Skip to main content

SALT RIVER PROJECT - CORONADO GENERATING STATION is a fossil fuel electric power generation employer in ST JOHNS, AZ. Federal records show 2 OSHA inspections with 5 violations and $9,750 in penalties. All data sourced from public federal enforcement records.

Data sourced from OSHA, DOL WHD, MSHA, EPA ECHO, NLRB, FMCSA, OFLC, BLS, SAM.gov, CMS, USAspending, CPSC, NHTSA, and the UVA Corporate Prosecution Registry. Last updated: May 2, 2026.

SALT RIVER PROJECT - CORONADO GENERATING STATION

11 MILES N. OF ST JOHNS, AZ ON HW 191, ST JOHNS, AZ, 85936

Parent: SRP (10 locations)

221112 Top companies in Fossil Fuel Electric Power Generation

157 employees

Federal Enforcement
2
OSHA inspections
5 violations
$9,750 in penalties

Industry Benchmark

Industry Avg TRIR
2.3
Industry Avg DART
1.4
Self-Reported DART
3.2
Self-Reported TRIR
4.5
Industry rates from BLS SOII 2024. Self-reported rates from OSHA ITA Form 300A (employer self-reported).
OSHA Inspections
2
OSHA Violations
5
Total Penalties
$9,750
Trend
STABLE
WHD Cases
0
Back Wages Owed
$0
Confidence
MEDIUM
SVEP Flag
No

Data Insights

History Span
23 years
Last Activity
14yr ago
Inspection Rate
0.1/yr
Violation Rate
0.2/yr
Violation Severity Mix
80% serious$1,950 avg per violation$4,875 avg per inspection
Active Agencies:
OSHA$9,750 total across all agencies
TRIR vs Industry Avg
+2.2
Above industry average
DART vs Industry Avg
+1.8
Above industry average

Inspection Breakdown

Planned
1
Complaint
1
Complaint and accident-triggered inspections are stronger risk signals than routine planned inspections.
Violation rate: 50% of inspections

Peer Comparison

95%
Worse than most peers
vs 57 employers in same industry & state
Fewer violationsMore violations
Penalty Percentile
95%
Inspection Frequency Percentile
88%

Need API access, CSV upload, or PDF reports? Upgrade to Paid for $79/mo.

Inspection History

No inspection records found.

Loading news...

The FastDOL Report

Weekly workplace compliance news. Free.

Data aggregated from public federal enforcement and program records (OSHA, WHD, MSHA, EPA, NLRB, FMCSA, OFLC, BLS, SAM.gov, CMS, USAspending, CPSC, NHTSA) plus the UVA Corporate Prosecution Registry. Employer profiles matched by name and location — matching errors may occur. Risk scores computed by FastDOL, not official government assessments. OSHA citations typically appear 3-8 months after the inspection, so very recent enforcement actions may not yet be reflected. Data provided as-is. Report a data error.

Part of a larger organization

SALT RIVER PROJECT - CORONADO GENERATING STATION is one of 10 establishments in our dataset that roll up under the parent organization SRP.

Federal enforcement records on SALT RIVER PROJECT - CORONADO GENERATING STATION represent activity at this specific establishment. The full enforcement footprint of SRP across all 10 of its tracked locations is viewable on the parent profile.

Other establishments operated by SRP

Other employers in Fossil Fuel Electric Power Generation within AZ

Industry context

Within the fossil fuel electric power generation industry in AZ, SALT RIVER PROJECT - CORONADO GENERATING STATION ranks in the 95th percentile of OSHA violation frequency across 57 comparable establishments. That places this employer among the highest-violation establishments in its peer set.

OSHA penalty totals rank in the 95th percentile of the same peer group. Inspection frequency ranks in the 88th percentile.

The Bureau of Labor Statistics reports an industry-average Total Recordable Incident Rate (TRIR) of 2.3 for the fossil fuel electric power generation sector, with a Days Away, Restricted, or Transferred (DART) rate of 1.4. SALT RIVER PROJECT - CORONADO GENERATING STATION's self-reported DART rate is 3.2, which is above the industry average.

Activity timeline

No federal enforcement activity has been recorded against this establishment in the past 14 years.

Frequently Asked Questions

What is SALT RIVER PROJECT - CORONADO GENERATING STATION's OSHA violation history?
SALT RIVER PROJECT - CORONADO GENERATING STATION has 2 OSHA inspections on record with 5 violations and $9,750 in total penalties.
How does SALT RIVER PROJECT - CORONADO GENERATING STATION's safety record compare to its industry?
SALT RIVER PROJECT - CORONADO GENERATING STATION operates in the fossil fuel electric power generation industry. The industry average Total Recordable Incident Rate (TRIR) is 2.3. SALT RIVER PROJECT - CORONADO GENERATING STATION's self-reported DART rate is 3.2 compared to an industry average of 1.4.

About this data

This profile aggregates federal enforcement records on SALT RIVER PROJECT - CORONADO GENERATING STATION of ST JOHNS, AZ from 17 federal data sources. Records were found in 2 sources: OSHA workplace safety inspections, and BLS industry safety benchmarks. The remaining 15 sources were checked and found no matching records: WHD, MSHA, EPA, NLRB, OFLC, OFCCP, FMCSA, USAspending, SAM.gov, CMS, CPSC, NHTSA, UVA, SEC enforcement, SEC facts.

Establishments are matched across agencies using normalized employer name, state, and ZIP code. The dataset was last refreshed on May 2, 2026. SALT RIVER PROJECT - CORONADO GENERATING STATION resolves to the parent rollup SRP, which operates 10 establishments in our dataset.

This profile may be incomplete if SALT RIVER PROJECT - CORONADO GENERATING STATIONoperates under multiple legal names, files under variations our entity-matching rules don't yet cover, or maintains records below current matching thresholds. To report a missing record or correction, email corrections@fastdol.com.