERAL BUILDING AND U.S. POST OFFICE, 315 W ALLEGAN ST., LANSING, MI 48933-1500.
    contract · Last action 2015-03-20
    $496,916
  • General Services Administration
    CONTRACT FOR THE REPLACEMENT OF SWITCHGEAR EQUIPMENT AT THE FEDERAL BUILDING AND U.S COURTHOUSE IN ANN ARBOR, MI.
    contract · Last action 2013-11-06
    $478,228
  • General Services Administration
    CPG INCLUDED IN CONTRACT.
    contract · Last action 2010-03-17
    $455,174
  • General Services Administration
    IGF::OT::IGF PORT HURON CHAMBERS&COURTROOM RENOVATION, 525 WATER ST., PORT HURON, MI. AWARD OF CONSTRUCTION CONTRACT FOR RENOVATIONS TO EXISTING CHAMBERS SUITE AND COURTROOM.
    contract · Last action 2017-06-22
    $442,078
  • General Services Administration
    IGF::CL::IGF GS-05P-11-FB-D-0038/GS-P-05-14-FB-0069, PROJECT NAME: SOCIAL SECURITY ADMINISTRATION, (SSA), ODAR WRITING UNIT LOCATION: P.V. MCNAMARA FEDERAL BUILDING, 477 MICHIGAN AVENUE, DETROIT, MICHIGAN 48226. (MI0131ZZ). CONSTRUCTION AWARD IN THE AMOUNT OF $372,800.00, SUBMITTED IN RESPONSE TO OUR SUBJECT REQUEST FOR QUOTATION, IS ACCEPTED IN ACCORDANCE WITH THE SPECIFICATIONS, TERMS, CONDITIONS, AND AMENDMENT 0001 DATED MARCH 28, 2014, AMENDMENT 0002 DATED APRIL 15, 2014, AMENDMENT 0003 DATED APRIL 18, 2014, AMENDMENT 0004 DATED APRIL 29, 2014 AND DRAWING NUMBERS AD-101 THROUGH MP-L4.
    contract · Last action 2015-04-29
    $412,109
  • General Services Administration
    IGF::OT::IGF INITIAL AWARD OF THE UNITED STATES MARSHALL'S SERVICE OFFICE BUILD-OUT PROJECT AT THE LEVIN U.S. FEDERAL BUILDING AND COURTHOUSE IN DETROIT, MI
    contract · Last action 2016-01-25
    $346,110
  • General Services Administration
    PVM OFFICE BUILDOUT
    contract · Last action 2011-05-13
    $342,815
  • General Services Administration
    SSA ODAR 6TH FLOOR OFFICE RENOVATION
    contract · Last action 2009-02-03
    $320,402
  • General Services Administration
    IGF::OT::IGF PVM GSA FIELD OFFICE SPACE CONSOLIDATION, PVM FEDERAL BUILDING, DETROIT, MI THE PURPOSE OF THIS PROJECT IS TO PROVIDE ALL LABOR, SUPERVISION, MATERIALS AND EQUIPMENT TO DEMO EXISTING WALLS, CEILINGS, FINISHES AND CASEWORK IN AN EXISTING OFFICE SPACE, AND CONSTRUCT NEW. ALSO, SOME REMOVAL OF ASSOCIATED MECHANICAL, PLUMBING AND ELECTRICAL IS INVOLVED. THOSE ITEMS WILL NEED TO BE INSTALLED IN A DIFFERENT AREA IN THE REMODELED SPACE, AS FURTHER DESCRIBED IN THE DRAWINGS AND SPECIFICATIONS.
    contract · Last action 2016-04-25
    $280,906
  • General Services Administration
    IGF::OT::IGF GS05P13SCC0010 - AHU-VHE MOTORS/VFD DRIVE PROJECT AT THE E. ROSS ADAIR FEDERAL BUILDING&USCH, 1300 S. HARRISON STREET, FORT WAYNE, IN 46802 THE CONTRACTOR SHALL: REPLACE EXISTING MOTORS ON EXISTING AIR HANDLING UNITS WITH NEW MOTORS TO ACCOMMODATE NEW VARIABLE FREQUENCY DRIVES FOR AIR SUPPLY AND RETURN FANS. BUILDING AUTOMATION SYSTEM CONTROLS UPDATES WILL BE NECESSARY IN ORDER TO REPORT APPROPRIATE SYSTEM INFORMATION. PERFORM TESTING, ADJUSTING, AND BALANCING OF THE NEW SYSTEM FOR ACHIEVEMENT OF BUILDING REQUIRED AIR FLOWS. PROVIDE AN ACCOMPANYING TESTING, ADJUSTING AND BALANCING REPORT.
    contract · Last action 2013-03-21
    $279,450
  • General Services Administration
    IGF::OT::IGF U.S. DISTRICT COURT PRO SE OFFICE RENOVATION, GR FORD FEDERAL BLDG., GRAND RAPIDS, MI.
    contract · Last action 2013-09-12
    $276,431
  • General Services Administration
    IGF::OT::IGF CONSTRUCTION SERVICES FOR RENOVATION OF U.S. PROBATION 1ST FLOOR LOCATED AT THE ANN ARBOR FEDERAL BUILDING, 200 EAST LIBERTY STREET, ANN ARBOR, MICHIGAN.
    contract · Last action 2016-12-07
    $270,473
  • General Services Administration
    INSTALLATION OF NEW CARPET, PAINT AND COVE BASE IN UNITED STATES SECRET SERVICE OFFICE SPACE ON TENTH FLOOR - MCNAMARA FEDERAL BUILDING - MI0131MC - DETROIT, MICHIGAN IGF::OT::IGF
    contract · Last action 2017-01-30
    $258,100
  • General Services Administration
    FBI SPACE RENOVATIONS-20TH & 26TH FLOORS, P.V. MCNAMARA FED. BLDG.
    contract · Last action 2009-07-21
    $246,973
  • General Services Administration
    CARPET REPLACEMENT AND RENOVATIONS
    contract · Last action 2008-12-16
    $235,559
  • General Services Administration
    ROSA PARKS FEDERAL BUILDING, DETROIT, MICHIGAN - WINDOW REPLACEMENT PROJECT
    contract · Last action 2011-12-22
    $233,942
  • General Services Administration
    GS05P08FBC0051 THEODORE LEVIN COURTHOUSE COMPUTER ROOM STANDBY POWER 231 WEST LAFAYETTE BLVD. DETROIT, MI 48226
    contract · Last action 2009-03-30
    $200,690
  • General Services Administration
    IGF::OT::IGF ROADWAY REPAIRS, US CUSTOMS CARGO FACILITY, DETROIT, MI. CONTRACTOR SHALL PROVIDE ALL LABOR, SUPERVISION, MATERIALS AND EQUIPMENT TO REMOVE AND REPLACE DEGRADED SECTIONS OF THE ROADWAY, REPLACE CURB AND GUTTER, AND CLEAN AND CAULK JOINTS AS FURTHER DESCRIBED IN THE PROJECT SCOPE OF WORK AND DRAWINGS.
    contract · Last action 2016-05-27
    $164,450
  • General Services Administration
    IGF::OT::IGF PRETRIAL RENOVATIONS, THEODORE LEVIN U.S. COURTHOUSE, DETROIT MI THE PURPOSE OF THIS PROJECT IS TO PROVIDE ALL LABOR, SUPERVISION, MATERIALS AND EQUIPMENT TO PROVIDE RENOVATIONS IN THE PRETRIAL OFFICES INCLUDING INTAKE AREA, OFFICE SUITE, CONFERENCE ROOM, AND GALLEY ON THE 3RD FLOOR OF THE LEVIN U.S. COURTHOUSE.
    contract · Last action 2016-08-05
    $154,852
  • General Services Administration
    SSA OFFICE RENOVATION
    contract · Last action 2008-09-24
    $154,196
  • General Services Administration
    LEVIN LIGHTING CONTROLS
    contract · Last action 2010-02-16
    $151,261
  • General Services Administration
    JUDGE MURPHY COURTROOM UPGRADES - SHELF INSTALLATION, ELECTRICAL/LAN INFRASTRUCTURE INSTALLATION, CARPET INSTALLATION, MODIFY PODIUM, UPGRADE JURY BOX, UPGRADE WITNESS BOX, INSTALL NEW BENCHES - LEVIN US COURTHOUSE - MI0029ZZ - DETROIT, MICHIGAN IGF::OT::IGF
    contract · Last action 2015-09-23
    $148,149
  • Department of Veterans Affairs
    IGF::OT::IGF WINDOW WASHING
    contract · Last action 2021-11-18
    $140,600
  • General Services Administration
    IGF::OT::IGF AWARD FOR CONSTRUCTION OF THE PRE-TRIAL URINALYSIS LAB FOR THE U.S. PROBATION COURT, LANSING, MICHIGAN.
    contract · Last action 2014-09-18
    $140,096
  • General Services Administration
    IGF::OT::IGF GSA TEMPORARY OFFICE BUILD-OUT PROJECT AT 985 MICHIGAN AVE., IN DETROIT, MI. WORK INCLUDES BUT NOT LIMITED TO, CARPET, PAINT, ELECTRICAL, DEMO, PARTITION WALLS, MILLWORK, PLUMBING, REPLACE DOORS AND FRAMES.
    contract · Last action 2016-08-03
    $139,154
  • General Services Administration
    IGF::OT::IGF COURT ADMIN OFFICE RENOVATION 8TH FLOOR PROJECT THEODORE LEVIN U.S. COURTHOUSE, DETROIT, MI
    contract · Last action 2015-01-30
    $136,536
  • General Services Administration
    5TH FLOOR JURY ASSEMBLY ROOM PROJECT, THEODORE LEVIN U.S. COURTHOUSE, DETROIT, MI
    contract · Last action 2008-11-03
    $131,451
  • Department of Defense
    DEMO CHIMNEYS BLDG 303/304/305
    contract · Last action 2011-12-20
    $123,812
  • General Services Administration
    IGF::OT::IGF TO PROVIDE ALL LABOR, MATERIALS, SUPERVISION AND PERMITS TO COMPLETE CHILD CARE UPDATE PROJECT TO PAINT, REFINISH DOORS, CLEANING OF WAINSCOT, INSTALL CARPET/TILE AT THE JOHN WELD PECK FEDERAL BUILDING, 550 MAIN STREET, CINCINNATI, OHIO 45202. WORK TO BE DONE AS DESCRIBED IN RFQ OH0189CN03313.
    contract · Last action 2014-12-30
    $111,813
  • General Services Administration
    FURNISH AND INSTALL NEW CARPET, REBUILD JURY BOX, PERFORM AUDIO/VIDEO INFRASTRUCTURE UPGRADES, AND ASSOCIATED ELECTRICAL AND MILLWORK UPGRADES - USDC JUDGE CLELAND COURTROOM UPGRADES - LEVIN US COURTHOUSE - MI0029ZZ - DETROIT, MICHIGAN IGF::OT::IGF
    contract · Last action 2016-04-22
    $111,297
  • General Services Administration
    JUDGE ROBERTS CHAMBERS/COURTROOM RENOVATIONS, THEODORE LEVIN US COURTHOUSE, DETROIT, MI
    contract · Last action 2012-05-24
    $108,923
  • General Services Administration
    IGF::OT::IGF CHAMBERLAIN FEDERAL BUILDING&U. S. COURTHOUSE, 315 W. ALLEGAN ST., STE. 208, LANSING, MI 48933-1514 FOR THE HHS CENTERS FOR MEDICARE&MEDICAID SERVICES.
    contract · Last action 2014-09-09
    $97,906
  • General Services Administration
    REPLACE 16 SETS OF DOUBLE DOORS AND 6 SINGLE DOORS.
    contract · Last action 2011-11-23
    $96,391
  • General Services Administration
    IGF::OT::IGF REPLACEMENT OF FAILED STEAM VALVES AT THE POTTER USCH. WORK TO BE DONE AS DESCRIBED IN RFQ OH0028CN03513.
    contract · Last action 2014-11-26
    $95,280
  • General Services Administration
    IGF::OT::IGF RENOVATE JUDGE COOK COURTROOM, THEODORE LEVIN US COURTHOUSE, 231 W LAFAYETTE, DETROIT, MI 48226. AWARD TO PROVIDE ALTERATIONS SUCH AS PAINT AND CARPET FOR JUDGE COOK COURTROOM.
    contract · Last action 2015-04-28
    $93,245
  • General Services Administration
    CONTRACTOR TO PROVIDE ALL NECESSARY LABOR, SUPERVISION, SUPPLIES, MATERIALS, AND EQUIPMENT TO PROVIDEEMOVAL OF STEEL STAIRS AND ASSOCIATED MASONRY REPAIRS IN THE TOLEDO US COURTHOUSE, 1716 SPIELBUSCH AVE, TOLEDO OH. WORK AS OULTINED IN RFQ OH0143ZZ08811
    contract · Last action 2012-08-16
    $93,190
  • General Services Administration
    DE - ROOM 860 CARPET AND BENCHES PROJECT - LEVIN US COURTHOUSE, DETROIT, MICHIGAN
    contract · Last action 2011-03-02
    $92,626
  • General Services Administration
    IGF::OT::IGF RENOVATOIN OF THE FEDERAL BUREAU OF INVESTIGATION'S OFFICE SPACE ON THE 3RD FLOOR OF THE FEDERAL BUILDING AND U.S. COURTHOUSE, ANN ARBOR, MI.
    contract · Last action 2013-08-26
    $82,407

Federal contract dollars to this establishment. Primary NAICS: 236220 - COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION. Last action: 2021-11-18. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.

Inspection history

DateTriggerViolationsSeriousPenalty
2024-03-12Complaint0$0
2016-08-11Referral43$4,900

Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.

In the news

Other employers in this industry and state

Other employers in water and sewer line and related structures construction within MI, ordered by federal enforcement volume:

Related searches

About this data

This profile aggregates federal enforcement records on ALLIED BUILDING SERVICE COMPANY OF DETROIT, INC. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is ALLIED BUILDING SERVICE COMPANY OF DETROIT, INC.'s OSHA violation history?
ALLIED BUILDING SERVICE COMPANY OF DETROIT, INC. has 2 OSHA inspections on record with 4 violations and $4,900 in total penalties.
How does ALLIED BUILDING SERVICE COMPANY OF DETROIT, INC.'s safety record compare to its industry?
ALLIED BUILDING SERVICE COMPANY OF DETROIT, INC. operates in the water and sewer line and related structures construction industry. The industry average Total Recordable Incident Rate (TRIR) is 1.9.