Skip to main content

Establishment profile

Advanced Solutions Group, LLC

PO Box 125, Kaysville, UT, 84037
236220Commercial and Institutional Building Construction

Download as PDF →

OSHA inspections
0
over 13 years
Violations
0
Penalties
$0
Context
No OSHA inspections on record. This does not mean the employer is violation-free — OSHA inspects a small fraction of workplaces annually.

Summary

Advanced Solutions Group, LLC has no OSHA inspection history on file. Federal records covering wage, environmental, labor relations, and other agencies are noted below where present.

The most recent federal enforcement activity was recorded 13 years ago.

Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

Advanced Solutions Group, LLC appears in WHD wage enforcement and CPSC product recalls records only. No matching records were found in OSHA workplace safety, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, or NHTSA vehicle recalls.

OSHA workplace safety

No OSHA inspections, citations, or accidents on file for Advanced Solutions Group, LLC. Verify directly with Occupational Safety and Health Administration

Safety self-report (OSHA 300A)

No self-reported injury rates filed with OSHA's Injury Tracking Application for Advanced Solutions Group, LLC. Verify directly with OSHA Injury Tracking Application

Industry benchmark

Industry avg TRIR
2.2
BLS SOII 2024
Industry avg DART
1.3
BLS SOII 2024
Self-reported TRIR
Not in OSHA ITA

BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for Advanced Solutions Group, LLC. Verify directly with Occupational Safety and Health Administration

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
13 years ago

No federal enforcement activity has been recorded against this establishment in 13+ years. Most recent activity: 13 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

Cases
1
Back wages owed
$0

Department of Labor Wage & Hour Division — minimum-wage, overtime, child-labor, FMLA, and prevailing-wage enforcement.

Wage and hour cases

Closed DOL Wage & Hour Division cases (FLSA, FMLA, H-2B, MSPA, and related statutes). Backwages reflect amounts the agency assessed; civil penalty (CMP) is a separate fine levied on top, where the statute provides for one (FLSA / H-1B / H-2A / MSPA / FMLA / EPPA / FLSA Child Labor; other acts have no CMP column in DOL’s data). The Statutes column lists which laws each case cited. 1 case · $0 in backwages

Case periodIndustryStatutesViolationsWorkersBackwagesCivil penalty
Oct 2010 – Oct 2012Commercial and Institutional Building Construction0

Source: DOL WHD enforcement database. Cases shown reflect those the agency has closed and made public. A violation count is the agency’s tally of cited violations (one violation can affect many workers); the workers column counts distinct employees the agency found to be affected.

Mine safety (MSHA)

No MSHA mine safety violations on file for Advanced Solutions Group, LLC. Verify directly with Mine Safety and Health Administration

Labor relations (NLRB)

No NLRB unfair labor practice charges or union representation cases on file for Advanced Solutions Group, LLC. Verify directly with National Labor Relations Board

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for Advanced Solutions Group, LLC. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for Advanced Solutions Group, LLC. Verify directly with Environmental Protection Agency

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for Advanced Solutions Group, LLC. Verify directly with UVA Corporate Prosecution Registry

CPSC product recalls

Total recalls
1
Last 5 years
0
Last 12 months
0
Units recalled
0

Top hazard: The brake component housed within the bicycle's carbon fork can disengage from the fork and allow the brake assembly to contact the wheel spokes while rotating, posing a fall hazard.. Most recent recall: 2011-09-22. Source: Consumer Product Safety Commission, matched on company name.

Federal contracts

This location

Obligated (5-yr)
$9.0M
Obligated (all-time)
$88.9M
Awards
195
Top agency
Department of the Interior
$47.3M
Top agencies by obligation (this location)
Department of the Interior$47.3M
Department of Defense$38.8M
General Services Administration$1.4M
Department of the Treasury$481K
Department of Veterans Affairs$461K
Largest awards (top 50 of 195)
  • Department of Defense
    IGF::OT::IGF BLDG 225 AND 233 F-35 EQUIP INSTALL CENTERALIZED DOCK SUPPORT EQUIPMENT TO MAINTAIN TEMPERATURE OF THE AIRCRAFT WHILE IN HANGER.
    contract · Last action 2017-03-28
    $16,274,777
  • Department of the Interior
    RECOVERY - GRTE 083219, REHABILITATE MOOSE MAINTENANCE BUILDING, GRAND TETON NATIONAL PARK, MOOSE, WYOMING
    contract · Last action 2014-08-11
    $14,421,659
  • Department of the Interior
    TAS::14 1041::TAS RECOVERY DINO PMIS # 021511 REPLACE CONDEMNED PORTIONS OF THE QUARRY VISITOR CENTER
    contract · Last action 2012-08-28
    $7,991,855
  • Department of the Interior
    CANY NEEDLES PV SYSTEM
    contract · Last action 2026-03-13
    $4,519,264
  • Department of the Interior
    GRAND TETON NATIONAL PARK, TETON COUNTY, WYOMING, 'REHABILITATE ADMINISTRATION BUILDING TO PROVIDE HEADQUARTERS AND GTA OFFICE SPACE' CONSTRUCTION PROJECT, GRTE 164574
    contract · Last action 2014-04-30
    $2,897,953
  • Department of Defense
    IGF::OT::IGF ADD/REPAIR SQUADRON OPERATIONS, BUILDING 1927
    contract · Last action 2018-09-28
    $2,389,630
  • Department of the Interior
    IGF::OT::IGF ZION NATIONAL PARK - MODIFICATIONS TO VISITOR CENTER AND SHUTTLE STOP AREAS
    contract · Last action 2019-06-12
    $1,610,036
  • Department of the Interior
    IGF::OT::IGF HUNGRY HORSE VISITOR AREAS AND PARKING LOT IMPROVEMENTS
    contract · Last action 2018-11-15
    $1,473,803
  • Department of Defense
    IGF::OT::IGF CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, MATERIALS, LABOR, AND SUPERVISION NECESSARY FOR THE CONSTRUCTION OF A NEW ADDITION TO THE EXISTING FACILITY. THE CURRENT BUILDING SPACE IS LIMITED AND NEEDS TO BE EXPANDED TO SUPPORT NEW MISSION REQUIREMENTS. THE EXPANSION CONSISTS OF THE CONTRACTOR CONSTRUCTING (VIA DESIGN/BUILD METHODS) A HIGH BAY MAINTENANCE AREA AND AN ADMINISTRATIVE WORK AREA TO ACCOMMODATE ADDITIONAL PERSONNEL. THIS REQUIREMENT ALSO ENCOMPASSES REPAIR TO THE EXISTING BUILDING, AS WELL AS THE REPAIR OF CONCRETE PAVEMENT TO BE COMPLIANT WITH AFM 32-1084 REGULATIONS. WORK TO INCLUDE INSTALLING/REPAIRING LIGHTNING PROTECTION SYSTEM (TO INCLUDE NEW FACILITY AREAS), REMOVING/REPLACING EXISTING CONCRETE PAVEMENTS, AND REPAIRING/REGRADING ALL EXTERIOR EARTHWORK AND GRADES. DUE TO THE SENSITIVE NATURE OF THE LOCATION OF BUILDING 2695 AND THE ASSETS THEREIN, THE DESIGN OF THE EXPANSION TO THE CURRENT FACILITY REQUIRES APPROVAL FROM DOD DEFENSE EXPLOSIVES SAFETY BOARD (DDESB). THE PERIOD OF PERFORMANCE FOR THIS PROJECT IS 380 CALENDAR DAYS.
    contract · Last action 2015-09-29
    $1,470,306
  • Department of Defense
    BATTERY SHOP BLDG 1263 CONSTRUCTION
    contract · Last action 2010-09-02
    $1,429,804
  • Department of the Interior
    ZION-REPLACE ROOF ON HQ/MUSEUM
    contract · Last action 2024-07-22
    $1,282,976
  • Department of Defense
    BLDG 105 & 131 HVAC, FT DOUGLAS
    contract · Last action 2010-06-02
    $1,108,901
  • Department of Defense
    BLDG 214 UPGRADE
    contract · Last action 2009-12-15
    $1,070,205
  • Department of Defense
    REMODEL BUILDING 576-MAINT AND REPAIR
    contract · Last action 2010-02-25
    $1,050,000
  • Department of Defense
    RUN POWER TO AREA 10 IGLOOS AND INSTALL RAMP WITH LIGHTNING PROTECTION SYSTEM, DESERET CHEMICAL DEPOT, UTAH.
    contract · Last action 2012-10-19
    $1,007,880
  • Department of the Interior
    ZION-EMPO RELOCATE EMERALD POOLS BRIDGE
    contract · Last action 2025-06-02
    $979,410
  • Department of the Interior
    ARCH-RECONSTRUCT RETAINING WALL
    contract · Last action 2025-04-01
    $946,933
  • Department of the Interior
    ZION-WATER SYSTEM DEFICIENCY CORRECTIONS
    contract · Last action 2023-11-06
    $888,347
  • Department of the Interior
    IGF::OT::IGF CAVE - WATER LINE REPLACEMENT
    contract · Last action 2016-05-04
    $829,187
  • Department of Defense
    IGF::OT::IGF B120 COMPLETE INTERIOR REPAIR MODERNIZE (F-35) SPECIAL ACCESS PROGRAM FACILITY
    contract · Last action 2015-09-26
    $790,167
  • Department of Defense
    REPLACE FURNACES, E. WHERRY HOUSING, DUGWAY PG, UT
    contract · Last action 2010-08-12
    $775,724
  • Department of the Interior
    ZION PMIS 240155 & 240083 - LODGE AND TEMPLE SHUTTLE STOP MODIFICATIONS AT ZION NATIONAL PARK
    contract · Last action 2023-02-23
    $765,335
  • Department of Defense
    AMMO ROAD REPAIRS
    contract · Last action 2009-08-27
    $759,178
  • Department of the Interior
    REHAB HQ/HOUSING WASTEWATER AND TWO LIFT STATIONS AT CAPITAL REEF NATIONAL PARK
    contract · Last action 2021-06-16
    $754,063
  • Department of Defense
    REPLACE BUILDING 508 HEATING SYSTEM
    contract · Last action 2011-08-10
    $735,849
  • Department of Defense
    CONSTRUCTION FOR NEW AEMD FABRICATION SHOP AT TOOELE ARMY DEPOT (TEAD), TOOELE, UT.
    contract · Last action 2011-03-23
    $734,550
  • Department of the Interior
    HUNGRY HORSE DAM DRAINAGE SUMP PUMP REPLACEMENTS
    contract · Last action 2024-01-16
    $725,322
  • Department of Defense
    CONSTRUCTION OF NEW BOX&CRATE SHOP BUILDING # B1225
    contract · Last action 2011-03-21
    $704,364
  • Department of Defense
    CONSTRUCTION
    contract · Last action 2010-03-22
    $692,419
  • Department of Defense
    WIDEN ROADWAY TO 1400
    contract · Last action 2010-06-21
    $642,041
  • Department of the Interior
    IGF::OT::IGF REPLACE EXISTING DETERIORATED WATERLINES AT ROCK CREEK CAMPGROUND, CENTRAL CAMPGROUND DAY USE AREA AND COLD SPRINGS CAMPGROUND AT CHICKASAW NATIONAL RECREATION AREA. THE ACTUAL CONSTRUCTION WILL NOT BEGIN UNTIL OCTOBER 1, 2018 WITH PROJECT COMPLETION DATE OF JANUARY 31, 2019. ROCK CREEK CAMPGROUND: THE WORK INCLUDES CONSTRUCTION OF 4-IN HDPE WATER DISTRIBUTION MAIN LINE WITH ASSOCIATED FITTINGS, VALVES, YARD HYDRANTS, WATER SERVICE LINES, METERS, VAULTS/PITS AND CONNECTION TO EXISTING BUILDING POTABLE WATER SERVICES AND EXISTING DISTRIBUTION LINES. WORK INCLUDES ASPHALT REMOVAL/REPLACEMENT, DITCH CROSSING, CLEARING, SURFACE RESTORATION, EXISTING WATER LINE AND APPURTENANCES REMOVAL/ABANDONMENT, WATERLINE DISINFECTION AND TESTING. CENTRAL: THE WORK INCLUDES CONSTRUCTION OF 6-IN AND 2-IN HDPE WATER DISTRIBUTION MAIN LINES WITH ASSOCIATED FITTINGS, VALVES, YARD HYDRANTS, WATER SERVICE LINES, METERS, VAULTS/PITS, AIR RELEASE VALVES AND CONNECTION TO EXISTING BUILDING POTABLE WATER SERVICES AND EXISTING DISTRIBUTION LINES, INCLUDING THE CITY OF SULPHUR SUPPLY VAULT. WORK INCLUDES A BORE UNDER A STATE HIGHWAY WITH CASING PIPE, ASPHALT REMOVAL/REPLACEMENT, CLEARING, SURFACE RESTORATION, EXISTING UNUSED CHLORINATION BUILDING DEMOLITION, EXISTING WATER LINE AND APPURTENANCES REMOVAL/ABANDONMENT, WATERLINE DISINFECTION AND TESTING. COLD SPRINGS CAMPGROUND: THE WORK INCLUDES CONSTRUCTION OF 2-IN HDPE WATER DISTRIBUTION MAIN LINES WITH ASSOCIATED FITTINGS, VALVES, YARD HYDRANTS, WATER SERVICE LINES, METERS, VAULTS/PITS, AIR RELEASE VALVE AND CONNECTION TO EXISTING BUILDING POTABLE WATER SERVICES AND EXISTING DISTRIBUTION LINES. WORK INCLUDES ASPHALT REMOVAL/REPLACEMENT, CLEARING, SURFACE RESTORATION, EXISTING WATER LINE AND APPURTENANCES REMOVAL/ABANDONMENT, WATERLINE DISINFECTION AND TESTING SCOPE OF WORK: ALL WORK, TERMS AND CONDITIONS, CLAUSES AND PROVISIONS, AS STATED IN SOLICITATION 0040378937, WITH ALL ATTACHMENTS, IS HEREIN EXPRESSLY INCORPORATED INTO THIS CONTRACT.
    contract · Last action 2020-06-02
    $630,650
  • Department of the Interior
    REPLACE SHOP/GARAGE - LEADVILLE NFH
    contract · Last action 2012-11-15
    $625,881
  • Department of the Interior
    IGF::OT::IGF HUNGRY HORSE LOWER ROAD CHIP SEAL
    contract · Last action 2018-12-18
    $598,677
  • Department of the Interior
    ZION-INSTALL CHARGING STATION FOR BUSES
    contract · Last action 2019-08-21
    $560,125
  • Department of Defense
    RENOVATION OF BUILDING 1201
    contract · Last action 2012-03-27
    $550,271
  • Department of Defense
    REPAIR IGLOO APRONS
    contract · Last action 2011-02-10
    $536,522
  • Department of Defense
    FIRE SUPPRESSION SYSTEM BUILDING 1235 AT TOOELE ARMY DEPOT, TOOELE, UT.
    contract · Last action 2011-11-29
    $525,886
  • General Services Administration
    ROAD REPAIR FOR ARMY
    contract · Last action 2010-09-28
    $506,267
  • Department of Defense
    REPAIR MAIN HELOPAD
    contract · Last action 2009-03-12
    $493,291
  • Department of the Interior
    CARE REHABILITATE VISITOR CENTER
    contract · Last action 2020-05-07
    $493,269
  • Department of Defense
    BUILDING 214 CHILLER REPAIR
    contract · Last action 2009-12-22
    $485,156
  • Department of the Interior
    IGF::OT::IGF GRCA: FOUR PROJECTS-INSTALL FIRE PROTECTION SYSTEM, REPAINT INTERIOR OF HOMES, RADON MITIGATION (2) HOMES&PROVIDE&INSTALL BOILERS
    contract · Last action 2016-02-24
    $484,063
  • Department of Defense
    RKMF 09-0105, INSTALL MONACO D21 FIRE MG
    contract · Last action 2009-10-02
    $474,928
  • Department of the Interior
    IGF::OT::IGF ROMO-CONSTRUCT QUARTERS 1169
    contract · Last action 2016-01-11
    $455,425
  • Department of the Interior
    HUNGRY HORSE DOMESTIC WATER WELL PLAN -- FLATHEAD COUNTY, MONTANA
    contract · Last action 2024-02-20
    $450,951
  • Department of the Treasury
    TIRWR-07-C-00024 GROUNDS CONTRACT
    contract · Last action 2014-05-30
    $423,088
  • Department of Agriculture
    IGF::OT::IGF CONSTRUCT SANPETE BUNKHOUSE WITH UTILITIES SCHEDULE OF ITEM PRICING (REFER TO ATTACHED DOCUMENT ALSO) 000501-1 MODULAR BARRACKS UNIT $291,955.00 010250 CONSTRUCTION STAKING $ 4,954.00 011900 MOBILIZATION $ 6,881.00 033000-1 CONCRETE SIDEWALK $ 22,950.00 033000-2 CONCRETE CURB AND GUTTER $ 6,230.00 101400 REGULATORY SIGNS $ 688.00 221100-1 PIPELINE $ 7,150.00 221102-1 2" POLY CURB VALVE AND BOX $ 523.00 221300-1 SEWERLINE $ 8,600.00 221300-2 SEWER CLEANOUT $ 1,827.00 231123 NATURAL GAS PIPING $ 5,400.00 260500-1 UTILITY ELECTRICAL SERVICE $NO COST 31200-1 SPECIAL BEDDING $ 80.00 31200-2 PIPE ZONE $ 480.00 312100 PROJECT SITE PREPARATION/GRADING $ 3,440.00 321200 - HOT MIX ASPHALT PAVEMENT $ 3,275.00 321204-1 CRUSHED AGGREGATE BASE COURSE $ 6,050.00 321204-2 CRUSHED AGGREGATE BASE COURSE $ 2,750.00 TOTAL OF BASE ITEMS: $373,233.00 321200 HOT MIX ASPHALT PAVEMENT $ 19,980.00 322640-1 PAVEMENT MARKINGS $ 810.00 322640-3 PAVEMENT MARKINGS-ACCESSIBLE $ 344.00 TOTAL OF OPTION ITEMS: $ 21,134.00 GRAND TOTAL OF AWARD: $394,367.00 CONTRACT TIME: 180 CALENDAR DAYS (BEGINNING WITHIN 10 DAYS AFTER ISSUANCE OF NOTICE TO PROCEED) PROJECT COR: CATHLEEN CHRISTENSEN PHONE: 435.636.3552
    contract · Last action 2018-03-29
    $394,418
  • Department of Defense
    BALLAST PLACEMENT
    contract · Last action 2010-08-11
    $376,152
  • Department of Defense
    TAS::21 2022::TAS REPAIR ROADS ARRA::YES::ARRA
    contract · Last action 2009-08-07
    $370,898
  • Department of Defense
    INSTALL EVAPORATIVE COOLERS BLDG. 1160
    contract · Last action 2009-08-05
    $320,296

Federal contract dollars to this establishment. Primary NAICS: 236220 - COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION. Last action: 2026-04-01. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.

In the news

Other employers in this industry and state

Other employers in commercial and institutional building construction within UT, ordered by federal enforcement volume:

Related searches

About this data

This profile aggregates federal enforcement records on Advanced Solutions Group, LLC from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is Advanced Solutions Group, LLC's OSHA violation history?
Advanced Solutions Group, LLC has no OSHA inspections on record.
How does Advanced Solutions Group, LLC's safety record compare to its industry?
Advanced Solutions Group, LLC operates in the commercial and institutional building construction industry. The industry average Total Recordable Incident Rate (TRIR) is 2.2.